Loading...
CM-2024-070 - 3/1/2024U.S. Department of Housing and Urban Development * � I y : 451 Seventh Street, SW II��I Washington, DC 20410 J9sN Devc}`xa MM.AW,goy as apknCO 4AGM Environmental Review for Activity/Project that is Exempt or Categorically Excluded Not Subject to Section 58.5 Pursuant to 24 CFR 58.34(a) and 58.35(b) Project Information Project Name: RRHA-Capital-Fund-Grant-2023 HEROS Number: 900000010382257 State / Local Identifier: Project Location: 1505 Lance Ln, Round Rock, TX 78664 Additional Location Information: N/A Description of the Proposed Project 124 CFR 50.12 & 58.32; 40 CFR 1508.25): The Capital Fund Grant will be used to pay for administrative and operations for the Round Rock Housing Authority. The Round Rock Housing Authority has 3 locations in Round Rock. The main administrative offices are located at 1505 Lance Lane. Level of Environmental Review Determination Activity / Project is Exempt per 24 CFR 58.34(a): 58.34(a)(3) Funding Information Grant Number HUD Program Program Name TX59P32250123 Public Housing Public Housing Capital Fund (including CFFP and other grants) $248,398.00 Estimated Total HUD Funded Amount: $248,398,00 Estimated Total Project Cost [24 CFR 58.2 (a) (5)1: $248,398.00 Mitigation Measures and Conditions [CFR 1505.2(c)1: Summarized below are all mitigation measures adopted by the Responsible Entity to reduce, avoid or eliminate adverse environmental impacts and to avoid non-compliance or non-conformance with the above -listed authorities and factors. These measures/conditions must be incorporated into project �M,702#t-. d RRHA-Capita!-Fund-Grant-2023 Round Rock, TX 900000010382257 contracts, development agreements and other relevant documents. The staff responsible for implementing and monitoring mitigation measures should be clearly identified in the mitigation plan. Law, Mitigation Measure or Condition Authority, or Factor Preparer Signature: k' Comments on Complete Completed Measures Date: 3 I f 1242 Name / Title/ Organization: Elizabeth G. Alvarado / / ROUND ROCK Responsible Entity Agency Official Signature: 4Date: �d2 Name/ Title: This original, signed document and related supporting material must be retained on file by the Responsible Entity in an Environment Review Record (ERR) for the activity / project (ref: 24 CFR Part 58.38) and in accordance with recordkeeping requirements for the HUD program(s). 02/27/2024 16:53 Page 2 of 2 U.S. Department of Housing and Urban Development 451 Seventh Street, SW Washington, DC 20410 www.huo.gov esoanol.hud.gov Environmental Review for Activity/Project that is Exempt or Categorically Excluded Not Subject to Section 58.5 Pursuant to 24 CFR 58.34(a) and 58.35(b) Project Information Project Name: RRHA-Capital-Fund-Grant-2023 HERDS Number: 900000010382257 Responsible Entity (RE): ROUND ROCK, 301 W Bagdad Ave Round Rock TX, 78664 State / Local Identifier: RE Preparer: Elizabeth G. Alvarado Grant Recipient (if different than Responsible Entity): Round Rock Housing Authority Point of Contact: Ebby Green Consultant (if applicable): Point of Contact: Project Location: 1505 Lance Ln, Round Rock, TX 78664 Additional Location Information: N/A Description of the Proposed Project [24 CFR 50.12 & 58.32; 40 CFR 1508.25]: The Capital Fund Grant will be used to pay for administrative and operations for the Round Rock Housing Authority. The Round Rock Housing Authority has 3 locations in Round Rock. The main administrative offices are located at 1505 Lance Lane. Level of Environmental Review Determination Activity / Project is Exempt per 24 CFR 58.34(a): 58.34(a)(3) Signature Page RRHA-Capital-Fund-Grant-2023 Round Rock, TX 900000010382257 Fundine Information Grant / Project HUD Program Program Name Funding Identification Amount Number TX591332250123 Public Housing Public Housing Capital Fund (including $248,398,00 CFFP and other grants) Estimated Total HUD Funded, Assisted $248,398.00 or Insured Amount: Estimated Total Project Cost [24 CFR 58.2 (a) (5)]: $248,398.00 Compliance with 24 CFR 50.4 & 58.6 Laws and Authorities Compliance Factors: Are formal Compliance determination Statutes, Executive Orders, and compliance steps (See Appendix A for source Regulations listed at 24 CFR §50.4 & or mitigation determinations) §58.6 required? STATUTES, EXECUTIVE ORDERS, AND REGULATIONS LISTED AT 24 CFR §50.4 & § 58.6 Airport Runway Clear Zones and ❑ Yes M No Based on the project description the Clear Zones project includes no activities that would 24 CFR part 51 require further evaluation under this section. The project is in compliance with Airport Runway Clear Zone requirements. Coastal Barrier Resources Act ❑ Yes 0 No This project is not located in a CBRS Coastal Barrier Resources Act, as Unit. Therefore, this project has no amended by the Coastal Barrier potential to impact a CBRS Unit and is in Improvement Act of 1990 [16 USC compliance with the Coastal Barrier 35011 Resources Act. Flood Insurance ❑ Yes El No Based on the project description the Flood Disaster Protection Act of project includes no activities that