Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Contract - Braun & Butler Construction, Inc. - 3/28/2024
- ¢ , Document A1 33 2019 Exhibit A Guaranteed Maximum Price Amendment This Amendment dated the 4 v day of March in the year 2024 ,is incorporated into the accompanying AIA Document A 133T"t--2019,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the 8 day of ADDITIONS AND DELETIONS: February i n the year 2024 (the"Agreement") The author of this document has added information needed for its (In words, indicate day, month, and jvar) completion.The author may also far the following PROJECT: have revised the text of the original g AIA standard form.An Additions and (A'ame and address or location) Deletions Report that notes added information as well as revisions to Griffith Remodel and Paseo Project the standard form text is available 212 and 226 East Main Street,Round Rock,TX 78664 from the author and should be reviewed.A vertical line in the left THE OWNER: margin of this document indicates (A'ame, legal slalus, and address) where the author has added necessary information and where City of Round Rock the author has added to or deleted 221 East Main Street,Round Rock,TX 78664 from the original AIA text. THE CONSTRUCTION MANAGER: This document has important legal consequences.Consultation with an (Nance, legal slams, and address) attorney is encouraged with respect to its completion or modification. Braun&Butler Construction Inc. 300 Hazelwood Street,Suite 100,Leander,TX 78641 AIA Document A201111-2017, General Conditions of the Contract TABLE OF ARTICLES for Construction,is adopted in this document by reference.Do not use A.1 GUARANTEED MAXIMUM PRICE with other general conditions unless this document is modified. A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER'S CONSULTANTS,CONTRACTORS,DESIGN PROFESSIONALS,AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE §A.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 of the Agreement,the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price.As agreed by the Owner and Construction Manager,the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed.The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work,as that term is defined in Article 6 of the Agreement. §A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Fifteen Million Thirty-One Thousand Seven Hundred Twenty-Eight and No/100 Dollars ($ 15,031,728.00 ),subject to additions and deductions by Change Order as provided in the Contract Documents. Init. AIA DocumentA133—2019 Exhibit A.Copyright m 1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects,This document was produced at 17.30:29 1 ET on 03/12/2024 under Order No.21145031.00 which expires on 01/21/2025,is not'or resale,is licensed for one-time use only,and may only be used in l accordance with the AIA Contract Documents*Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA31) (Z-Zo2g -C)(91 §A.1.1.2 Itemized Statement of the Guaranteed Maximum Price.Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories,including allowances;the Construction Manager's contingency;alternates;the Construction Manager's Fee;and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement belmp or reference an attachment.) See Attachment A §A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 of the Agreement. §AAAA The method of adjustment of the Construction Manager's Fee for changes in the Work is set forth in Section 6.1.3 of the Agreement. §A.1.1.5 Alternates §A.1.1.5.1 Alternates,if any,included in the Guaranteed Maximum Price: Item Price ` Alternate Item No. 11 $32,034.00-included in the$15,031,728.00 Guaranteed I Maximum Price §A.1.1.5.2 Subject to the conditions noted below,the following alternates may be accepted by the Owner following execution of this Exhibit A.Upon acceptance,the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that mast be met for the Owner to accept the alternate.) Item Price Conditions for Acceptanc N/A §AAAA Unit prices,if any: (Identify the item and state the unit price and guantit)p limitations, if any, to which the unit price ivill be applicable.) Item Units and Limitations Price per Unit($0.00) 14"Piers 20'Depth $50/LF 18"Piers 20'Depth $60/LF 24"Piers 20'Depth $65/LF ARTICLEA.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §A.2.1 The date of commencement of the Work shall be: (Check one of the following boxes.) [ ] The date of execution of this Amendment. [X] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) A Notice to Proceed will be issued no later than May 6,2024 for the Commencement of the Work If a date of commencement of the Work is not selected,then the date of commencement shall be the date of [ execution of this Amendment. r §A.2.2 Unless otherwise provided,the Contract Time is the period of time,including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work.The Contract Time shall be measured from the date of commencement of the Work. §A.2.3 Substantial Completion §A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Construction Manager shall achieve Substantial Completion of the entire Work: (Check one of the following bares and complete the necessa/y information.) Init. AIA Document A133—2019 Exhibit A.Copyright®1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,"AIA;the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 17:30:29 2 ET on 03/12/2024 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in f t accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracls.com. User Notes: (3139ADA31) I' y f [ ] Not later than ( )calendar days from the date of commencement of the Work. [X] By the following date:October 6,2025 §A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents,if portions of the Work are to be completed prior to Substantial Completion of the entire Work,the Construction Manager shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date Associated"Brass Tap"Work July 31,2024 §A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages,if any,shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED §A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: §A.3,1.1 The following Supplementary and other Conditions of the Contract: Document Title Date Pages AIA Document A133- Standard Form of April 13,2023 32 2019 Agreement Between Owner and Construction Manager as Constructor §A.3.1.2 The following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) 2230-CORR Griffith and Paseo CD95 SPECIFICATIONS-24_0119 Section Title Date Pages Specifications Griffith Remodel and January 19,2024 1389 Paseo Project Manual §A.3.1.3 The following Drawings: (Either list the Draivings here, or refer to an exhibit attached to this Amendment) 2230-CORR Griffith and Paseo-CD95 DRAWINGS-24_0119 Number Title Date MYA 2230 95%Construction January 19,2024 Documents §A.3,1.4 The Sustainability Plan,if any: (If the Owner identified a Sustainable Objective in the O)Vner's Criteria, idents the document or documents that comprise the Sustainability Plan by title, date and number,of pages,and include other identifying information. The Sustainability Plan identifies and describes the Sustainable Objective;the targeted Sustainable Measitres; implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles and responsibilities associated with achieving the Sustainable Measures;the specific details about design reviews, testing or metrics to verify achievement of each Sustainable Measure;and the Sustainability Documentation required for the Project,as those terms are defined in Exhibit C to the Agreement.) Title Date Pages N/A AIA Document A133-2019 Exhibit A.Copyright®1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,"`American Institute of hilt.it. ,architects,"'AIA,"the AIA Logo,and"AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 17:30:29 3 ET on 03/12/2024 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in / accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA31) Other identifying information: §A.3.1.5 Allowances,if any,included in the Guaranteed Maximum Price: (Identify each allowance) Item Price Contractor's Contingency $375,000.00 Owner's Betterment $375,000.00 Distributed Antenna System $56,806.00 200 cf Self-Leveling Floor Float $19,200.00 Additional Building Irrigation $10,000.00 95%to 100%Design Changes, $150,000.00 Additions,Clarifications Temporary Pier Casings $28,300.00 Concrete Paving-East Parking and Drive $36,000.00 Additional Steel at FPD for Installation $2,500.00 Architectural Columns $40,000.00 Additional Level 5 Finish Not Defined $5,000.00 Two(2) 12"Storm Basin Under Wood $2,500.00 Deck Additional 2"Water to Irrigate $5,000.00 Gravel Bed Under Porous Concrete $3,500.00 Drainage Under Artiffcal Turf $6,500.00 Electrical Gear Package $40,000.00 Elevator Electrical Requirements $10,000.00 Mechanical and Plumbing Circuitry $45,000.00 Epoxy Filler at Masonry Joints and $25,000.00 Cracks §A.3.1.6 Assumptions and clarifications,if any,upon which the Guaranteed Maximum Price is based: (Identh;each assumption and clarification) See Attachment B. §A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents o►•information here,or refer to an exhibit attached to this Amendment.) Schedule to be mutually agreed upon by Owner and Contractor.See Attachment C for Preliminary Schedule. ARTICLE A.4 CONSTRUCTION MANAGER'S CONSULTANTS,CONTRACTORS, DESIGN PROFESSIONALS,AND SUPPLIERS §A.4.1 The Construction Manager shall retain the consultants,contractors,design professionals,and suppliers, identified below: (List name, discipline,address, and other information) As previously specified in the Standard Form of Agreement and/or subject to approval by Owner This Amendment to the Agreeme t entered into as of the day and year first written above. �� A OWNER igna r CONSTRUCTION MANAGER(S afore) CraigMora Ma or k Kenton Heinze,President (Printed name and title) (Printed name and title) E Inst. AIA Document At 33—2019 Exhibit A.Copyright®1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 17:30:29 4 ET on 03/12/2024 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in i accordance with the AIA Contract Documentse Terms of Service.To report copyright violations,e-mail docinfo®aiacontracls.com. User Notes: (3B9ADA31) i Additions and Deletions Report for AIA(D Document A133©— 2019 Exhibit A This Additions and Deletions Report,as defined on page 1 of the associated document,reproduces below all text the author has added to the standard form AIA