Loading...
R-2024-013 - 2/8/2024 RESOLUTION NO. R-2024-013 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Capital Excavation Company for the Gattis School Road Segment 6 Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Capital Excavation Company for the Gattis School Road Segment 6 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of February, 2024. /Z1 A/ C MOR AN, Mayor City f Roun Rock, Texas ATTEST: /(/A h 1' , City Clerk �"M 1 Gv,e wa. E�i4wu-()s 0112.20242;48746392-5664 EXHIBIT "A" ^►► Page I of 9 Contract Quantity Adjustment/Change Order p -ev,01/16 Department: Transportation Project Name: Gattis School Road Segment 6 Date: 1/4/24 City Project Change Order/Quantity ID Number STP 2021(685)MM Adjustment No. 1 Vendor Capital Excavation Company P.O. Box 1301 Austin,TX 78767 (512)440-1717 Company Name Address Phone No. Justification Termination of the"Standard Form of Agreement" between the City and Capital Excavation Company for the Gattis School Road Segment 6 Project. SUMMARY Amount %Change Original Contract Price: $17,464,326.27 ; Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: -$17,290,326.27 Total Quantity Adjustment(s): -$17,290,326.27 r s Total Contract Price with Quantity Adjustment(s): $174,000.00 Previous Change Order(s): $0.00 0% This Change Order: $1,119,554.01 643% Total Change Order(s)To Date: $1,119,554.01 643% Adjusted Contract Price [Original Contract Price Plusi "; -js Quantity Adjustment(s)Plus Change Order(s)]: $1,293,554.01 Difference between Original and Adjusted Contract Prices: -$16,170,772.26 Original Contract Time: Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: 0 Prepared By: Andy W nes, Project Manager,Capital Excavation Company 1/4/24 Printed Name,Title,Company Date Contractor: Joe Chesney,Vice President,Capital Excavation Company 1/4/24 Fli4nature Printed Name,Title, Company Date City Project ((�� 1 Manager: �.14L_ ���t S�e/r�Pf,.\ Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page I of 8 Contract Quantity Adjustment/Change Order Project Name: Gattis School Road Segment 6 Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) 1 Handling/Storage/Ins.of MOH (5%) LS 1 $56,902.92 $56,902.92 2 Transportation of MOH to CORR LS 1 $60,957.67 $60,957.67 3 Subcontractor Indirect Costs LS 1 $25,745.35 $25,745.35 4 Job Labor&Equipment Costs to Date LS 1 $8,018.27 $8,018.27 5 Overhead&Indirect Costs LS 1 $38,133.94 $38,133.94 $0.00 6 Material on Hand LS 1 $929,795.87 $929,795.