CM-2024-007 - 1/8/2024Construction Change Order
)epartment: Community Development Block Grant
'rogram: Home Repair Program
.ovation: 2324 Wright Circle
iomeowner: Cozette Butler
)riginal Contract Price:
his Change Order
'.hange Orders to Date:
9aximurn Change Order Allowed $ amount
3alance available
Item #
1
2
3
4
5
6
7
8
9
10
11
$24,893.29
$3,693.40
$0.00
$6,223.32
$6,223.32
Change Data
Page: 1 of 1
Date: 12.15.2023
Change Order No. 1
Original Contract: $ +4 c
7
Y-9-41Justification: g 1:3
441,
Repair subflooring at two 2nd floor
bathrooms. Replace sheet vinyl
- or
N
Description of Changes
Unit
OTY
Unit Price
Amount
Days +!-
{+
Remove vinyl flooring at both restrooms
EA
1
$175.00
$175.00
1
{+)
Remove 3/4" subflooring at toilets.
EA
1
$95.00
$96.00
1
Install 2 x 4 blocking and 3/4" plywood.
EA
1
$167.00
$167.00
1
Install underlayment over subfloor
EA
1
$459.60
$459.60
1
Install new vinyl flooring
EA
1
$1,560.00
$1,560.00
1
Install new shoe base moulding
EA
1
$247.20
$247.20
1
Caulk and paint base and shoe
EA
1
$175.00
$175.00
1
Cut drywall ceiling to inspect plywood
under 2 toilets
EA
1
$95.00
$96.00
1
Install new drywall repair
EA
1 1
$125.00
$125.00
1
Ta e, float and texture to match
EA
1
$305.00
$305.00
1
Paint repair are to match as close as
possible
EA
1
$289.60
$289.60
1
1 t92oz3
Date
/ Z 0 ` 3
Homeowner Date
a0at/-6e7
Percent of Original Contract Price
Maximum % allowed 25.00%
This Change Order 14.80%
Total % Change 14.80%
Contract +///J, ange Orders: $28,586.69
•-'1.'Fr'v w
Title Laurie Hadley, City M age
Date I r< _ � 07
CDOG Farm 2010
1 011 12/18/2023