R-2024-093 - 4/25/2024 RESOLUTION NO. R-2024-093
WHEREAS, the City of Round Rock ("City") desires to complete the Cycle 3 —Basins 4 and 5
Manhole Rehabilitation Project; and
WHEREAS, Chapter 271, Subchapter F of the Texas Local Government Code allows for local
governments to participate in cooperative purchasing programs with other local governments; and
WHEREAS, the Buy Board Cooperative Purchasing Program ("Buy Board") is a cooperative
purchasing program administered by the Texas Association of School Boards for the purpose of
procuring goods and services for its members; and
WHEREAS, the City is a member of Buy Board; and
WHEREAS, Fuquay, Inc. is an approved vendor of Buy Board; and
WHEREAS, the City now wishes to enter into a "Standard Form of Agreement Between
Owner and Contractor" with Fuquay, Inc. through Buy Board Contract No. 731-24, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City a "Standard
Form of Agreement Between Owner and Contractor" with Fuquay, Inc.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551,Texas Government Code, as amended.
0112.20242:48H14)122-6807
RESOLVED this 25th day of April, 2024.
—� A
CRAIG ORG , Mayor
City of R and "ck, Texas
ATTEST:
Qmt4-9
MEAGAN SP S, 61y Clerk
2
Q FUQUAY, INC.
''8 Board
IJ Cooperative Purchasing
D
4861 Old Hwy 81,New Bnaefels,TX 78132 Phone(830)606-1882 Fax(830)606-1885
PROPOSAL
DATE: March 26,2024
PROJECT: City of Round Rock Cycle 3 Basin 4&5 Manhole Rehabilitation 2023
Cured In Place Pipe CIPP for Pipeline Rehabilitation #731-24
PROJECT SPECIFIC
LIST PRICING MEMBER PRICING DISCOUNTED PRICING
SECTION II: UV CURED PRODUCT
REM 3
Structure(Manhole)Rehabilitation and Corrosion Protection
and Related Items
s.aw l nem
3 22101 Condition Standards and Repair Methods--Condition 1 SOFT 2774 23.00 S63.802DO -111.611 21.39 $59.335.86 18.00 $49.932.00
3 m 22103 Condition Standards and Repair Methods--Condition 3 SOFT 3250 51.00 $175.5DO.00 4178 50.22 $163.215.00 1.00 $133.250.00
3 m 22100 Inflow 8 Infiltration Repair--Injection of Chemical Grout Material GAL 50 $321.DO $16,050.00 -$22.4 298.53 $14,926.50 $245.00 $12,250.00
3 em 22105 Inflow 8 Infiltration Repair--Injection of Chemical Grout Material-Labor&Equipment HR 50 $244.00 $12 200.00 417.08 $226121 $11,346.00 $185.00
$9,250.00
3 em 22106 Manhole Bench and Invert Repair 4'Diameter Base EA 51 $802.50 $40.92T50 .18 $746.33 $38,062.58 $600.00 $3000,00
3 em 22120 Manhole Rehabilitation Polyurethane PCM -Additional 1 mil thickness SOFT 346750 $0.30 $1D4,025VO .02 $0.28 $95,74315 $0.20 $69.35000
3 .m 22123 Provide and Install Internal Drop Assembly.up to 12' EA 1 $2,247.00 $2,247,00 4157.29 2 089.71 $2,089.71 $1,74000 $1,740.00
s.aw i nem
