Loading...
GM-11-07-13-015 Page 1 of 1 BRUSHY CREEK Contract Quantity Adjustment/Change Order WP,-,.�1l^.VL UTILITY AUTHORITY rev.2/2011 ., ...,. ,... ......., .. «.,..,, ._... Department: Project BCRUA Raw Water Pipeline Phase One - Name: Contract i Date: 6/20/2011 Project Change Order/Quantity Adjustment ID Number No. 5 Justification SUMMARY Amount % Change Original Contract Price: $19,371,138.19 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $19,371,138.19 Previous Change Order(s): $64,333.20 0.33% This Change Order: $37,694.01 0.190/0 Total Change Order(s)To Date: $102,027.21 0.53% Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): $19,473,165.40 Original Contract Time: 630 calendar days Contract Time Prior to this Change Order: 611 calendar days Contract Time with All Approved Change Orders: 623 calendar days Glenn A. Bridges, P.E., Project Engineer Prepared By: Jacobs Engineering Group, Inc. Signature Printed Name,Title and Company Date Contractor DAviD A, <DuT1tTp,)As AdifA Approval: ' � � w`-r S.J. LOWS 6owSfW6gow OF Tik*P41 OP. fo Zo'l l Signature Printed Name,Title and Company Date BCRUA Approval: I//� / a4'`+4& r 7,44," 70�2gPff Af G'.2A''ll Signature Printed Name,Title Date BCRUA / Approval: ' l,— 3 Signature Printed Name,Title # bate ■WMbBRUSHYCREEK REGIONAL UTILITY AUTHORITY A Partnership of Cedar Park, Leander. and Round Rock CHANGE ORDER No. 5 DATE OF ISSUANCE: 06-20-11 EFFECTIVE DATE: OWNER: BCRUA CONTRACTOR: S.J. Louis Construction of Texas,Ltd. PROJECT: BCRUA Raw Water Pipeline Phase One—Contract 1 ENGINEER: Jacobs Engineering Group,Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: Change Proposal Requests and Field Orders 1. Add the scope of work required to provide mail delivery access to stone/stucco/brick mailboxes, per CPR #15 and the response to CPR#15 from S.J. Louis, dated 2/21/11. ADD$27,645.40 2. Add the scope of work required to connect to existing yard piping at BCRUA's WTP, per S.J.Louis Proposal#1, dated 01/21/11 (also identified as CPR#16) and Jacobs' recommendation letter,dated 03/04/11. ADD$5,195.16 3. Add the scope of work required for miscellaneous driveway revisions, per Field Order#21 (also identified as CPR#20)and the response to Field Order#21 from S.J.Louis,dated 2/21/11. ADD$4.853.45 TOTAL ADD$37,694.01 Page 1 Project:BCRUA Raw Water Pipeline Phase One—Contract I Change Order No.5 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price: Original Contract Times: Substantial Completion(Days): 630 calendar days $ 19,371,138.19 Final Completion (Days): 730 calendar days Substantial Completion(Date): July 10,2011 Final Completion(Date): October 18,2011 Net increase from previous Change Orders Net change from previous Change Orders: No. I through No.4: Substantial Completion(Days): (19 calendar days) Final Completion(Days): N/A $64,333.20 Substantial Completion(Date): June 21,2011 Final Completion(Date): October 18,2011 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion(Days): 611 calendar days $ 19,435,471.39 Final Completion(Days): 730 calendar days Substantial Completion(Date): ,Tune 21,2011 Final Completion(Date): October 18,2011 Net increase from this Change Order: Net increase this Change Order: 12 days Substantial Completion(Days): July 3,2011 $37,694.01 Final Completion(Days): October 18,2011 Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion(Days): 623 calendar days $19,473,165.40 Final Completion(Days): 730 calendar days Substantial Completion(Date): July 3,2011 Final Completion(Date): October 18,2011 Page 2 JACOBS AuV r., a Ow"Road,46sU�1�300 aust��,z-ra;zszaU u.s.a. 1.512.314,3100 rax 1 