Loading...
R-2024-042 - 2/22/2024 RESOLUTION NO. R-2024-042 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with No-DigTec, LLC for the Rawhide AC Waterline Replacement Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with No-DigTec, LLC for the Rawhide AC Waterline Replacement Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of February, 2024. CRAO MO AN, Mayor City f Rou d Rock,Texas ATTEST: EAGAN SP KS, CiF Clerk 0112.20242:4854-2046-1220 EXHIBIT Page I of Contract Quantity Adjustment/Change Order —.01/16 Department: UES Project Name: Rawhide AC Waterline Replacement Date: 1/16/24 City Project Change Order/Quantity ID Number RHIDE Adjustment No. 2 Vendor No-Digtec LLC 415 Ewing Boulevard, Ferns,Texas 75125-1500 (972)488-9910 Company Name Address Phone No. Justification Change Order/Quantity Adjustment No.2 is for final quantiy adjustments. SUMMARY Amount %Change Original Contract Pace: $1,276,513.67 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $98,362.39 Total Quantity Ad3u5tment(s): $98,362.39 Total Contract Price with Quantity Adjustment(s): $1,374,876.06 11 Previous Change Order(s): $40,807.98 3% This Change Order: $0.00 0% Total Change Order(s)To Date: $40,807.98 3% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)): $1,415,684.04 Difference between Original and Adjusted Contract Prices: $139,170.37 Original Contract Time: 186 Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: 186 Prepared=Z ,," Eddie Zapata,Senior Project Manager,City of Round Rock Signature A Printed Name,Title,Company Date /� Contractor: Cole Eby,Project Manager,No-Ditec,LLC Signature Printed NameACompan Date City Project kwlS Manager: Eddie Za ata, or Pro ecTMana er Signature Printed Name,Title Date Mayor/City Manager Craig Morgan Mayor Signature Printed Name,Title Date Page 3 of 3 Contract Quantity Adjustment/Change Order n 01/Ifi Project Name: Rawhide AC Waterline Replacement Quan,Adj./Change Order No.: 2 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Unit Price Amount Adjustment 3 8"Gate Valve Ea .3 $4,062.50 -$12,187.50 4 6"Gate Valve Ea 2 $3,320.00 $6,640.00 5 1.5"Water Service Long-Dual Service Ea -12 $4,958.00 -$59,496.00 6 1.5"Water Service Long-Dual Service with new bore Ea 16 $9,165.00 $146,640.00 7 1.5"Water Service Short-Dual Service Ea -2 $3,265.00 -$6,530.00 8 1.5"Water Service Short-Single Ea -1 $2,652.00 -$2,652.00 9 Meter Box Ea 11 $465.00 $5,115.00 10 8"45-Degree Bend Ea 2 $1,262.00 $2,524.00 11 Connect to exisbng water main Ea 3 $4,650.00 $13,950.00 15 Granular Backfill Ton 65 $67.00 $4,355.00 16 Install 4"to 8"by open cut for unknown alignment LF 50 $198.00 $9,900.00 17 Install 8"Tee(8"X6"or 8"X8") Ea 4 $2,932.62 $11,730.48 18 Install 8"Cross Ea -2 $3,426.56 -$6,853.12 19 Install Fire Hydrant Assembly Ea -3 $7,864.32 -$23,592.96 20 Remove Fire Hydrant Ea -2 $250.00 -$500.00 21 Remove Existing Gate Valve Ea -3 $200.00 -$600.00 22 Remove and Replace ADA Handicap Ramp Ea .3 $7,952.25 -$23,856.75 23 Remove and Replace 2"Asphalt SY 56 $108.54 $6,078.24 24 Remove and Replace 8"Flex Base SY -19 $95.00 -$1,805.00 25 Remove and Replace 6"Concrete Paving SF 481 $23.00 $11,063.00 26 Remove and Replace 4"Sidewalk SF 635 $21.00 $13,335.00 27 Remove and Replace Curb and Gutter LF 240 $67.00 $16,080.00 28 Sod includes Top Soil SY 200 $12.25 $2,450.00 30 Traffic Control DAY 17 $110.00 $1,870.00 31 Li hted Arrow Board DAY -10 $265.00 -$2,650.00 34 Operation of Approved 2"Bypass DAY 15 $132.00 $1,980.00 CO1.2 Install Single 2"Water Service EA -5 $2,925.00 -$14,625.00 TOTALS: t98.362.391 0 Page 2 of 3 Contract Quantity Adjustment/Change Order 2 01/16 Project Name: Rawhide AC Waterline Replacement Quan.Adj./Change Order No.: 2 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount Da s T $0.001 01 W Yucca Dr �r t0,,0 pc T O Purple Sage Dr r 3 v rr r� 0,d gest Dr a` N Q/ 3 J\ v 35 o a- Ip Ip c west IH 35 o� N � V N W W a \c9�d Leo 35 - Waterlines - �RawhideA/CWaterlines Waterline Replacement Project Gate Valve JIROUND ROCK i f Xl1S RawhideACWatedines_shp