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,119,554.011 0 Nage 2 of 8 Contract Quantity Adjustment/Change Order rev,01/16 Project Name: Gattis School Road Segment 6 Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount 100-6002 PREPARING ROW STA -62.62 $4,400.00 -$275,528.00 100-6003 PREPARING ROW(TREE)(5"TO 12"DIA) EA -31 $550.00 -$17,050.00 PREPARING ROW(TREE)(12"TO 24" 100-6004 DIA) EA -12 $700.00 -$8,400.00 104-6015 REMOVING CONC(SIDEWALKS) SY -4308 $11.90 -$51,265.20 110-6001 EXCAVATION (ROADWAY) CY -12222 $17.90 -$218,773.80 110-6003 EXCAVATION (SPECIAL) CY -1110 $26.85 -$29,803.50 EMBANKMENT(FINAL)(ORD COMP)(TY 132-6003 B) CY -1497 $14.75 -$22,080.75 FURNISHING AND PLACING TOPSOIL 160-6006 (3") SY -25226 $3.35 -$84,507.10 BROADCAST SEED(PERM)(URBAN) 164-6007 (CLAY) SY -25226 $0.25 -$6,306.50 164-6009 BROADCAST SEED(TEMP)(WARM) SY -12614 $0.25 -$3,153.50 164-6011 BROADCAST SEED(TEMP)(COOL) SY -12614 $0.25 -$3,153.50 168-6001 VEGETATIVE WATERING MG -757 $31.50 -$23,845.50 FL BS(CMP IN PLC)(TYA GRI-2)(FNAL 247-6041 POS) CY -4496 $58.70 -$263,915.20 260-6002 LIME (HYDRATED LIME(SLURRY)) TON -1656 $175.00 -$289,800.00 260-6011 LIME TRT(EXST MATL) (12") SY -7818 $14.05 -$109,842.90 260-6027 LIME TRT(EXST MATL)(8") SY -41560 $5.80 -$241,048.00 310-6009 PRIME COAT(MC-30) GAL -1000 $5.95 -$5,950.00 316-6001 ASPH (MULTI OPTION) GAL -9569 $4.35 -$41,625.15 316-6246 AGGR(TY-PE GR-3 SAC-B) CY -281 $192.00 -$53,952.00 354-6002 PLAN &TEXT ASPH CONC PAV(0"TO 2") SY -1553 $8.05 -$12,501.65 360-6020 CONC PVMT(JOINTED-CPCD)(10") SY -41560 $92.00 -$3,823,520.00 400-6005 CEM STABIL BKFL CY -2116 $215.00 -$454,940.00 400-6006 CUT&RESTORING PAV SY -2210 $61.20 -$135,252.00 402-6001 TRENCH EXCAVATION PROTECTION LF -4021 $9.20 -$36,993.20 403-6001 TEMPORARY SPL SHORING LF -1432 $23.65 -$33,866.80 416-6030 DRILL SHAFT(TRF SIG POLE)(24 IN) LF -72 $280.00 -$20,160.00 416-6031 DRILL SHAFT(TRF SIG POLE)(30 IN) LF -60 $310.00 -$18,600.00 416-6032 DRILL SHAFT(TRF SIG POLE)(36 IN) LF -98 $360.00 -$35,280.00 416-6034 DRILL SHAFT(TRF SIG POLE)(48 IN) LF -66 $450.00 -$29,700.00 416-6088 DRILL SHAFT(RDWY ILL POLE)(24 IN) LF -250 1 $280.00 -$70,000.00 Page 3 of 8 _ Contract Quantity Adjustment/Change Order l?00. ev,01/16 432-6031 RIPRAP(STONE PROTECTION)(12 IN) CY -88 $197.00 -$17,336.00 450-6052 RAIL(HANDRAIL)(lY F) LF -223 $163.00 -$36,349.00 462-6014 CONC BOX CULV(7 FT X 3 FT) LF -82 $990.00 -$81,180.00 462-6058 CONC BOX CULV(7 FT X 3 FT)(EXTEND) LF -27 $790.00 -$21,330.00 CONC BOX CULV(10 FT X 10 462-6078 FT)(EXTEND) LF -60 $1,980.00 -$118,800.00 464-6003 RC PIPE(CL III)(18 IN) LF -2186 $157.00 -$343,202.00 464-6005 RC PIPE(CL III)(24 IN) LF -1782 $161.00 -$286,902.00 464-6007 RC PIPE(CL III)(30 IN) LF -10 $410.00 -$4,100.00 464-6008 RC PIPE(CL