512 314 3135 March 4,2011 Michael F.Thuss,P.E. Construction Manager Brushy Creek Regional Utility Authority(BCRUA) 1906 Hur Industrial Boulevard Cedar Park,Texas 78613 Re: BCRUA Raw Water Pipeline,Phase One-Contract 1 Change Proposal Request#15 Dear Mr.Thuss: Based on the information submitted by S.J. Louis as Proposal#3(dated 2/21/11, copy enclosed,which is also referred to as CPR#15),Jacobs hereby recommends acceptance of the proposal in the amount of$27,645.40. If you have any questions or need additional information,please call. Sincerely, JACOBS ENGINEERING GROUP,INC. Glenn A. Bridges E. Senior Project Engineer XC: Jenn Higby,BCRUA Natalie Williams,BCRUA w/enclosures K:W0844\consaucdonkontnct 1\correspondence\to8CRUA\CPR#15ktter04041Moc SUMMARY SHEET-LABOR,EQUIPMENT,MATERIALS(12410 TRAILS END RD.) A B Iioua Worked Rate Tbaea . BO"51 SOWN TOTAL Rota I ITotal Tow HoursX Amount A B JUAN LUNA CREW CLEAN UP = r JUAN LUNA S 54.00 5.0 5.0 $ 270 00 .- 1 59 90X 161.73 S 431.73 Exawator Opersior s 23.00 5.0 5.0 S 115.00 45.W% S -_5 S 167.67 Tlacia Blade o s 13.00 5.0 5.0 $ 75.00 50.5096 S 37.88 y 11288 L S 15.00 5 0 5manteewwam .0 $ 75.00 ; 50.50'!. 37581 y 112.88 Am mansw 1$ 96.00 0.0S Maroyer s 63.00 00 i r. ., Haan Wow EA a Rad Tknes Eqwpm^t raw Total Noun " 2;CA7 416 TORM S33.73 5.0 5.0 S 173.65 'BOX BLADE TRACTOR s 31.73 5.0 50 158.65 F250 TR K S 13.5150 5.0 s 87.55 A maleftela 1 Nlse-Cosa Vendor or"mno s _ TOTAL Pdo� OuamMy COST A M E RUBY $ 1600 TN ROCK FOR DRIVING SURFACE 4 y 64.00 S 9400 SJL $ 5000 EA CONC.FOUNDATION FOR MAIL 8OX 1 y 50.00 S 5000 y s - $ s $ s $ s $ s s s $ - s f " 114.00 s 114.00 TOTAL cosy s 1,341.06 SUMMARY SHEET-LABOR,EQUIPMENT,MATERIALS(12ne TRAILS END RD.) A g NOiaj w0�`� Rate Tis 80.01t ow-W TOTAL Toto ToW llonra Amamt A B JUAN LONA CREWCLEANUP CR a . JUAN LUNA $ 54A0 110.0 1 1 1 1 1 1 1 1 1 10.0 S 540.00J 59.80% S 323.48 883.46 Excavator s 2300 1oA 10.0 $ 23000 , 43.8076 S 105.34 $ 335.34 Traylor 187ada ala 3 15.04 10.0 10.0 150.00 50.5071, S 75.78 228.73 Laborer S WOO t0A 10.0 1 50.50% S 75.751$ 225.75 IN" ana t s 95Ob 0.0 S Is- sa.00 0.0 $ i I 1.470 00 S t acs 30 ,. A Hor.vrortna ,-. ,. .. Raft TWO" N TOTAL Rib Tata- Tool Hours CAT 418 A f 3373 1a.o 10.0 S 35730 -.; BOX BLADE TRACTOR S 3173 10,0 1 110.0 317.30 357.30 F250 TRUCK S 1331 lo.o 317.30 10.0 135,10 $ 135.10 .,.-..., rJ`. - ':S aa.To i f ooa.ia MaNAaN 1 to",Posts A YaaMex Or Ilam ao. If Dasartp0oa OmaMlty COST �° TOTAL A M.E.RUBY $ 18.00 TN ROCK FOR DRMNG SURFACE 4 S 84.(10 S 64.00 SJL S 50.00 EA CONIC.FOUNDATION FOR MAIL BOX 1 S 50.00 $ 50.00 FELL COUNTRY CUL S 15.55 LF 18'CMP 16 S 248.80 i 248.80 HILL COUNTRY CULN&F S 23.32 EA 18'C DN NECTING BANDS 2 17 46.84 $ 46.84 SJL S 75.00 LD FILL( 1 $ 7i'00 $ 75.00 $ S y $ i f 404.44 f 4MA4 TOTAL COPT SUWAARY"ET-LABOR.EQUU'MENT,MATERIALS(12718 TRAILS END RD.) A 8 Hors Woftd RYto Tim" Banoltt 8~1 1 TOTAL Tout ToW H." I Amount I A a 8 JUAN LUNA CREW CLEAN4)P CREM JUAN LVNA f b1.00 10.0 10.0 S 540.00 ."% 323.46 863.46 Evwvator Opwow s 21.00 10.0 10.0 s 230.00 45.80% 105.34 $ 335.34 TmcAO iMOM f 15.00 100 100 S 150.00 50.50% 75.75 225.75 Labour f 15.00 10.0 1Q4 15000 "Wit 50 50'i 75.75 $ 225.75 �•• AM s A6.00 0.0 • as.00 OA ' i 1,010.00� i 1.6fa.a0 Hours .A. � •d e Itit� Rant TYaa i 0. t t R, ., TOTAL ToW Towmowa A CAT 416 f 36.73 10.0 10.0 BOX BLADE TRACTOR s 3173 1 of 10.0 S 31730 n 317.30 F250 TRUCK S 13.s/ too 10.0 S 135.10 c 135.10 f i �'� s iosao A matem"I Atbo.cool TOTAL Vaador oro m no. : LW7 Qraroky COST A M.E.RUBY S 16.00 TH ROCK FOR DRMNG SURFACE 4 S $4001S 6100 SJL $ 50.00 FA CONC FOUNDATION FOR MAB.BOX 1 s 50.001S 50.00 HILL COUNTRY CtJLVEF S 15.55 LF 18'CMP 16 $ 248.801, $ 246.80 HILL COUNTRY CULVEF $ 23.32 EA 18'CONNECTM BANDS 2 S 46.64 $ 46.64 SJL $ 75.00 LD FILL(TRUCKING) 1 S 75.00 S 75.00 $ S s S $ S S $ s 4f4.0 i 4M.44 P TALOSTZA44.44 SUMMARY SHEET-LABOR,EQUIPMENT,MATERIALS(12702 TRAILS EMD RD.) A B NoarsYhdwd pme Tri ss ' ' sonam 8"wfc TOTAL rataTOW TOW Haws yy L % A.0 JUANLUNAC/1EW CL.EANdJP - X,.