Loading...
GM-11-05-11-013 Page 1 of 3 r BRUSHY CREEK Contract Quantity Adjustment/Change Order REGIONAL UTILITY AUTHORITY rev.2/2011... . o, c.... .... ...<., .,,. .m .. .,.,. Department: Project Brushy Creek Regional Water Treatment Plant, Name: Phase 1A Date: 5/2/2011 City Project Change Order/Quantity Adjustment ID Number No. $ 24,389.00 Justification This change order includes CPR #7 (Owner Request), CPR #9 (Fire Marshal Request/Requirement), CPR #14 (Owner Request) and Ten (10) additional calendar days due to rain events through March 31, 2011. SUMMARY Amount %Change Original Contract Price: $47,323,000.00 Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $47,323,000.00 Previous Change Ordell $2,462.81 0.010/0 This Change Order: $24,389.00 0.050/0 Total Change Orders)To Date: $26,851.81 0.06% Original Contract Price Plus Change Orders) Plus Quantity Adjustment(s): $47,349,851.81 Original Contract Time: 930 Calendar Days Contract Time Prior to this Change Order: 930 Calendar Days Contract Time with All Approved Change Orders: 940 Calendar Days Prepared B V. Ly,ll C.WA 5-IT- it ignaty. ure Printed Name,Title and Company ate Contractor Approval: 4&� L1dGCl�N�1 �cc o E747 ,•1�14A S tl Signature Printed Name,Title and Company Date City Staff Approval: „/�L��ig�'.0 �i�u�i d' `',// Signature Printed Name,Title Date City Official rr Approval: h r�r Signature Ffrinted Name,Title Date 61q-I/-cpv/--0/3 Page 2 of 3 r�BRUSHY CREEK Contract Quantity Adjustment/Change Order REGIONAL UTILITY AUTHORITY rev.Z12011 Change Order Data Contract Time Adjustment Bid Item # Item Description and Chane Unit Qty. Unit Price Amount (Days) um SUM , Base Bid #14, and 10 additional calendar Item No. 1 days due to weather events) LS 1 $24,389.00 $24,389.00 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:1 $24,3$9.00 10 Page 3 of 3 'lob BRUSHY CREEK Contract Quantity Adjustment/Change Order REGIONAL UTILITY AUTHORITY rev.2/2011., e .�., ..,. .... .- ... .ee., . .. Qunatity Adjustment Data Contract Time Adjustment Bid Item # Item Descri tion and Chane Unit Qty. Unit Price Amount (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: X0.00 0 ,► BRUSHY CREEK REGIONAL UTILITY AUTHORITY A p•.i ncr a Fip of Ce dae P A. L cr. and Roucd R k CHANGE ORDER No.2 DATE OF ISSUANCE: 4-20-11 EFFECTIVE DATE: OWNER: BCRUA CONTRACTOR: Pepper-Lawson Construction(PLC) PROJECT: Brushy Creek Reizional Water Treatment Plant—Phase I Project ENGINEER: CDM The Contractor is hereby directed to make the following changes in the Contract Documents: Change Proposal Requests 1. CPR No.007—Disinfection Facility Electrical Room HVAC Modifications(Owner Request) ADD$13,677.00 2. CPR No. 009 — Disinfection Facility, Fire Protection System Modifications (Fire Marshal Requirement/Request) ADD$14,012.00 3. CPR No.014—Deletion of two(2)Logos on EST(Owner Request) DELETE$3,300.00 4. Ten (10) additional calendar days are added to the Contract due to February 2010 and September 2010 rain events,which includes all rain events through March 31,2011. $0.00 TOTAL(Items 1 -2) ADD$24,389.00 Page 1 Project:Brushy Creek Regional Water Treatment Plant—Phase I Project Change Order No.2 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price: Original Contract Times: Substantial Completion(Days):840 Calendar Dam $ 47,323,000.00 Final Completion(Days): 930 Calendar Days Substantial Completion(Date):March 21,2012 Final Completion(Date): Tune 19,2012 Net Increase(Decrease)from previous Change Orders Net change from previous Change Orders No. to No._ No. 1 to No. 1 Substantial Completion(Days): N/A Final Completion(Days): N/A $ 2,462.81 Substantial Completion(Date): N/A Final Completion(Date): N/A Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion(Days):840 Calendar Days $ 47,325,462.81 Final Completion(Days): 930 Calendar Days Substantial Completion(Date):March 21,2012 Final Completion(Date): lune 19,2012 Net increase of this Change Order: Net increase(decrease)this Change Order: Substantial Completion(Days): +10 $ 24,389.00 Final Completion(Days): +10 Substantial Completion(Date): March 31,2012 Final Completion(Date): June 29,2012 Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion(Days):Calendar Days $ 47,349,851.81 Final Completion(Days): q146 Calendar Days Substantial Completion(Date):March 31,2012 Final Completion(Date): Tune T9,2012 RECOMMEN ED B ACCEPTED BY: By: VV 7M ENGINEER CONTRACTOR Date: S L l Date: APPROVED BY: MANAGEMENT REVIEW: By: / ��'�✓Yi�/IILLG�t.� By: BCRUA Construction Manager BCRUA General Manager Date: Date: l l Page 2 CDM 2357•A P.,ata Tra;?Parkway.5::ite 210 �������� Ausun.Texas75759 f-i: 5,2346.111;0 fax: 5`2 3-'3-141,1 y f f B Michael F. Thuss P.E. at 9:47 am Feb 23, 2011 February 22,2011 �� Michael F.Thuss, P.E. 2011.02.23 09:48:45 -06'00' Mr.Mike rg+a-38' ?£. RCVD 2/22/11 MFT Construction Manager Brushy Creek Regional Utility Authority (BCRUA) 221 East Main Street Round Rock,Texas 78664 Subject: Brushy Creek Regional Water Treatment Plant-Phase 1A Project Change Proposal No. 7-Final Letter of Recommendation File No.:L-EO-0034 Dear Mr.Thuss: CDM received Pepper-Lawson s Change Proposal No. 7 (i.e., Disinfection Facility Electrical Room HVAC Modification) on January 19, 2011. As you are aware, BCRUA previously authorized this work with a maximum not to exceed of $14,500. Since that time, Pepper-Lawson submitted Change Proposal No. 7, which we have reviewed and find it reasonable. Accordingly, this letter shall serve as CDM's recommendation that Change Proposal No. 7 be included in an upcoming change order to the Contract for $13,677.00. If you have any questions,please do not hesitate to contact me at(512)346-1100. Sincerely, 114,k 41 Steven V.Lynk,P.E.,BCEE Associate Project Manager Camp Dresser&McKee Inc. TBPE Firm Registration No. F-3043 xc: Chris Lippe, BCRUA General Manager Jennifer Higby, CDM o�ns.:�ci+'.o•enyinee•iny-cun;ci.,c:ion•opera[rons L-EO-0034-CPR07 LOR2.22-11.doc CDM 2357-A P.,ata Trace PoOw•a7 5_1'e 210 Auann,Texas 78759 .el, 512 3461 1✓O 'ax: 5'2 345.1463 February 22,2011 Mr. Mike Thuss,P.E. Construction Manager Brushy Creek Regional Utility Authority (BCRUA) 221 East Main Street Round Rock,Texas 78664 Subject: Brushy Creek Regional Water Treatment Plant-Phase 1A Project Change Proposal No. 7-Final Letter of Recommendation File No.: L-EO-0034 Dear Mr.Thuss: CDM received Pepper-Lawson s Change Proposal No. 7 (i.e., Disinfection Facility Electrical Room HVAC Modification) on January 19, 2011. As you are aware, BCRUA previously authorized this work with a maximum not to exceed of $14,500. Since that time, Pepper-Lawson submitted Change Proposal No. 7, which we have reviewed and find it reasonable. Accordingly, this letter shall serve as CDM's recommendation that Change Proposal No. 7 be included in an upcoming change order to the Contract for $13,677.00. If you have any questions,please do not hesitate to contact me at (512) 346-1100. Sincerely, Steven V.Lynk,P.E.,BCEE Associate Project Manager Camp Dresser&McKee Inc. TBPE Firm Registration No.F-3043 xc: Chris Lippe,BCRUA General Manager Jennifer Higby,CDM I,_e-,1,q canstin-Qp [rws L-EO-0034-0PRO7LOR2-22-11.doe CDM ?2357-A Rata Trace Par'',.,w 5-i'rt 21", A.atm,Texas??759 512 346-115'7 5'2 3==•1483 November 30,2010 Mr.Mike Thuss,P.E. Construction Manager Brushy Creek Regional Utility Authority(BCRUA) 221 East Main Street Round Rock,Texas 78664 Subject: Brushy Creek Regional Water Treatment Plant-Phase 1A Project Change Proposal Request No. 7 - Disinfection Facility Electrical Room HVAC Modification File No.:L-EO-0027 Dear Mr.Thuss: As a follow-up to CDM's August 26, 2010 email to Pepper-Lawson (PLC) and previous discussions in construction progress meetings, attached please find the drawing modifications depicting the Owner-requested change to the Disinfection Facility Electrical Room. As you are aware, PLC provided a $16,467 budgetary estimate for this work; however, they stated that this number would be reduced $2,000-$4,000 based on further discussions with their subcontractor. Assuming that this change is still requested by the Owner, CDM recommends that this change proposal request (Change Proposal Request No. 7) be issued to Pepper- Lawson (PLC) to include all work described herein. Due to the time sensitivity of this work, CDM further recommends that the Owner authorize a formal authorization for Pepper- Lawson to proceed with this work with a maximum not to exceed of $14,500. This amount will be negotiated as a lump sum change to the Contract that is mutually agreeable between Pepper-Lawson and the Owner/Engineer. This work should be considered as part of the directed work described in the Bid Form (Section 00300), Bid Item 7, and Section 01026 (Measurement and Payment). If you have any questions,please do not hesitate to contact me at(512)346-1100. Sincerely, .1k4 Steven V.Lynk,TX P.E.82706,BCEE Associate Project Manager Camp Dresser&McKee Inc. TBPE Firm Registration No.F-3043 ATTACHMENTS xc: Chris Lippe,BCRUA General Manager Jennifer Higby,CDM avt;.,i:i•+_•_cyivae•n'IJ-iLI1:U'C:IJf•717313I:Ci'] L-EO-0027-CPR711-30-10.doc I FLATWORK RE: CIVIL I DISINFECT I BUIL MIXED (AS NOTE H-3 I EXTEND FLATWORK AS INDICATED: 4' x 1$' S-2 HVAC EQUIP 1 I FLATWORK S-2 R E: CIVIL I S-2 17 I Fo- U? �? I KNOX J EMERGENCY SERVICES KEYBOX FLATWORK LOADING ZONE AND ELECTRICAL DISCONNECT RE: CIVIL RE: CIVIL I vot I SERVICE DRIVE RE: CIVIL 1 BRUSHY CREEK REGIONAL WATER TREATMENT PLANT - PHASE 1A CPR EXHIBIT SHEET No LOCATION No No cm DATE 11/19/10 AC-1 — 07 AC1 —A A A.1 I I II I q 6.1 07.3 PARAPET CAP 07.3 GUTTER '- 07.1 BEYOND WITH DOWNSPOUT 10.3 ANGLED AWAY FROM BLDG 12" MINIMUM AS SHOWN 1 03.1 _J7.,-1- 04.7 OQLi- U - � i. EXTEND 0,3.6--' 03.6 PER EXHIBIT AC1-A BRUSHY CREEK REGIONAL WATER TREATMENT PLANT - PHASE 1A CPR EXHIBIT SHEET No LOCATION NO No cm DATE 11/19/10 AC-4 ELEV-1 07 AC4-A CL3 <xp 4 CL5 16' I 16' I 16' 07.1 07.3 07.3 GUTTER, 07.3 16' L, WITH DOWNSPO T 07.1 d PER EXHIBIT AC4—A f " L� 07:4 07.4 (tea I i J----�-� r�__I�)�.... I S ....