Loading...
CM-2024-011 - 1/12/2024Page I of 3 Contract Quantity Adjustiment/Change Order It.—M •e.�, (W. 01. r6 Department: PARD Project Name: Meadow Lake Dods Improvement Pro ect 2023 Date:.t?jo/n �— City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor AGH20 HoWnp, LLC 3817 Bent Brook Drive Round LoS& Texas 78664 512.484.7611 Company Name Address Phone No. Judmcafim After dealing with the unexpected groundwater previously, contractor moved forward with the engineer's neoommendatlons to Instal a vapor barrier (previous Change Order). However, even after using the vapor barrier, the abutment was still cornpromised by persistent ground water. After Consulting with a geotu hnical engineer, It was suggested to remove the vapor barrier and Install weep holes and gravel to allow the ground water bo drain from the abutment. 1V A MAKT Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): TOW Contract Price with Quantity Adjustment(s): Previous Change O►der(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Pius Quantity Adjustments) Plus Change Order(s)]' Dlfferenee between Original and Adjusted Contract Prices: Original Contract lime: Time Adjustment by previous Quan. Ad)./CNnge Order: Time Adjustment by this Quan. Adj./Change Order: 90 4ays- 15 days 15 days $15,252.57 5% $9,394.74 3% #24 647.31 8% $324,557,31 $24,647.31 New Contract Tme: 120 days ri Prepared By: 12 Sigrrabr Printed Name, Tide, Company gate Printed Name, Title, Company Date City Project Signature Printed Name, Title Date Mayor/City Mane er ► Y '�� 2� Signature Printed Name, Title IJ Date 60, 2-02-'�,e I / Page 2 of 3 Contract Quantity Adjustment/Change Order Pn � .. F*. avis Project Name; Meadow Lake Dock Improvement Project 2023 Quen. Adj./Change Order No.: Chador Order Data Dewaterfin-g-Operatims and Water Probection Measures _- Mill 1 IYI 1 11 ( l �- I F _- MIL, 1 i't Page 3 of 3 Contract Quantity Adjusbnent/Chatge Order M- Lifl4 Project Name: Meadow Lake Dods Improvement Project 2023 Quan. Adj./Change Order No.