document in order to complete it,as well as any text the author may have added to or deleted from the original AIA text.Added text is shown underlined.Deleted text is Indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for Information purposes only and is not incorporated into or constitute any part of the associated AIA document.This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 17:30:29 ET on 03112/2024. PAGE This Amendment dated the, may of March in the year 2024 ,is incorporated into the accompanying AIA Document A133T"'-2019,Standard Farm of Agreement Between Owner and Construction Manager as Constructor' where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the day of March in the year 2024 (the"Agreement") Griffith Remodel and Paseo Project 212 and 226 East Main Street,Round Rock,TX 78664 City of Round Rock 221 East Main Street,Round Rock,TX 78664 Braun&Butler Construction Inc. 300 Hazelwood Street,Suite 100,Leander,TX 78641 §A.1,1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Fifteen Million Thirty-One Thousand Seven Hundred Twenty-Eight and No/100 Dollar's ($ 15,031,728.00 ),subject to additions and deductions by Change Order as provided in the Contract Documents. PAGE See Attachment A Alternate Item No, 11 $32,034.00-included in the$15,031,728,00 Guaranited Maximum Price Item Price Conditions for AcseptaflseAcceptanc N/A Additions and Deletions Report for AIA Document Al 33—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved.'The American Institute of Architects,"'American Institute of Architects,""AIA,"the AIA Logo,and'AIA Contract Documents"ate trademarks of The American Institute of Architects.This 1 r, document was produced at 1730:29 ET on 03/12/2024 under Order No.2114503100 which expires on 01/2112025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents'Terms of Service.To report copyright violations,e-mail docinfu n@aiacontracts.com. User Notes: (3n9ADA31) I; I I r 14"Piers 20'Depth 50/LF 18"Piers 20'De th 60/LF 24"Piers 20'Depth 65/LF [X] Established as follows: A Notice to Proceed will be issued no later than May 6 2024 for the Commencement of the Work PAGE [X] By the following date:October 6,2025 Associated"Brass Tap"Work July 31,2024 AIA Document A]33- Standard Form of April 13,2023 32 2019 Agreement Between Owner and Construction Manager as Constructor 2230-CORR Griffith and Paseo CD95 SPECIFICATIONS-24 0119 Specifications Griffith Remodel and January 19,2024 1389 Paseo Proiect Manual 2230-CORK Griffith and Paseo-CD95 DRAWINGS-24 0119 i MYA 2230 95%Construction January 19,2024 Documents N/A PAGE 4 Additions and Deletions Report for AIA Document A133—2019 Exhibit A.Copyright®1991,2003,2009,and 2019.All rights reserved.'The American Institute of Architects,""American Institute of Architects,'"AIA,'the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This 2 document was produced at 17:30:29 ET on 03/1212024 under Order No.2114503100 which expires on 01/2112025,Is not for resale,is licensed for one-lime use only,and may only be used In accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail docinfo@aiacontrecls.com. User Notes: (3B9ADA31) Contractor's Contingency $375,000.00 Owner's Betterment $375,000.00 Distributed Antenna System $56,806.00 200 of Self-Leveling Floor Floa $19,200.00 Additional Building Irrigation $10,000.00 95%to 100%Design Changes, $150,000.00 Additions,Clarifications $28,300.00 Teinpora►y Pier Casings $36,000.00 Concrete Paving-East Parking and Drive $2,500.00 Additional Steel at FPD for Installation $40,000.00 Architectural Columns $5,000.00 Additional Level 5 Finish Not Defined $2,500.00 Two(2) 12"Storm Basin Under Wood $5,000.00 Deck Additional 2"Water to $3,500.00 Irrigate Gravel Bed Under $6,500.00 Porous Concrete $40,000.00 Drainage Under Artifical Tur $10,000.00 Electrical Gear Package $45.000.00 Elevator Electrical Requirements $25,000.00 Mechanical and Plumbing Circuitry Epoxy Filler at Masonry Joints and Cracks See Attachment B. Schedule to be mutually agreed upon by Owner and Contractor.See Attachment C for Preliminary Schedule. As previously specified in the Standard Form of Agreement and/or subject to approval by Owner Craig Morgan,Mayor Kenton Heinze,President Additions and Deletions Report for AIA Document A133—2019 Exhibit A.Copyright®1991,2003,2009,and 2019.All rights reserved.'The American Institute of Architects,"'American Institute of Architects,""AIA,"Ilia AIA Logo,and'AIAConlract Documents"are trademarks of The American Institute of Architects.This 3 document was produced at 17:30:29 ET on 03/12/2024 under Order No.2114503100 which expires on 01/21/2025,is not for resale,Is licensed for one-time use only,and may only be used In accordance with the AIA Contract Documenlsm Terms of Service.To report copyright violations,e-mail docinfo@alaconlracts.com. f User Notes: (3B9ADA31) t Certification of Document's Authenticity Alk') Document D401 TA, -2003 I,Stephanie L.Sandre,hereby certify,to the best of my knowledge,information and belief,that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 17:30:29 ET on 03/12/2024 under Order No.2114503 100 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA11 Document A]33"-2019 Exhibit A, Guaranteed Maximum Price Amendment,other than those additions and deletions shown in the associated Additions and Deletions Report. U (Signe (Title) cy (Dated) i i f !I 4I i i AIA Document D401—2003.Copyrighl©1992 and 2003.All rights reserved.'The American Institute of Architects,""American Institute of Architects,'"AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 17:30:29 ET on 03/12/2024 under .� Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail docinfo@alaconlracls.com. iUser Notes: (389ADA31) i Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 10Date: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty Unit UP Amount UP Amount UP Amount 0 Project Information 0 Building SF 45935 sf 0 Project Duration 515 days 0 0 1 General Conditions 0 Preconstruction-to be invoiced separately 1 Is 0 0 Supervision & Management Cost 1 Is 499950 499,950 Temp Facilities,Associated Eqpt&Supplies Cost 1 Is 89,900 89,900 0 1.0 Allowances 0 contractor's contingency 3 % 375,000 375,000 owner's betterment 3 % 375,000 375,000 Distributed Antenna Service 1 Is 56,806 56,806 200cf additional floor float 1 Is 19,200 19,200 Additional design/build irrigation revisions 1 Is 10,000 10,000 95%to 100%design changes/additions/clarifications 1 IS 1 150,000 150,000 0 1.1 General Requirements 0 TCEQ Application/Plan/NOI 1 Is 1,500 1,500 1 1,500 TCEQ Inspections 16 mo 450 7,200 1 7,200 Registered Surveyor 80 hr 175 14,000 14,000 Project Final Clean 45,935 sf 0.45 20,671 20,671 0 DIV 2- EXISTING CONDITIONS 0 0 2.40 Demolition 667,200 667,200 concrete planter walls 147 sf 0 curb inlets and grate 1 ea 0 downspouts 5 ea 0 ramp guardrails and handrails 107 If 0 flag pole 1 ea 0 Bell Relocation- BY OWNER 0 ea 0 bell concrete plinth 58 sf 0 bike rack 1 ea 0 bench 1 lea 1 0 light pole 1 ea 0 cmu dumpster enclosures 385 sf 0 remove/salvage dumpster gates 4 ea 0 remove/salvage dumpster ped gates 2 ea 0 stone wall planter 220 sf 0 fence at Brass Tap 3411f 1 0 ate at Brass Tap 2 ea 0 rock&gravel at Brass Tap 248 sf 0 steel eclaina at Brass Tap 83 If 0 remove/salvage irr boxes&lines at Brass Tap 1 Is 0 remove/salvage hose reels at Brass Tap 1 Is 0 remove/salvage power cords&lights at Brass tap 1 Is 0 remove/salvage metal planter troughs at Brass Tap 9 ea 0 demo light poles at Brass Tap 5 ea 0 remove/salvage grease trap at Brass Tap 1 ea 0 Servicing/cleaning grease trap NOT INCLUDED 0 ea 0 Trailer&wood walkway removed by Brass Tap 0 ea 0 Kegs,tents&furniture removed by Brass Tap 0 ea 0 2,434 sf 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP Date: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty Unit UP Amount UP Amount UP Amount hollow core planks 160 sf 0 column 5 ea 0 concrete planter walls 54 sf 0 3' piers 2 ea 0 2nd floor slab and metal deck 2,540 sf 0 4"deep recess cut outs 6 ea 0 W8x10 beams 9 If 0 diagonal bracing 12011f 0 framing at barrel roof 315 sf 0 CB21x53 beams 252 If 0 roof deck for access hatch 9 sf 0 roof deck for elevator 95 sf 0 joist at elevator opening 1 ea 0 X bracing 9011f 0 plumbing fixtures 28 ea 0 toilet partitions 11 ea 0 interior stairs 1 Is 0 OHCD 1 ea 0 entry canopies 277 sf 0 canopy column masonry 384 sf 1 0 canopy columns 4 ea 0 drywall- raming to remain 15,102 sf 0 interior walls 16,520 sf 0 d/f/h 31 sets 0 slidina alass doors 4 sets 0 remove/salvage stone building plaque 1 lea 1 0 floor access hatch 1 ea 0 spray applied fireproofing from columns 4 ea 0 slab for new floor access hatch 9 sf 0 VCT 2,292 sf 0 CPT 23,612 sf 0 ceramic tile floor 4,2311s 0 millwork 50 If 0 porch railinq 10 If 0 roof hatch 2 ea 0 roof expansion joint 84 If 0 roof deck 71 sf 0 utters 25611f 0 stone coping 72 If 0 CMU veneer,WRB, sheathing& insulation 8,160 sf 0 spray applied fireproofing from deck and trusses 1,254 sf 0 0 2.50 Asbestos Abatement-no protocol provided 1 Is 9,250 9,250 0 DIV 3-CONCRETE 0 0 3.0 Concrete 585,000 585,000 Pier P1 14"x20' 4 ea 0 Pier P2 18"x20' 13 ea 0 Pier P3 NNW 41 ea 0 Temporary pier casing Allowance 20'depth 1 Is 28,300 28,300 18"x2'8" balcony rade beam 31 If 0 4"concrete on structural EPS foam 81 sf 0 748 sf 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 16 Date: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler Mhrs Qt Unit UP Amount UP Amount UP Amount CONSTRUCTION Y 5"sog @ N Paseo landing 271 sf 0 1'x2'grade beam @ N Paseo steps& landing 45 If 0 elevator pit walls 307 sf 0 12" elevator pit on carton forms 165 sf 0 2'' on metal deck 952 sf 0 2 1/2" on metal deck 43 sf 0 1 1/2''floor levelling 78 sf 0 2'6"x2'6" plinth at large canopy 4 ea 0 2'x2' plinth at small canopies 8 ea 0 3'' curb at breezeway walls 160 If 0 curb& gutter 196 If 0 concrete paving - Pedestrian 9,979 sf 0 concrete paving-drive&parking Allowance 2,823 sf 36,000 1 36,000 sidewalk at Sheppard 75 sf 0 stamped sidewalks 2,385 sf 0 stamped concrete paving 2.300 sf 0 truncated pavers 102 sf 0 xfmr pad 100 sf 0 dumpster pad large 706 sf 0 dumpster pad small 2601 sf 0 chalk wall footer 1'x2'3" 60 sf 0 limestone seatwall footer 1'x1'4" 86 sf 0 art pedestal footer 1'x5'x5' 25 sf 0 art pedestal plinth 1'6''x3'x3' 9 sf 0 HC ramp 1 ea 0 porous concrete at Brass Tap 515 sf 0 light pole piers (relocated street lights) 2 ea 4,500 4,500 haul off spoils 1 Is 18,000 18,000 0 DIV 4 - MASONRY 0 0 4.0 Masonry 295,980 295,980 brick veneer 4,469 sf 0 cmu infill 274 sf 0 stone veneer 521 sf 0 granite block at art pedestal 1'6"x4' dia 12 sf 0 cmu at dumpster 866 sf 0 cmu at chalk wall 144 sf 0 cut limestone cap at chalk wall 25 If 0 cut limestone veneer at chalk wall ends 12 sf 0 0 0 4.10 Masonry Rebar 1,500 1,500 0 DIV 5 - METALS 0 0 5.10 Structural Steel Framing 1,099,143F 1,099,143 angle for roof access hatch 12 If 0 metal deck infill 995 sf 0 4x4x1/4 an le at infill 33 If 0 HSS 4x0.25 dia column 5 ea 0 HSS 8x6x3/8 column 1 ea 0 HSS 5x5x3/16 column 1 ea 0 h� i� �r �t31p 2.8.24 27 If Takeoff Summary 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 10 Date: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty I Unit UP Amount UP Amount UP Amount HSS 10x5x3/8 beam 19 If 0 WT10.5x28.5 19 If 0 W10x19 95 0 C10x15.3 56 0 W1 2x26 53 0 WT6x20 261 0 HSS 4x4x1/4 column 3 ea 0 HSS 12x6x1/2 beam 36 If 0 HSS 10x3x5/16 beam, 13 If 0 HSS 5x5x3/8 column 6 ea 0 W12x19 15 If 0 W1 8x55 21 If 0 4x4x3/8 angle for toilet partitions 18611f 0 4x4x5/16 angle 19011f 1 0 W 14x22 12 If 0 HSS 441/4 beam 8 If 0 W4x 13 70 If 0 W1 8x4O 16 If 0 W 14x22 12 If 0 5x3x1/4 an le 3411f 1 0 W8x21 hoist beam 9 If 0 3x3x1/4 angle 32 If 0 C5x9 channel at raised roof 36 If 0 7x5x1/4 tube at Kalwall 73 If 0 4x4x1/4 angle at parapet 60 If 0 3x3x1/4 angle at parapet 5511f 1 0 HSS 2x4x1/4 at parapet 66 If 0 HSS 2x2x1/4 roof handrail framing 9 If 0 Small Paseo Canopies 2 ea): 0 HSS 3.50x0.216 columns 16 ea 0 HSS 600/8 beams 274 If 0 HSS 6x3x1/2 beams 180 If 1 0 C30.5 channels 116 If 0 Lar a Paseo Canopy 1 ea): 0 HSS 4.500.337 columns 8 ea 0 HSS 8x4x1/2 beams 345 If 0 HSS 6x3x1/4 beams 166 If 0 C3x3.5 channels 1341 If 1 0 0 5.50 Metal Fabrications 143,776 143,776 dumpster bollards 9 ea 0 xfmr bollards-none shown 8 ea 990 7,920 7,920 reinstall salvaged dumpster gates 4 ea 0 reinstall salvaged dumpster ped gates 2 ea 0 dumpster gates 2 ea 0 dumpster ped gate 1 ea 0 perforated steel ped bride 12"x6' planks 173 sf 0 stair handrail at wood deck 15 If 0 1/2"x2'x2' steel plate at art pedestal 1 lea 0 36"threaded bolts at art pedestal 2 ea 0 steel planter 1 18"x12'x42' 108 If 0 steel planter 2 18"x3'x20' 46 If 0 steel planter 3 18"x4'x12' 32 If 0 r 1 ea 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP Date: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty I Unit UP Amount UP Amount UP Amount handrail at N Paseo stairs 421 If 0 guardrails at N Paseo stairs 5011f 0 HSS 2x1 1/2x 3/16 bench seat framing 60 If 0 roof access ladder 1 ea 0 WT3x10 @ FPD frame 60 If 0 loose lintels 173 If 0 steel plate balcony guardrail 57 If 0 steel pipe balcony guardrail 29 If 0 sunshade building canopies- 4 ea 0 0 Allowance for additional steel at FPD frame 1 Is 2,500 2,500 Architectural Columns @ W Balcony ALLOWANCE 1 Is 40,000 40,000 0 0 DIV 6-WOOD, PLASTICS, COMPOSITES 0 0 6.10 Rough Carpentry 0 34240 27354 61,594 in wall blocking 1 Is 0 plywood box protection at light pole 5 ea 0 1x6 wood planks at limestone block seat 208 If 0 1x4 deadman at limestone block seat 2'oc 50 If 0 1 x4 wood plank fasacia at limestone block seat 14611f 0 1x6 wood planks at bench seat 57 If 0 1x4 deadman at bench seat 14 If 0 Chalk ledge 6 If 0 2x blocking at canopy wall 84 If 0 MDF FPD back 38 sf 0 Finish grade plywood at FPD face 38 sf 0 blockinq at FPD frame 100 If 0 0 0 6.30 Wood Framing 62,750 62,750 wood deck on Bison pedestal system 773 sf 0 0 0 6.40 Architectural Woodwork 173,302 173,302 aluminum clad plywood wall panels 74 sf 0 aluminum clad plywood ceiling 100 sf 0 base cabinets 86 If 0 upper cabinets 75 If 0 7' storage cabinets 2 ea 0 countertop on existing base cabinets 1411f 1 0 Visitor Center reception desk 47 sf 0 2'tall brochure rack 22 If 0 Gallery reception desk 30 sf 0 restroom countertops 15 If 0 display case 6 if 0 Reception desk at 202 30 sf 1 0 1x6 wood base at Gallery 250 If 0 0 DIV 7-THERMAL& MOISTURE PROTECTION 0 0 7.10 Dampproofing and Waterproofing 12,988 57,307 57,307 a 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 10 Date: 2/8/2024 Miscellaneous Labor Material Total B coNSTsucr:oNraun&Butler Mhrs Qty Unit UP Amount UP Amount UP Amount 7.20 Insulation 3,600 3,600 K13 spray applied at roof deck 1,250 sf 0 0 7.40 EIFS 81,986 81,986 ceilings 1,520 sf 0 E-US ultrasmooth finish 254 sf 0 E-LS light finish 3,658 sf 0 high impact finish 970 sf 0 0 7.50 Membrane Roofing 22,735 sf 645,800 645,800 S4 metal soffit 60 sf 8,500 8,500 0 7.60 Flashinq and Sheet Metal 12,651 12,651 0 7.80 Fire and Smoke Protection 37,850 37,850 0 7.90 Joint Protection 1 Is 19,427 19,427 epoxy filler at masonry joint cracks Allowance 1 Is 25,000 25,000 0 DIV 8-OPENINGS 0 0 8.10 Hollow Metal Doors and Frames 464 116 45 20880 159,622 180,502 HM frames 9 ea 0 HM doors 9 ea 0 aluminum frames 70 ea 0 aluminum doors 28 ea 0 0 8.30 Wood Doors w/8.10 184 46 ea 45 8280 0 8,280 0 8.40 Entrances, Storefront&Curtainwall 547,070 547,070 SF1 89369 (1 ea) 321 sf 0 SF2 95108 (1 ea) 100 sf 0 SF3 93212 (1 ea) 196 sf 0 SF4 105206 1 ea 212 sf 0 SF5A 81186 (1 ea) 77 sf 0 SF5B 811163 1 ea 148 sf 0 SF6 70810 arched top(1 ea) 60 sf 0 SF7 8998 (1 ea) 85 sf 0 SF8 89108 (1 ea) 94 sf 0 SF9 72100(1 ea) 72 sf 0 SF10 4987 arched to 3 ea 120 sf 0 SF11 82189 1 ea 154 sf 0 AW2 2895 1 ea 25 sf 0 AW4 1889 3 ea 45 sf 0 AW5 5090 3 ea 1351s 0 AW6 10090 (1 ea) 90 sf 0 AW7 2076 (2 ea) 30 sf 0 AWS 4620 1 ea 9 sf 0 AF1 3080 1 ea 24 sf 0 AF2 4870 1 ea 33 sf 0 AF3 5272 1 ea) 37 sf 0 AF4 4590 1 ea 40 sf 0 AF5 5780 1 ea 45 sf 0 0 88 sf 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 10Date: 2/8/2024 Miscellaneous Labor Material Total BraunButler CONSTRUCTION Mhrs Qty I Unit UP Amount UP Amount UP Amount AF7 4380 1 ea 34 sf 0 AF8 9980 1 ea 79 sf 0 AF9 81080 (4 ea) 284 sf 0 AF10 81080 (3 ea) 213 sf 0 AF11 111080 (1 ea) 95 sf 0 AF12 8480 (1 ea) 67 sf 0 AF13 5080 (1 ea) 40 sf 0 AF14 2020 1 ea) 4 sf 0 AF 15 4870 13 ea 429 sf 0 FR1 82252 1 ea) 204 sf 0 FR2 821311 1 ea 113 sf 0 FR3 0582 (1 ea) 4 sf 0 FR4 35592 (1 ea) 323 sf 0 FR5 9892 (1 ea) 89 sf 0 FR6 4492 (1 ea) 40 sf 0 FR8 231082 1 ea 194 sf 0 KW1 375176 1 ea 655 sf 0 KW2 15810 2 ea 50 sf 0 storefront doors& hardware 20 ea 0 frameless glass doors 9 ea 0 lass at display case 1 Is 0 large format restroom mirrors 3 ea 0 lass auardrail 60 If 0 0 0 8.50 Access Doors 0 0 access doors in wood deck by Brass Tap Owner 0 ea 0 floor access hatch at Griffith building 1 ea 360 12001 1,560 0 8.70 Hardware w/8.10 220 55 sets 45 9900 0 9,900 knox box 1 ea 550 550 0 8.90 Louvers&Vents 880 360 1,240 L1 2610 1 ea 0 L2 3020 1 ea 0 0 DIV 9 -FINISHES 0 0 9.10 Metal Stud Framing & Drywall 514,550 514,550 interior walls 33,296 sf 0 exterior walls 3,715 sf 0 drywall on existing framing 13,482 sf 0 drywall ceilings 2,218 sf 0 Acoustibuilt ceilings 3,5501 sf 1 0 plywood blocking at Gallery walls 4,435 sf 0 wood slat wall 135 sf 0 0 9.30 Ceramic Tile 201,802 201,802 T1 wall the 1,071 0 T5 wall tile 2,714 0 T1 floor tile 249 0 T2 floor tile 1,441 0 T3 floor tile 4,074 0 1,310 1 1 1 1 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 123) Date: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty I Unit UP Amount UP Amount UP Amount Wasau tile at library entry 830 sf 32,466 32,466 0 0 9.40 Specialty Flooring 2,505 2,505 sealed concrete 1,165 0 0 9.50 Acoustical Ceilings 340,550 340,550 ACP1 Optima square edge#3352- 1" 19,173 sf 0 ACP2 Optima Te ular#3250- 1" 2,143 sf 0 ACP3 wood ceilings 1,354 sf 0 ACP4 wood ceilings 965 sf 48,250 48,250 0 9.60 Flooring 81,654 81,654 CPT1 781 sy 0 CPT2 400 sy 0 LVT1 3,900 sf 0 LVT2 997 sf 0 cove base 3,520 If 0 floorre 40 bas 0 0 9.80 Acoustic Treatment 0 0 AP acoustic wall panels 890 sf 1,150 6400 19580 27,130 0 9.90 Paint&Coatings 1 164,900 1 164,900 drywall ceilings 2,218 sf 0 HM frames 9 ea 0 HM doors 9 ea 0 Wood base 25011f 0 acoustibuilt ceilings 3,550 sf 0 power wash existing masonry 13,838 sf 1 7,285 7,285 Allowance for additional Level 5 finishes not defined 1 IS 1 5,000 5,000 0 DIV 10 -SPECIALTIES 0 0 1o.14Buildin Signage 59,030 59,030 ST1 48 ea 0 ST2 13 ea 0 ST3 20 ea 0 ST5 6 ea 0 ST6 1 ea 0 SD1 GALLERY 1 ea 0 SD2 VISITORS CENTER 1 ea 0 SD3 ROUND ROCK 1 ea I I 1 0 SD4 VISITORS CENTER 1 ea 0 SD5 ROUND ROCK CHAMBER 1 ea 0 SD6 GRIFFITH 1 ea 0 SD7 216 1 ea 0 0 10.20 Interior Specialties 1 0 1 0 Expansion joint covers 153 If 38,470 38,470 CG1 corner guards 12 ea 45 270 115 1380 1,650 CG2 corner guard 2 ea 45 45 185 370 415 0 10.2 i s o 41,877 41,877 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 10Date: 2/8/2024 Miscellaneous Labor Material Total BraunButler CONSTRUCTION Y Mhrs Qt Unit UP Amount UP Amount UP Amount grab bars 22 ea 0 toilet paper 20 ea 0 napkin 16 ea 0 soaps 17 ea 0 paper towel 13 ea 0 baby changing station 3 ea 0 bag hook 2 ea 0 24x36 mirror 9 ea 0 mop holder 2 ea 0 toilet partition 11 ea 0 urinal screen 1 ea 0 0 1o.4o Safety Specialties 0 0 FEC 11 11 45 495 360 3960 4,455 0 to 8o Site Specialties 0 0 removable bollards 12 ea 24,000 24,000 bike rack single loop 6 ea 21699 2,699 Bill board chalk board 6x24 144 sf 1,800 3600 5760 11,160 0 0 DIV 11 - EQUIPMENT 0 0 11.30 Residential Equipment 0 0 REF1 Whilpool WRS315SNHM or equal 1 ea 250 400 1500 1500 2,150 REF2 Whirlpool WRS588FIHZ or equal 1 ea 250 400 2000 2000 2,650 REF 3- OFCI 1 ea 250 400 0 650 DW- Bosch SGX78B55UC or equal 3 ea 750 1200 1350 4050 6,000 0 DIV 12 - FURNISHINGS 0 0 12.20 Window Treatments 17,006 17.006 W1 horizontal louvered blinds cordless not available 56 ea 0 W2 roller shades 11 ea 0 0 12.5o Furniture 0 0 Facilities Resource Inc furniture 1 Is 382,006 382,006 mail sorter-Southwest Solutions Grp SMS-90-L3-36E12 1 ea 1,500 1,500 Barstools by Brass Tap owner 0 ea 0 0 12.70 3-Form Panels 2.127 sf 406,143 406,143 B24 panels 30 ea 0 B26 panels 36 ea 0 B42 panels 10 ea 0 B46 panels 32 ea 0 B48 panels 12 ea 0 G51 panels 16 ea 0 0 DIV 14 -CONVEYING EQUIPMENT 0 0 14.2o Elevator 191,740 191,740 EndurallMRL hydraulic elevator 1 ea 1 100225 modernization of existing 1 ea 9,E,5 0 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 10 Date: 2/8/2024 Miscellaneous Labor Material Total BraunButler CONSTRUCTION Y Mhrs Qt Unit UP Amount UP Amount UP Amount DIV 21 - FIRE SUPPRESSION 0 0 21.2o Fire Extinguishing Systems 279,853 279,853 includes dry system at porches 0 piping will be exposed at exterior balconies 0 0 DIV 22 - PLUMBING 0 0 22.0 Plumbing 357,850 357,850 WC1 18 ea 0 WC2 2 ea 0 UR1 3 ea 0 Lav L1 7 ea 0 Lav L2 12 ea 0 Lav L3 2 ea 0 SK1 4 