-._ ... .. '. c • • L l_., - 05.5 05.5 BRUSHY CREEK REGIONAL WATER TREATMENT PLANT - PHASE 1A CPR EXHIBIT SHEET No LOCATION No No cm DATE 11/19/10 AC-5 ELEV-2 07 AC5-A f...! W Z = t DF-CU-001 UZ BC z _ � o DRYWELL Z I Q 12x1 MZ CONDENSATE ,T TRANS, wa DRAIN LINE / T M BELOW GRADE - / w p m� z I Li w U 3 W = 2 V) DF-AHL ON EQUIPMENT PAD. PROVIDE o WITH RETURN PLENUM AND GRILLE. TOP DISCHARGE, BOTTOM RETURN. w F Q 0 POL FILTER UNIT m DESIGNATION TSC-AHU-001 TSC-AW NO. pfU-i SERVING OFFICE AREA CON C FA SERVED MAINT.BLDG. X WELD SHOP W Z MANUFACTURER MON UFACTURER CM-MON PRODUCTS MODEL NO. RM-010 RM-DEL NO CMX-124PA MCA 6 TYPE PACKAGEDROOFTOP HP PACKAGED 4R6T DIMENSIONS 39'X270%68 W/SUPP.ELEC.HEATING W/SUPP.EUME EXTRACTOR,LENGTH 10 VOLTS/PHASE/HERR 460/3 60 460 ME EXTRACTOR,DUMETER 8' OPERATING WEIGHT(LBS.) 1350 9 TILS SUPPLY AIR CFM 4200 p PRE-FILTER MATERIAL ALUMINUM OUTSIDE AIR CFM 300 60----PARTICLE FILTER MATERIAL MEDIA PARTICLE FILTER EFFICIEN 95x of EXTERNAL STATIC PRESSURE IN.W.G. 0.6 HP 1 TOTAL STATIC PRESSURE IN.W.G. - ,ALTS PH SE HERR 120/1160 FAN RPM 1533 15 OPERATING MOTOR HP 3.0 2J O DESIGN CFM 4200 21C S ENTERING AIR DB/W8 'F 76/62 78.8/ O LEAVING AIR OB/WB'F 52.3/52.1 51.7/ i AMBIENT AIR DB/W8'F 98/74 98/ U Z p SENSIBLE CAPACITY MBH 106.3 68. v TOTAL CAPACITY BTUH 115.1 83, MAX. FACE VELOCITY FPM 360 291 DESIGN CFM 4200 25C ENTERING NR DB 'F 60 6C v LEAVING NR OB 'F 97.7 103 AMBIENT TEMPERATURE'F 26.0 26. = TPE OF HEAT HEAT PUMP+ ELECT. HEAT PUMP Z TOTAL HEAT CAPACITY,MBH 170.7 102 ELECTRIC HEATING,kW 50 3C Q O STEPS OF CONTROL SCR SC NO.OF COMPRESSORS 2 1 W Q HP - 3 COMPRESSOR RLA 7.8 12. Q O u COMPRESSOR LRA - - Q d J NO.OF CONDENSER FANS 1 2 z w FAN.HP 0.75 0.3 O I i FAN M 2.3 1.' W FAN LRA - - (L'Z NO.OF FILTERS 4 4 Y g AIR VELOCITY 247.5 247 W d MINIMUM EFFICIENCY 30% 301 L+1 C FL (L'F- IER SIZE - - U Z P.D. CLEAN IN.W.G. W REMARKS SEE NOTES 1-13 SEE NOTE' 1n W _~ NOTES: m F- Z 1. UNITS TO INCLUDE DOUBLE WALL CONSTRUCTION. 2. PROVIDE UNITS WITH STAINLESS STEEL SLOPED DRAIN PAN. � 1 3. PROVIDE UNITS WITH BELT DRIVE EVAPORATOR FANS. 4. ABOVE TABLE DATA BASED ON AAON AND TRANE UNITS.SEE SPECIFICATION FOR CDISCHARGE/RETURNE w 5. UNIT TO BE DOWNFLOW DISCHGE/RETURN CONFIGURATION. 6. PROVIDE UNIT TERMINAL STRIP TO ACCEPT THERMOSTAT. 7. UNITS TO OPERATE ON R-410A REFRIGERANT. 8. PROVIDE SINGLE POINT POWER CONNECITON. HEATING 9. REQUIRES HACR-RATED CIRCUIT BREAKER. WEIGHT MAKE AND MODEL NO. NOTES 10. PROVIDE UNITS WITH CONDENSER COIL FAIL GUARDS UNLESS COIL DESIGN GIVE IN BTUH O 1T (Ibe) 11. REFER TO SPECIFICATION SECTIONS 15500 AND 15855 FOR UNIT COATING REOUIR 12. PROVIDE DUCT MOUNTED SMOKE DETECTOR IN RETURN DUCT. 13 . PROVIDE ECONOMIZER PACKAGE WITH ENTHALPY LIMIT CONTROLS,SENSORS AND U 13,60D 27 MITSUBISHI MSZ-FD12NA 1, 2 14. PROVIDE UNIT WITH RETURN AIR CO2 SENSOR AND MODULATING OUTSIDE AIR DAMI 18,000 62 MITSUBISHI PKA-A36FA 1, 2 ODESIGNATION L-1 LD-1 LD-2 L-3 L-4 LD - 155 TRANS 41EC3F60B1000 1, 2 DESCRIPTION INTAKE LOUVER/N LOUVER/ INTAKE INTAKE COINER DAMPER DAMPER LOUVER LOUVER 20200 i5D TRANS 4TEH3F42B7000 1, 2 MANUFACTURER CREENHECK CREENHECK CREENHECK RUSKIN CREENHECK GR CV MODEL NO. ESD-403 ECO-401 ECD-401 ACL845AF ESD-403 ECD SIZE, WxH 60'X18' 60'X18' 30'X54' 32X32' 34X24' 344. FREE AREA, 3.47 3.23 4.81 1.13 2.61 2. (SO FT) MATERIAL I ALUMINUM I ALUMINUM ALUMINUM I ALUMINUM I ALUMNUM I ALUM FRAME TYPE ALUMINUM I ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUN w MAXIMUM S.P., 0.1 0.1 0.1 0.1 0.1 0 (IN.W.G) Q NOTES 1 1,3 1,3 1 1 1,3 Q NOTES, -R U0. LINE GAS UNE MAKE AND NOTES 1. PROVIDE WITH ALUMINUM BIRD SCREEN AND ALUMINUM INSECT SCREEN. VOLTS/PHASE SIZE SIZE MODEL NO. 2. PROVIDE WITH PVC-COATED BIRD SCREEN AND FIBERGLASS INSECT SCREEN. MITSUBgISHI 3. PROVIDE 120V/1PH MOTORIZED DAMPER WHERE SHOWN ON THE DRAWINGS. 208/1 1/4 3/8 MUZ-FD72NA 1, 2 ACTUATOR SHALL HAVE NEMA RATING SUITABLE FOR THE LOCATION IN WHICH INSTALLED,AS SPECIFIED IN SECTION 16000. DAMPER ACTUATOR SHALL'FAL MITSUBISHI OF POWER. 208/1 3/8 5/8 pUZ-HA36NHA 1, 2 460/3 1/4 3/8 4TTATRANE 000 1 460/3 3/8 7/8 4TWA3T0�3N6M000 1 PEPPER—LAWSON Change Proposal CONSTRUCTION,L.P. Request No. 07 R3 (Not a Change Order) Project Name: Brushy Creek Regional Water treatment Project Owner.BCRUA Plant Phase 1A Contractor. Pepper-Lawson Construction Initiated by: Owner Date:January 17,2011 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer, • Work shall not commence until authorized by the Owner. Description of the Proposed Change: New HVAC unit for the Disinfection Electrical Building Reference the attached: Cost breakdown sheet • Email quote and data from RM Mechanical,CW Oats,Tracy Dean By Chad Mitchell,Project Manager All work shall be in accordance with the terms,stipulations,and Camp,Dresser,McKee, Inc. Recommendation: conditions of the original Contract Documents, If the work ❑Recommend Acceptance herein provided for Is Approved by Change Order,the time of Do Not Recommend Acceptance completion will be: ❑ Increased ® Decreased ® Unchanged by_C^calendar days. By:Steve Lynks,RE Date This change will: LKIAdd IFDeduct D No Change BCRUA: $ 677.0 ❑ Accepted ❑ Not Accepted t.Y41pperilln Construction,L.P. By: Mike Thuss,P.E. Date January 17,2011 ' Date Change Proposal Request Porn Brushy Creek Regional Water Treatment Plaat Phase 1A Pepper Lawson Construction,L.P.lob No.19981 I a-lea-11 Brusby Creek Regional Water Treatment Plant Phase IA CPR 07 R2 Additiond HVAC for Disinfection Electrical Building Nor,Taxed Labor Materiel Subcontract E u' ent/TexedMatarial Itam Unit Total Unit Total Unit Total Unit Total No. Description Qty Unit Coat Cost Coat Cost Cost Cost Cost Cost 1 RMMechinoal 1.00 LS - 11,518.00 11,518,00 Tracy Dean Roofwg 1.00 LS - - - 450.00 450,00 Additional Concrete 2.00 CX - 200.00 400.00 MV Geta(Patch opening) 1,00 LS 321.00 321.00 C3 �_A A Direct Cost Subtotal 12,689.00 B Labor Burden @ 55% n/a n/a IDA C Tax®8.25% n/a n/a n/a D Conhactafe Fee[15%for labor,mnNl,and equipment&5%for sube] 634.45 E Subtotal 2(A+B+C+D) - 13,323.45 F Liability&Insurance(d 2.00%of F(0.02 x F) 266.47 3 Bonds @.65%(0065 x F) 86.60 H Subtotal(F+(1+M 13,676.52 I Total of all columns(CI+C2+C3+C4) 13,576.52 Other a/a Owrent lotalCost 513,677 R*u1b al,Inc. TAGLA04 E rACLAW9A r�ttnnort 3312 DUKE ROAD arre� AUSTf,4,TE><AS78724 612 826-247o Proposal Pepper Lawson Construction Phone:382-6207 Date: 1906 Hur Industrial Blvd. Fax:382-6218 10-21-2010 Cedar Park,Texas 78641 Attn:.Sam•Gide Brushy Creek slide@PePPerlawson.C.om DF Electrical Room HVAC Revision 2 We hereby submit saedfications and estimates for: Furnish and Install HVAC as follows: A.Delete proposed package wall unit B. Install (1)3-ton heat pump split system with no supplementary heat C. Split system to have stand alone programmable thermostat D. Exposed ductwork to be un-Insulated galvanized sheetmetal E..Air Handier Unit to sit on angle iron stand F. Condensate to terminate in.drywell as per plans Exclusions: Salestax,electrical,plumbing,concrete pads,cutting,patching,and painting ��1� � :.�.. Price for split system---------$17,523;.00 Deduct package wall unit and labor to hang-----4�1;69 oo' 005&Z (revised for unit price change) Total installed price------------------------$I4,5I13.00 `t St We Propose-hereby th fumish.materfal and labor—complete In accordance'with the above specifications,forthe sum afi fL Uoan Camoletlon l THANKYOU FOR ACCEPUING OUR 91Df All material Is guaranteed to be as specified.AQ work to be completed in a.professional manner according to standard Authorized practices.Any alteration or deviatlon from above- siigriature; spedflmtions Im�olving extra costs•wlll be executed only upon written orders,and will become an extra charge over and This Proposal maybe withdrawn If not acceptedvAMn 30 above the estimate. AN agreements contingent upon strikes, days. accidents or delays beyond ourcontroi.Ownerto carry fire, tornado,and other necessary insurance. Our workers are fully covered by Worker's Compensation Insurance. Signature Acceptance of Proposal—The above prices,speciflcatlons and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above Signature Date of Acceptance:_ Regulated by the Texas Department or Ucensing and P—nuladon P.O.Bax 12157,Austin,Texas 78711 1-600-803-9202,512-4n-6599 Chad Mitchell From: Sam Gide Sent: Tuesday, December 21, 2010 7:57 AM To: Chad Mitchell Subject: FW: FW: Change Proposal Request#7(Disinfection Facility Electrical Room HVAC Modification) Chad, $470.00 for the Gutter& Downspout to protect outdoor AHU at the Disinfection Facility CPR#7. Thanks Somers(Sam)Glde,LEED AP I Project Engineer Pepper-Lawson Construction 12:1906 Hur Industrial BLVD,Cedar Park,TX 786411 W Office:512.382.62071)Cell:281 757 77171 A f=ax: 512.382.6218 www,peace rconstruction.com From:Tracey Dean [mailto:tracey@deancoenterprises.com] Sent: Tuesday, December 21, 2010 7:12 AM To: Sam Gide Subject: Re: FW: Change Proposal Request#7 (Disinfection Facility Electrical Room HVAC Modification) $ 470.00 TRACEY DEAN - PRESIDENT DEAN CONTRACTING COMPANY, INC. 340 COUNTY ROAD 158 KYLE, TX 78640 512-268-1233-OFFICE 512-268-1422-FAX --- On Fri, 12/17/10, Sam Gide<S'Gide(a7pepperla}vson.con'i>wrote: From: Sam Gide<SGide(c Vepperlawson.com> Subject: FW: Change Proposal Request#7 (Disinfection Facility Electrical Room HVAC Modification) To: "Tracey Dean"<trace @deancoenterprises.com> Date: Friday, December 17,2010, 7:57 AM Tracey, Can you please give me a price for gutter and downspout as shown in the attached CPR#7. W. 0� asm e. o • • doa k.�•r, "'�y.�... �t-�ys Z' :"fT^!`.n f'7.Q, I_moo }�{.T'-��F.':�';7,.. 7�'f. iTlry� h ^?'`�R`} 1; -y .'"r'f"^�-_ �V, n�-q•�•r5 �'lti..�+ �.'r�+ / � r �I .a t .!?.••.�•��'1'. �J33 rn4n�r "e't�. I i�6 _ 1,i+F a ;k:�'{ad l'- r s as r -r r ti i �•�" Y J r '`• ..s.. iH'=4.�':Yi'-z.'L.,.:k��;"Y_�..l�rl3.t_ �- �.Ti_.•..�...�.��L-a•i-�..cr� �'� r�_' 1:�.�:��r_r.� '.a.-. .1; _ .,6.,.,1.,,.:._�_.c....:. .; • • Labor Burden � ® FY'.I'P' Y�• '� �'aGt Iji,.tl.fi+ t.:ln...:J+. w.a_:...._.� � Es "+# r '�''1"�" a '��"i "v dC�ti..�.ii;f�..�fyr_'.il�l C t-r'p��•-t.,__r�.•.�z_.