Contract - No-Digtec, LLC - 2/22/2024 Page I of 3
Contract Quantity Adjustment/Change Order
2w,01/16
Department: UES
Project
Name: Rawhide AC Waterline Replacement Date: 1/16/24
City Project Change Order/Quantity
ID Number RHIDE Adjustment No. 2
Vendor No-Digtec,LLC 415 Ewing Boulevard,Ferns,Texas 75125-1500 (972)488-9910
Company Name Address Phone No.
Justification
Change Order/Quantity Adjustment No.2 is for final quantiy adjustments.
SUMMARY Amount %Change
Original Contract Price: $1,276,513.67
Previous Quantity Adjustment(s): $0.00
This Quantity Adjustment: $98,362.39
Total Quantity Adjustment(s): $98,362.39
Total Contract Price with Quantity Ad)ustrrent(s): $1,374,876.06
Previous Change Order(s): $40,807,98
3%
This Change Order. $0.00 00r6
Total Change Order(s)To Date: $40,807.98 3%
Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s)Plus Change
Order(s)): $1,415,684.04
Difference between Original and Adjusted Contract Prices: $139,170.37
Original Contract Time: 186
Time Adjustment by previous Quan.Adj/Change Order:
Time Adjustment by this Quan Adj./Change Order:
New Contract Time: 186
Prepared By: Eddie Zapata,Senior Project Manager,City of Round Rock
Signature A Printed Name,Title,Company Date
^
Contractor: Cole Eby,Project Manager,No-Ditec,LLC
Signature Printed Name,Titl Compan Date
Qty Project tla n J i�Al S
Manager: E le Zapata,Senior Proj Manager
Sig ure Printed Name,Title Date
Mayor/City
Manager
Craig Morgan,Mayor C 951L
/s
gn re Printed Name,Title Date
R- 202 - 042--
Page 3 of 3
Contract Quantity Adjustment/Change Order
m
01 16
Project Name: Rawhide AC Waterline Replacement
Quan.Adj./Change Order No.: 2
Quantity Adjustment Data
Contract
Time
Bid Item# Item Description Unit Unit Price Amount Adjustment
3 8"Gate Valve Ea -3 $4,062.50 -$12,187.50
4 6"Gate Valve Ea 2 $3,320.00 $6,640.00
5 1.5"Water Service Long-Dual Service Ea -12 $4,958.00 -$59,496.00
6 1.5"Water Service Lo -Dual Service with new bore Ea 16 $9,165.00 $146,640.00
7 1.5"Water Service Short-Dual Service Ea -2 $3,265.00 -$6,530.00
8 1.5"Water Service Short-Single Ea -1 $2,652.00 -$2,652.00
9 Meter Box Ea 11 $465.00 $5,115.00
10 8"45-Degree Bend Ea 2 $1,262.00 $2,524.00
11 Connect to exisbng water main Ea 3 $4,650.00 $13,950.00
15 Granular Backfill Ton 65 $67.00 $4,355.00
16 Install 4"to 8"by open cut for unknown alignment LF 50 $198.00 $9,900.00
17 Install 8"Tee(8"X6"or 8"X8") Ea 4 $2,932.62 $11,730.48
18 Install 8"Cross Ea -2 $3,426.56 -$6,853.12
19 Install Fire Hydrant Assembly Ea -3 $7,864.32 -$23,592.96
20 Remove Fire Hydrant Ea -2 $250.00 -$500.00
21 Remove isting Gate Valve _ Ea -3 $200.00 -$600.00
22 Remove and Replace ADA Handicap Ramp Ea -3 $7,952.25 -$23,856.75
23 Remove and Replace 2"Asphalt SY 56 $108.54 $6,078.24
24 Remove and Replace 8"Flex Base SY -19 $95.00 -$1,805.00
25 Remove and Replace 6"Concrete Paving SF 481 $23.00 $11,063.00
26 Remove and Replace 4"Sidewalk SF 635 $21.00 $13,335.00
27 Remove and Replace Curb and Gutter LF 240 $67.00 $16,080.00
28 Sod includes Top Soil SY 200 $12.25 $2,450.00
30 Traffic Control DAY 17 $110.00 $1,870.00
31 Li hted Arrow Board DAY -10 $265.00 -$2,650.00
34 O eration of Approved 2"Bypass DAY 15 $132.00 $1,980.00
C01.2 JInstall Single 2"Water Service EA -5 $2,925.00 -$14,625.00.
$98,362.391 0
Page 2 of 3
Contract Quantity Adjustment/Change Order
.a, ---
m Oui6
Project Name: Rawhide AC Waterline Replacement
Quan.Adj./Change Order No.: 2
Change Order Data
Contract
Time
Adjustment
Item# Item Description Unit Qty. Unit Price Amount p