ea 0 MS1 2 ea 0 EWC1 3 ea 0 EWH 3 ea 0 Elevator sump pump 2 ea 0 TMV 11 ea 0 FS 5 ea 0 FD 10 ea 0 3/4'' RPZ 1 ea 0 8" roof drain 1 ea 0 IMB 3 ea 0 HB 3 ea 0 RH 2 ea 0 0 DIV 23 - HVAC 0 0 23.0 HVAC 24,930 sf 1 1,172,284 1,172,284 demo: 0 IHP 15 ea 0 Relocate IHP 1 ea 0 OHP 17 ea 0 Rooftop exhaust fan 1 ea 0 Remove/reinstall OHP 2 ea 0 Remove/reinstall roof hood 2 ea 0 Relocate CU's 5 ea 0 VRF FCU's 36 ea 0 VRF Condensing units 4 ea 0 splits stems 4 ea 0 MAU 3 ea 0 EF roof 3 ea 0 EF ceilinq 2 ea 0 DF destratification 2 ea 0 0 25.0 Integrated Automation - BY OWNER 0 ea 0 0 0 DIV 26 - ELECTRICAL 0 0 26.01 Electrical 2,115,122 2,115,122 r ghting) 1 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP le3pDate: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty Unit UP Amount UP Amount UP Amount bollard light fixture 7.1 12 ea 0 LED strip li ht 7.2 160 If 0 tree upli hts 7.3 12 ea 0 sculpture downlights 7.4 4 ea 0 canopy strip lights 7.5 1.155 If 0 fiber optic constellation lights 20 ea 0 Al 143 ea 0 A2 321 ea 0 B1 85 ea 0 C1 16 ea 0 C2 11 ea 0 C3 26 ea 0 C4 7 ea 0 C5 61 ea 0 D1 132 ea 0 D2 20 ea 0 F1 45 ea 0 G1 1 ea 0 H1 16 ea 0 11 8 ea 0 K1 5 ea 0 L1 1 ea 0 L2 2 ea 0 L3 1 ea 0 M1 16 ea 0 P1 assumed 4'at Storage 106.1 unlabeled 1 ea 0 Q1 4 ea 0 Q2 4 ea 0 Q3 4 ea 0 R1 4 ea 0 R2 4 ea 0 R3 4 ea 0 S1 9 ea 0 T1 100 ea 0 T2 3 ea 0 U1 5 ea 0 V1 assumed 4'&6'at Break Room 103.1 unlabeled 2 ea 0 W1 3 ea 0 Occ sensors 65 ea 0 Floor boxes 22 ea 0 Gear package not complete-Allowance included 1 Is 40000 0 Panel CCH1 -circuitry not provided 1 ea 0 Panel CCL1 -circuitry not provided 1 ea 0 Panel CCI-2-circuitry not provided 1 ea 0 Panel 1 LG-circuitry not complete 1 ea 0 Panel 1 EHA-circuitry not provided 1 ea 0 Panel 1 LF- circuitry not complete 1 ea 0 Panel 1 HA-circuitry not complete 1 lea I 1 0 Relocate panels 1LE, 2LE & 21-F 3 ea 0 Lial-itina controls on NEW fixtures only 1 Is 0 Existing light fixtures will not interface with new controls 0 UGE based on E drawings and does not include on—design changes 0 Utility transformer-not designed, not included 0 ea 0 r t ® Iowa nce included 1 Is 1o0oo 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP Date: 2/8/2024 Miscellaneous Labor Material Total BraunButler coNsrRvCONSTRUCTIONY Mhrs Qt Unit UP I Amount UP Amount UP Amount Mech&Plumbing circuitry not designed-Allowance included ills 45000 0 0 26.6o Fire Alarm w/26.0 electric 1 Is 0 0 0 26.7o Li htning Protection - Existing to remain 1 Is 0 0 0 DIV 27 -COMMUNICATIONS 0 0 27.0 Communications- BY OWNER 0 0 0 27.10 Structured Cabling - BY OWNER 0 0 0 27.40 Audio/Video Communications-BY OWNER 0 0 0 DIV 28 - ELECTRONIC SAFETY& SECURITY 0 0 28.0 Electronic Safety& Security-BY OWNER 0 0 0 28.2o Electronic Surveillance- BY OWNER 0 0 0 28.3o Electronic Detection &Alarm - BY OWNER 0 0 0 DIV 31 - EARTHWORK 0 0 31 Sitework 158,700 158,700 demo: 0 curb& gutter 907 If 0 sawcut asphalt 256 If 0 paving and base 18.236 sf 0 sidewalks 188 sf 0 concrete ramp 291 sf 0 0 0 paving prep-moisture condition onsite material 6" 17.935 sf 0 —Geotech not provided— 0 0 DIV 32 - EXTERIOR IMPROVEMENTS 0 0 32.10 Asphalt Paving 6,800 6.800 repair at Sheppard St 250 sf 0 0 32.2o Striping/Traffic Signage 9,075 9,075 black out/remove existing striping 162 If 0 cross hatch striping 1 Is 0 HC symbol 1 ea 0 HC sign 1 ea 0 wheel stop 1 ea 0 fire lane striping 48 If 0 parking striping 378 If 0 0 32.40 Permanent Fence 91,930 91,930 Brass Tap tall fence 32 If 69999 0 Brass Tap short fence 98 If 0 x4RA4Q,�tg1p -Q,4 1 lea 10306 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 10 Date: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty I Unit UP Amount UP Amount UP Amount Brass Tap short gates 3 ea 0 Brass Tap counter brackets 18 ea 11625 0 Brass Tap composite wood counters 144 If 0 Brass Tap Post and footing for string lights 4 ea 5,120 5,120 0 32.6oj Erosion Controls 0 0 silt fence 264 If 4.25 1,122 1,122 tree protection 919 If 5 4,595 4,595 curb inlet protection 7 ea 125 875 875 area inlet protection 2 ea 75 150 150 construction entrance 1 ea 1500 1,500 1,500 concrete washout 1 lea 750 750 750 0 0 32.8o Irrigation 1 Is 49,599 49,599 0 32.90 Landscape 290,923 290,923 remove/salvage pavers 1,472 sf 0 reinstall salvaged pavers 1,065 sf 0 10"angled cut limestone block planter curb 418 If 0 artificial turf 920 sf 0 manhole cover turf tray 1 ea 0 3"greenscreen panel 5'5"x25' 135 sf 0 limestone block seat 1'4"x1'7" 69 If 0 granite gEavel under ped bridges 3" 2 cy 0 steel edainci 260 If 0 Texas Redbud 8' 5 ea 0 Yau on Holl 3"cal. 6 ea 0 Monterey Oak 5"cal. 3 ea 0 ShrubbyBoneset 5 gal 46 ea 0 Blue Grama 1 gal 116 ea 0 Tx Sedge 1 gal 131 ea 0 Berkeley Sedge 1 gal 49 ea 0 Inland Sea Oats 1 gal 166 ea 0 Gre 's Mistflower 1 gal 40 ea 0 Variegated Flax Lily 1 gal 72 ea 0 Bicolor Iris 5 gal 105 ea 0 Red Yucca 5 Gal 28 ea 0 Dwarf Yau on Holly 3 gal 4 ea 0 Purple Tr iling Lantana 1 gal 39 ea 0 White Trailing Lantana 1 gal 22 ea 0 New Gold Lantana 1 gal 92 ea 0 Giant Lirio e 1 gal 129 ea 0 Turks Cap 15 gal 4 ea 0 Bi Muhl 5 gal 12 ea 0 Dwarf Wax Myrtle 15 gal 43 ea 0 Hameln Fountain Grass 1 gal 24 ea 0 Fall Aster 1 gal 28 ea 0 Pale Leaf Yucca 3 gal 15 ea 0 Soft Leaf Yucca 10 gal 8 ea 0 Creeping Fig 1 gal 14 ea 0 Star Jasmine 1 gal I 6 ea I 1 0 Dwarf Plumbago I 230 sf I I0 r 34 cy 0 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP le3pDate: 2/8/2024 Miscellaneous Labor Material Total Braun&Butier CONSTRUCTION Mhrs Qty Unit UP I Amount UP Amount UP Amount soil 6" at existing areas NOT 18'' 1301cy 1 0 till existing soil with amendments 2.085 1 sf 0 mulch 0 0 33 Site Utilities 334,151 334,151 demo: 0 storm pipe 17611f 0 areaways and grates 17 ea 0 trench drain 20 If 0 2''water service 25 If 0 WW manhole 1 ea 0 wastewater 130 If 0 0 60'' manhole 1 lea 0 12'' hdpe storm 280 If 0 18" hdpe storm 105 If 0 12"storm basin under wood deck Allowance 2 ea 2,500 2.500 18" storm basin 5 ea 0 24'' drain basin 1 ea 0 12'' cleanout 1 ea 0 6'' roof drain 26 If 0 trench drain 20 If 0 3' curb inlet 2 ea 1 0 18'' RCP 42 If 0 48" manhole 1 ea 0 8" DI water 40 If 0 2"water 10 If 0 Allowance for additional 2"water to irr meter 20 If 5,000 5,000 8"storm 26 If 0 8"tee 1 ea 0 8"gate valve 2 ea 0 8x2 reducer 1 ea 0 8"45 bend 2 ea 0 0 Areaway inlets-custom not precast 13 ea 0 Areaway rates 13 ea 0 cast iron downspout boots 6 ea 500 1 2300 968 58081 8,608 0 Allowance for gravel bed under porous concrete 515 sf 3,500 3,500 Allowance for drainage under artificial turf 1 Is 6,500 6,500 0 Regulatory Requirements 0 Plan Review Fee- BY OWNER Is 0 Building Permit Fee- BY OWNER Is 0 0 0 Project Specific Requirements 0 Commissioning by MYA 0 ea 0 Site Safety Inspections 15,000.000 Is 12,000 12,000 CPRS 1 Is 10,000 10,000 Shoring 1 Is 47,000 47,000 Mockups 5 ea 15,000 15,000 Scaffold at elevator pit 1 Is 6,000 6.000 wl space 1 Is 15,000 15.000 Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo 95% GMP 10Date: 2/8/2024 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty I Unit UP I Amount UP Amount UP Amount Chemical Toilets x 2 each 14 Is 1200 15,000 15,000 Waste Management Plan 1 Is 1,400 1,400 Close Out Documents 1 Is 6,380 1 6,380 Temporary Fence 2,400 If 6.75 16,200 16,200 Temporary Gates 6 ea 650 3,900 3,900 Temporary Water Meter&Usage-Provided by owner 0 Is 0 Traffic Control Plan 1 Is 2,186 2,186 Traffic Control Devices Rental 8 mos 1402.48 11,220 11,220 Public Notices 1 Is 1,200 1,200 0 Project Insurance 0 eneral liability 1 Is 157,500 157,500 0 SUBTOTAL14,343,350 CM Fee 1 3.75%1 537,777 Total Before Bond 14, 1, Bond Cost es=1) 118,4 Sales tax on Material qo 0 Sales tax on Total FFo 0 SUMMARY TOTAL 14,999,694 Griffith&Paseo 95%GMP 2-8-24 Takeoff Summary Attachment A to AIA Document A133-2019 Exhibit A Job Name: Griffith & Paseo le3) Date: 2/8/2024 ALTERNATE 11 Miscellaneous Labor Material Total Braun&Butler CONSTRUCTION Mhrs Qty Unit UP Amount UP Amount UP Amount DIV 4-MASONRY 0 0 4.0 Masonry 18,670 18,670 remove/reinstall 2 courses cmu 146 sf 1 0 scaffold 110 If 0 0 DIV 6-WOOD, PLASTICS,COMPOSITES 0 0 6.10 Rough Carpentry 3,600 1080 1200 5,880 2x wood blocking 110 If 0 1x wood blocking 110 If 0 insulation 146 sf 0 0 DIV 7-THERMAL&MOISTURE PROTECTION 0 0 7.10 Dampproofing and Waterproofing 146 sf 4,880 4,880 0 0 Pro'ect S ecific Requirements 0 Site Safety Inspections 32,000 Is 64 288 352 0 Project Insurance 341 341 0 SUBTOTAL 27,555'1— 1,368 Mj CM Fee 1 3.75%1 Total Before Bond ---3=5 5 Bond Cost es=1 1 Sales tax on Material 0. o Sales tax on Total 0.00 0 SUMMARY TOTAL 32,034 Attachment B to AIA Document A133 - 2019 Exhibit A Assumptions and Clarifications City of Round Rock Griffith and Paseo 1. This is not a line item Guaranteed Maximum Price (GMP). The breakdown provided is used to show the path to the lump sum GMP and is for reference only. Construction Manager may amend specific line items of Exhibit A.1.1.2 to reflect a schedule of values consistent with what is provided by subcontractors but the lump sum GMP will not change. 2. Owner must sign Exhibit A by May 6, 2024 for the GMP to remain effective. If Exhibit A is signed by owner after May 6, 2024, Construction Manager may adjust the GMP based upon current market conditions and subcontractor pricing. 3. This GMP is based on receiving a written Notice to Proceed no later than May 6, 2024 and upon being able to begin construction on that date without delays caused by issues outside of our control. 4. This GMP is based on 95%Construction Documents and Specifications from McKinney York Architects dated January 19, 2024. 5. The Construction Managers fee is 3.75% 6. Braun & Butler has excluded sales and use taxes to the extent City of Round Rock is exempt. 7. Braun & Butler has included $375,000 Contractor's Contingency. 8. Braun & Butler has included $375,000 Owner's Betterment. 