III)(36 IN) LF -164 $240.00 -$39,360.00 464-6009 RC PIPE(CL III)(42 IN) LF -1320 $340.00 -$448,800.00 464-6010 RC PIPE(CL III)(48 IN) LF -290 $420.00 -$121,800.00 465-6014 INLET(COMPL)(PCO)(3FT)(LEFT) EA -5 $6,100.00 -$30,500.00 465-6015 INLET(COM PL)(PCO)(3 FT)(RIGHT) EA -2 $6,100.00 -$12,200.00 465-6016 INLET(COMPL)(PCO)(3FT)(BOTH) EA -33 $6,400.00 -$211,200.00 465-6071 INLET(COMPL)(PSL)(RC)(4FTX4FT) EA -14 $5,700.00 -$79,800.00 465-6074 INLET(COMPL)(PSL)(RC)(5FTX5FT) EA -12 $11,400.00 -$136,800.00 INLET(COMPL)(PSL)(FG)(3FTX3FT- 465-6126 3FTX3FT) EA -1 $4,650.00 -$4,650.00 466-6173 WINGWALL(PW- 1) (HW=12 FT) EA -2 $39,700.00 -$79,400.00 466-6180 WINGWALL(PW- 1) (HW=5 FT) EA -3 $7,800.00 -$23,400.00 466-6181 WINGWALL(PW- 1) (HW=6 FT) EA -1 $15,900.00 -$15,900.00 467-6363 SET(TY II) (18 IN) (RCP)(6: 1) (P) EA -6 $1,520.00 -$9,120.00 467-6388 SET(TY II)(24 IN) (RCP)(3: 1) (C) EA -1 $2,360.00 -$2,360.00 467-6395 SET(TY II)(24 IN)(RCP)(6: 1) (P) EA -1 $2,090.00 -$2,090.00 496-6002 REMOV STR(INLET) EA -16 $1,020.00 -$16,320.00 496-6003 REMOV STR(MANHOLE) EA -7 $980.00 -$6,860.00 496-6004 REMOV STR(SET) EA -8 $340.00 -$2,720.00 496-6006 REMOV STR(HEADWALL) EA -3 $4,660.00 -$13,980.00 496-6007 REMOV STR(PIPE) LF -2328 $21.70 -$50,517.60 496-6016 REMOV STR(PIPE) EA -8 $300.00 -$2,400.00 496-6023 REMOVE STR(JUNCTION BOX) EA -3 $3,840.00 -$11,520.00 496-6030 REMOVE STR(BOLLARD) EA -4 $450.00 -$1,800.00 500-6001 MOBILIZATION LS -0.884 $1,500,000.00 -$1,326,000.00 BARRICADES,SIGNS AND TRAFFIC 502-6001 HANDLING MO -26 $5,500.00 -$143,000.00 506-6003 ROCK FILTER DAMS(INSTALL) (TY 3) LF -130 $49.25 -$6,402.50 506-6011 ROCK FILTER DAMS(REMOVE) LF -130 $41.05 -$5,336.50 506-6020 CONSTRUCTION EXITS(INSTALL)(TY 1) SY -78 $22.55 -$1,758.90 506-6024 CONSTRUCTION EXITS(REMOVE) SY -78 $18.45 -$1,439.10 506-6038 TEMP SEDMT CONT FENCE(INSTALL) LF -4971 $4.10 -$20,381.10 506-6039 TEMP SEDMT CONT FENCE(REMOVE) LF -4971 $0.75 -$3,728.25 506-6040 BIODEG EROSN CONT LOGS(INSTL) (8") LF -237 $4.10 -$971.70 506-6043 BIODEG EROSN CONT LOGS(REMOVE) LF -237 $1.05 -$248.85 508-6001 CONSTRUCTING DETOURS SY -12009 $75.50 -$906,679.50 PORT CTB(FUR&INST)(LOW PROF)(TY 512-6009 1) LF 6160 $16.20 -$99,792.00 Page 4 of 8 No��rcx^`' Contract Quantity Adjustment/Change Order ffo ev,01/16 PORT CTB(FUR&INST)(LOW PROF)(TY 512-6010 2) LF -560 $16.20 -$9,072.00 512-6033 PORT CTB(MOVE)(LOW PROF)(TY 1) LF -14760 $6.15 -$90,774.00 512-6034 PORT CTB(MOVE)(LOW PROF)(TY 2) LF -640 $10.65 -$6,816.00 512-6057 PORT CTB(REMOVE)(LOW PROF)(TY 1) LF -6160 $16.20 -$99,792.00 512-6058 PORT CTB(REMOVE)(LOW PROF)(TY 2) LF -560 $16.20 -$9,072.00 