•�«t`;�." JUAN LUNA Is 54.00 5.0 5.0 270.00 59.909E $ 161.73$S 431.73 Ftccavator for s i].00 s 0 5.0 115.00 . a+a;, 45.80!6 520 167.87 TrWW 1&0*O im s 15.00 50 5.0 S 75.00 ''- 50.50% 37.8 112.88 LeOorx s MOD s.o 5.0 7b. 1'• 5050% 37.88 112.88 nMtrt Area hbrdW is ".00 - Iftods eb.00 0.0 00 s sum s as to Nessa Worked Raw Timm TOTAL � EqK TOW Tow News 4 A CAT 416 TRACT i 35.73 S.0 5.0 $ 178.65 178.65 BOX SLADE TRACTOR s 31.73 S.0 5.0 S 158.63 158.85 F250 TRUCE( $ u ft so 5.0 87. S 87.55 s 404M! S 1a.fa A , N*Wru"/M4a.Coati TOTAL vewor or!Nest no. s !UWT Da"dpdon (iwMiry GbSi A M.E.RUBY $ 16.00 TN ROCK FOR DRIVING SURFACE 4 S 64.00 S 64 00 Sit. $ 50.00 EA CONC.FOUNDATION FOR MAIL.BOX 1 s 50.00 S 50.00 s- $ 75.00 LD FILL(TRUCKW) 1 s 75.00 $ 75.00 i s S - i s - ; S I - s 1sf.fo s taf.os TOTAL COST s 1,11!.00 SUMMARY SHEET-LABOR,EQUIPMENT,MATERIALS{12410 TRAILS END RD.) A g t♦arf 11Yorfad RW TMfaa BMfN1t I D.Wk TOTAL Rift I I I I Total TWN Hors `..'°, '• Amount I A*B JUAN LONA CRBMI CLEAN-UP CREM JUM LUNA s 34.00 s.05.0 S 27000 59.90% S 161.73 431.73 Excavator Operalor s 23.00 s.0 5.0 115.00 46.80% S 52.67 167.67 Traebr r 81adf s 15.00w5A 75.00 50.5091 S 3788 S 112.88 L4borfr s 13.00 s.oiv4m 5-0 s manDowwww* 4A I00 SO 50% 5 37. 112.88 s ssoo 0 a 616.00 a us.,s Hows works Rao Tbrlfa TOTAL qL*-t Rho lbial Tow,"ou f A CAT416 S 36.13 5.0 5.0 178.65 . N' BOX TOR s 3t•TJ a.o 50 S 158.65 �', S 158.85 F250 TRUCK Is 13.511 3.0 1 5.0 67.53 . S 67.55 - s 401." a 41l" A Nfurtau/lows.Cwu Vendor ah.Mno. a Lon Dtacrf{Mun Ouanft CONT A ME RUBY S 16.00 TN ROCK FOR DRNMK`SURFACE 4 s 64.00 ~' ' f S 64.00 SJL S 50.00 EA CMC.FOUNDATION FOR MW BOX 1 S 5000 i 50.00 SJL S 75.00 LD FILL(TRUCKING) 1 $ 7500 $ 75.00 S i S i - i s ,6f.o6 a ielm TOTAL COST a ,,1/fA0 SUMtMARY 3MEET-LABOR,EQUIPMENT,MATERIALS 411514 TRAILS END RD.) A B _ Hours Worked Rate T-mas BerwM Beaem TOTAL Raft Tow Total"ours % Amount A+8 JUAN LONA CREW(CLEAN-UP CREW) JUAN LUNA s 54.00 10.0 1010 s 540.00 59.909A S 323.46 $ 863.46 Excavator ator s 23.00 10.0 10.0 $ 230.00 x5.80% E 105.34 E 335.34 Tractor/BW*OpeMorS 15.00 10.0 10.0 S 15000 ` ' 50.5ft S 7675 E 225.75 Laborer is 15.00 10.0 10.0 s 150.00 50.50% $ 7575 S 225.75 tMatta t Are, s 95.00 0.0 S Protea x s tk1.00 -1 L I 1010 $ s .,1..,, . S 1,OTO.DO� S 7,eD0.30 Hours Worked Rate T)mas TOTAL lith meat Rate Total Total Hours - - A CAT 416 T s 35.73 10-0 10.0 3$7.30 ._ `' $ 357.30 90X BLADE TRACTOR s 31.73 10.0 10.0 317.30 r+ " S 317,30 TUCK s 13.51 10,0 10.0 135.10 $ 135.10 rr , f 009.70"I S ttDe.TO A 4btteri'I°/M1ise,coskt TOTAL Vendor or ksm no, i UNIT Oes""on Querdhy COST A M.E.RUBY $ 16.00 TN ROCK FOR DRIVM SURFACE 4 $ 64,001 $ 64"00 SJL E 50.00 EA CONC FOUNDATION FOR MAIL BOX 1 $ 50.w s 50,00 HILL COUNTRY CULvEF $ 13.13 LF 15'CME' 32 $ 420.16 $ 420.16 HK.L COUNTRY CULVEF E 19.70 EA 15'CONNECTING BANDS 2 E 39.40 s 3940 SIL s 75.170 LD FILL(TRUCKING) 2 s 150.00 S 150.00 $ $ s s s $ s - $ : 723.59 s 72385 TOTAL COST f 9,1a1.ae SUMMARY SHEET-LABOR,EQUIPMENT.MATERIALS(10408 TRAILS END RD.) A g Reft Timm q..W" TOTAL To1M T-1Fbure nt A#111 JUAN 1.VNA CREW CLEAN t1P C +.I•',�' JUAN TUNA s ss 00 Sol 5. M75-00 59.90%. i 1181.73 S 431.73 EwcMlor O s 16.00 got5.0 458096 52.67 i t 87.87 Tractorl8lede r i 16.00 so 5.0 5080% S 37.88 112.88 5.0 5050% 3788 $ 11288 ant 9 96.00 0.0 s 66.00 0.0 s f bias s i28.ti Hous Worltid RaN Thos �{• `` TOTAL E4dPrtwK Raft T 4118 TRACTORMO s 3a n s.o 0 T 1 68 t��` �' `' 17 .85 BOX TRACTOR 6 31-7-3 s.o 5 0 158.68 s , -. 