R-2024-042 - 2/22/2024 RESOLUTION NO. R-2024-042
WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with
No-DigTec, LLC for the Rawhide AC Waterline Replacement Project, and
WHEREAS, the Council has determined that it is necessary to make adjustments/changes to
the quantity of work to be performed or materials, equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 2,Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity
Adjustment/Change Order No. 2 to the Contract with No-DigTec, LLC for the Rawhide AC Waterline
Replacement Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit
"A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 22nd day of February, 2024.
CRAO MO AN, Mayor
City f Rou d Rock,Texas
ATTEST:
EAGAN SP KS, CiF Clerk
0112.20242:4854-2046-1220
EXHIBIT Page I of
Contract Quantity Adjustment/Change Order
—.01/16
Department: UES
Project
Name: Rawhide AC Waterline Replacement Date: 1/16/24
City Project Change Order/Quantity
ID Number RHIDE Adjustment No. 2
Vendor No-Digtec LLC 415 Ewing Boulevard, Ferns,Texas 75125-1500 (972)488-9910
Company Name Address Phone No.
Justification
Change Order/Quantity Adjustment No.2 is for final quantiy adjustments.
SUMMARY Amount %Change
Original Contract Pace: $1,276,513.67
Previous Quantity Adjustment(s): $0.00
This Quantity Adjustment: $98,362.39
Total Quantity Ad3u5tment(s): $98,362.39
Total Contract Price with Quantity Adjustment(s): $1,374,876.06 11
Previous Change Order(s): $40,807.98 3%
This Change Order: $0.00 0%
Total Change Order(s)To Date: $40,807.98 3%
Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s)Plus Change
Order(s)): $1,415,684.04
Difference between Original and Adjusted Contract Prices: $139,170.37
Original Contract Time: 186
Time Adjustment by previous Quan.Adj./Change Order:
Time Adjustment by this Quan.Adj./Change Order:
New Contract Time: 186
Prepared=Z ,," Eddie Zapata,Senior Project Manager,City of Round Rock
Signature A Printed Name,Title,Company Date
/�
Contractor: Cole Eby,Project Manager,No-Ditec,LLC
Signature Printed NameACompan
Date
City Project kwlS
Manager: Eddie Za ata, or Pro ecTMana er
Signature Printed Name,Title Date
Mayor/City
Manager Craig Morgan Mayor
Signature Printed Name,Title Date
Page 3 of 3
Contract Quantity Adjustment/Change Order
n 01/Ifi
Project Name: Rawhide AC Waterline Replacement
Quan,Adj./Change Order No.: 2
Quantity Adjustment Data
Contract
Time
Bid Item# Item Description Unit Unit Price Amount Adjustment
3 8"Gate Valve Ea .3 $4,062.50 -$12,187.50
4 6"Gate Valve Ea 2 $3,320.00 $6,640.00
5 1.5"Water Service Long-Dual Service Ea -12 $4,958.00 -$59,496.00
6 1.5"Water Service Long-Dual Service with new bore Ea 16 $9,165.00 $146,640.00
7 1.5"Water Service Short-Dual Service Ea -2 $3,265.00 -$6,530.00
8 1.5"Water Service Short-Single Ea -1 $2,652.00 -$2,652.00
9 Meter Box Ea 11 $465.00 $5,115.00
10 8"45-Degree Bend Ea 2 $1,262.00 $2,524.00
11 Connect to exisbng water main Ea 3 $4,650.00 $13,950.00
15 Granular Backfill Ton 65 $67.00 $4,355.00
16 Install 4"to 8"by open cut for unknown alignment LF 50 $198.00 $9,900.00
17 Install 8"Tee(8"X6"or 8"X8") Ea 4 $2,932.62 $11,730.48
18 Install 8"Cross Ea -2 $3,426.56 -$6,853.12
19 Install Fire Hydrant Assembly Ea -3 $7,864.32 -$23,592.96
20 Remove Fire Hydrant Ea -2 $250.00 -$500.00
21 Remove Existing Gate Valve Ea -3 $200.00 -$600.00
22 Remove and Replace ADA Handicap Ramp Ea .3 $7,952.25 -$23,856.75
23 Remove and Replace 2"Asphalt SY 56 $108.54 $6,078.24
24 Remove and Replace 8"Flex Base SY -19 $95.00 -$1,805.00
25 Remove and Replace 6"Concrete Paving SF 481 $23.00 $11,063.00
26 Remove and Replace 4"Sidewalk SF 635 $21.00 $13,335.00
27 Remove and Replace Curb and Gutter LF 240 $67.00 $16,080.00
28 Sod includes Top Soil SY 200 $12.25 $2,450.00
30 Traffic Control DAY 17 $110.00 $1,870.00
31 Li hted Arrow Board DAY -10 $265.00 -$2,650.00
34 Operation of Approved 2"Bypass DAY 15 $132.00 $1,980.00
CO1.2 Install Single 2"Water Service EA -5 $2,925.00 -$14,625.00
TOTALS: t98.362.391 0
Page 2 of 3
Contract Quantity Adjustment/Change Order
2 01/16
Project Name: Rawhide AC Waterline Replacement
Quan.Adj./Change Order No.: 2
Change Order Data
Contract
Time
Adjustment
Item# Item Description Unit Qty. Unit Price Amount Da s
T $0.001
01
W
Yucca Dr
�r
t0,,0 pc
T
O
Purple Sage Dr r
3
v
rr
r�
0,d gest Dr
a`
N
Q/
3 J\
v 35
o a-
Ip
Ip
c west IH 35
o�
N �
V
N W
W
a \c9�d
Leo
35
- Waterlines -
�RawhideA/CWaterlines Waterline Replacement Project
Gate Valve
JIROUND ROCK i f Xl1S
RawhideACWatedines_shp