�C,�`� C c-._ ..., "' •i-+'-'-Fr's•� r1. `*."l.a --�•;ry _u.•4.L�.-ccP�fi`:: L 'el:. ;"•> 1F� �.�.._±l r1.:- ..,a.13%� MU�t-fi iy,�r yxr Ourri^e--]'-"' g �r T-..-.-r^^+ .• 8•r� rti i -�•rt"yr at:•'iz^^, '!�(� 9. . �u:i,PlZ'�s�LA� � iS'r`� tf,�•`.'" ry� �� "�a�:t��� z;� � r I .I�� i . i .s4Ff:� 'y� INVOICE " ADDITIONAL WORK AUTHORIZATION C.W. OATES MASONRY, INC. P.O. 130X 1337NO 0972 GEORGETOWN, TX 78626 (512) 869-1413 FAX: (512) 863-9447 OWNER'S PHONE DATE ) �f .NAME rG.•. �f1. �.AS.'N�D ................... . STREET` JOS NAME JOB NU ER CITY. . .STATE' .. STREET . 77dHN6CONTRACT-NOM0M DATE OF EASTING CONTRCr CITY STATE You are authorized to perform the following specifically described additional work: o l ED aef -- . ....... i`: r • S V J Al&t ge rJ a ADDITIONAL CHAR FOR ABOVE WORK IS: Paymehit wllf be made as follows: Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Date Authorizing Signature (OWNER SIGNS HERE) We hereby agree to furnish labof and maferi Is-complete In accordance with the above specifications,at above stated price. AuthP ized Signatur8 tb. r (CONTRACTORS SIGNATURE THIS IS CHANGE ORDER NO. NOTE:This Revision becomes part of,and In conformance with,the existing contract. I :.. i23�5r'A RIs*Aoif t' S ti 1#24 d s re `Avs#n �xas7fi9 ��rF at 9,0 ;. :. . ._ uss,PE :;•::. . . r e Mi Ha I F.Th :: ..;....•.; •.•:.. ..: :. 2010:12.019:08:09 1Voverilber 30;2010 0 Misr .1.0. Cdnstrurtion Manager,:::: . Brushy Creek.'Regidnal Utility A'uthoritii.(BC RPA). 221 tast,Main Street :. ::Round Rock,'Texas 7866.4":::>..;'. _ :;::,::: .. Subject Brushy Cieek:Reg orial.Water Tr eatment.Plarit'-Phase 1A Project• Change.ProppsalRa?quest IVo 7 - Disinfection Facility Electrical Room HVAC File No.:L-Ec=0*027:` ear Mr:Thuss: ; As -a-follow-up.to"CDM's August 26, 2010 email to Pepper-Lawson.(PLC) an previous ;. discussions in construction progress meetings,attached-please find the drawing modifications depicting the'Ownex-requested'change to the Disinfection Facility Electrical Room:' As:you ' :`:`are:•:aware, PLC-provided a $16,467 budgetary estimate for this work; howevei, they stated .that'tlus'humber.'would be reduced $2,000-$4,000 based on further discussion's with their 'subcontractor. Assuming that this change is still te.quested by the Owner,CDM recommends that.thus-change proposal request (Change Proposal Request No, 7) be issued.-to'Pepper- Lgwson.(PLC)to include all work described herein. Due to the time.sensitivity of this'work, ...Cpm. further.recommends'that .the Owner authorize' a formal 'authorization for Pepper- Lawson toproceed with this work with a maximum not to exceed of$14,500.' This amount will'b6 negotiated as a lump''sum'ehange to the Contract that is mutually agreeable bet�iveen • Pepper=Lawson and theOwner/Erigizi�er, This work should be,considered as.part'of the directedwork.described,:E';'tlie`Bid:Form (Section 00300); Bid Item 7,.and .Section 01026 :'(Measurement and Payment).­.'..'.< 1f you have any:questions;please do iiofhesitate to contact rile at(512)346-1100.. :Sincerely, Steven V Lynk;TX PX.82706 :BGEE Associate Project Manager.. : CampDresser&. Kee Inc:: :. WMI, TBPE Firm.Registration.No: AITACHMEIVTS xc: Chris Lippe,BCRUA General Manager Jermifer Higby;CDM: c�ns�lting. 119�4eet�jlQ Cunattaccipriopyt+pn� ::,;..:•::•;,$..:.>::;....:;, .: :•LLo•o027-CPR7.11i0.dao. I FLATWORK RE: CIVIL l DISINFECT I BUIL MIXED (AS NOTE H-3 I EXTEND FTD� AS INS-2 HVAFLATWOS-2RE: CII f S-2 C? vi KNOX J I EMERGENCY SERVICES KEYBOX FLATWORK LOADING ZONE I AND ELECTRICAL DISCONNECT RE: CIVIL RE: CIVIL f 1 I SERVICE DRIVE II RE: CIVIL I BRUSHY CREEK REGIONAL WATER TREATMENT PLANT - PHASE 1A CPR EXHIBIT SHEET No LOCATION No No C � DATE 1 1 i 9/10 AC-1 — 07 AC i—A A A.1 38'18" I I 6.1 07.3 PARAPET CAP 07.3 GUTTERr 07.1 BEYOND WITH DOWNSPOUT 10,3 ANGLED AWAY FROM BLDG 12" MINIMUM AS SHOWN 03.1 04,7 o Ii I Cod F^-1 EXTEND 03.6 03.6 PER EXHIBIT ACI-A BRUSHY CREEK REGIONAL WATER TREATMENT PLANT - PHASE 1A CPR EXHIBIT SHEET No LOCATION No No Cm DATE 11/19/10 AC-4 ELEV-1 07 AC4-A OCL3 CL4 3 4 CL5 16' 16' 1 16' 1 07.1 07.3 07.3 GUTTER, 16'- L, WITH DOWNSPO T 07.3 07 1 PER EXHIBIT AC4—A i ------�_ — a7:5 07:4 07.4 Lx 05.5 05.5 BRUSHY CREEK REGIONAL WATER TREATMENT PLANT - PHASE 1A CPR EXHIBIT SHEET No LOCATION No No cm DATE 11/19/10 AC-5 ELEV-2 07 AC5—A I + r 'T m r;------ - - Z w z° z r Df—CU-001I I =' r ' I I I I I RUN REFRIGERANT a o f I i LINES ABOVE I 1 S I �,z i CORRIDOR ` BC I� 1 DRYWELL Z - I >> r z I 1 BA i� K R'I �I ' S -[� i < o I I Z- 7 {r I I W � I 12x19 TO - I CONDENSATE12x14 + ITI DRAIN LINE TRANS ON BELOW GRADE ``��'� I -Sl- T DF-AHU-001 8x12 SA DUCT I - �•�i I ! i 14x12 SA DUCT _ t � t ��a - 1 t I TYP OF 4)AB 300 I ¢ I 1.200 CFM RAI HZ t ! ! L 3 uj _ DF—AHUT001 I ! I a ON EQUIPMENT PAD. PROVIDE I 4L L E L T P i C A L ROOM fl WITH RETURN PLENUM AND I + (-� fl I GRILLE. TOP DISCHARGE ! II I I BOTTOM RETURN. J � 1 I Qa i ! ! -_--___-.------- - ----------------------------------- DISINFECTION -------------------DISINFECTION FACILITY HVAC PLAN 1/4" = 1'-0" - YYr rGFrF�/��/f YY. a�� 3 neon uw� rnno magas mar 6 I fill p1,114 s� ises8 �� a gg g o p $ n . a _ B �i Nr Qa P E G gug�DE' "Si I.411:F' 619 p e11 e Ilk 01 d Y " ,n xa FR la a"s5if P� 6 C N Vl rN1 y � b5• -r -4 E,C�CG"�� BGG �� � �€Y IA s ° 111�111 sops i 01 21-60 mg e $ — -E r il G= I 5 T 6 9g ------------ BRUSHY CRK AL WATER IAEATMENT�PIANTCIPH E IA CPR EXHIBff SHEET No LOCATION No No cm PATE 11/24/10 HY-1 — 07 HY1—A PEPPER-LAWSON change Proposal CONSTRUCTION,L.P. Request No. 07 - (Not a Change Order) Project Name: Brushy Creek Regional Water treatment Project Owner:BCRUA Plant Phase 1A Contractor: Pepper-Lawson Construction Initiated by: Owner Date:Sept 28,2010 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: New HVAC unit for the Disinfection Electrical Building —Note: This Is price is based off primary drawings furnish by CDM. Final price may change upon received of final drawings Reference the attached: • Cost breakdown sheet • Email quote and data from RM Mechanical By Chad Mitchell,Project Manager All work shall be in accordance with the terms,stipulations, Camp,Dresser,McKee,Inc. Recommendation: and conditions of the original Contract Documents. If the work ❑Recommend Acceptance herein provided for is Approved by Change Order,the time of completion will be: ❑Do Not Recommend Acceptance ❑ Increased E: Decreased ® Unchanged by_0_calendar days. By:Steve Lynks,P.E Date Th' cha e wi FX Add � Deduct ❑ No Change BCRUA: $ 16, 00 ❑ Accepted ❑ Not Accepted ep La son Construction,L.P. By: Mike Thuss,P.E. Date Au u t 30,2010 I Date Change Proposal Request Form Brushy Creek Regional Water Treatment Plant Phase 1A Pepper-Lawson Construction,L.P.Job No.19981 28-Sep-10 Brushy Creek Regional Water Treatment Plant Phase I CPR 07 Additional HVAC for Disinfection Electrical Building Non-Taxed Labor Material Subcontract ui ent/TaxedMaterial Item unit Total Unit Total Unit Total unit Total No. Description Qty Unit Cost Cost Cost Cost Cost Cost Cost Cost 1 R-IMechincal 1.00 LS 1.00 15,551.00 15,551.00 C;1 C2 C3 C4 A Direct Cost Subtotal 1.00 15,551.00 B Labor Burden @ 55% 0.55 n/a n/a n/a C Tax®8.25% n/a n/a n/a D Contractor's Fee[15%for labor,mael.and equipment&5%for subs] 0.15 777.55 E Subtotal 2(A+B+C+D) 1.10 16,328.55 F Liability&Insurance @ 2.00%of F(0.02 x F) 0.03 326.57 G Bonds .654'*(.0065 x F) 0.01 106.14 H Subtotal(1'+U+1i) 1.75 16,761.26 I Total ofall columns(C1+C2+C3+C4) 16,763.00 Other n/a Trent I otal Cost $16,763 RM Mechanical, Inc. TA�ua„ TACLA000136C M/ AC-DE516N-FABHICAnON•INbTALLATON 3312 DUKE ROAD smnce•NFwTwa•wmunoN AUSTIN,TEXAS 78724 512.928-2470 Proposal Pepper Lawson Construction Phone:382-6207 Date: 1906 Hur Industrial Blvd. Fax:382-6218 9/10/2010 Cedar Park,Texas 78641 Brushy Creek Attn: Sam Gide DF Electrical Room HVAC sgide@pepperlawson.com Breakdown We hereby submit specifications and estimates for: Furnish and install HVAC as follows: A. Delete proposed package wall unit B. Install(1)3-ton heat pump split system with no supplementary heat C. Split system to have stand alone programmable thermostat D. Exposed ductwork to b e galvanized sheet metal with one inch interior liner E. Air Handler Unit to sit on angle iron stand wrapped with galvanized sheetmetal and lined with one inch rigid fiberglass duct board F. Condensate to terminate in drywell as per plans Cost Breakdown—Material and Labor Split system with special coating and programmable thermostat---------$7,721.00 Sheetmetal duct;liner;angle iron stand;hangers;duct sealer-----------$3,883.00 Refrigerant copper;hangers and insulation-----------------------------$591.00 Subtotal on material----—--------—-----------$12,195.00 Delivery—hours at$65---------—----------------------------------------------$130.00 Shop fabrication—9 hours at$65---------------------------------—----------$585.00 Piping labor-11 hours at$65---------------------------------------------------$715.00 Ductwork installation—24 hours at$65------—------—--------------—--------$1,560.00 Start Up—5 hours at$65----------------------------------------------------$325.00 Subtotal on labor------------—-------------------$3,315.00 Total Material and Labor--------------------------$15,510.00 15%OH&P----------—----------------------------—--------$2.327.00 Total price for split system------------------$17,837.00 Deduct package wall unit and labor to hang---------$2,286.00 Total installed price-------------------------------------------------------------------$15,551.00 Exclusions: Sales tax,electrical,plumbing,concrete pads,cutting,patching,and painting We Propose-hereby to furnish material and labor–complete In accordance with the above specifications,for the sum of($Upon Completion) THANK YOU FOR ACCEPTING OUR BIDI All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard Authorized practices. Any alteration or deviation from above Signature: specifications Involving extra costs will be executed only upon written orders,and will become an extra charge over and This Proposal maybe withdrawn If not accepted