9. Braun & Butler has included additional Material & Labor Allowances: • Distributed Antenna Service- $56,806 • 200cf self levelling floor float- $19,200 • Additional design build irrigation system - $10,000 • 95%to 100%design changes/additions/clarifications- $150,000 • Temporary Pier Casing: $28,300 - One (1) Mobilization @ $3,500 - Four(4) 14" Piers @ 20' Depth, $50/If - Thirteen (13) 18" Piers @ 20' Depth, $60/If - Four(4) 24" Piers @ 20' Depth, $65/If • Concrete paving—East parking& drive - $36,000 Attachment B to AIA Document A133 - 2019 Exhibit A Assumptions and Clarifications City of Round Rock Griffith and Paseo • Additional steel at FPD frame for installation - $2,500 • Architectural Columns at West Balcony- $40,000 • Additional Level 5 finishes not defined - $5,000 • Two(2) 12" storm basin under wood deck- $2,500 • Additional 2"water to irrigation meter- $5,000 • Gravel bed under porous concrete- $3,500 • Drainage under artificial turf- $6,500 • Electrical Gear package- $40,000 • Elevator electrical requirements- $10,000 • Mechanical & Plumbing circuitry- $45,000 • Epoxy filler at masonry joint cracks- $25,000 10. Braun & Butler proposes the following alternate which is not included in the GMP: • Alternate 11—Remove and reinstall top two courses of CMU along west fagade to repair 1151f discontinuous WRB to tie roofing into existing WRB- $32,034 11. Payment and Performance Bonds are included in this GMP. 12. Building permit fees are excluded from this GMP. All plan review fees, utility fees, aid to construction fees,application fees, extension of service fees or any other fees to local municipalities or utility providers are excluded and assumed to be by Owner. 13. Costs for temporary water meter and usage are excluded from this GMP and are to be provided by Owner at no cost to Braun & Butler Construction. 14. All utility consumption costs during construction including water,wastewater and electricity shall be paid by the Owner and are excluded from this GMP. All utility costs including temporary electrical service are excluded in General Conditions. 15. Dumpsters for building and site construction shall be reimbursed as a cost of work. 16. All temporary fencing and gates shall be reimbursed as a cost of work. Attachment B to AIA Document A133 - 2019 Exhibit A Assumptions and Clarifications City of Round Rock Griffith and Paseo 17. All surveying and layout shall be reimbursed as a cost of work. 18. All required road closures or rentals shall be reimbursed as a cost of work. 19. All general use equipment rentals shall be reimbursed as a cost of work. 20. 100%of cost savings revert to the Owner at completion of the project. 21. All material testing,special inspections and hazardous material testing have been excluded from this GMP and are assumed to be by Owner. 22. Hazardous material testing and monitoring are excluded from this GMP and are assumed to be by Owner. 23. It is assumed all permitting, plan approval and city approval of the projects will be in place prior to the start date and will not delay the start of the projects. Delays may require additional supervision costs to be covered as a contingency expense or change order to the contract and extended Substantial Completion date. 24. Subcontractor prices are based on current supplier prices and do not allow for price escalations to the extent supplier increases are without fault and are unmitigable, Construction Manager may assess, in accordance with terms of the Agreement, such price increases against the "Contractors Contingency" included in the GMP. 2S. Hazardous Material protocol has not been provided. Asbestos Containing Material abatement has been included in this GMP based on our understanding of the scope of work. 26. All costs and delays caused by additional abatement will be dealt with through a change order to the contract to include cost of work,extended general conditions, insurance, Construction Management fees, Payment and Performance bonds as required and extended Substantial Completion date. 27. This GMP does not include repairs, replacing, modifications, or removal of existing site utilities, electrical service,telecommunications or pathways not specifically identified on plans. 28. AISC Certification for steel fabricators and erectors are not included. 29. Unforeseen (concealed) conditions are specifically excluded. 30. Remediation of existing moisture or mold is not included. 31. Complete hard piped conduit for all specialty and life safety systems is excluded. Attachment B to AIA Document A133 - 2019 Exhibit A Assumptions and Clarifications City of Round Rock Griffith and Paseo 32. Braun & Butler has not included any requirements or costs associated with LEED or green building certification. 33. This GMP is based on the Architect providing a post bid conformed "For Construction" plan set including and clearly identifying all cost and/or value engineering options. Any items not clearly identified in the post bid conformed "For Construction"set shall be assumed excluded from the GMP. 34. Any design modifications made by the Owner,Architect, Engineer or Design Consultants during the submittal process which cause delays to the construction schedule may result in extended general conditions and extended Substantial Completion for the project. Additional costs, general conditions, insurance, Construction Management fees, Payment and Performance bonds as required and extended Substantial Completion date will be dealt with through a change order to the contract. 35. All CAD files and backgrounds, BIM/Revit models, electronic plans and specifications used for estimating, project record documents,subcontractor shop drawings, models shall be provided at no cost to Braun & Butler. We will sign document release forms as required. 36. This GMP does not include any work outside the identified Limits of Construction. 37. Site concrete including sidewalks are included based on Landscape plans. 38. Landscaping is based on the Landscape plans from Lionheart dated 01/19/2024. 39. Time extensions for rainfall events and impact days beyond normal weather conditions shall be granted to Braun & Butler. Normal weather conditions are established by information compiled by the National Weather Service. Recorded rainfall equal to or in excess of 0.01 inches in a daily 24 hour period and impact days caused by rainfall or weather events shall be granted as time extensions for Substantial Completion. 40. This GMP is based upon owner, architect, engineers, consultants, contractors and all others performing work on the site shall maintain Braun & Butler's safety program. 41. Owner and Construction Manager(the "Parties") recognize the recent events concerning the supply chain disruption and/or Covid-19 pandemic. The Parties acknowledge and agree that Construction Manager may bring, in accordance with Sections 8.3, 15.1.5 and 15.1.6 of the Agreement, claims for additional cost and claims for additional time relating to supply chain disruption or the Covid-19 pandemic. Construction Manager has used and will continue to use reasonable efforts to select and manage material suppliers and supply chains to minimize the risk of disruption 42. Bell to be removed and salvaged by Owner. Attachment B to AIA Document A133 - 2019 Exhibit A Assumptions and Clarifications City of Round Rock Griffith and Paseo 43. Servicing or cleaning of grease trap at Brass Tap is not included. 44. Trailer and wood walkway at Brass Tap to be removed by Brass Tap. 45. Kegs,tents &furniture at Brass Tap to be removed by Brass Tap. 46. Bar stools at Brass Tap are furnished by Brass Tap. 47. Refrigerator REF 3 to be furnished by Owner, installed by contractor. 48. Web-based Project software licenses are not provided by Braun & Butler for design team, owner, or other project member use. Braun & Butler has included utilizing Autodesk Construction Cloud as the web-based project software,for our use only. Any other platform requiring licensing,such as Procore,will be billed against the Owner's Betterment or as a change order to the contract. 49. W1 horizontal louvered blinds are not available in sizes requested. Corded horizontal louvered blinds are included. 50. Furniture in included in this GMP based on proposal provided by Facilities Resource Inc., Quote 23413A dated 1/31/2024. Owner shall review proposal for accuracy of furniture/furnishings and quantities. Braun & Butler Construction does not make any allowances for accuracy of proposal as these items were selected by Owner and Facilities Resource Inc.without input from Braun & Butler Construction. 51. Fire Suppression piping at exterior balconies will be exposed and cannot be concealed due to design of canopies. 52. Mechanical controls are excluded from this GMP and assumed to be by Owner. 53. Light fixture P1 is not noted on Electrical Lighting plans. One (1) P1 fixture has been included at Storage 106.1. 54. Light fixture V1 is not noted on Electrical Lighting plans. Two (2)V1 fixtures have been included at Break Room 103.1. 55. Electrical Gear package is not complete. Once complete Braun & Butler Construction will rebid the electrical for accurate pricing. Any costs over the allocated electrical allowances reflected in the 95%GMP will be billed against the 95%to 100% design changes/additions/clarifications allowance. 56. Any design changes/additions/clarification costs exceeding the 95%to 100%design changes/additions/clarifications allowance will be dealt with as a change order to this contract. Attachment B to AIA Document A133 - 2019 Exhibit A Assumptions and Clarifications City of Round Rock Griffith and Paseo 57. Lighting Controls are included for new light fixtures only. Existing light fixtures remaining will not interface with the new lighting controls. 58. Underground Electric service is included based on route and details shown on E011 and Civil sheet 9. This GMP does not include any design changes made by service provider. Any design changes will be dealt with as a change order to this contract. 59. Utility transformer and utility transformer costs are not included in this GMP and are assumed to be by Owner. 60. Communications,Structured Cabling, Audio/Visual Communications, Electronic Safety& Security, Electronic Surveillance and Electronic Detection &Alarm are excluded from this GMP and will be completed by Owner or Owner's Vendors. All back boxes and pathways shown on electrical power sheets are included. Additional backboxes or pathways not shown or relocation from electrical power sheets will be billed against the Owner's Betterment or as a change order to this contract. 61. All references to Geotechnical Report are excluded from this proposal. Geotechnical Report was not provided. 62. Paver design not provided. All pavers shown to remove will be salvaged and reinstalled without any allowances for purchasing or providing additional pavers if there are not adequate quantities per"color"for intended design. 63. 6" depth of soil is included at planting beds at areas with existing trees not the requested 18". There are existing trees to remain in these areas and removal of 18"soils and may cause severe damage. 