R-2024-088 - 4/25/2024 RESOLUTION NO. R-2024-088 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Muniz Concrete & Contracting, Inc. for the Lake Creek Trail — Round Rock West Park to Centennial Plaza Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Muniz Concrete & Contracting, Inc. for the Lake Creek Trail — Round Rock West Park to Centennial Plaza Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of April, 2024. 1,4 AZ CRA R , Mayor City of Round ock,Texas ATTEST: MEAGANKS, ity Clerk 0112.20242:4886-1520 EXHIBIT "A" " Page I of i Contract Quantity Adjustment/Change Order .a.b.oQ ,... 01.16 Department: PARD Project Name: Lake Creek Trail -Round Rod(West to Centennial Plaza Date: 4/3/24 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Muniz Concrete and Contractin 3523 Gonzalez St. B-110, Austin, TX 78702 512-385-2334 Company Name Address Phone No. Justification See attached Justification Sheet SUMMARY Amount %Chang* Original Contract Price: $2,461],328.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $7 Total Quantity Adjustment(s): $7 Total Contract Price with Quantity Adjustment(s): $2,53 Previous Change Order(s): 00/0 This Change Order: $17,220.50 10/0 Total Change Order(s)To Date: $17,220.50 1% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $2,554,237.67 Difference between Original and Adjusted Contract Prices: $92,909.67 Original Contract Time: 270 days Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 10 days New Contract Time: 280 days Prepared By: Signature Printed Name,title,Company Date Contractor: Q6a� Q. 2L4� Jose J Muniz, President, Muniz Concrete & Contracting Inc 04-05-2024 Signat Printed Name, Tide, Company Date City Project /� I/ M (� , t/ c- Manager: // -�E Cz�,�},, .1 LA&4— F�L+y' 7/ Signature Printed Name, Title Date Mayor/City Manager Signature Printed Name, Title Date Page 2 of i Contract Quantity Adjustment/Change Order Probed Name: Lake Creek Trail - Round Rock West to Centennial Plaza Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) 1 Deleted Cul-de-sac at 23+90.42 LS 1 -$5,210.10 -$5,210.10 0 2 Remobilization for Gas Line Interference LS 1 $1,063.46 $1,063.46 0 3 Heat Map LS 1 $2,321.89 $2,321.89 4 Trail Revisions - 30+20 to 34+60 LS 1 $19,045.25 $19,045.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:* Pagc 3 of i Contract Quantity Adjustment/Change Order rev n '.e Project Name: Lake Creek Trail Round Rock West to Centennial Plaza Quan. Adj./Change Order No.: 1 quantity Adjustment Data V,,,11917r,,.mar Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment 14 Embankment CY 227.45 $51.60 $11,736.42 17 Stone Walls SF 50 $64.50 $3,225.00 19 Stone Wall Footings CY 0.55 $550.00 $302.50 20 Shared Use Path LF 3.5 $139.00 $486.50 13 Excavation CY 831.7 $37.50 $31,188.7510 22 Rail(guardrail) LF 115 $250.00 $28,750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7s.682.171 is Lake Creek Tra i l Change Order #1 Summary Date:04/03/2024 Change Order#1 to the contract with Muniz Construction includes changes to the current phase of construction.These changes include: Deleted cul-de-sac at 23+90.42: This item includes all associated work with deleting the cul-de-sac at the western edge of the Union Pacific Railroad. This area of the trail was in conflict with the Utility Department bore under the Union Pacific Railroad ROW. Initially,their bore was to be completed prior to the construction of the trail project; however, during construction Union Pacific made them utilize a different type of bore which required a new approval process which lasted several months. The utility contractor will pour this section of trail at the completion of their project. Cost: $-5,210.00 Remobilization for Gas tine Conflict: During site layout and rough grading, Muniz identified a conflict with a gas line that did not show up on the plans. While the City and Engineers determined the best way to proceed with altering the wall section in this area, the contractor had to move to the other side of the trail. Since equipment was not able to move beneath the railroad, the equipment required a remobilization to the other end of the trail. Cost: $1,063.46 Heat Map: The trail project followed the utilities wastewater line project for the bulk of the trail. When Muniz Concrete reached the west side of the trail,they determined that the grades left behind by the utility contractor did not match the existing grades shown in the plans—they were much higher. Muniz conducted a heat map, performed by a surveyor,to demonstrate and quantify the additional amount of excavation required(next item on this list). Cost: $2,321.89 Excavation: This is the extra excavation required per the heat map(above) required to take the grades back down to the existing. PARD decided to remove the full limits of added grade since this area is adjacent to a drainage ditch and creek. This item was a quantity adjustment based on the contract unit price. Cost: $31,188.75 Trail Revisions between 30+20 and 34+60: This section of trail is beneath 1-35 where the contractor encountered solid rock. There is a drain under 1.35 that will discharge directly onto the trail. The engineer decided to place a French drain and dowel the concrete into the rock to armor the trail in this section. Cost: $19,045.25 Embankment: This is a quantity adjustment associate with the items above. Cost: $11,736.42 Stone Walls: This is a quantity adjustment associate with the items above. Cost: $3,225.00 Stone Wall Footings: This is a quantity adjustment associate with the items above. Cost: $302.50 Shared Use Path: This is a quantity adjustment associate with the items above. Cost: $486.50 Rail (guardrail): This is a quantity adjustment associated with additional walls needed after shop drawings were completed. The wall adjustment pricing is still under review and will be included on the next Change Order. Cost: $28,750.00 TOTAL:$92,909.67