within 30 above the estimate. All agreements contingent upon strikes, days. accidents or delays beyond our control. Owner to carry fire, tornado,and other necessary Insurance. Our workers are fully covered by Worker's Compensation insurance. Signature Acceptance of Proposal–The above prices,specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above Signature Date of Acceptance:—J--., CDM APPROVED 12357-A R,ara Trace Park.;:iv,Seca 210 By Michael F. Thuss, P.E. at 9:55 am, Feb 23, 2011 kw,njT xas7°%+9 tel. 512 3.16.1100 Michael F.Thuss,P.E. fax: 5;2 345.1463 z j- 2011.02.23 09:56:41 February 22,2011 -06'00' *�vir.Mike Thass,P.E. > RCVD. MFT. 2/23/11 Construction Manager Brushy Creek Regional Utility Authority(BCRUA) 221 East Main Street Round Rock,Texas 78664 Subject: Brushy Creek Regional Water Treatment Plant-Phase 1A Project Change Proposal No. 9-Final Letter of Recommendation File No.: L-EO-0035 Dear Mr.Thuss: CDM received Pepper-Lawson's revised Change Proposal No. 9 (i.e., Disinfection Facility, Fire Protection System Modifications) on January 19, 2011. As you are aware, this change was required by the City of Cedar Park Fire Marshal, and CDM recommended that BCRUA authorize this work for $10,593 to be included in an upcoming change order to the Contract per CDM's December 1, 2010 letter to BCRUA. Since that time, the Fire Marshal required another change in the scope and Pepper-Lawson subsequently submitted a revised Change Proposal No. 9, which we have reviewed and find it reasonable. Accordingly, this letter shall serve as CDM's recommendation that Change Proposal No. 9 be included in an upcoming change order to the Contract for$14,012.00. If you have any questions,please do not hesitate to contact me at(512)346-1100. Sincerely, ,1k 4 Steven V. Lynk, P.E.,BCEE Associate Project Manager Camp Dresser&McKee Inc. TBPE Firm Registration No. F-3043 xc: Chris Lippe,BCRUA General Manager Jennifer Higby,CDM ens_i:i _ •anyiu_e'ng-con4u_,c:ion.opsiat:cn, L-EO-0035-CPR09LOR2-22-11.doc CDM `1357•A Rata Trico_ParL.,•,ey, 217 k.,tm,Teas757 9 _1. s+23.16-11ar, `e... 5°2 3-5-1461 February 22,2011 Mr. Mike Thuss,P.E. Construction Manager Brushy Creek Regional Utility Authority(BCRUA) 221 East Main Street Round Rock,Texas 78664 Subject: Brushy Creek Regional Water Treatment Plant-Phase 1A Project Change Proposal No. 9-Final Letter of Recommendation File No.: L-EO-0035 Dear Mr. Thuss: CDM received Pepper-Lawson's revised Change Proposal No. 9 (i.e.,Disinfection Facility, Fire Protection System Modifications) on January 19, 2011. As you are aware, this change was required by the City of Cedar Park Fire Marshal, and CDM recommended that BCRUA authorize this work for $10,593 to be included in an upcoming change order to the Contract per CDM's December 1, 2010 letter to BCRUA. Since that time, the Fire Marshal required another change in the scope and Pepper-Lawson subsequently submitted a revised Change Proposal No. 9, which we have reviewed and find it reasonable. Accordingly, this letter shall serve as CDM's recommendation that Change Proposal No. 9 be included in an upcoming change order to the Contract for$14,012.00. If you have any questions,please do not hesitate to contact me at(512)346-1100. Sincerely, Steven V. Lynk,P.E.,BCEE Associate Project Manager Camp Dresser&McKee Inc. TBPE Firm Registration No.F-3043 xc: Chris Lippe,BCRUA General Manager Jennifer Higby, CDM __ :..!;ing•_-nyint"!Itg-Coo. u_:ioI,-op.raL•cos L-EO-0038-CPR09LOR2-22-11.doc CDM !2357-A Rata?race Parkvo 5.,ite 71'? A- imn.reAas 7?7A 512 346-11 XU 'HA: 5"-1 3=5.1 415's December 1, 2010 Mr.Mike Thuss,P.E. Construction Manager Brushy Creek Regional Utility Authority (BCRUA) 221 East Main Street Round Rock,Texas 78664 Subject: Brushy Creek Regional Water Treatment Plant-Phase 1A Project Change Proposal Request No.9-Letter of Recommendation File No.: L-EO-0028 Dear Mr.Thuss: CDM received Pepper-Lawsor{s Change Proposal No. 9 (i.e., Disinfection Facility, Fire Protection System Modifications) on September 28,2010, which describes modifications to Section 15300 (Fire Protection-Sprinkler and Standpipe Systems). As you are aware, this change was required by the City of Cedar Park Fire Marshal. CDM conducted a meeting with the Fire Marshal to inquire why this change was needed because the new requirements differed from the permitted design. Based on the outcome of the meeting, CDM determined that the Fire Marshall does indeed want this change. CDM has reviewed Pepper-Lawson s change proposal and find it reasonable. Accordingly, this letter shall serve as CDM`s recommendation that Change Proposal No. 9 for$10,593.00 be included in an upcoming change order to the Contract. If you have any questions,please do not hesitate to contact me at(512)346-1100. Sincerely, ""'k-44 Steven V. Lynk, P.E., BCEE Associate Project Manager Camp Dresser&McKee Inc. TBPE Firm Registration No. F-3043 xc: Chris Lippe, BCRUA General Manager Jennifer Higby, CDM ._.,...'[i++_•c-nyinee-u-;� .:C:;on•OpbiatL-EO-0028-CPR9 LOR 12-01-10.doc PEPPER—LAWSON Change Proposal CONSTRUCTION,L.P. Request No. 09 R1 (Not a Change Order) Project Name: Brushy Creek Regional Water treatment Project Owner.BCRUA Plant Phase 1A Contractor: Pepper-Lawson Construction Initiated by: Owner Date:January 17,2011 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer, • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Additional Fire Sprinkler system for Bulk LAS area of Disinfection Facility per the Fire Marshal request.PLC has priced a dry system for the Bulk LAS only. Reference the attached: • Cost breakdown and Data sheet from Automatic Fire Protection • Cost breakdown and Data sheet from T-Morales By Chad Mitchell,Project Manager All work shall be in accordance with the terms,stipulations, Camp,Dresser,McKee, Inc. Recommendation: and conditions of the original Contract Documents. If the work ❑Recommend Acceptance herein provided for Is Approved by Change Order,the time of completion will be: ❑Do Not Recommend Acceptance ❑ increased F_ Decreased ® Unchanged by 0`calendar days. By:Steve Lynks,RE Date This change will: EX Add 0 edu F__J No Change BCRUA: $ $14 11.73 ❑ Accepted ❑ Not Accepted By.(EVI!(e4awb6n Co struction,L.P. By: Mike Thuss,P.E. Date January 17, 11 ( Date Change Proposal Request Form Brushy Creek Regional Water Treatment Plant Phase 1A Pepper-Lawson Constrwtion,L.P.Job No.19981 t8-tan-11 Brushy Creek Regional Water TreatmentPlaat Phase 1 A CPR 09 RI Additional Fire Sprinkers System for LAS Room Non-Taxed Labor Material Subcontract nt/TaxodMaterial Item Unit Total Unit Total Unit Total Unit Total No. Descr. 'on Qty Unit Cost Cost Cent Coat Cost Coat Cost Cost 1 Additional fire sprinken(See Automatic Fire Protection Sco 1.00 LS 8,800.00 8,800.00 2 Additional wiring(See T-M) 1.00 LS 4,200.00 4,200.00 U g3 Q4 A Direct Cost Subtotal 13,000.00 B Labor Burden @ 5594 n/a n/a n/a C Tax Q 8.25% n/a n/a n/a D Contractor's Fee[15%for labor,mael,and equipment&5%for subs] 650.00 B Subtotal 2(A+B+C+D) 13,650.00 F Liability&loswanoe(412 00%of F(0.02 x F) 273.00 G Bonda(ct�.65%(.0065 x F) 88.73 H Subtot +C1+fi) 14,011.73 I Total of all columna(C1+C2+C3+C4) 14,011.73 Other n/a CurrentTotal st $14,012 Sam Gide From: Carlos Kraly[ckraiy@automaticfireprotection.com] Sent: Monday,January 03, 20113:32 PM To: Sam Gide Cc: Chad Mitchell Subject: RE: BCWTP-Sprinkler System for the LAS Canopy Follow Up Flag: Follow up Flag Status: Flagged Sam I ran the numbers for putting a system by the rear canopy and the cost for putting remote dry system is $8,800.00,but you will need to run power and alarms back to that dry valve assembly. This would be the way to go cost wise on our end. Carlos Kraly Automatic Fire Protection, Inc. 210.653.2121 office 210.421.6935 cell From: Carlos Kraly [mailto:ckraly@automaticfireprotection.com] Sent: Tuesday,December 28, 2010 10:31 AM To: 'SGide@pepperlawson.com' Ce: 'CMitchell@pepperlawson.com' Subject: RE: BCWTP - Sprinkler System for the LAS Canopy Sam The anti-freeze system will not work with the hydraulic calculation, Our only option will be to go with the dry system. i BCWTP LAS CANOPY Automatic Fire Protection, Inc. ADDING AUXILLARY DRY PIPE VALVE ASSEMBLY LaborLabor Total No. Item Trade Quantity Unit MAIL Unit Co Total Material Factor Total Hours Rete Total Lobar Lab&Malls Labo INSTALL SSUSPRINILERS FOREMAN 1.00 EA 16.00 30.15 482.40 48240 INSTALL SSU SPRINKLERS APPRUMCE 1.00 EA 16.00 26.44 407.04 407.04 ENGINEERING SPRINKLERS ENGINEERING 1.00 EA 16,00 40.00 640,00 640,00 Sub-Total ( 1.529.44 Fee 10% 152.94 Total Labor 1,68238 Equipment -- "it 1.00 ea 2TO.80 270.00 270.80 Smak Tools 1.00 ea 84.12 84,12 Vehicle mci nse 2.00 es 15.00 30.00 30.00 0.00 0.00 0.00 0.00- 384.92 Fee 10.0% 3&49 423.41 Matertals SEE ATTACHMENT 1.00 ea 6,020.33 6,020.33 6,020.33 0.00 0,00 o.oG 0.00 _ o.ao a.ao 6,020.33 Sales Tax 0-0%1 0.00 LIFee 10.0% 60203 6,627.38 Subcontractors Fabrication Labor 1.00 ea 6&14 66.14 66,14 0.00 0.00 0.00 0,00 66.14 Fee &00% 6,29 Total for Subcontractors 71,14 Summary Labor 1,682.38 Equipment&Materials 7,045.77 Subcontractors 71.4411 Grand otal SB 8 MATERIAL SHEET QTY. UNIT MATERIAL UNIT TOTAL 1.00 ea 4" dry pipe valve $ 2,261,16 $ 2,939.51 1.00 ea ps10 switch $ 63.84 $ 63.84 1.00 ea ps40 switch $ 73.92 $ 73.92 1.00 ea main drain assembly $ 102.71 $ 102.71 1.00 ea drum drip assembly $ 125.40 $ 125.40 1.00 ea riser assembly piping $ 749.96 $ 749.96 63.00 ft 4"sch 40 pipe $ 9.08 $ 572.14 12.00 ea 4"groove coupling $ 7.60 $ 91.24 4.00 ea 4"groove elbows $ 42.66 $ 170.65 1.00 ea 4x1 meth tee $ 21.85 $ 21.85 1.00 ea pipe stand $ 99.00 $ 99.00 1.00 ea 4"butterfly valve $ 246.92 $ 246.92 1.00 ea 1" globe valve $ 23.40 $ 23.40 1.00 ea air compressor $ 739.79 $ 739.79 1.00 ea air compressor trim package $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - PCO 0 TOTAL $ 6,020.33 FABRICATION LABOR QTY. UNIT MATERIAL UNIT TOTAL 16.00 ea 4" pipe cut $ 2.05 $ 32.86 16.00 ea 4"roll groove $ 2.08 $ 33.28 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ - 0.00 $ - $ 0.00 $ - $ 0.00 $ - $ - PCO 0 TOTAL $ 66.14 4 3 2 1 N[�16 t REDRAVIN TO AIlfOC/1D AVDEDZM 11 7 13 3/4" 1/2" NPT INTAKE DISCHARGE FILTER 8 1/2" CHECK PRESSURE VALVE SWITCH I 1—r COMPRESSOR RELIEF O gir 7 3/4" VALVE 40 4 HOLES Y I 5/16 DIA 2 3/4" RISER MOUNTING PLATE 4 1/4' —6 3/4" NOTES: SIZE 1)THIS DRAWING REPRESENTS MULTIPLE TO WISER SER UNE SCHEFDULE 40 ASSEMBLIES. SEE TABLE FOR MODELS REPRESENTED. REFERENCE ONLY STEEL PIPE 82.W 4' 2) REFERENCE INDIVIDUAL PARTS LISTS 4' 6 FOR COMPONENT PART NUMBERS. 