would 1973 and National Flood Insurance require further evaluation under this Reform Act of 1994 (42 USC 4001- section. The project does not require 4128 and 42 USC 5154a) flood insurance or is excepted from flood insurance. While flood insurance may not be mandatory in this instance, HUD recommends that all insurable structures maintain flood insurance under the National Flood Insurance 02/27/2024 16:55 Page 2 of 7 RRHA-Capital Fund -Grant 2023 Round Rock, TX 900000010382257 Compliance Factors: Are formal Statutes, Executive Orders, and compliance steps Regulations listed at 24 CFR §50.4 & or mitigation §58.6 required? Compliance determination (See Appendix A for source determinations) STATUTES, EXECUTIVE ORDERS, AND REGULATIONS LISTED AT 24 CFR §50.4 & § 58.6 Program (NFIP). The project is in compliance with Flood Insurance requirements. Mitigation Measures and Conditions [CFR 40 1505.2(c)]: Summarized below are all mitigation measures adopted by the Responsible Entity to reduce, avoid or eliminate adverse environmental impacts and to avoid non-compliance or non-conformance with the above -listed authorities and factors. These measures/conditions must be incorporated into project contracts, development agreements and other relevant documents. The staff responsible for implementing and monitoring mitigation measures should be clearly identified in the mitigation plan. Law, Mitigation Measure or Condition Comments on Mitigation Complete Authority, or Completed Plan Factor Measures Project Mitigation Plan Supporting documentation on completed measures 02/27/2024 16:55 Page 3 of 7 RRHA Capital Fund Grant 2023 Round Rock, 7X 900000010382257 02/27/2024 16:55 Page 4 of 7 RRHA-Ca pital-Fund-Grant-2023 Round Rock, TX 900000010382257 APPENDIX A: Related Federal Laws and Authorities Airport Runway Clear Zones General policy Legislation It is HUD's policy to apply standards to prevent incompatible development around civil airports and military airfields. Regulation 24 CFR Part 51 Subpart D 1. Does the project involve the sale or acquisition of developed property? ✓ No Based on the response, the review is in compliance with this section. Yes Compliance Determination Based on the project description the project includes no activities that would require further evaluation under this section. The project is in compliance with Airport Runway Clear Zone requirements. Supporting documentation Aimorts.jpig Are formal compliance steps or mitigation required? J Coastal Barrier Resources Yes No General requirements Legislation Regulation HUD financial assistance may not be Coastal Barrier Resources Act used for most activities in units of the (CBRA) of 1982, as amended by Coastal Barrier Resources System the Coastal Barrier Improvement (CBRS). See 16 USC 3504 for limitations Act of 1990 (16 USC 3501) on federal expenditures affecting the CBRS. 02/27/2024 16:55 Page 5 of 7 RRHA-Capital-Fund-Grant-2023 Round Rock, TX 900000010382257 1. Is the project located in a CBRS Unit? ✓ No Document and upload map and documentation below. Yes Screen Summary Compliance Determination This project is not located in a CBRS Unit. Therefore, this project has no potential to impact a CBRS Unit and is in compliance with the Coastal Barrier Resources Act. Supporting documentation cbrs MAP.gif Are formal compliance steps or mitigation required? Flood Insurance General requirements Certain types of federal financial assistance may not be used in floodplains unless the community participates in National Flood Insurance Program and flood insurance is both obtained and maintained. Yes No Legislation Flood Disaster Protection Act of 1973 as amended (42 USC 4001-4128) Regulation 24 CFR 50.4(b)(1) and 24 CFR 58.6(a) and (b); 24 CFR 55.1(b). 1. Does this project involve financial assistance for construction, rehabilitation, or acquisition of a mobile home, building, or insurable personal property? ✓ No. This project does not require flood insurance or is excepted from flood insurance. Based on the response, the review is in compliance with this section. Yes 4. While flood insurance is not mandatory for this project, HUD strongly recommends that all insurable structures maintain flood insurance under the National Flood Insurance Program (NFIP). Will flood insurance be required as a mitigation measure or condition? 02/27/2024 16:55 Page 6 of 7 RRHA-Capital-Fund-Grant 2023 Round Rock, TX 900000010382257 Yes ✓ No Screen Summary Compliance Determination Based on the project description the project includes no activities that would require further evaluation under this section. The project does not require flood insurance or is excepted from flood insurance. While flood insurance may not be mandatory in this instance, HUD recommends that all insurable structures maintain flood insurance under the National Flood Insurance Program (NFIP). The project is in compliance with Flood Insurance requirements. Supporting documentation RRHA CAP GRANT FUND FEMA MAP.docx Are formal compliance steps or mitigation required? Yes ✓ No 02/27/2024 16:55 Page 7 of 7