529-6005 CONC CURB(MONO) (TY II) LF -15288 $18.45 -$282,063.60 529-6008 CONC CURB&GUTTER(TY II) LF -4140 $27.40 -$113,436.00 529-6015 CONC CURB(TY Cl) LF -978 $79.00 -$77,262.00 529-6027 CONC CURB(TY C2) LF -205 $161.00 -$33,005.00 530-6001 INTERSECTIONS(CONC) SY -2030 $100.00 -$203,000.00 530-6004 DRIVEWAYS(CONC) SY -2387 $160.00 -$381,920.00 530-6005 DRIVEWAYS(ACP) SY -366 $67.00 -$24,522.00 531-6002 CONC SIDEWALKS(5") SY -6988 $52.20 -$364,773.60 531-6004 CURB RAMPS(TY 1) EA -3 $1,280.00 -$3,840.00 531-6005 CURB RAMPS (TY 2) EA -1 $1,780.00 -$1,780.00 531-6008 CURB RAMPS(TY 5) EA -7 $1,280.00 -$8,960.00 531-6010 CURB RAMPS(TY 7) EA -5 $1,260.00 -$6,300.00 531-6013 CURB RAMPS(TY 10) EA -1 $3,180.00 -$3,180.00 536-6002 CONC MEDIAN SY -3528 $69.90 -$246,607.20 560-6004 MAILBOX INSTALL-S(TWG-POST)TY 2 EA -5 $260.00 -$1,300.00 618-6023 CONDT(PVC)(SCH 40)(2") LF -10593 $15.65 -$165,780.45 618-6046 CONDT(PVC)(SCH 80)(2") LF -1265 $20.10 -$25,426.50 618-6047 CONDT(PVC) (SCH 80)(2")(BORE) LF -2234 $48.05 -$107,343.70 620-6007 ELEC CONDR(NO.8) BARE LF -2975 $2.25 -$6,693.75 620-6008 ELEC CONDR(NO.8) INSULATED LF -4420 $2.80 -$12,376.00 620-6009 ELEC CONDR(NO.6) BARE LF -30 $3.05 -$91.50 620-6010 ELEC CONDR(NO.6)INSULATED LF -60 $3.35 -$201.00 621-6002 TRAY CABLE(3 CONDR)(12 AWG) LF -2435 $3.90 -$9,496.50 624-6002 GROUND BOX TY A(122311)W/APRON EA -64 $1,230.00 -$78,720.00 624-6009 GROUND BOX TY D(162922) EA -16 $2,010.00 -$32,160.00 ELC SRV TY D 120/240 628-6145 060(NS)SS(E)SP(0) EA -4 $7,300.00 -$29,200.00 644-6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA -8 $900.00 -$7,200.00 IN SM RD SN SUP&AM 644-6007 TYIOBWG(1)SA(U) EA -1 $1,130.00 -$1,130.00 IN SM RD SN SUP&AM TYS80(1)SA(P- 644-6028 BM) EA -1 $1,280.00 -$1,280.00 644-6056 IN SM RD SN SUP&AM TYTWT(1)UA(P) EA -18 $330.00 -$5,940.00 644-6057 IN SM RD SN SUP&AM TYTWT(1)UA(T) EA -1 $440.00 -$440.00 644-6076 REMOVE SM RD SN SUP&AM EA -40 $100.00 -$4,000.00 662-6060 WK ZN PAV MRK REMOV(W)4"(BRK) LF -11493 $0.45 -$5,171.85 662-6061 WK ZN PAV MRK REMOV(W)4"(DOT) LF -1253 $0.45 -$563.85 662-6063 WK ZN PAV MRK REMOV(W)4"(SLD) LF -23773 $0.45 -$10,697.85 662-6071 WK ZN PAV MRK REMOV(W)8"(SLD) LF -7777 $0.95 -$7,388.15 Page 5 of 8 t NOCI[1 Contract Quantity Adjustment/Change Order ,ev,01/16 662-6075 WK ZN PAV MRK REMOV(W)24"(SLD) LF -985 $7.95 -$7,830.75 662-6080 WK ZN PAV MRK REMOV(W)(ARROW) EA -71 $76.90 -$5,459.90 662-6093 WK ZN PAV MRK REMOV(Y)4"(BRK) LF -3235 $0.45 -$1,455.75 662-6095 WK ZN PAV MRK REMOV(Y)4"(SLD) LF -67307 $0.46 -$30,961.22 662-6102 WK ZN PAV MRK REMOV(Y)24"(SLD) LF -1294 $7.95 -$10,287.30 