5' 8` 3) REFERENCE INSTRUCTION MANUAL FOR INSTALLATION AND WIRING RECOMMENDATIONS. 4) DIMENSIONS ARE FOR REFERENCE ONLY. MODEL VOLTAGE –QL11016AC 1 3 OL1101BAC-50 220V/50HZ/1PH AAFpp2wLsA GENERALARRANGEMENT 1)6 HORSE POWER ACAD DRAWINGSICOMPRESSORSIOILLESS RISER MOUNT10L11016.DWG .na oPH aL+EssooraPREssoRs :IV* a .o. .+� c 4 �N0. G2000s2 'a 3 2 SYSTEM SENSOR EPS40-1 AND EPS40-2 Supervisory Pressure Switches System Sensor EPS40 Series switches are designed for use in dry pipe systems or pressure tanks and water pressure supplies ofoutomatic water control valves. Features The EPS40-1 has a single SPDT switch while the EPS40-2 model -Sensitivity adjustment wheel,no special tools required contains two SPDT switches.The EPS40 Series features field adjustable pressure sensitivity to provide an alarm response between •Reinforced diaphragm resists pressure spikes 10 and 100 psi.All models are factory set for use In a nominal 40 psi •Two conduit entrances system.The EPS4.0-1 Is factory set to respond at 30 psi at decreasing •Both one-and two-switch models available pressure while the EPS40-2 15 factory set to respond at SO psi on rising pressure and 30 psi at decreasing pressure.The pressure adjustment wheel requires no special tools and does not of ect Agency Listings switch synchronization on the EPS40-2 The EPS40-1 and EPS40-2 supervisory pressure switches are NEMA 4 rated. UL IPCB FM U�C APPROVE O LISTED 1186a1 UWAV C5169 S739 WS aMEA pproved GOMM 7770-1109:147 16793-E Specifications,EPS40-1 and EPS40-2 Architectural/Engineerinu Specifications EPS40-1(SPDT),EPS40-2(2/5PDT) Model shall be an EPS40-1 or EPS40-2 pressure type waterflow switch as manufactured by System Sensor of St Charles,11-They shall be Installed on the sprinkler system with connection as shown on the drawings and/or as specified herein.Pressure switches shall be of the bellows-activated type.Switches shall have a maximum service pressure rating of 250 psi and shall be adjustable from 10-100 psi,There shall be one(1)or two(2)SPDT contacts rated at 10.0 Amp @ 125/250 VAC and 25 Amp L56/12/24 VDC-The contractor shall furnish and install,where indicated on the plans,pressure switches according to appropriate NEPA standards.Switches shall be provided with a%'NPTmale pressure connection to be connected Into the air supply line on the system side of any shut-off valve.Switches shall provide 1 knockout type and 1 open hole for Wconduitfitting attachment and a ground screw provision for electrical grounding. The switch enclosure shall be weatherproof and carry a UL 4x/NEMA 4 rating when used with proper electrical fittings and conduit.The cover shall Incorporate tampertesistant screws The unit shall be listed by Underwriters Laboratories,Inc.,the California Slate Fire Marshal,MEA,CSFM,LPCB,VdS and approved by Factory Mutual. Specifications,EPS40-1 and EPS40-2(continued) Physicall/Operating Specifications Maximum Operating 250 psi Operating Temperature Indoor or outdoor use: Pressure Range -VF to 160T(-401C to 71 IQ Maximum Adjustment 10 to 100 psi CoverTamper Switch UL Models:Opdona I P/N 546-8000 Pressure Range ULC Models:Factory Installed Differential Approximately 3psl@10psi,6psi @100psi Enclosure Rated UL 4x,NEMA 4 for Indoor or outdoor use Factory Setting EPS40-1 operates at decreasing pressure at 30 psi ShippingWelght IQ I bs.(.54 Kg) EPS40 2 operates at Increasing pressure at 50 psi and decreasing pressure at 30 psi Switch Contact Ratings EPS 10-1;One set SPDT(Form C) Service Use Automatic Sprinkler:NFPA 13 EPS10-2:Two sets SPDT(Form C) One or Two Family Dwelling:NFPA 13D 10.0 A,Yz HP @ 125/150 VAC Residential Occupancies up to 4 Stories:NFPA 13R 25 A @ 6/17114 VDC National Fire Alarm Code:NFPA 72 Pressure Connection '/i NPTmale Warranty 3years Dimensions 5.12"Hx3.325'Wx4.250"L (13.0 cm x 8.4 cm,x 10.8 cm) Typical Sprinkler Applications WIRE ro sLF'eRVISORY WIRE ro AtMM CIRCUIT OF FIRE ALARM NDICATWO COiCUR YY YY AA SS S 'UT OO EPS40 CONTROL PANEL EP840 OF FlREALARM CONTROL PAN EL S PRINKLER SYSTEM IN31:4L1. CHECK CHECK BLEEDER DRY VALVE VALVE FOR PIPE VALVE WATF_R TESTINO VALVE MOTOR GONG AIRLINE SHUT-OFF VALVE WATER LOCAL ALARLI VALVE BTESTS VALVE VALVE DRY SYSTEM Electrical Connections Pressure Switch Basic Dimensions MODELS EPS40-I MODELS EPS40-2 1 41/4" SWITCH AT 40 P.S.I.(NORMAL) SWITCHES AT3C P.S.I.(LOW TRIP PT.) LGROUNDCOM COCOAX A A EN .SWITCH#2 HEX SWI SW2 ADJUSTMENT SWITCH AT 30 P.S.1.(LOWTRiIPPT.) SWITCHES AT 40 P.S.I.(NORMAL) a SCREW COM A COM COM A A 51/8" SWi SW2 MAIN ADJUSTMENT SWITCH 1 SWITCHES AT 5D P.S.I.(HIGH TRIP PT.) WHEEL LDC KI NG R^_ p 0 SCREW cam A COA '/2"NPT SWI SW2 Ordering Information .PartNo. Description EPS40-1 Low Pressure Supervisory Switch,One SPDT,10-100 PSI EPS40-2 HlgI-Aow Pressure Supervisory Switch,Two SPDT,10-100 PSI EPSA40-1 Low Pressure Supervisory Switch,One SPDT,10-100 PSI(ULC Model) EPSA40-2 High/Low Pressure Supervisory Switch,Two SPDT,10-100 PSI(ULC Model) Replacement Parts S07-66-XX ReplacementTamper Screws for Cover of EPS WFDW Replacement7bmper Proof Wrench for Cover cf EPS 546-8000 CoverTamper Switch For FPS Series SYSTEM oa�ase° ` `� SENSOR" 3825 Ohio Avenue•St.Charles,IL 60174cicnbI4wM1%hdjcewa ebtaLm.a afflimrgmd m rn \]],�1 Phone:800-SENSOR2-Fax 630-377-6495 ""'a°�TIr�"wm^"am"olkw«2 e"de,6meo ADS-0177-010.'A�06•:1070 SYSTEM .SENSOR® EPS10-1 AND EPS10-2 Alarm Pressure Switches System Sensor EPS 10 Series switches are designed for use in wet,dry,deluge,and pre-action automatic sprinkler systems to indicate a discharge from a sprinkler, Features The EPS10-1 has a single SPDT switch while the EPS10-2 model Sensitivity adjustment wheel,no special tools required contains two SPDT switches.The EPS10 Series features field adjustable pressure sensitivity to provide an alarm response between Reinforced diaphragm resists pressure spikes 4 and 20 psi.It is factory setto respond at 4—8 psi on rising or falling Two conduit entrances pressure.The pressure adjustment wheel requlres nD special tools •Both one-and two-switch models available and does not affect switch synchronization on the EPS10-2.The EPS10 Series switches are NEMA 4 rated, Agency Listings 'dI" ULA' FM LISTED Arrnovr6 $739 05169 3OD5803 ® aMEApproved VdS 7770-=9:10 167.913-E CID20029'27 Specifications,EP510-1 and EPS10-2 Model shall be an EPS10-11 or EPS1 o-2 pressure type waterflow switch as manufactured by System Sensor of St.Charles,IL.They shall be installed on the sprinkler system with connection as shown on the drawings and/or as specified herein.Pressure switches shall be of the bellows-activated type.Switches shall have a maximum service pressure rating of 250 psi and shall be factory adjusted to operate ata pressure of 4—8 psi.There shall be one(1)or two(2)SPDT contacts rated at 10,0 Amp @ 125/250 VAC and 25 Amp @ 6/12/24VDC-The contractor shall furnish and install,where indicated on the plans,pressure switches according to appropriate NFPA standards Switches shall be provided with a 1A-MPT male pressure connection to be connected to the alarm check valve of a "wet'sprinkler system,Into the Intermediate chamber of a dry'system,or to a pre-action or deluge valve.They shall be activated by any Flow of water equal to or in excess of the discharge from one sprinkler head.Switches shall provide 1 knockout type and 1 open hole for V2-conduit fitting attachment and a ground screw provision for electrical grounding.The switch enclosure shall be weatherproof and carry a UL 4x/NEMA 4 rating when used with proper electrical fittings and condult.The cover shall Incorporate tamper-resistant screws.The unit shall be listed by Underwriters Laboratories,Inc and approved by Factory Mutual. Specifications,EPS10-1 and EPS10-2(continued) Physicalf0perating Specifications Maximum Operating 250 psl Operating Temperature Range Indoor or outdoor use: Pressure -40'F to 1607(-WC to 71•C) Maximum Adjustment 4 to 20 psi CoverTamper Switch UL Models:Optional P/N 546-WW Pressure Range ULC Models:Factory Installed Differential Approximately 3 psi throughout range Enclosure Rated UL 4x,NEMA 4 for Indoor or outdoor use Factory Setting Operates at rising pressure 4t 8 psi Shipping Welght 12 lbs.(.54 Kg) Switch Contact Ratings EPS 10-i:One set 5POT(Form C) Service Use Automatic SprinWer:NFPA 13 EPS 10-2:Two sets SPDT(Form C) One orTwo Family Dwelling:NFPA 13D 10,0 A,'A HP @ 125/250 VAC Residential Occupancies up to 4 Storles;NFPA 13R 2.5 A @ 6/12124 VDC Natlonal Fre Alarm Code:NFPA 72 Pressure Connection 12'NPTmale glass reinforced nylon Warranty 3 years Dimensions 5.12-Hx3.325'Wx4.250'L (13.0 cm x 8.4 cm x 10.3 cm) ntpical Sprinkler Applications WIRE TO ALARM OER WIRE TO WIRE TO EPSIO INDICATING CIRCUIT EPS10 ALARM ALARM OF FIRE ALARM INDICATING EP510 INDICATING TO CIRCUIT TCONTROL PANEL R CIRCUIT SPRINKLER OF FIRE ALARM TO ALAROF FIRE TSYSTEM ALARM SPRINKLER CHECR ALARM CONTROL PANEL CHECK SYSTEM WATER VALVCONTROL CHECK VALVE MOTORPANEL DRY VALVEWATTGONG PIPE MOTOR RETARDRETARD VALVE —'l GONG WATER LOCALALARM LOCAL ALARM WATER LOCAL ALARM OS&Y BY-PASS SHUT OFF OS& SHUT OFF OS&Y BY-PASS SHUT OFF VALVE VALVE VALVE VALVVALVE VALVE VALVE VALVE WET SYSTEM WET SYSTEM DRY SYSTEM Pressure Switch Basic Dimensions Electrical Connections 411e MODEL EP510-1 MODEL EPS10.2 SWITCH AT 0 PSI SWITCHES AT 0 PSI GROUND B B SCREW 2i;t2 _HEX COM COM COM (GREEN .SWITCH A A SWI ASW2 SWITCH AT 4-8 PSI(HIGH TRIP PT.) SWITCHES AT 4-8 PSI(HIGH TRIP PT.) ADJUSTMENT B— B — - O SCREW COM COMA COM SWI SW2 SWITCH 1 I I BOTH SWITCHES ACTIVATE SIMULTANEOUSLY rJ�9° MAIN ADJUSTMENT WHEEL LOCKING SCREW 1/2"NPT Ordering Information Part No. Description EPS 10-1 Alarm Waterflow Pressure Switch,One SPDT 4-20 PSI EPS10-2 Alarm Waterflow Pressure Switch,Two SPOT,4-20 PSI EPSA10-1 ULC/CanadianVersion EPSA10-2 ULC/CanadianVersion Replacement Parts S07-66-02 ReplacementTamper Screws for Cover of EPS WFDW Replacement Tamper Proof Wrench for Cover of EPS SsyYSTEM �arr nvu u �c�.546-8000 CoverTamper Switch for EPS Series ✓/STEM 3825 Ohio Avenue•St Charles,IL 60174 01006 "" 5ENSOR' Phone:80Q-SENSOR2•Fax:G30-377495 ■xtimo� �rttgmrme��a �'"�++ra°d++tw,,ee.