64. Building Commissioning is excluded from this GMP. 65. Dimensioned locations of starlight patterns not provided. Braun & Butler will not guarantee the locations of dots to be within 1" of detail plan. Detailed plans have not been provided. 66. City of Round Rock standard specifications referenced in Section 4000 not provided and are excluded from this GMP. Attachment B to AIA Document A133 - 2019 Exhibit A Assumptions and Clarifications City of Round Rock Griffith and Paseo 67. Engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations is excluded from this GMP and assumed to be completed by McKinney York Architects'structural engineer. L -1 Preliminary Schedule Roofing Plan Sections 4-10 El 0 -10 ---- -- 4-4----- ---------- ---- ----- MOobb C -30 Eil 0000 0 G --------- ------ It Preliminary Schedule 1=2 ........................ ............ ............ Attachment C to AIA Document A133-2019 Exhibit A Preliminary Schedule — o == Document A1312019 Exhibit B Insurance and Bonds This Insurance and Bonds Exhibit ij part of the Agreement,between the Owner and the Construction Manager,dated the'kl day of March in the year 2024 (In words, indicate day, month and year.) ADDITIONS AND DELETIONS: for the following PROJECT: The author of this document has (Name and location or address) added information needed for its completion.The author may also Griffith Remodel and Paseo Project have revised the text of the original AIA standard form.An Additions and 212 and 216 East Main Street,Round Rock,TX 78664 Deletions Report that notes added information as well as revisions to THE OWNER: the standard form text is available (Name, legal status, and address) from the author and should be reviewed.A vertical line in the left City of Round Rock margin of this document indicates 221 East Main Street,Round Rock,TX 78664 where the author has added necessary information and where THE CONSTRUCTION MANAGER: the author has added to or deleted (Name, legal status, and address) from the original AIA text. Braun&Butler Construction Inc. This document has important legal 300 Hazelwood Street,Suite 100,Leander,TX 78641 consequences.Consultation with an attorney is encouraged with respect TABLE OF ARTICLES to its completion or modification. This document is intended to be B.1 GENERAL used in conjunction with AIA Document A201 TM'-2017,General B.2 OWNER'S INSURANCE Conditions of the Contract for Construction.Article 11 of A201 TM_ B.3 CONSTRUCTION MANAGER'S INSURANCE AND BONDS 2017 contains additional insurance provisions. B.4 SPECIAL TERMS AND CONDITIONS ARTICLE B.1 GENERAL The Owner and Construction Manager shall purchase and maintain insurance,and provide bonds,as set forth in this Exhibit.As used in this Exhibit,the term General Conditions refers to AIA Document A201Tm-2017,General Conditions of the Contract for Construction. ARTICLE B.2 OWNER'S INSURANCE §B.2.1 General Prior to commencement of the Work,the Owner shall secure the insurance,and provide evidence of the coverage,required under this Article B.2 and,upon the Construction Manager's request,provide a copy of the property insurance policy or policies required by Section B.2.3.The copy of the policy or policies provided shall contain all applicable conditions,definitions,exclusions,and endorsements. §B.2.2 Liability Insurance The Owner shall be responsible for purchasing and maintaining the Owner's usual general liability insurance. Inst. AIA Document A133—2019 Exhibit B.Copyright(D 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 16:19:13 ET on 03/12/2024 1 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA / Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA32) §B.2.3 Required Property Insurance §B.2.3.1 Unless this obligation is placed on the Construction Manager pursuant to Section B.3.3.2.1,the Owner shall purchase and maintain,from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located,property insurance written on a builder's risk"all-risks"completed value or equivalent policy form and sufficient to cover the total value of the entire Project on a replacement cost basis.The Owner's property insurance coverage shall be no less than the amount of the initial Contract Sum,plus the value of subsequent Modifications and labor performed and materials or equipment supplied by others.The property insurance shall be maintained until Substantial Completion and thereafter as provided in Section B.2.3.1.3, unless otherwise provided in the Contract Documents or otherwise agreed in writing by the parties to this Agreement.This insurance shall include the interests of the Owner,Construction Manager,Subcontractors,and Sub- subcontractors in the Project as insureds.This insurance shall include the interests of mortgagees as loss payees. §B.2.3.1.1 Causes of Loss.The insurance required by this Section B.2.3.1 shall provide coverage for direct physical loss or damage,and shall not exclude the risks of fire,explosion,theft,vandalism,malicious mischief,collapse, earthquake,flood,or windstorm.The insurance shall also provide coverage for ensuing loss or resulting damage from error,omission,or deficiency in construction methods,design,specifications,workmanship,or materials.Sub- limits,if any,are as follows: (Indicate below the cause of loss and any applicable sub-limit.) Cause of Loss Sub-Limit See 00900-Special Conditions of the Griffith Remodel and Paseo Project for all Insurance Requirements §B.2.3.1.2 Specific Required Coverages.The insurance required by this Section B.2.3.1 shall provide coverage for loss or damage to falsework and other temporary structures,and to building systems from testing and startup.The insurance shall also cover debris removal,including demolition occasioned by enforcement of any applicable legal requirements,and reasonable compensation for the Architect's and Construction Manager's services and expenses required as a result of such insured loss,including claim preparation expenses.Sub-limits,if any,are as follows: (Indicate below type of coverage and any applicable sub-limit for specific required coverages.) Coverage Sub-Limit See 00900-Special Conditions of the Griffith Remodel and Paseo Project for all Insurance Requirements §B.2.3.1.3 Unless the parties agree otherwise,upon Substantial Completion,the Owner shall continue the insurance required by Section B.2.3.1 or,if necessary,replace the insurance policy required under Section B.2.3.1 with property insurance written for the total value of the Project that shall remain in effect until expiration of the period for correction of the Work set forth in Section 12.2.2 of the General Conditions. §B.2.3.1.4 Deductibles and Self-Insured Retentions.If the insurance required by this Section B.2.3 is subject to deductibles or self-insured retentions,the Owner shall be responsible for all loss not covered because of such deductibles or retentions. §B.2.3.2 Occupancy or Use Prior to Substantial Completion.The Owner's occupancy or use of any completed or partially completed portion of the Work prior to Substantial Completion shall not commence until the insurance company or companies providing the insurance under Section B.2.3.1 have consented in writing to the continuance of coverage.The Owner and the Construction Manager shall take no action with respect to partial occupancy or use that would cause cancellation,lapse,or reduction of insurance,unless they agree otherwise in writing. §B.2.3.3 Insurance for Existing Structures If the Work involves remodeling an existing structure or constructing an addition to an existing structure,the Owner shall purchase and maintain,until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions,"all-risks"property insurance,on a replacement cost basis,protecting the existing structure against direct physical loss or damage from the causes of loss identified in Section B.2.3.1,notwithstanding the undertaking of the Work.The Owner shall be responsible for all co-insurance penalties. AIA Document A133-2019 Exhibit B.Copyright®2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,'"AIA,'the Init. AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 18:19:13 ET on 03/12/2024 2 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA / Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA32) §B.2.4 Optional Extended Property Insurance. The Owner shall purchase and maintain the insurance selected and described below. (Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es)next to the description(s)of selected insurance. For each type of insurance selected, indicate applicable limits of coverage or other conditions in the fill point below the selected item.) [ ] §B.2.4.1 Loss of Use,Business Interruption,and Delay in Completion Insurance,to reimburse the Owner for loss of use of the Owner's property,or the inability to conduct normal operations due to a covered cause of loss. [ ] § B.2.4.2 Ordinance or Law Insurance,for the reasonable and necessary costs to satisfy the minimum requirements of the enforcement of any law or ordinance regulating the demolition,construction, repair,replacement or use of the Project. ( ] §B.2.4.3 Expediting Cost Insurance,for the reasonable and necessary costs for the temporary repair of damage to insured property,and to expedite the permanent repair or replacement of the damaged property. [ ] §B.2.4.4 Extra Expense Insurance,to provide reimbursement of the reasonable and necessary excess costs incurred during the period of restoration or repair of the damaged property that are over and above the total costs that would normally have been incurred during the same period of time had no loss or damage occurred. [ ] §B.2.4.5 Civil Authority Insurance,for losses or costs arising from an order of a civil authority prohibiting access to the Project,provided such order is the direct result of physical damage covered under the required property insurance. [ ] § B.2.4.6 Ingress/Egress Insurance,for loss due to the necessary interruption of the insured's business due to physical prevention of ingress to,or egress from,the Project as a direct result of physical damage. [ ] §B.2.4.7 Soft Costs Insurance,to reimburse the Owner for costs due to the delay of completion of the Work,arising out of physical loss or damage covered by the required property insurance:including construction loan fees;leasing and marketing expenses;additional fees,including those of