662-6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA -3935 $0.55 -$2,164.25 662-6111 WK ZN PAV MRK SHT TERM(TAB)TY Y-2 EA -4462 $0.55 -$2,454.10 666-6003 REFL PAV MRK TY I (W)4"(BRK)(100MIL) LF -3868 $0.65 -$2,514.20 666-6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF -178 $1.80 -$320.40 666-6036 REFL PAV MRK TY I(W)8"(SLD)(100MIL) LF -3556 $1.80 -$6,400.80 666-6126 REFL PAV MRK TY I (Y)4"(SLD)(100MIL) LF -14144 $0.65 -$9,193.60 666-6224 PAVEMENT SEALER 4" LF -20211 $0.25 -$5,052.75 666-6226 PAVEMENT SEALER 8" LF -2496 $0.30 -$748.80 666-6228 PAVEMENT SEALER 12" LF -1344 $0.35 -$470.40 666-6229 PAVEMENT SEALER 18" LF -140 $0.55 -$77.00 666-6230 PAVEMENT SEALER 24" LF -393 $1.25 -$491.25 666-6231 PAVEMENT SEALER(ARROW) EA -32 $25.65 -$820.80 666-6232 PAVEMENT SEALER(WORD) EA -25 $56.40 -$1,410.00 RE PM W/RET REQ TY I 666-6303 (W)4"(SLD)(100MIL) LF -8572 $0.95 -$8,143.40 668-6074 IPREFAB PAV MRK TY C(W)(12")(SLD) LF -1664 $10.50 -$171472.00 668-6075 PREFAB PAV MRK TY C(W)(18")(SLD) LF -140 $17.20 -$2,408.00 668-6076 PREFAB PAV MRK TY C(W) (24")(SLD) LF -483 $26.15 -$12,630.45 668-6077 PREFAB PAV MRK TY C(W)(ARROW) EA -32 $410.00 -$13,120.00 668-6085 PREFAB PAV MRK TY C(W)(WORD) EA -25 $460.00 -$11,500.00 672-6007 REFL PAV MRKR TY I-C EA -402 $7.95 -$3,195.90 672-6009 REFL PAV MRKR TY II-A-A EA -91 $7.95 -$723.45 680-6002 INSTALL HWY TRF SIG (ISOLATED) EA -4 $25,700.00 -$102,800.00 681-6001 TEMP TRAF SIGNALS EA -3 $66,000.00 -$198,000.00 682-6001 VEH SIG SEC(12")LED(GRN) EA -37 $360.00 -$13,320.00 682-6002 VEH SIG SEC(12")LED(GRN ARW) EA -12 $360.00 -$4,320.00 682-6003 VEH SIG SEC(12")LED(YEL) EA -37 $360.00 -$13,320.00 682-6004 VEH SIG SEC(12")LED(YEL ARW) EA -19 $360.00 -$6,840.00 682-6005 VEH SIG SEC(12")LED(RED) EA -37 $360.00 -$13,320.00 682-6006 VEH SIG SEC(12")LED(RED ARW) EA -11 $360.00 -$3,960.00 682-6018 PED SIG SEC(LED)(COUNTDOWN) EA -24 $840.00 -$20,160.00 682-6023 BACK PLATE (12")(3 SEC) EA -40 $129.00 -$5,160.00 682-6024 BACK PLATE(12")(4 SEC) EA -7 $151.00 -$1,057.00 682-6025 BACK PLATE(12")(5 SEC) EA -1 $179.00 -$179.00 684-6028 TRF SIG CBL(TY A)(14 AWG)(2 CONDR) LF -3100 $2.25 -$6,975.00 684-6031 TRF SIG CBL(TY A)(14 AWG)(5 CONDR) LF -5580 $3.35 -$18,693.00 Page 6 of 8 NOAo�1 Contract Quantity Adjustment/Change Order rev,01/16 684-6033 TRF SIG CBL(TY A)(14 AWG)(7 CONDR) LF -545 $3.90 -$2,125.50 TRF SIG CBL(TY A)(14 AWG)(20 684-6046 CONDR) LF -1945 $6.70 -$13,031.50 INS TRF SIG PL AM(S)1 686-6032 ARM(28')LUM&ILSN EA -3 $12,300.00 -$36,900.00 INS TRF SIG PL AM(S)1 686-6036 ARM(32')LUM&ILSN EA -2 $12,900.00 -$25,800.00 INS TRF SIG PL AM(S)1 686-6044 ARM(40')LUM&ILSN EA -3 $14,500.00 -$43,500.00 INS TRF SIG PL AM(S)1 686-6048 ARM(44')LUM&ILSN EA -2 $15,100.00 -$30,200.00 INS TRF SIG PL AM(S)1 686-6052 ARM(48')LUM&ILSN EA -2 $15,600.00 -$31,200.00 INS TRF SIG PL AM(S)1 686-6060 ARM(55')LUM&.ILSN EA -3 $36,900.00 -$110,700.00 687-6001 PED POLE ASSEMBLY EA -12 $2,460.00 -$29,520.00 688-6001 PED DETECT PUSH BUTTON(APS) EA -24 $840.00 -$20,160.00 688-6003 PED DETECTOR CONTROLLER UNIT EA -4 $3,130.00 -$12,520.00 3076-6007 D-GR HMA TY-B SAC-B PG70-22 TON -901 $152.00 -$136,952.00 3076-6015 D-GR HMA TY-C PG64-22 TON -4572 $118.00 -$539,496.00 3076-6025 D-GR HMA TY-C SAC-B PG70-22 TON -1350 $144.00 -$194,400.00 3076-6066 TACK COAT GAL -982 $3.15 -$3,093.30 5001-6001 GEOGRID BASE REINFORCEMENT(TY I) GEOGRID (TENSAR TX-5) SY -7818 $3.30 -$25,799.40 6001-6002 PORTABLE CHANGEABLE MESSAGE SIGN EA -4 $10,700.00 -$42,800.00 6054-6004 ANTENNA(OMNI-DIRECTIONAL) EA -4 $2,790.00 -$11,160.00 6090-6001 ILSN (LED) (6 D) EA -2 $3,910.00 -$7,820.00 6090-6002 ILSN(LED) (8 D) EA -14 $4,360.00 -$61,040.00 6185-6002 TMA(STATIONARY) DAY -18 $460.00 -$8,280.00 6185-6005 TMA(MOBILE OPERATION) DAY -10 $1,330.00 -$13,300.00 6306-6001 VIVDS PROSR SYS EA -4 $11,200.00 -$44,800.00 6306-6002 VIVDS CAM ASSY FXD LNS EA -15 $2,240.00 -$33,600.00 6306-6007 VIVDS CABLING LF -2735 $4.45 -$12,170.75 JACKING OR BORING 18 IN. STEEL PIPE, CORR 501-1 3/8"THICK LF -116 $670.00 -$77,720.00 JACKING OR BORING 24 IN. STEEL PIPE, CORR 501-2 3/8"THICK LF -90 $680.00 -$61,200.00 ADJUSTING WATER VALVE BOXES TO CORR 504-1 GRADE EA -4 $1,200.00 -$4,800.00 CORR 505-1 18-INCH STEEL ENCASEMENT PIPE LF -72 $178.00 -$12,816.00 CORR 505-2 24-INCH STEEL ENCASEMENT PIPE LF -156 $138.00 -$21,528.00 CORR 505-4 30-INCH STEEL ENCASEMENT PIPE LF -193 $460.00 -$88,780.00 CORR 506-1 CONNECTION TO EXISTING MANHOLE EA -2 $3,430.00 -$6,860.00 STANDARD PRE-CAST MANHOLE W/PRE- CORR 506-2 CAST BASE,48-INCH DIAMETER EA -4 $6,300.00 -$25,200.00 EXTRA DEPTH STANDARD PRE-CAST MANHOLE W/PRE-CAST BASE,48 INCH CORR 506-3 DIAMETER VF -8 $450.00 -$3,600.00 MAJOR MANHOLE HEIGHT CORR 506-4 ADJUSTMENT,48-INCH DIA. EA -4 $5,400.00 -$21,600.00 Page 7 of 8 NOROM UxA Contract Quantity Adjustment/Change Order e,01/16 TRENCH EXCAVATION SAFETY CORR 509-1 PROTECTIVE SYSTEMS(ALL DEPTHS) LF -3403 $9.50 -$32,328.50 PIPE, 6-INCH DIAMETER, AWWA C151, CLASS 350(ALL DEPTHS), INCLUDING CORR 510-1 EXCAVATION AND BACKFILL LF -93 $190.00 -$17,670.00 PIPE, 8-INCH DIAMETER, AWWA C151, CLASS 350(ALL DEPTHS), INCLUDING CORR 510-2 EXCAVATION AND BACKFILL LF -222 $205.00 -$45,510.00 PIPE, 12-INCH DIAMETER,AWWA C151, CLASS 350(ALL DEPTHS), INCLUDING CORR 510-3 