158. F250 TRUCK i t6 st s.o so 67.56 - 87.55 .� i 404M S 404 a5 A M4ftrftle!Misc.Cos4 TOTAL Vendor or Um no. f Droerlptlon ouanft OMT A M.E.RUBY S 18.00 TN ROCK FOR DRIVING SURFACE 4 i 64.00 $ 64.00 S1L S 50 00 EA CONC.FOUNDATION FOR MAIL BOX 1 s 50.00 i 50.00 i i i S s $ S i s s s i $ s f 1l4m f 114.ii TOTAL CAST s t,u4m SUMMARY SHEET-LABOR,EQUIPMENT,MATERIALS(10m,10ONTRAILS END RD,) A B "owwtKoewa RawTgpaa Bongo sawlk TOTAL Tom Tow Mous � �br., Aaeount JUAN L1JNA CREW GLEANIIP C . A+B JUAN LUIJA Is Sa 00 I aA 5 0 270• t ' 69.90% IS 181.73 1 2 431.73 Em wta opwow Is 231* as S 0 115.00 .' 4 , i 67 167.67 ThdprlBhda s 15.00 a.0 5 i 75.00 50. ,6 37.88 S 112.88 la0aer s tS.oO s.0 50 S 75.00 50.50!6 Is 37.88 5 112.88 tMs m t' ' a1i- �+ s as.Oq 00 s POW Mm--mS 65.00 00 r� A aRw Times H Manes 1AfoTktd Y�._ TOTAL 9MPawTq Rah Tow! TOW Moues � ICAT416 3x.73 a.0 6.0 1 65 t+ 178.83 BOX BLADE TRACTOR i st.73 as 5.0 16865 ` 158,85 F250 TRUCK s 13 at a o i 67.56 i a01J1x s +o..xx moor*$I aha,coag A TOTAL 1/aMot a MM11q. f Oafcelp0oel Gwanpry COST ` A M.E.RUBY $ 16.00 TN ROCK FOR DRIVING SURFACE 4 S 84.00 - s 6400 S.N. S 50,00 EA CONC.FOUNDATION FOR IwWL BOX 1 $ $000 i 5000 SUBCONTRACTOR $1,186.00 EA NEW MAIL BOX(DOUBLE RESIDENTWL) 1 $ 1,16600 $ 116600 $ S i $ i s s - s s s $ s .. S 1,=x0.00' f 1.7x0AD TOTAL COST S 2,x70.00 SUMMARY SHEET-LABOR,EQUIPMENT,MATERIALS(9819 TRAILS END RD.) A g llOusRaw tNakW Rao now r BsrtsTlt BMMt TOTAL TOW TON Hous % AenatM A B JUAN LUNA CREW CLEAN-UP CRUM JUAN LONA s 5.0s s.o 6.0 324.00 ) 59.90% 194.08 516.08 ExavMa tar s 23tq 4.o BA $ 138.00 . 45.60�G i 63.20 201.20 BW*J B0 S ts.00 0.0 8.0 s 90.00 30.50% S 45.45 i 133.45 Lebatar i 1500 s.o 6.0 S 90.00 50.50% i 45.45 135,45 Mni Arts MW&W Is 95,00 ItYttOpsr i 0500 L I I F I 10.0 S r - .. {s ..44700 i Ys0.1/ _ a " y <; �.... M01"+► tt�t.TImN TOTAL EgWplfaNk Rab I I f I I I Tow TOW Naves : . ,:C, " A Rg NAM 418 S ss 7J 6.0 6.0 21436i 214.38 TRACTOR s �t.7� 6.0 6.0 19038 "'_ ' i 190.38 F250 TRUCK Is M611 0.01AO 3 4o4ys i s 4w.T4 A unswri tt I Mlsc cosh TOTAL VssdaatMmno. s p OtwnMy COST q M.E.RUBY L 16.00 TN ROCK FOR DRIVING SURFACE 4 $ 84.00 $ 64.00 SJL S 50.00 EA CONC.FOUNDATION FOR MAIL BOX 1 $ 50.00 $ 5000 OUTDOOR SOL S 722.00 NEW MAIL BOX(SINGLE.RESIDENTIAL) 1 S 722.00 S 722.00 S - S s s s $ s $ s - s s s s Moo s 43t 00 TOTAL COST f 2,234.94 MAILBOX REPLACEMET CHANGES MAILBOX B ADDRESS SCOPE OF WORK MATERIALS SALVAGED YES OR NO 12900 TRAIIS ENT)ROAD INSTALL WIDENED DRIVE(APPROX 6' CRLSHED ROCK-3 CY (� 1) 15 SY),NO CULVhR I-REQUIRED, NU PLACE 10f FROM EDGE OFT.E.R NEW 7 RECEPTICAL MAIU30X 1,2 129W"GRAILS END ROAD INSTALL WIUENEU DRIVE(APPROX 6"CRLSHED ROCK-3 CY (0 2) IS SY),NO CULVERT REQUIRED, NO PLACE 10'FROM F.DOE OF T.F.R. NEW 5 RECEPTICAL MAILBOX WSTALL WIDENED DRIVE(APPROX. 6"CRUSHED ROCK-3 CY 3 12810 TRAILS END ROAD IS SY),NO CULVERT REQUIRED, YES GRAVELTURNOU7 PLACE 10'FROM EDGE OF T.E.R. NEW CONC.FOUNDATION 6"CRUSHED ROCK.3 CY FILL-2 LOADS INSTALL WIDENED DRIVE(APPROX. 4 12806 TRAILS END ROAD 15 SYj EXTEND CULVERT,PLACE 18"CMP-16 LF YES STONE MAIL BOX HY FROM EDGE OF T.E.R. NFW COVC FOUNDATION 18"BANDS-1 EA 6"CRUSHED ROCK-3 CY FILL-2 LOADS INSTALL WIDENED DRIVE(APPROX. 5 12718 TRAILS END ROAD 15 SY} EXTEND CULVERT,PLACE 18"CMP-16 LF YES STONE.MAIL,ROX IV FROM EDGE OF T.E R NEW CONC.FOUNDATION 18'BANDS-2 EA 6"CRUSHED ROCK-3 CY INSTALL WIDENED DRIVE(APPROX. 