`rw,°whiett.�,�rmhmnepn. ADS-017GOG9.9VOfi•I1u76 . Morales Cemmy Project: Brushy Creek Regional WTP Phase 1A Owner: Brushy Creek regional Authority Date: 1/13/11 TMC Change#: COR-05 Project Change#: ? Change Order Request T.Morales Company is pleased to offer this change proposal for the additional conduit,wire, terminations and added monitors to the fire alarm control system for the dry sprinkler system. Work consists of • Supplying new conduit,wire and terminations from DF-LP2 to new air compressor and pressure switch. Suggest using circuits 24&26 in DF-LP2 • Supplying new conduit,wire and terminations from fire alarm control panel to new pressure switch • Addition of 2 new monitors for flow and pressure in the fire alarm control panel (Material-$1875.00: Labor($2325.00) Total additional cost for this proposal: $4,200.00 Change Initiated By: Sam/Pepper Lawson Change Prepared By: Ron Wile/TMC Change Delivered To: Sam/Pepper Lawson Response Rgst'd By: ASAP Carbon Copy To: None PO Box 859 601 South Patterson Avenue Florence,Texas 76527 Florence,Texas 76527 Phone:254-793-4344 Fax:254-793-3044 PEPPER-LAWSON Change Proposal CONSTRUCTION,L.P. Request No. 09 (Not a Change Order) Project Name: Brushy Creek Regional Water treatment Project Owner:BCRUA Plant Phase 1A Contractor: Pepper-Lawson Construction Initiated by: Owner Date:Sept 28,2010 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Additional Fire Sprinkler for Disinfection Facility per the Fire Marshal request Reference the attached: • Cost breakdown sheet • Email quote and data from Automatic Fire Protection • Email quote and data from T-Morales By Chad Mitchell,Project Manager All work shall be in accordance with the terms,stipulations,and Camp,Dresser,McKee,Inc. Recommendation: conditions of the original Contract Documents. If the work ❑Recommend Acceptance herein provided for is Approved by Change Order,the time of ❑Do Not Recommend Acceptance completion will be: ❑ Increased ® Decreased Unchanged by_0,_calendar days. By:Steve Lynks,RE Date Nichan1ge 'll: dd Q Deduct Q No Change BCRUA: ❑ Accepted ❑ Not Accepted epp r-Lason Construction,L.P. By: Mike Thuss,P.E. Date Septe ber 28,2010 I Date Change Proposal Request Form Brushy Creek Regional Water Treatment Plant Phase I A Pepper-Lawson Construction,L.P.Job 1`o.19981 28-Sep-10 Brushy Creek Regional Water Treatment Plant Phase 1A CPR 09 Additional work regtured by PEC reviseddrawings Non-Taxed Labor Material Subcontract E ui ent/TaxedMaterial Item Unit Total Unit Total Unit Total Unit Total No. Description Qty Unit Cost Cost Cost Cost Cost Cost Cost Cost 1 Additional fire sprinkers(See Automatic Fire Protection ScoF 1.00 LS 9,178.00 9,178.00 2 Additional wiring(See T-M) 1.00 LS 650.00 650.00 C1 CC2 C3 C4 A Direct Cost Subtotal 9,828.00 B Labor Burden @ 55% n/a n/a n/a C Tax @ 8.25% n/a r✓a n/a D Contractor's Fee[15%for labor,mael,and equipment&5%for subs] 491.40 E Subtotal 2(A+B+C+D) 10,319.40 F Liability&Insurance @ 2.00%of F(0.02 x F) 206.39 G Bonds @.65%(.0065 x F) 67.08 H Subtotal(F+Cr-H) 10,592.86 I Total of all columns(C1+C2=M+C4) 10,592.86 Other n/a Current otal Cost 510,593 Chad Mitchell Subject: FW: electrical heat trace requirements From: Ron Wile [mailto:rwile@moralescompany.com] Sent: Friday, September 17, 2010 9:32 AM To: Sam Gide Subject: RE: electrical heat trace requirements (No=$650 onnection for your change order. From: Sam Gide [mailto:SGide@pepperlawson.com] Sent: Friday, September 17,2010 8:53 AM To: Chad Mitchell Cc: Ron Wile Subject: RE: electrical heat trace requirements Ron, One Circuit and 120V for heat trace at the LAS Canopy. Thanks Semere(Sam) Gide, LEED AP I Project Engineer Pepper-Lawson Construction I *: 1906 Hur Industrial BLVD, Cedar Park,TX 78641 (Office: 512.382.6207 Cell: 281 757 7717 17 Fax: 512.382.6218 www.pepperconstniction.com From: Chad Mitchell Sent: Wednesday, September 15,2010 1:06 PM To: Sam Gide Subject: electrical heat trace requirements i AUTOMATIC ,► ■ PROTECTION■ . • 20111A MASHBURN STREET SCR-0005 PHONE: 512-251-5752 PFLUGERVILLE, TEXAS 78660 FAX: 512-251-5783 08-Sep-10 CHANGE ORDER PROPOSAL Pepper-Lawson Construction Brushy Creek WTP Jobsite Job Name: Brushy Creek WTP Cedar Park, TX Job No.: 50026 Attention: Sam Gide Reference: Add coverage to LAS Bulk Storage and heat trace and insulate Materials: $1,200.00 Tax Rate 0.00% _ $1,200 Field Labor: 48.0 Hours @ $45.00 = $2,160 Design/Project Management: 16.0 Hours @ $40.00 = $640 Material Handling 5% of labor: $2,160.00 x 5% _ $108 Expendable Tools&Consumables 6%of Material: $1,200.00 x 6% — $72 Rentals: $0.00 $0 Other: $3,500.00 (Heat trace&insulate) $3,500 Subtotal $7,680 Warranty 4% $307 Overhead 10% $768 Profit 5% $422 Total Change Bond 0.0% $9,178 This change proposal is valid for sixty days. Sincerely, AUTOMATIC FIRE PROTECTION, INC. Joel T. Sands Branch Manager NELSON" HEAT TRACING SYSTEMS SPECIFICATION/APPLICATION TA4X140 THERMOSTAT INSTALLATION DESCRIPTION ENCLOSURE Die Cast Aluminum CLASSIFICATIONS NEMA Type 4X IP66 TEMPERATURE RANGE Range -9 to 60°C(15 to 140°F) CAPILLARY Length Material Max.Bulb Temperature NIA Stainless Steel 71°C(160°F) ELECTRICAL DATA CSA Rating UL Rating �? 22 amp resistance 480 VAC 22 amp resistance 480 VAC k` CALIBRATION ACCURACY 1.1°C(2°F) ¢ SWITCH TYPE Single Pole Double Throw These thermostats are used for ambient temperature control in ordinary or corrosive locations. OUTLINE 124mm(4.9") 26mm(3*) 114mm(4b-) 102 mm(4') 420- 102m(1)203-(8) 114mm(4.6� IQ-(S 6� (0.16 20mm(.81� Annual Maintenance: 1. Remove Cover. 2. Lubricate dial stem and spray a coat of lubricant and rust preventative such as CRC Stor&Lube, electrical grade,on the thermostat body. 3. Replace Cover. Approvals: General Locations UL - E89748 CSA - LR701949 CE P.O.BOX 726 ■ TULSA,OK 74101 ■ TEL 918-627-5530 ■ FAX 918-641-7336 ■ www.nelsonheaters.com GA-1990 Rev.3 August,2005 NELSON'm HEAT TRACING SYSTEMS SPECIFICATION /APPLICATION TA4X140 THERMOSTAT INSTALLATION INSTALLATION Junction Box Sensing Bulb land-0R Condull to Thermostat hermostat Pipe Clamps Power Supply Method for installing LT, HLT, CLT and NC heater cable types. MI Cold Section Low Point Drain Pipe WIRING DIAGRAM DIRECT CONTROL LOW TEMP.ALARM 0 Phase C 0 Phase C ® NO ® NO Heater NC Alarm NC (low temperature) Nelson Heat Tracing Systems products are supplied with a limited warranty.Complete Terms and Conditions may be found on Nelson's website at www.nelsonheaters.com. P.O.BOX 726 ■ TULSA,OK 74101 ■ TEL 918-627-5530 ■ FAX 918-641-7336 ■ www.nelsonheaters.com GA-1990 Rev.3 August,2005 NELSONTM HEAT TRACING SYSTEMS SPECIFICATION/APPLICATION TF4X40 THERMOSTAT INSTALLATION DESCRIPTION ENCLOSURE Molded Fiberglass Polyester CLASSIFICATIONS NEMA Type 4X IP66 TEMPERATURE RANGE r e, Fixed Range 4,4eC(40°F) CAPILLARY Length Material Max.Bulb Temp. 0.9m(3ft.) Copper 71°C(160°F) ELECTRICAL DATA CSA Rating UL Rating 22 amp Resistance 250VAC 22 amp Resistance 250VAC These thermostats are used for controlling heat tracing CALIBRATION ACCURACY systems in ordinary locations.The capillary bulb should 22eC(4eF) be mounted on the side of the pipe. SWITCH TYPE Single Pole Single Throw OUTLINE 36m(I b-) s 1 118 Hole for,75'NFT Conduit Hhb 25—(1.0') + 64—(2.5") 5—(115')2 pla •tOmm(3/8 O 80mm(3 1181 14mm(4.5') 137mm(5.25") I A . .2mm peal Two ewg Ah4 Stranded 1 r long wmmon•parol.I NC-blue 83mm(325') /s.---25')hbun8ng Hole,2 pia Annual Maintenance: 1. Remove cover. 2. Spray a coat of lubricant and rust preventative such as CRC Stor& Lube,electrical grade, on the thermostat body. 3. Replace cover. Approvals: General Locations UL - E50023 CSA - LR52088-4 CE P.O.BOX 726 ■ TULSA,OK 74101 ■ TEL 918-627-5530 ■ FAX 918-641-7336 ■ www.nelsonheaters.com GA-2240 Rev.5 December 2005 NELSON' HEAT TRACING SYSTEMS SPECIFICATION/APPLICATION TF4X40 THERMOSTAT INSTALLATION INSTALLATION Jundon Box and-off Condull to Thermostat O Thermostat Capillary Power Supply Pipe Clamps Method for installing LT, HLT, CLT and NC heater cable types. Low Point Drain MI Cold Section WARNING: Do not mount sensing bulb near heater cable. Pipe Fiberglass Tape Sensing Bulb WIRING DIAGRAM Paver Supply l } Heater Cable Nelson Heat Tracing Systems products are supplied with a limited warranty.Complete Terms and Conditions may be found on Nelson's website at www.nelsonheaters.com. P.O.BOX 726 ■ TULSA,OK 74101 ■ TEL 916-627-5530 ■ FAX 918-641-7336 ■ www.nelsonheaters.com GA-2240 Rev.5 December 2005 NELSONTM Non-Metallic Connection Systems Accessories Selection Guide PCT Enclosure Option NEMA V "' Tension-Clamp Enclosure Terminal Blocks Quarter-turn quick-release cover screws As an option to our standard enclosure enclosures provide oil, chemical and and terminal block found in our corrosion resistance with a working successful PLT Series line of connection temperature range of-40°C to +80°C. systems, Nelson introduces the new PCT The enclosure is approved by UL, CSA optional enclosure. The PCT option is and BS for NEMA 4X and IP65 comprised of a high quality polycarbonate protection. Quarter-turn, quick-release lid enclosure complete with DIN rail fixing screws are standard. Each mounted, tension-clamp style terminal enclosure is provided with DIN rail block connections. The enclosure is mounted terminal blocks with the tension- molded from light grey RAL7035 clamp connection feature for reduced polycarbonate which provides excellent installation labor. Maximum wire size is 8 strength, stiffness and impact resistance AWG. with good thermal stability. These