EXCAVATION AND BACKFILL LF -1718 $217.00 -$372,806.00 PIPE, 16-INCH DIAMETER,AWWA C151, CLASS 250(ALL DEPTHS), INCLUDING CORR 510-4 EXCAVATION AND BACKFILL LF -1328 $246.00 -$326,688.00 PIPE, 8-INCH DIAMETER, PVC DR 26 ASTM D3034(ALL DEPTHS), INCLUDING CORR 510-5 EXCAVATION AND BACKFILL LF -248 $211.00 -$52,328.00 WET CONNECTIONS,8-INCH DIAMETER CORR 510-6 X 8-INCH DIAMETER EA -2 $5,700.00 -$11,400.00 WET CONNECTIONS, 12-INCH CORR 510-7 DIAMETER X 12-INCH DIAMETER EA -12 $7,700.00 -$92,400.00 WET CONNECTIONS, 16-INCH CORR 510-8 IDIAMETER X 12-INCH DIAMETER EA -1 $8,300.00 -$8,300.00 WET CONNECTIONS, 16-INCH CORR 510-9 DIAMETER X 16-INCH DIAMETER EA -1 $9,500.00 -$9,500.00 RECONNECTING LATERAL SERVICE TO REPLACED PIPE(2"DIA. SERVICE)IN CORR 510-10 (12" DIA. PIPE) EA -4 $3,120.00 -$12,480.00 RECONNECTING LATERAL SERVICE TO REPLACED PIPE(1 1/2" DIA. SERVICE) CORR 510-11 IN (12" DIA. PIPE) EA -1 $2,980.00 -$2,980.00 RECONNECTING LETERAL SERVICE TO REPLACED PIPE(1 1/2" DIA. SERVICE) CORR 510-12 IN (16" DIA. PIPE) EA -1 $3,010.00 -$3,010.00 CORR 510-13 CONCRETE TRENCH CAP, 5FT. WIDTH LF -67 $55.30 -$3,705.10 CORR 510-14 DUCTILE IRON FITTINGS (ALL SIZES) TON -3.61 $17,200.00 -$62,092.00 VALVES, RESILIENT WEDGE GATE CORR 511-1 VALVE,4-INCH DIAMETER EA -1 $1,850.00 -$1,850.00 VALVES, RESILIENT WEDGE GATE CORR 511-2 VALVE,6-INCH DIAMETER EA -9 $2,070.00 -$18,630.00 VALVES, RESILIENT WEDGE GATE CORR 511-3 VALVE, 8-INCH DIAMETER EA -1 $2,570.00 -$2,570.00 VALVES, RESILIENT WEDGE GATE CORR 511-4 VALVE, 12-INCH DIAMETER EA -9 $4,120.00 -$37,080.00 VALVES, RESILIENT WEDGE GATE CORR 511-5 VALVE, 16-INCH DIAMETER EA -2 $10,900.00 -$21,800.00 FIRE HYDRANTS(SEE STANDARD NO. CORR 511-6 5115-17) EA -7 $6,600.00 -$46,200.00 Page 8 of 8 Contract Quantity Adjustment/Change Order nouNa none rt.a; rev,01/16 REMOVAL OF EXISTING FIRE HYDRANT CORR 511-7 (MINIMUM 6-INCH BELOW GROUND EA -5 $1,340.00 -$6,700.00 AUTOMATIC COMBINATION AIR/VACUUM RELEASE VALVE CORR 511-8 ASSEMBLY, 2"DIAMETER EA -1 $4,530.00 -$4,530.00 CORR 511-9 CORR 511-9 DRAIN VALVE ASSEMBLIES EA 1 $7,100.00 -$7,100.00 CORR 593-1 CONCRETE RETARDS EA -5 $620.00 -$3,100.00 TOTAL UTILITY MOBILIZATION CORR 700-1 PAYMENT LS -1 $52,000.00 -$52,000.00 460-6004 CMP(GAL STL 30 IN) LF -38 $155.00 -$5,890.00 467-6407 SET(TY II)(30 IN)(CMP)(3:1)(P) EA -1 $1,770.00 -$1,770.00 T TAL : -$17,290,326.27 0 s e Ob n R T• �1 i,' .. .� a 1� At- VAN 30 IL 77 122 t .►. u d _.v rl. a �•I - ? �w .1. r, � ,�{ ��' �'.1'T" M„yv i Y " 'w `i# ,gyp► ..r', „A y. /'w ,�, lot ~r • ,•+� �' yp tet+ IwH' v !/�!/ t Ilk Y � L ^��..rL � Y•�,J'".=..Jt jJ/.jam/j�r�T � ,o ry MMEMM,1: 1