6 12702 TRAILS END ROAD 15 SY),NO CULVERT RF.QUIRFD, NEW CONC.FOUNDATION YES GRAVEL TURNOUT PLACE 10'FROM EDGE OF T.E.R. FILL-1 LOAD 6"CRUSHED ROCK-3 CY INSTALL WIDENED DRIVE(APPROX. 7 12410 TRAILS END ROAD 15 SY),NO CULVERT REQUIRED, NEW CONC,TOUNDATION YES GRAVEL TURNOUT PLACE 10'FROM EDGE OF"l.E.11 FILL-1 LOAD 6"CRUSHED ROCK-3 CY FILL-2 LOADS INSTALL WIDENED DRIVE(APPROX. 8 11514 TRAILS FND ROAD IS SY),EXTEND CULVERT,PLACE NEW CONC.FOUNDATION YES STONt MAILBOX 10'FROM EDGE OF T.E.R. IS'CMP-30 LF 15'RANDS-2 EA INSTALLCjRAVF.1,TURNOUT 6"CRUSHED ROCK-3 CY 9 10405 1'RAlLS END ROAD YES (APPROX IS SY). NEW CONC.FOUNDA'T'ION INSTALL WIDENED DRIVE(APPROX, 6"CRUSHED ROCK-3 CY 10 10005 TRAILS END ROAD IS SY).NO CULVERT REQUIRED, NO GRAVEL TURNOUT PLACE 10'FROM EDGE OF T.E.R. NEW CONC.FOUNDATION INSTALL WIDENED DRIVE(APPROX. 6"CRUSHED ROCK-3 CY W-A 10001 TRAILS END ROAD IS SY) NO CULVERT REQUIRED, NO GRAVEL TURNOUT PLACE IV FROM EDGC OF T.Lk NEW CONC.FOUNDATION 6'CRUSHED ROCK-3 CY INSTALL WIDENED DRIVE(APPROX. 11 9819 TRAILS END ROAD 15 SY),NO CULVERT REQUIRED, NEW CONC.FOUNDATION NO GRAVEL TURNOUT PLACE 10'FROM EDGE OF T.E.R. NEW SINGLE RECEPTICLE MAIL BOX Austin Outdoor Solutions P.O. Box 1812 Round Rock, Texas, 78680 Proposal We 02/17/11 Status: nposed as listed Payment Toms: we below Estimated duration of Effort: One week barring weather issues Prepared For: Sam Montoya S.J. Louis Construction of Texas Ltd 9862 Lorene St. Suite 200 San Antonio, TX 78216 210-340-9998 Submitted by Cesar Beltran, TCLP www.austinoutdoorsolutions.com Page 1 of 3 Austin Outdoor Solutions proposes to provide all the necessary labor and Item materials to carry out scope of work. Costs to build each unit were derived from the description offered by client by means of photographs. if the actual scope of work varies greatly in size, quantity, stone selection etc. client will be notified of changes to scope of work and costs. All work performed to a professional manner,corned out to meet or exceed the industry standards and ANSI procedures ore adhered to during each of the various phases of work. All modification to property(in order to gain access)such as the removal of fence panels,shall be executed so that once job is complete,everything is back in place and no lasting harm is done to existing grounds. Daily debris and trash clean ups are standard operation procedure,additional care to be taken in the storage of supplies and tools to ensure the area is kept safe and in order. 1 Professionally construct four different mailbox enclosures all using the $4,992.80 limestone fieldstone, chop and sawed to achieve the same or similar resuft as depicted in photos. Each to have properly formed poured and finished reinforced concrete footer. Below is an itemized description of each of the masonry enclosures: • The largest to involve opproxtmateiy 80 sq, ft of stone plus top and four conventional residential and 1 large capacity nail box. Fieldstone an be substituted with 4" chop with sawed skks....$1,731.80 • The second (also second largest)to have approximately 45 sq. ft of stone with sawed limestone cap and 7 conventional residential boxes in place—$1,373.00 • The third will have an arched top and contain only two conventional mall boxes. Approximately 45 sq. ft of stone to be mortared into place to form this one-----$1,166.00 • The lost will be a single box unit approximately 24" wide by 24" deep and about 4%5" $722.00 bemolition and removal of debris Is not Included in scope of work or costs. Scope of work to include installing the various mail boxes (15 total) within the stone work. Total $4,992.80 Om Won scheduling We u tion All workmanship is warranted for one calendar year from the daft of installation. Any changes to original seope of Mork to be treated as a change order and due upon acce lance from client. • Client Is responsible for identifying all buried cables,piping,and other utilities prior to the beginning of any work Any discrepancies will be brought to the attention of homeowr rs for review. • Austin Outdoor Solutions will guarantee for a period o one year from the date of installation that our product will be free of any defective material"or workmanship. In the event our product or a portion of our product is found to be defective,we will repair or replace the defective item free of charge,at our discretion. • In no event will AOS be responsible for any damages caused by events unrelated to the construction such as,but not limited to fire,hail, winds,high water,poor soil conditions or criminal mischief. Page 2 of 3 *Stone and wood are natural products in which surface cracks,discoloration and other imperfections may surface during installation and are inherent properties of the various natural building materials used in building the patios and its elements. • Plant materials and sod guaranteed for 90 days from the date of installation Client Date ADS Date Page 3 of 3 y Dr HILI— COUNTRY Address: Austin TX�78734 �J CULVERTS , INC Phone: 512-532-M63 Quotation QUOTE M gg2-3-11 BID DATE: 2/412011 PROJECT: BCRUA Raw Water Pipeline Phase I Contract i CUSTOMER:SJ Louis LOCATION: Leander,Texas ATT: Sam DIAM DESQRIPTION gUANTi Y UNIT PRICE AMOUNT S - 18" Galy CMP 16GA 2 2/3"x1/2" 30 $ 15.55 $ 46650 Bands 4 $ 23.32 S 93.28 15" Galy CMP 16GA 2 2/3"x1/2" 30 $ 1313 3 39390 Bands 2 $ 1970 $ 3940 S - Delivery Included $ - S - S S - S - s - s - s - s - s - TOTAL s 99308 PRICE INCLUDES DELIVERY TO JOBSITE PLEASE ALLOW ONE TO TWO WEEKS FOR DELIVERY PRICE GOOD FOR 30 DAYS AFTER QUOTE DATE PRICES ARE BASED UPON LOCAL MINIMUM STANDARDS ONLY! CONTRACTOR TO VERIFY WrM PLANS AND SPECIFICATIONS GARRETT GEORGE-SALES REPRESENTATIVE 830-832-4967 phone 1512-857-1288 Efax oarrett0hillcauntrycarlverts.corn 2705 Bee Caw Road,Supe 3M 83 Auttirt,Taxan 7874646 U.SA 1.512.314 3140 Fax 15 12 314 3135 January 4,2011 Curtis Ostrander.P.E. S.J.Louis Construction of Texas Ltd 9862 Lorene St.,Suite 200 San Antonio,Texas 78216 Re: Srusby Creel:Rational Utility Authority(BCRUA) Raw Water Pipeline,Phase One-Contract 2 Change Proposal Request R'Ar rr Dear Mr.Ostrander. Please provide a cost proposal for the following additional scope of work required to provide mail delivery access to stonestuccolbt'ick"boxes that were removed prior to construction Addrom Required 94ope of Worst lastap witkmed dnw(approx.15 SY)for men Ws wary,for two separate structures wob rr uh*k 1.2 12900 Trails land Road moilboxwoo eaeit stneMre. 7 12810 Trailt End Rad Mttall widertad drive(aligim IS SY)for nail delivery. EXWA II,. 11 CMP(appmx.IS t F)sad WAUN arrdMW drive(epprox.tS SY)Cor+poll 4 128106 Trade End Rad delivery. Ex and 194ncb CMP(approx.IS LF)and ms"wickned drive(opprim. 13 SY)for amt 3 12718 Tali!End Road delivery. 6 12702 TYaI6 End Rad fr W widened drive(apps IS SY)for tad dekwory. 7 12410 Tmib EW Rad lnsmU widened drive(approx,15 SY)tar maul debt ary. ExWW Ildmdr CMP(approx.lS LF)and install widened drive(sppimt IS SY)ror raml E 11514 Tnek rod Rand delivery. 