PCT Power Connection Option R' =NELSON HEAT TRACE NELSON TM Non-Metallic Connection Systems Accessories Selection Guide EnclosurePCT • ! _ The selection tables below allow for the proper specifying of the optional systems. For custom configurations or modifications, consult factory. SPECIFY PIPE SIZE 3 .75-3.0 12 3.5-12.0 20 12.5-20.0 SPECIFY CABLE CONSTRUCTION B Braided Heater J Overjacketed Heater U Multiple(2)Cable Entry or Special Heater Constructions SPECIFY KIT CONFIGURATION PCT Optional Enclosure-Power Connection PCT Optional Enclosure-Splice Connection PCT Optional Enclosure-Tee Connection Nelson Heat Tracing Systems products are supplied with a limited warranty.Complete Terms and Conditions may be found on Nelson's website at www.nelsonheaters.com. NELSON HEAT TRACE NELSON HEAT TRACING SYSTEMS P.O. Box 726 • Tulsa, OK 74101 • 918-627-5530 • Fax: 918-641-7336 • www.nelsonheaters.com 309-SG-035 ©2005 Nelson Heat Tracing Systems September 2005 NELSONTM SELECTION PLT SERIES CONNECTION KITS GUIDE Nelson's PLT Series non-metallic connection kits are Factory Mutual, Underwriter's Laboratory and Canadian Standards Association approved for use in ordinary and Division 2 hazardous areas when used with approved Nelson heating cables. Nelson PLT-BC, BS and BY Series connection kits with a C2D1 prefix are Factory Mutual approved for use in Class II, Division 1 hazardous areas when used with Nelson Type C2D1-LT heating cables. PLT Series connection kits are approved for use with all Nelson LT, HLT and NC Series field-fabricated heating cables. Enclosures supplied in PLT Series connection kits are rated NEMA 4X. PLT-BC Power Connection Kit: The PLT-BC Power Connection Kit is suitable for connecting up to two heating cables to customer supplied power wiring. Kit Contents: 1 Universal Base, Box Adapter,Sealing Gasket,O-Ring and Locknut t 1 Junction Box with Sealing Gasket and Cover 1 Sealing Grommet(Specify Cable Construction`) 1 Power Termination and Cable End Seal with Adhesive Sealant 1 3-Point Floating Terminal Block 1 Ground Connection Splice 2 Stainless Steel Pipe Clamps(Specify Pipe Size) ` Selection of-U grommet includes(1)additional power termination and(1) additional end seal for multiple cable entry. PLT-BS Splice Connection Kit: The PLT-BS Splice Connection Kit is designed for connecting two heating cables in an in-line splice configuration. Kit Contents: 1 Universal Base, Box Adapter,Sealing Gasket,O-Ring and Locknut K _ _ 1 Junction Box with Sealing Gasket and Cover 1 Universal Sealing Grommet 2 Power Terminations with Adhesive Sealant 1 3-Point Floating Terminal Block 1 Ground Connection Splice 2 Stainless Steel Pipe Clamps(Specify Pipe Size) PLT-BY Tee Connection Kit: The PLT-BY Tee Connection Kit is designed for connecting three heating cables in a tee splice configuration. Kit Contents: 1 Universal Base, Box Adapter,Sealing Gasket, O-Ring and Locknut 1 Junction Box with Sealing Gasket and Cover 1 Watertight Connection Fitting and Hi-Temp Flexible Tubing 1 Sealing Grommet(Specify Cable Construction) Power Terminations and Cable End Seals with Adhesive Sealant 1 3-Point Floating Terminal Block 1 Ground Connection Splice 2 Stainless Steel Pipe Clamps(Specify Pipe Size) Number of cable terminations based on standard usage of tee splice configuration;(3)power terminations and(2)end seals. NELSON TWI SELECTION PLT SERIES CONNECTION KITS GUIDE Nelson's PLT Series non-metallic connection kits include all components necessary to complete the installation of Nelson's full line of heat tracing cables. The selection tables below allow for the proper specifying of the complete connection kit assembly(example: PLT-BC-J- 12). - PLT- SPECIFY PIPE SIZE 3 .75-3.0 12 3.5- 12.0 20 12.5- 20.0 SPECIFY CABLE CONSTRUCTION B Braided Heater J Overjacketed Heater U Multiple (2) Cable Entry or Special Heater Constructions SPECIFY KIT CONFIGURATION BC Power Connection BS Splice Connection BY Tee Connection C2D1 SPECIAL PREFIXES Used with BC, BS and BY configurations for Class II, Division 1 hazardous areas when used with C2D1-LT Series heating cables. Nelson Heat Tracing Systems products are supplied with a limited warranty.Complete Terms and Conditions may be found on Nelson's website at www.nelsonheaters.com. =NELSON MHEATTRACE P.O.BOX 726-TULSA,OKLAHOMA 74101 -918-627-5530.918-641-7336-www.nelsonheaters.com 309-SG-010 0 2006 Nelson Heat Tracing Systems 03106 NELSON TM TYPE LT SPECIFICATION/APPLICATION SELF-REGULATING HEATER CABLE INFORMATION • Optional Overjacket • Standard Metal Braid LT3-CB LT23-CB LT5-CB LT25-CB LT8-CB LT28-CB LT10-CB LT210-CB • Stranded Plated Copper Conductors • Self-Regulating Conductive • Bonded Inner Thermoplastic Jacket ` • Outer Thermoplastic Elastomer Jacket Description: Nelson Type LT self-regulating heater to temperature changes.Two jackets provide A stranded tinned copper metal braid is cable Is a parallel circuit electric heater strip.An extra dielectric strength,moisture resistance,and supplied on all heaters.An optional overjacket irradiation cross-linked conductive polymer core protection from Impact and abrasion damage, (fluoropolymer or modified polyolefln)can be material Is extruded over the multi-stranded,tin- The inner thermoplastic Jacket Is extruded over specified when the heater cable Is to be installed plated,16-gauge copper bus wires.The and bonded to the core material.A thermoplastic in wet or corrosive environments. conductive core material increases or elastomer outer jacket is then extruded over the decreases Its heat output in response innerjacket, Principle of Operation: The parallel bus wires apply voltage material temperature increases,the number of The self-regulating effect allows the cable along the entire length of the heater cable.The conductive paths in the core material decrease, to be overlapped without creating hot spots or conductive core provides an infinite number of automatically decreasing the heat output.As the burnout.As the cable self-regulates its heat parallel conductive paths permitting the cable temperature decreases,the number of output,it provides for the efficient use of to be cut to any length in the field with no dead conductive paths increase,causing the heat electric power,producing heat only when and or cold zones developing.The heater cable output to increase.This occurs at every point where it is needed,and also limiting the derives its self-regulating characteristic from along the length of the cable,adjusting the power maximum sheath temperature. the inherent properties of the conductive core output to the varying conditions along the pipe. material.As the core Application: Nelson's Type LT self-regulating heater Options:(Delete-CB and add) D1- Approved for use in Class I,Division 1, cable Is ideal for use in maintaining fluid flow -JT A tinned copper metal braid with a Groups B,C,and D,Class II,Division 1, under low ambient conditions.Freeze protection modified polyolefin overjacket is Groups E,F and G,Class III hazardous and low watt density process temperature available for use when the heater cable areas.D1 heating cable requires the use systems such as product pipelines,fire protection, Is exposed to aqueous solutions of of HASK series connection kits. process water,dust suppression systems,lube inorganic chemicals(phosphate,dilute oil,condensate return,hot water and structure acids,chlorides,bases and carbonites). anti-icing are typical applications for this product. It Is also recommended where The base product Is supplied with a tinned mechanical abuse is a problem. copper metal braid that may be used in both 1 A tinned copper metal braid with a general applications and In dry,non-corrosive fluoropolymer overjacket is available for hazardous(classified)areas.It Is also used to use when the heater is available for provide a conductive ground path when cable is use when the heater cable is exposed installed on non-conductive surfaces,such as to excessive moisture,organic plastic or painted pipe. chemicals,solvents,etc.In hazardous (classified)areas and ordinary areas. NELSON TM TYPE LT SPECIFICATION/APPLICATION SELF-REGULATING HEATER CABLE INFORMATION Performance and Rating Data: Catalog Service Maximum Maximum Maximum T-Rating* Number Voltage Length Maintenance Intermittent Temperature Exposure LT3 120 325 150°F 65°C 185°F 85°C T6 LT23 240 650 150°F 65°C 185°F 85°C T6 LT5 120 270 150°F 65°C 185°F 850 T6 LT25 240 540 150°F 65°C 185°F 85°C T6 LT8 120 210 150°F 65° 185°F 85°C T5 LT28 240 420 150°F 65°C 185°F 85°C T5 LT10 120 180 150°F 65°C 185°F 85°C T5 LT210 240 360 150°F 65°C 185°F 85°C T5 *Electrical equipment T-rating codes define the maximum surface temperature that equipment will reach.It is used in hazardous (classified)area applications. Circuit Breaker Selection: Max.Lencath Feet Vs.Circuit Breaker Size Start-Up 120 Volt 240 Volt Watts/Ft. Temp. 15A 20A 30A 40A 15A 20A 30A 40A 3 50°F (10°C) 325 650 0°F (-18°C) 230 305 325 460 620 650 -20°F -29°C 205 275 325 410 550 650 5 50°F (10"C) 225 270 460 540 0°F (-18°C) 155 205 270 310 415 540 -20°F -29°C 135 180 270 275 370 540 8 50°F (10°C) 145 195 210 295 390 420 0°F (-18°C) 100 130 195 210 200 265 395 420 -20°F -29'C 90 115 175 210 175 235 350 420 10 50°F (10°C) 115 150 180 230 305 360 0°F (-18°C) 85 110 155 180 165 220 325 360 -20°F -29'C 75 1 100 145 180 150 195 290 360 NOTES: 1. Circuit breakers are sized per national electrical codes. 2. When using 240 volt product at 208,220 or 277 volts,use the circuit adjustment factors shown in the Voltage Adjustment Table. 3. When using 2 or more heater cables of different wattage ratings in parallel on a single circuit breaker,use the 15A column amperage of 15 amps,divide it by the maximum footage to arrive at an amps/foot figure for each cable. You can then calculate circuit breaker sizes for these combination loads.These ampstfoot factors include the 125%sizing factor. 