CM-2024-075 - 3/8/2024Construction Change Order
Department:
Community Development Block Grant
Program:
Home Repair Program
Location:
1408 Clearview Loop
Homeowner:
Yours H. & Ja H. Kim
Original Contract Price:
This Change Order
Change Orders to Date:
Maximum Change Order Allowed $ amount
Balance available
$21,931.28
$2,285.00
$0.00
$5,482.82
$5,482.82
Page: 1 of 1
Date: 03/01 /24
Change Order No. 1
Original Contract: $ 21,931.28
Justification:
Change Data
Original recommended repair not sufil`lclent.
Ali siding replacement at right side of house
due to siding delamination at seams and
nails caused by water penetration. This will
be a more permanent repair
Item #
- or
(+j
Descri tion of Changes
Unit
QTY
Unit Price
Amount
Days +!-
cope OT WOrK callacalleCl Tor partial
replacement of the Masonite siding at
the right side of house, only the bottom
two feet to include flashing tape and
paint to match. The contractor has
requested to replace entire siding from
top to bottom because the Masonite
siding Is delaminating at the seams and
nails above the recommended original
repair area. The entire siding
replacement at the right side of the
home will solve the problem of any
water penetration and rotting issues
and will be a more permanent repair.
Chief Building Inspector James Shine
met with the contractor and
recommends the change order is
Outside 41
Ineeded,
JEA
1
1
$2,285.00
$2,285.00
1
$2,285.00
1
Percent of Original Contract Price
Maximum % allowed 25.00%
This Change Order 2285.00%
Total % Change
BY: B&O Construction ( 1O
Titre Owner Date I Contract +
Ja H. & Young Kim p�G�% AaL7 A rove
omeowner Date -Title La
Date
Homeowner Date
10.40%
Orders: $24,216.28
Form 2019