architects, engineers,consultants,attorneys and accountants,needed for the completion of the construction, repairs,or reconstruction;and carrying costs such as property taxes,building permits,additional interest on loans,realty taxes,and insurance premiums over and above normal expenses. §B.2.5 Other Optional Insurance. The Owner shall purchase and maintain the insurance selected below. (Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es)next to the description(s)of selected insurance.) ]nit. AIA Document A133-2019 Exhibit B.Copyright®2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 18:19:13 ET on 03/12/2024 3 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documentse Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA32) [ ] §B.2.5.1 Cyber Security Insurance for loss to the Owner due to data security and privacy breach, including costs of investigating a potential or actual breach of confidential or private information. (Indicate applicable limits of coverage or other conditions in the fill point below) [ ] §13.2.5.2 Other Insurance (List below any other insurance coverage to be provided by the Owner and any applicable limits) Coverage Limits See Attachment A-00900 Special Conditions for insurance Requirements ARTICLE B.3 CONSTRUCTION MANAGER'S INSURANCE AND BONDS §B.3.1 General §B.3.1.1 Certificates of Insurance. The Construction Manager shall provide certificates of insurance acceptable to the Owner evidencing compliance with the requirements in this Article B.3 at the following times:(1)prior to commencement of the Work;(2)upon renewal or replacement of each required policy of insurance;and(3)upon the Owner's written request.An additional certificate evidencing continuation of commercial liability coverage, including coverage for completed operations,shall be submitted with the final Application for Payment and thereafter upon renewal or replacement of such coverage until the expiration of the periods required by Section B.3.2.1 and Section 13.3.3.1.The certificates will show the Owner as an additional insured on the Construction Manager's Commercial General Liability and excess or umbrella liability policy or policies. §B.3.1.2 Deductibles and Self-Insured Retentions.The Construction Manager shall disclose to the Owner any deductible or self-insured retentions applicable to any insurance required to be provided by the Construction Manager. §13.3.1.3 Additional Insured Obligations.To the fullest extent permitted by law,the Construction Manager shall cause the commercial general liability coverage to include(1)the Owner,the Architect,and the Architect's consultants as additional insureds for claims caused in whole or in part by the Construction Manager's negligent acts or omissions during the Construction Manager's operations;and(2)the Owner as an additional insured for claims caused in whole or in part by the Construction Manager's negligent acts or omissions for which loss occurs during completed operations.The additional insured coverage shall be primary and non-contributory to any of the Owner's general liability insurance policies and shall apply to both ongoing and completed operations.To the extent commercially available,the additional insured coverage shall be no less than that provided by Insurance Services Office,Inc. (ISO)forms CG 20 10 07 04,CG 20 37 07 04,and,with respect to the Architect and the Architect's consultants,CG 20 32 07 04. §B.3.2 Construction Manager's Required Insurance Coverage §6.3.2.1 The Construction Manager shall purchase and maintain the following types and limits of insurance from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located.The Construction Manager shall maintain the required insurance until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions,unless a different duration is stated below: (If the Construction Manager is required to maintain insurance for a duration other than the expiration of the period for correction of Work,state the duration.) N/A § B.3.2.2 Commercial General Liability §B.3.2.2.1 Commercial General Liability insurance for the Project written on an occurrence form with policy limits of not less than Two Million and No/100 Dollars ($2,000,000.00 )each occurrence,Five Million and No/100 Dollars ($5,000,000.00 )general aggregate,and Five Million and No/100 Dollars ($5,000,000.00 )aggregate for products-completed operations hazard,providing coverage for claims including Init. AIA Document A133-2019 Exhibit B.Copyright®2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,'the AIA Logo,and"AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 18:19:13 ET on 03/12/2024 4 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA / Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA32) .1 damages because of bodily injury,sickness or disease,including occupational sickness or disease,and death of any person; .2 personal injury and advertising injury; .3 damages because of physical damage to or destruction of tangible property,including the loss of use of such property; .4 bodily injury or property damage arising out of completed operations;and .5 the Construction Manager's indemnity obligations under Section 3.18 of the General Conditions. §B.3.2.2.2 The Construction Manager's Commercial General Liability policy under this Section B.3.2.2 shall not contain an exclusion or restriction of coverage for the following: .1 Claims by one insured against another insured,if the exclusion or restriction is based solely on the fact that the claimant is an insured,and there would otherwise be coverage for the claim. .2 Claims for property damage to the Construction Manager's Work arising out of the products-completed operations hazard where the damaged Work or the Work out of which the damage arises was performed by a Subcontractor. .3 Claims for bodily injury other than to employees of the insured. .4 Claims for indemnity under Section 3.18 of the General Conditions arising out of injury to employees of the insured. .5 Claims or loss excluded under a prior work endorsement or other similar exclusionary language. .6 Claims or loss due to physical damage under a prior injury endorsement or similar exclusionary language. .7 Claims related to residential,multi-family,or other habitational projects,if the Work is to be performed on such a project. .8 Claims related to roofing,if the Work involves roofing. .9 Claims related to exterior insulation finish systems(EIFS),synthetic stucco or similar exterior coatings or surfaces,if the Work involves such coatings or surfaces. .10 Claims related to earth subsidence or movement,where the Work involves such hazards. .11 Claims related to explosion,collapse and underground hazards,where the Work involves such hazards. §B.3.2.3 Automobile Liability covering vehicles owned,and non-owned vehicles used,by the Construction Manager,with policy limits of not less thanOne Million and No/100 Dollars($$1,000,000.00 )per accident,for bodily injury,death of any person,and property damage arising out of the ownership,maintenance and use of those motor vehicles along with any other statutorily required automobile coverage. §B.3.2.4 The Construction Manager may achieve the required limits and coverage for Commercial General Liability and Automobile Liability through a combination of primary and excess or umbrella liability insurance,provided such primary and excess or umbrella insurance policies result in the same or greater coverage as the coverages required under Section B.3.2.2 and B.3.2.3,and in no event shall any excess or umbrella liability insurance provide narrower coverage than the primary policy.The excess policy shall not require the exhaustion of the underlying limits only through the actual payment by the underlying insurers. §B.3.2.5 Workers'Compensation at statutory limits. §B.3.2.6 Employers'Liability with policy limits not less than One Million and No/100 Dollars ($ 1,000,000.00) each accident,One Million and No/100 Dollars ($$1,000,000.00 )each employee,and One Million and No/100 Dollars ($ 1,000,000.00 )policy limit. §B.3.2.7 Jones Act,and the Longshore&Harbor Workers' Compensation Act,as required,if the Work involves hazards arising from work on or near navigable waterways,including vessels and docks §B.3.2.8 If the Construction Manager is required to furnish professional services as part of the Work,the Construction Manager shall procure Professional Liability insurance covering performance of the professional services,with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and Zero Dollars and Zero Cents($0.00)in the aggregate. Init. AIA Document A133-2019 Exhibit B.Copyright®2019.All rights reserved."The American Institute of Architects,""American Institute of Architects;"AIA,"the AIA Logo,and'AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 18:19:13 ET on 03/12/2024 5 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA / Contract Documents*Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (369ADA32) §B.3.2.9 If the Work involves the transport,dissemination,use,or release of pollutants,the Construction Manager shall procure Pollution Liability insurance,with policy limits of not less than Zero Dollars and Zero Cents($0.00) per claim and Zero Dollars and Zero Cents($0.00)in the aggregate. §B.3.2.10 Coverage under Sections B.3.2.8 and B.3.2.9 may be procured through a Combined Professional Liability and Pollution Liability insurance policy,with combined policy limits of not less than Zero Dollars and Zero Cents($ 0.00)per claim and Zero Dollars and Zero Cents($0.00)in the aggregate. §B.3.2.11 Insurance for maritime liability risks associated with the operation of a vessel,if the Work requires such activities,with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and Zero Dollars and Zero Cents($0.00)in the aggregate. §B.3.2.12 Insurance for the use or operation of manned or unmanned aircraft,if the Work requires such activities, with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and Zero Dollars and Zero Cents ($0.00)in the aggregate. §B.3.3 Construction Manager's Other Insurance Coverage §B.3.3.1 Insurance selected and described in this Section B.3.3 shall be purchased from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located.The Construction Manager shall maintain the required insurance until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions,unless a different duration is stated below: (If the Construction Manager is required to maintain