3 22135 Travel and Mobilization-Manhole Rehabilitation Craw from New Braunfels,TX MILE 62 $25.501 112.091DO -$1.79 $23.72 $1944.63 $14.00 $1,14800
REM 4
Bypass for Gravity Pipelines and Related Items
ss�l m,m
4 23102 Set Up 6'P-D Per Pum FA 8 $2 568.00 $20,54400 -$179.761 2 38824 $19.10592 995.DO $7.960001
4 23108 Set Up 6'Piping/How LF 3200 $25.50 $81,60000 4179 79 23.72 $75,888.00 .00 $25.600,DO
4 23114 Operate 6'pumping System DAY 8 $385200 $30.81600 -$269.64 $3,58236 $28,658.88 $1.20000 $9.60000
All Other Underground Construction and Supplemental Items
and Related Items
Supplemental Items
B.Qbn l 'tern
20 38297 Tre18c control _ DAY 64 $3,210 00 $205,440.00 -$224,701 $2 985.30 $191,059.20 $500.00 $32 DD0.DO
zo 38300 Traffic Control Plan(3rd PartyCued) EA 32 9 630.00 30B 160.00 74.10 955.90 286 588.80 5500.00 16 000.00
111,083,402.50 $988,964.33 $398,880.00
SPECIAL PROJECT NOTES P.nomow b P.Ym.n1 B.-(gr.4uvw) $11960.40
1) ALL MANHOLE TO BE REHABILITATED,NO REMOVAL AND REPLACEMENT OF ANY MANHOLE IS INCLUDED
2) NO EXTERNAL DROP WILL BE INSTALLED,AN INTERNAL DROP IS INCLUDED IN THE PROPOSAL
TOTAL: $410,64040
ALL MATERIAL IS GUARANTEED TO BE AS SPECIFIED,AND THE WORK TO BE PERFORMED IN ACCORDANCE WITH THI
DRAWING AND SPECIFICATIONS SUBMITTED FOR THE ABOVE WORK AND COMPLETED IN A SUBSTANTIAL WORKMANLIKF
MANNER.ANY ALTERATION OR DEVIATION FROM SPECIFICATIONS AND DRAWINGS INVOLVING EXTRA COSTS WILL BF
EXECUTED ONLY UPON WE ORDERS AND WILL BECOME AN EXTRA CHARGE.OVER AND ABOVE THE QUOTATION.
WORKER'S COMPENSATION AND PUBLIC LIABILITY INSURANCE ON ABOVE WORK TO BE FURNISHED BY FUQUAY,INC.
THERE MAY BE AN ADDITIONAL CHARGE FOR PROVIDING A WAIVER OF SUBROGATION AND/OR BEING
N
LISTED AS AADDITIONAL INSURED ON FUQUAY'S INSURANCE.THE CHARGE SHALL BE EQUAL TO THE
AMOUNT CHARGED TO FUQUAY FOR SAID SERVICE.
EXCLUSIONS:
BOND,SALES TAX,AND OCP BARRICADES,SIGNS,TRAFFIC HANDLING
PERMITS,BURDENS,FEES INFILTRATION REPAIR
WASTE HAUL-OFF DEWATERING
SURVEYING ALL BYPASS PUMPING AND PIPE PLUGGING
SITE CLEARING PROVIDING AND/OR PERFORMING ANY TESTING
TERMS:
PAYMENT FOR SERVICES SHALL BE DUE AND PAYABLE WITHIN THIRTY DAYS OF THE DATE/MONTH THE WORK IS ACCEPTED BY:
PERFORMED.THIS PROPOSAL MAY BE WITHDRAWN BY US EF NOT ACCEPTED WITHIN THIRTY DAYS.
COMPANY:
RESPECTFULLY SUBMITTED,
NAME:
Cycle 3 Basin 4 & 5
Manhole Rehabilitation Project
W
Mayfield Park Z "se
'Qa
E Old Settlers 6w`�
0
s PKN� m Wood Glen
6eh�e� �anbelt
v 3406
m
BrightwatW74:1 OC28 OC27 �s
Greenbelt 1
S
f 79 7s
dss Rd BC22 N _
BC23
Brushy Creek BRUSHY Brushy �e'W BC21
Greenbelt CREEK ou�d ROCk Ave `
BC210UND
KOK
very a LC09 LC09
Ranch CD
Golf Club LC17 1 N E Logan St N
.o W
LC18 a m
Brushy Creek �/ �` m
Communityo
Park � �� � �» Gattis School Rd O
- LC16
LC19
aln Pie LC15 u,
Nees LC45 s
yy
620 45� " � 1 '
Legend
C6
4 Manhole Rehab Area `