4. National electrical codes require ground-fault equipment protection for each branch circuit supplying electric heating equipment.Exceptions to this requirement can be found in the 2002 N.E.C. 5. Heater cables with D1 optional construction require the use of ground fault interrupter/ground leakage device with a trip setting no greater than 30mA. EOlmE�ENN1■■■Nf■■#iii■lElRif■■■iR■N■i■■■■#■lREi■■■fiiiiffiffilMfii■iE■ E1lt■ ■■illi\//MEEENi■lift■fffiffl■■#ffiiE■REIElElEii■EElif■#Ef#ifilE fill!!O■illfEtwt■MEMtE■R■ttE!■ii■tEEt#liiEEttMwtEEERRMtwEiff!lwtw■■fff iifMEEEEllfflEE■■tiE■#Nfl■■lflf!■■MlEE■■■■lE■tE!#N■##EEENNSltiflREEE#■ ■/EEE■■lit■■tEtEM■■!■■EtMtt■■ttE■■M■■E■■!lMttttttttlfRtEMEE!!!#tsEEt■! ■!!!!■w!ltEE//■lsttt■E1■ttM■■■tit!!!!!/■IMMUNlfit■iRttw!lttEf■ttt■REE ■SlEli!lIMM■E■■ERlEifll■wt■■ENHHUMlli#i!t/tliiEllw!■EE#iN!/t!1■■N#■ ■■ttlOER1■tNESUBsNltEttr■E1SEfR■MltNt■liMR■EER■lfREttEi#f#R1lR!■##iN ■■R■ffflffElRiilfifEff■■■■■S■■iiifiElfffwiliERNi#fM#i■ilM■flit■■if■E■■ Elt1■Elt■E■swrlt■■ttlwtlt■■■w■■OOOt■twt■tttiOOt1S1OROlOtlfttMOtt*MMSI/ wtwiMr■ ■ttttltt■EtEtMw!■tMwtttttt■wtltEMMwtlwtltEM■E/ttttttttltttas■ lIfNEEiIiEEt■lRfiiliMiwRENiiEM■E!#i■■!lttEtliilR##liiRliERElRMIi■■ Esf�wr�►.• ■���iri�ril���M�MMw���r�wM��rtSi����M �����lCMwr\��MMrEr���� ■ails■■f•■■■REta/tt■tit!!M■■EEEEEt■MtllElEMtlttlEltMltMREtEEMtIttMEEE1 Eltw!lttt.tttwtatltatt■fit!!!ltttrrrttRERt■■M EttttwttlMtlttttttltEttE■ ■■lIEERlEfll■"EIEIiEEEIiMMEEEftiERttEliN#il�ElttRRttEtMEElREtEtEMitEE1 ■!M/!!!t!t!E■la`MMtt■tit/■■MtwtwwtM■lttt■tttl■tElttilttO■wR■tttttrMttti 1 ttttti! ■Mtwlt►7tttttttt■/■RREMtttMtt■■tttMtltlttlisttMttR■■Ettrtlttt ffffMt flEttt#!IftfittttMfiliiEttilllifililltfttttltrtlllfitllttfilf ���w��� ■�����Ml�MM���iAA����tNwR�MA�If�x�l��®�������A�%r�i�r�����r�r . tEEEttR��iEERSEtttttt►\t!tltME1EM11tlEElSEElttltEltftif■tttlrtrlEtMElt ■/tlttii!\tit■tit/■i■rt�ltltittt■it!!■tRla a awwlsttsls lwMtE!!w!!MlERt■ �f.IMEi��Alfft��twiilfif/t��ttlRt���MUMMOMiillAsotltsAsttl��� t ■■fi■IEEEIIf\\EMEE#ifR!■t►tE■NiftEElitl#■NEEttlEiflfiEttffffEEElEEEltt ■■t■■ttitEEE■11■■■■E1■tfttt!tittttttttEElilt//tllittffllttllttf/tttlstt M■EEtiEMts■■tOl►■■ttOO Mlt�ttttOrttitEEEEt■tEstEltlElt■RttERtttMMME■ Mang ■■■i■■M■E■fERlEMERRf1Etttlftti#l1E!#Ewtl■EEMi!!tl■ill#E■if■EtlfElEtEER■tE!■tt►■Rtl\ttE\i■Rl■t!Ell\■f\E.Eltttitlt\MiMR\ltMEftEitE■tRlEf1l►tl■it\fEtE\1fRRR:E■�Ett►!`lR■Ef1■t1Ef■i\Rf#tEf■�ES!t EE##/Rt■fftMtwEEElEEi■1tMt■1EEt■EEMtffEEtllitf!fNti!1RtEEt!l!■!EEtEE■E■■tl■SEillElEEttEttEt#ttEEIREtEutEttElnMEEiEtiE1M RfllttitflEE111l1EEEtllEl MEMEM wtsllwftlMtsM MENSOMEENElwR ► tt111 1 R # ■EttttzS■RsttttRtE RlERR■ ER■■EEEEER■■REEME):\ittttttttt►ttEEtitfE!■##!E!ElRRMlEtf■#1RE Etll/w� lEEttttttR■■tEtEtEEt�iEMt!lEEtt\\tttlEtlMtlEtltMMME!lEsittttE ■ttltwt►'\EE/■■■■ittttitttlittt►`\■s11■■!!■ai\MlttiE1s1M1E1EE■■■/!■itEftt ■MEwOOOfl►aEMttttEMtEltttMlMttl\;�EtwEltlttt.�l�tttllttttMtEEtttlttlftlE ■■■iEIEEE/M�\■■EEEftlEEEt tREIIEM►\/REE■EE/E► Etii1REMMltIfEiREEElM■sslEI ■REEEEtIiIMt��\EEtEltEEEEEMl■■■■■R►\RSE1is/s■\'\EEMMt/rttSEilEttlEMt /1!M■Ositttliwr:\tlOttwtrlis!lwOwls■1:wtsttrMEwt�wOtswwltttttiRRMElEEE! Slwt■EEE■EEMtElEE►\Effft/MtRiIE■Mitt!`\NItEMrtlMriltttE!■#/■REEElEERam 11fNE/E■RfffllNliEi►'�MtttiliEflElitlt0 0 .EwtltEEtt►'1EEEE■■■lEEElEltEElf ■Nf■lERlEt■■■E!■El■■i6�fEE■ilifE/!t■R■■■►\M#E■■tEl\�EREtS#l■R■E■Ni!!!■ ■ElEttw ER■fttlww!■tt��tltitwtttttttEt■r:l1lMMt/lam.\lttMilM/MIIEEENf! ■twlR! 1Ettttlsttt■■tt�l.".\E■■t1tERR1■■tt■►\MMEEtttl�lMMMMMMttttMliER ■t■#Et iff■lEtfffilltEEEr�\Eli##Iii#NEiflt�i■■Nltlta'!Ei!llii■ifffN# ■fffE!!� ■■lllfMEEfif■■EEM■■fti!■■Eit!■1■■■E1E>;\EREREEE\'lfEffEEEES■E!E if!■wMM■i�!>tiwEsw/EEttMtwrtt/tttl\��tEIEtEEtEEtM��wtEMMNi\111tMEEEEEsIa ■EEEEEE■/EfliZ�ItREE■EEEERMsEEE!\ \tEEtEEREEEEE►`1EEElEEl:1lltt!■Mass! Et1R■tO■tE■MREEtI���lttt■■tttt■t■ttttM�!1EMRtst!Elft\�tltEttt>;itlt!lEREE ■■REEREEffll■flit!Eri��!■t!■■!E!■tti!!■��lElEEtEEEtE►'\ftEEE1\\fttMEiif ■NflEEf■■RiIEEREEEEEEEE•IIw2�Mif iE■/lEEEEE■\�!iffi#■iEEEI�EIEEEtt\EEifff■ ■E■REl1tE■MtE!lEEttREEtRtEEti��M■EEE■EEEEI■E�!rMREltlEMt►'!fMSMRlE:11tM#if ■ElfEEEI■itltttE//RR!■R1/EER!■ttr.�.!IMS!!lEIEEEi\�\iiMEfE!!r\EtlEt►tlil: ■EEtw rftt■■ttlEOOrwlMR■Ot 1ltOt tillsw:��sstsEO101tN1M11COMMOss!\msM! ■N■!lE■t■■ElEEttttEl■■MM■tMEtEE!!■EREEEIi�!lEE!lEElvin1ttRERIMOROSIME\\t■ ■N■t■■1■ElR1!!!t/1M■■tttMttE■■til!!R!lEEltllryS#EEEl�a`\EEtRMM�\EMfl�l ■EE1MEEiE■■f■ESiEEiRIERtMtEEMREltwttfifE■!lEEffli�!�ltll�'��EMtEi�EtlM� ■EIMtMMtSttfREwlsElElEtt■MttlttEltttttEE■/ttE1tERERt���itMt�i■tEEYi�l1/ ■EEOMON■■ttltti■tttttttMMfttttttwttMEittlEMtfttt/litM!lM��!\l��llwsll•�m lifN■tliffiE#fR■tt■■Mt/■t■■Et■■■R1EREfliRlRRtlttIERRE■■tElMli�'_�g1:�EtE� !ifllEfiRfi■illi■lR■fEN!lEEf1■SERB■■1E■■■lEEREI■fl■■llilEiiiffl�li���\■ li#■!Sill!■■EMEMEMifEtfitE■fEEt■■■■EEE■■tf■/EEEEEtttfEElEtiRwtEttMtOr�� 1 1ttEMOlwt■■■■wMOiwttlEtltil■Et■tR■■OiOO■tSlttwfttlwllO!lMMOMOwssumflt! 1 1 1 •1 1 / 1 1 , � � 1 NELSON TM TYPE LT SPECIFICATION/APPLICATION SELF-REGULATING HEATER CABLE INFORMATION Catalog Numbers: Standard Feature Suffix: BASIC CATALOG NUMBERS -CB Tinned Copper Braid Voltage Watts Per Foot 3 1 5 1 s 1 10 Optional Features Suffix: 120 VAC LT3 LT5 LT8 LT10 240 VAC LT23 LT25 LT28 LT210 J Tinned Copper Braid and Fluoropolymer Overjacket JT Tinned Copper Braid and Modified Polyolefin Overjacket D1- Division 1 approved Voltage Adjustment: Use of Self-Regulating heater products at other than rated voltages require minor adjustments In power and maximum circuit lengths. ADJUSTMENT MULTIPLIER 208 VAC 220 VAC 277 VAC Absolute Product Power Length Power Length Power Len th Max Length LT23 .76 .93 .85 .96 1.27 1.07 650 ft. LT25 .79 .93 .87 .96 1.24 1.07 640 ft. LT28 .84 .93 .90 .96 1.19 1.08 420 ft. LT210 .86 .93 .92 .96 1.16 1.09 360 ft. Approvals: FM CSA UL Ordinary Locations- Ordinary Locations- Ordinary Locations- (-CB,-J or-JT options) (-CB,-J or-JT options) (-CB,-J or-JT options) Hazardous(Classified) Hazardous(Classified) Hazardous(Classified) Locations Locations Locations (-CB,-J or-JT options) (-CB,-J or-JT options) (-CB,-J or-JT options) Class I,Division 2; Class I,Division 2 Class I,Division 2; Groups B,C,D Groups B,C.D Groups A,B.C,D Class II,Division 2 Class II,Division 2 Class II,Division 2 Groups G Groups E,F,G Groups F,G Class III,Division 2 Class III,Division 2 Class III,Division 2 (-J option) (-J option) (-J option) Class I,Zone 1 Class 1, Division 1 Class I,Zone 1 and 2 Group IIC Groups B,C,D Group IIC (D1 option) Class II,Division 1 (D1 option) Class I,Division 1 Groups E.F,G Class I,Division 1 Groups B,C,D Class I,Zone 1 Groups B,C,D Group IIB+H2 Class II,Division 1 Zone 1,Ex a li T6(T5) Groups E,F.G FAPPF:�O�vmClass��® U G III �5 o usrl:n Accessories: • Connection Kits for Power Connection,Tee Splice,Splices and End Seals(Nelson PLT and ALT Series) • Thermostatic Controls(Nelson TA,TH,TE and HC Series) • Junction Boxes,Tapes and Warning Signs • Custom Control,Monitoring and Power Panels • Division 1 Connection Kits for Power Connection,Tee Splice,Splice and End Connection(Nelson HASK Series) • Zone 1 Connection Kits for Power Connection,Tee Splice,Splice and End Connection(Nelson Z1-PLT and Z1-ALT Series) Nelson Heat Tracing Systems products are supplied with a limited warranty.Complete Terms and Conditions may be found on Nelson's website at www.nelsonheaters.corn. =NELSON HEAT TRACE NELSON HEAT TRACING SYSTEMS•P.O.BOX 726•TULSA,OK 74101•918-627-5530•FAX 918-641-7336•www.nalsonheaters.com 316-SA-001 0 2006 Nelson Heat Tracing Systems October 2006 L I BRUSHY CREEK REGIONAL UTILITY AUTHORITY A Partnership of Cedar Park . Leander. and Round Rock January 27, 2010 Mr. Chad Mitchell Pepper-Lawson Construction,L.P. 2050 East Hwy 290, Suite D Dripping Springs,TX 78620 Re: Brushy Creek Regional Utility Authority Brushy Creek Regional Water Treatment Plant(BCRWTP)—Phase 1A CPR#014 Dear Mr.Mitchell: BCRUA has received Pepper-Lawson's email(dated 1/26/11)regarding the Elevated Storage Tank Logo pricing. The Operating Committee has decided to delete two (2)logos from the project scope; therefore,requests one(1) logo on the tank facing Ranch Road 1431. This letter shall serve as notice that a credit of$3,300 will be included in an upcoming change order to the Contract. If you have any questions,please do not hesitate to contact myself or Mike Thuss at(512)215-9151. Sincerely, Digitally signed by Jennifer L. Higby Date:2011.01.27 09:44:29-06'00' Jennifer L Higby, E.I.T. BCRUA Construction Manager/Project Controls ATTACHMENT Cc: Michael F. Thuss,P.E.,BCURA Chris Lippe,P.E.,BCRUA Kenneth A. Wheeler,P.E.,COCP Wayne Watts,P.E.,COL T.J. Dawkins,P.E.,COCP Michael Thane,P.E.,CORR Jeff Bell, CORR Don Rundell,P.E.,CORR Steven V. Lynk,P.E.,CDM David Briggs,P.E.,CDM Jo Zunker, WRM CPR#014 TO PLC 01.27.1 1 Higby, Jennifer From: Chad Mitchell [CMitchell@pepperlawson.com] Sent: Wednesday, January 26, 2011 10:17 AM To: Higby, Jennifer Cc: Sam Gide Subject: Logos Categories: CPR Jenn, Landmark can offer a deduct of$1650 per logo to eliminate one or two and a deduct of$6,825 for the deleting all of the logos. Please let me know by 1/28/11 if the DOC wants to delete the logos. Right now I have everything on hold. A delay getting a response could affect Landmark the overall project schedule. Chad Mitchell I Project Manager Pepper-Lawson Construction I : 1906 Hur Industrial Blvd, Cedar Park, TX 78613 1 Office: 512.382.6207 1 ❑ Fax: 512.382.6218 1 ❑ Cell: 512.626. 9514 www.r)er)perconstruction.com A% Water Resources WAW Management,L.P. MEMORANDUM To: BCRUA From: Jo Zunker Re: BCRUA W713-February Weather Days The contractor lost work on the following adverse weather days in February 2010: Feb.P Fe b.40 Feb.Stn Feb. 11' Feb. 12' Feb. 23re Feb. 24' Feb. 29th September Rain Days • 9/1 Wed. None 9/16 Thur. None • 9/2 Thur. .03" 9/17 Fri. 1.32" • 9/3 Fri. .37" 9/18 Sat. .01" • 9/4 Sat. None 9/19 Sun. None • 9/6 Sun. None 9/20 Mon. None • 9/6 Mon. .08" 9/21 Tues. .35" • 9/7 Tues. 8.25" 9/22 Wed. .11" • 9/8 Wed. 3.69" 9/23 Thur. None/ Muddy • 9/9 Thur. .01"/Muddy 9/24 Fri. .10" • 9/10 Fri. None/Muddy 9/25 Sat. .39" • 8/11 Sat. None/ Muddy 9/26 Sun. None • 9/12 Sun. None 9/27 Mon. None • 9/13 Mon. .01" 9/28 Tues. None • 9/14 Tues. None 9/29 Wed. None • 9/15 Wed. None 9/30 Thur. None PLC is requesting 16 days. C7�y s��