9 10404 Trails tad Read Magpmt was mol tmovcd. ratan widened drivt(approx i S Sin fbr amt ddivery 10005 110001 Trans 10 end Rad arum widened drive(approx.IS SY)for mail delrrery 11 9819 Trails Cad Road Wan widenod drive(approx_I S SY)ror aril delivery. Refer to the attached photographs and typical mailbox seem sketch. Please provide a unit cost per SY for the widened drives,assuming approximately IS SY per location x 1 I bcaliom and a unit cost per LF for the culvert extensions,assuming approxirtmtely 15 LF per location x 3 locations. If tax proposal is accepted,a change order will be prepared for the work. If you have any questions,picasc do not hesitate to contact nx at 512.3143182. sincerely, JACOBS ENGINEERING GROUP,INC. Glean A.8 ' P.E. Senior Project gineer XC: Mice Thus,P.E.,BCRUA Natalie Witliatm,BCRUA K 1'cbagye propmtl rcqumU%CPR 1114 doe Jacobs Engineering Group Inc. .JAcoBS 2705 R3300Austin,Texas 7874646 U.S.A. 1.512.314.3100 Fax 1.512.314.3135 March 4,2011 Michael F.Thuss,P.E. Construction Manager Brushy Creek Regional Utility Authority(BCRUA) 1906 Hur Industrial Boule"M Cedar Park,Texas 78613 Re: BCRUA Raw Water Pipdine,Phase One-Contract 1 Change Proposal Request 016 Dear Mr,Thuss: Based on the information submitted by S.J.Louis as Proposal#1 (dated 1121 r 11,copy enclosed,which is also referred to as CPR#16)and the discussion following the March 7,2011 construction meeting,it is the recommendation of Jacobs that payment for CPR#16 should be made as fopows: Materials I Misc. 1. 1.75'of 78"pipe from NW Pipe S 172.99 2. 1-78"butt strap $1,070.67 3. 78"welds from Custom Welding $1,000.00 4. Weld testing from MWM Testing S 200.00 S. Mortar Joints S 40.00 Labor 6. Excavator Operator(3 hour) $ 100.60 7. Loader Operator(3 hour) S 103.85 8. Pipe Layer(3 hours) S 90.30 9. CAT 385 Excavator(3 hour) 51,079.31 10. 966 Loader(3 boars) S 299.41 Sub-total $4,156.13 25%OH&P S 1.039.03 Net Contract Change $5,195.16 If you have any questions or need additional information,please call. Sincerely, JACOBS ENGINEERING GROUP,INC. Gleno A.Bridges, Senior Project Engineer XC: Jenn Higby,BCRUA Natalie Williams,BCRUA w/enclosures K: =wvact N=apmdaweiWXRUAICPR 016 kna 00M]Ldw Jacobs Engineering Group Inc. Proposal Arama Propria!Aro. Daa Raw Water Pli wine Phase One-Contrad 1 1 1/21111 R"Wrsd Ry 7Fanxr UlodBy W.Glenn Bridges,P.E. Curtis A.Ostrander,P.E. Jacobs Engineering Group,Inc. Project Mormer 2705 Bee Cave Road,Suite 300 Slpnatrxr Austin,Texas 78746 DowdoWn or Charw This proposal addresses additional costs associated with the tie-in at station 284+75.71. After excavation it was discovered that the existing 78'steel pipe was actually 1.75 LF short of the planned tie-in location(actual tl&4n station-284+78.48). Due to the added length additional materiels,welding weld testing and 3 hours of crow and squ4ment time were required to make the final tie4n. NOTES: -See attached breakdown sheet for specific additional costs assocdeted with the 78"tie-in AN worldmateriais not specifically described herein are mckided. &wkdmnofPmposa( Mom Unit I Cly. UnitS I ToW Cast NEWADWKML MAS'LMOR&ECUWWW QED FOR LS 1.00 S 8,716.88 S 8,718.30 TIE-W OF THE 78'STEEL WATM MAN SUBTOTAL S 8,718.08 28%OH&P S 2,170.12 Not Con&Wt ChWV $ 10,891.10 REC?UESTM ADDMMAL CALENDAR DAYS 1 S„IL Lout CwmWLv►on Aofiarr !ss Y.Whitman S.J.Lours Cordon of Texas Ltd. L'�� : , : i C:�IIi��O�������������0�3 yam• �:•.1::iT� VIA DIM C14yi4y Tl �� �'� Q�'{'Y�l������������'��L�::�!':•717.CN}:eL:•:ITt�I E?UMM"E ''';:psi ��„[b�i�r�;�+�.;�.y ,'4�-• � [:J���������r������C3�G�t ]fir'. CY�[[SY7,�l�?i':'•'. �` ,t [I:IYe7i��®�������������G3C�T� " S1UKW OMET-LA90P.EQUIPM@Nr,MATERIALS(W STEEL PIPE 7te uq . '.�^'s'•5=.�'Y+! fas. Aft77- owswim mIuhm comb A t��Y.aaor bw am fTOTAL,sr NWPCo, M 3 9S.lS OF !