any of the types of insurance selected below for a duration other than the expiration of the period for correction of Work state the duration) A period of two(2)years following the expiration or completion of the contract with Owner. §B.3.3.2 The Construction Manager shall purchase and maintain the following types and limits of insurance in accordance with Section B.3.3.1. (Select the types of insurance the Construction Manager is required to purchase and maintain by placing an X in the box(es)next to the description(s)of selected insurance. Where policy limits are provided, include the policy limit in the appropriate fill point.) [ ] §B.3.3.2.1 Property insurance of the same type and scope satisfying the requirements identified in Section B.2.3,which,if selected in this Section B.3.3.2.1,relieves the Owner of the responsibility to purchase and maintain such insurance except insurance required by Section B.2.3.1.3 and Section B.2.3.3.The Construction Manager shall comply with all obligations of the Owner under Section B.2.3 except to the extent provided below.The Construction Manager shall disclose to the Owner the amount of any deductible,and the Owner shall be responsible for losses within the deductible.Upon request,the Construction Manager shall provide the Owner with a copy of the property insurance policy or policies required.The Owner shall adjust and settle the loss with the insurer and be the trustee of the proceeds of the property insurance in accordance with Article 11 of the General Conditions unless otherwise set forth below: (Where the Construction Manager's obligation to provide property insurance d ffers from the Owner's obligations as described under Section B.2.3, indicate such differences in the space below. Additionally, if a party other than the Owner will be responsible for adjusting and settling a loss with the insurer and acting as the trustee of the proceeds of property insurance in accordance with Article 11 of the General Conditions, indicate the responsible party below) [ ] §B.3.3.2.2 Railroad Protective Liability Insurance,with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and ($ )in the aggregate,for Work within fifty(50)feet of railroad property. [ ] §B.3.3.2.3 Asbestos Abatement Liability Insurance,with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and Zero Dollars and Zero Cents($0.00)in the aggregate,for liability arising from the encapsulation,removal,handling,storage,transportation,and disposal of asbestos- Init. AIA Document A133-2019 Exhibit B.Copyright 02019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 18:19:13 ET on 03/12/2024 6 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA / Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (369ADA32) containing materials. [ ] §B.3.3.2.4 Insurance for physical damage to property while it is in storage and in transit to the construction site on an"all-risks"completed value form. [ ] §B.3.3.2.5 Property insurance on an"all-risks"completed value form,covering property owned by the Construction Manager and used on the Project,including scaffolding and other equipment. [ a] §8.3.3.2.6 Other Insurance (List below any other insurance coverage to be provided by the Construction Manager and any applicable limits.) Coverage Limits Builder's Risk Insurance Builder's Risk Insurance shall be effective when veritical construction ommences and may be terminated at the time the City accepts the vertical structure as substantially completed,unless the Project is being completed in phases.If completed in phases,the coverage shall remain effective until the City accepts the entire structure or structures as substantially complete. §B.3.4 Performance Bond and Payment Bond The Construction Manager shall provide surety bonds,from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located,as follows: (Speck type and penal sum of bonds.) Type Penal Sum($0.00) Payment Bond $15,031,728.00 Performance Bond $15,031,728.00 Payment and Performance Bonds shall be AIA Document A312TM,Payment Bond and Performance Bond,or contain provisions identical to AIA Document A312TM,current as of the date of this Agreement. ARTICLE B"4 SPECIAL TERMS AND CONDITIONS Special terms and conditions that modify this Insurance and Bonds Exhibit,if any,are as follows: See 00900 Special Conditions of the Griffith Remodel and Paseo Project Manual for Insurance Requirements not set forth in this Exhibit. Init. AIA Document A133-2019 Exhibit B.Copyright®2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 18:19:13 ET on 03/12/2024 7 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA / Contract Documentse Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA32) Additions and Deletions Report for AIA' Document A1330— 2019 Exhibit B This Additions and Deletions Report,as defined on page 1 of the associated document,reproduces below all text the author has added to the standard form AIA document in order to complete it,as well as any text the author may have added to or deleted from the original AIA text.Added text is shown underlined.Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document.This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 18:19:13 ET on 03/12/2024. PAGE 1 This Insurance and Bonds Exhibit is part of the Agreement,between the Owner and the Construction Manager, dated the day of March in the year 2024 Griffith Remodel and Paseo Project 212 and 216 East Main Street,Round Rock,TX 78664 City of Round Rock 221 East Main Street,Round Rock,TX 78664 Braun&Butler Construction Inc. 300 Hazelwood Street,Suite 100,Leander,TX 78641 PAGE 2 See 00900-Special Conditions of the Griffith Remodel and Paseo Proiect for all Insurance Requirements See 00900-Special Conditions of the Griffith Remodel and Paseo Proiect for all Insurance Requirements PAGE 4 See Attachment A-00900 Special Conditions for Insurance Requirements N/A Additions and Deletions Report for AIA Document A133—2019 Exhibit B.Copyright®2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,'the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 18:19:13 ET on 03/12/2024 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA32) §B.3.2.2.1 Commercial General Liability insurance for the Project written on an occurrence form with policy limits of not less than Two Million and No/100 Dollars ($2,000,000.00 )each occurrence,Five Million and No/100 Dollars ($5,000,000.00 )general aggregate,and Five Million and No/100 Dollars ($5,000,000.00 )aggregate for products-completed operations hazard,providing coverage for claims including PAGE 5 §B.3.2.3 Automobile Liability covering vehicles owned,and non-owned vehicles used,by the Construction Manager,with policy limits of not less thanOne Million and No/100 Dollars($$1,000,000.00 )per accident,for bodily injury,death of any person,and property damage arising out of the ownership,maintenance and use of those motor vehicles along with any other statutorily required automobile coverage. §6.3.2.6 Employers'Liability with policy limits not less than One Million and No/100 Dollars ($ 1,000,000.00) each accident,One Million and No/100 Dollars ($$1,000,000.00 )each employee,and One Million and No/100 Dollars ($ 1,000,000.00 )policy limit. §B.3.2.8 If the Construction Manager is required to furnish professional services as part of the Work,the Construction Manager shall procure Professional Liability insurance covering performance of the professional services,with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and Zero Dollars and Zero Cents($0.00)in the aggregate. PAGE 6 §B.3.2.9 If the Work involves the transport,dissemination,use,or release of pollutants,the Construction Manager shall procure Pollution Liability insurance,with policy limits of not less than Zero Dollars and Zero Cents($0.00) per claim and Zero Dollars and Zero Cents($0.00)in the aggregate. §B.3.2.10 Coverage under Sections B.3.2.8 and B.3.2.9 may be procured through a Combined Professional Liability and Pollution Liability insurance policy,with combined policy limits of not less than Zero Dollars and Zero Cents($ 0.00)per claim and Zero Dollars and Zero Cents($0.00)in the aggregate. §B.3.2.11 Insurance for maritime liability risks associated with the operation of a vessel,if the Work requires such activities,with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and Zero Dollars and Zero Cents($0.00)in the aggregate. § B.3.2.12 Insurance for the use or operation of manned or unmanned aircraft,if the Work requires such activities, with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and Zero Dollars and Zero Cents ($0.00)in the aggregate. AAReriod of two(2)years following the expiration or completion of the contract with Owner. [ ] §B.3.3.2.2 Railroad Protective Liability Insurance,with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and ($ )in the aggregate,for Work within fifty(50)feet of railroad Additions and Deletions Report for AIA Document A133—2019 Exhibit B.Copyright®2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced 2 at 18:19:13 ET on 03/12/2024 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA32) property. PAGE 7 [ ] §8.3.3.2.3 Asbestos Abatement Liability Insurance,with policy limits of not less than Zero Dollars and Zero Cents($0.00)per claim and Zero Dollars and Zero Cents($0.00)in the aggregate,for liability arising from the encapsulation,removal,handling,storage,transportation,and disposal of asbestos- containing materials. [ \ ] § B.3.3.2.6 Other Insurance 13uiIder's Risk Insurance Builder's Risk Insurance shall be effective when veritical construction ommences and may be terminated at the time the City accepts the vertical structure as substantially completed,unless the Project is being completed in phases.If completed in phases,the coverage shall remain effective until the City accepts the entire structure or structures as substantially complete. Payment Bond $15,031,728.00 Performance Bond $15,031,728.00 See 00900 Special Conditions of the Griffith Remodel and Paseo Project Manual for Insurance Requirements not set forth in this Exhibit. Additions and Deletions Report for AIA Document A133-2019 Exhibit B.Copyright®2019.All rights reserved."The American Institute of Architects,'"American Institute of Architects,""AIA,'the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced 3 at 18:19:13 ET on 03/12/2024 under Order No.2114503100 which expires on 01/21/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3139ADA32)