Loading...
CM-2024-055 - 2/16/2024Page I or3 Contract Quantity Adjustment/Change Order rev. Ol/r6 Department: PARO Project Name: Stagecoach inn Rehabilitation Project Date: 2/9 2� 4 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor KCS, Inc. 365 Wayside Dr. Waco, Texas 76705 254-829-3200 Company Name Address Phone No. 3ustification k fire alarm system was specified in the drawings. After a discussion with the Fire Marshall, it was determined that portions of the fire alarm system were not requrled so they were deleted from the contract and credited back to the project. The original light fixtures that were bid were not longer avallabe when the contractor attempted to purchase them during construction. The new fixtures were slightly more expensive than the original. Additionally, the light was Installed per plan, but while onsite it was determined that it needed to move to meet ADA (it protruded into the pedestrian ramp). Finally, the electrical meter was installed, but after looking at the placement, PARD requests that they flip the meter so it can be screened along Chisholm Trail Road. SUMMARY Original Contract Price: Previous Quantity Adjustmenl(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment try previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount 714 $0.00 $0.00 $714 371. 300 days 0 14 days 314 days $2,437.77 $2,437.77 $716,808.77 $2,437.77 Change 0% 0% 00/0 Prepared By: (04A t f Y1r— IcAfX- f 2M I-MW DEV. AA (W. (_SIC 9Wd "I Serrature ! Printed Name, Title, Company Date Approvals Contractor: Jeff Kirk atrick-PM-FICS Inc. 2.9.2024 Printed Name, Title, Company Date City Project Manager: /turr]e�'�-� G�1/y V! I _ ri�nE ���1!' pA�tC Del. %N(yK, 2L-q/zozy Signature Printed Name, Title Date Mayor/City �I � �, 2-01 Mannagerager Signature Printed Name, Title Date Af-202-4!55- Condact Quantity Adjustment/Change Order N-. Olt A Project Narm: Stagecoach Inn Reha49itation Project Quan. Adj./Change Order No.: Chance Order Date Page 2 of 3 im 0ff mu �0 © _, . ©0 �- off �- I i �- FAIL, Page 3 of 1 Contrail Quantity Adjustment/Change Order f« u•Ic Project Name: Stagecoach Inn RehabiNtation Project Quan. Adj./Change Order No.: uentity Adiustment Outs Contract Time Adjustment, -- I 1 I 71 1 1 will _- lot _- fit too _- too