`STEEL PPE 1SOP31 e' l'-' 'Tri j 1729 1.76 3 / O9 .:�' r f 1,070.67 EA STEEL BUTT STRAA = 1, 87 r r CWOM WELDM f 260.00 EA 7r WEIAS i � .; J " i 1,07057 .: f::. MWM TE3T0.1G 4 S 1 00 .!s '.r'K+- " r-^a 6 1,00000 i 30.00 EA TESTING `�t, 4 = 20000 $ 200 00 3JL i 20.00 EA MORTi�RXMI S ;` Y'�• ), 4000 i ,�l1C�1'fi'T{!'. �: .. ,tT t.t' ;;�15,,'�"�:, �: r►]�• 4 ��• I'f• l.Ni.M f .r rFr TOTAL �T f •TM.p FR] Northwest Pipe Company CHANGE ORDER 361 LOW94ORN RD SAGINAW.TX 76179 TELEPHONE(817)547-1402 FAX(817)232-0372 S.J.Louls Constnsction of Texas,Ltd. Change Order#8 Attn: Curtis A.Ostrander,P.E. Sepbamber 21,2010 8862 Lorene Street AddMortal 80.128" ID x 0.383"TK buttstrap Suite 200 San Antonio,TX 78216 PH:210.340.9988 MNP Order M 77023 SAP#:SA-09.915 13CRUA•78"Raw Water Line byz-tillaal GUMMY 0e204iifon O*Pace Amwnt 1.00 80.126"ID X 0.397 TK Burp $1,070.67 $1,070.87 rotas $1,070.97 Rernerks: Please sign and rohn one copy of this Champs Order attest indicating you acceptance of the cost.We will need We r*nmad prior to the start of fabrication.Al Terms and Cond lone per the aripinsl Confimlina Scope Leder shalt apply. Thank You Accepted by- Date: Customer Name/Tire NVYP Track Record 0 2311009 Prinled Sep 21.2010 1:27 PrA 1011 S.J.LOUIS CONSTRUCTION OF TEXAS LTD. 9882 Lorene St.,Suite 200 2 10040-9998 Ofee•210640.9997 Fax San Antonio,7X 78216 Equal Opporhx*Empioyer/Co*wW January 18,2011 Mr. Glenn Bridges,P.E. Jacobs Engineering Group,Inc. 2705 Bee Cave Road,Suite 300 Austin,Texas 78746 Re: Brushy Creek Regional Utility Authority(BCRUA) Raw Water Pipeline,Phase One—Contract 1 Claim#3-Trails End Road Changes Mr. Bridges: Please consider this letter a claim for additional cost incurred by the roadway subcontractor, Site Rite Construction Group(Site Rite)associated with the grade changes to Trails End Road. The attached Trails End Downtime worksheet from Site Rite shows their cost for the downtime associated with the work stoppage issued in Field Order#17 issued by Jacobs Engineering Group, Inc. and the Brushy Creek Regional Utility Authority on December 14,2010. The total costs shown associated with Field#17 Order is$12,012.00. The attached Change Order from Site Rite accounts for the additional work that Site Rite was required to perform when the revised Sheets R11 and R12 were issued as Field Order #18. As shown on the Change Order,additional excavation and haul off was required for the area between Station 70+50 to Station 85+00. The total cost shown associated with Field Order#18 is$13,590.40. The total cost of Site Rite's work associated with this claim is$25,602.40. The SJ Louis markup of this work amounts to$2,560.24(10%). That brings the total of Claim#3 to $28,162.64. Should you have any questions or require additional information, please do not hesitate to contact me. Regards, S.J.LOUIS CONSTRUCTION OF TEXAS LTD. Curtis A. Ostrander,P.E. Project Manager SITE RITE CONSTRUCTION GROUP TRAILB-END DOWN TIME TO: JEJ L[ ft C0M61RU671DN CONTACT: CUXTIS OSTRANDER ADOR[R\: 9067 LDR[NA 6Tw[[T rHON[: 710.340.9996 SAN ANTONMI.TX 7631 D FAx: 310-D 90-2076 EMAIL: PROJ[OT NAM[: RAK.IN,R9A0 EXDAYATIDN DID#: 'ROJ[Ci LOCATION: C[OAR RIARK,TX ■ID DAT[: 1/41201 1 OEicwIPT1pN AMOUNT SITE WOR[ MONTHLY PRICE OAT PRIDE TOTAL DAYS 1 MOTOR GRADER 6000 295 I1 $ 3,245.00 2 LOADER 4500 215 11 • 2.305.00 3ROLLER 4000 191 11 $ 2.101.00 4 WAT[R TRUCK 3000 143 11 • 1.573.00 5 •ADK•HOC 2000 95 11 $ 1.045.00 6 CXC.AYATOR 32012 153 11 • 1.063.00 NOT[:THERE A [21 CALENDAw DAY TO A MONTHLY CYCLE NOT[: I 1 DAY:RDOWN[X.Woto MO.CAVS TOTAL 12.012.00 ACCEPTED my' DATE: SITE RITE CONSTRUCTION GROUP 406 FANNIN Avc ROUND ROCK,TEXAS ❑—icE:51 2-394-5460 FAX!5 1 2-057-1143 SITE R/TE CONSTRUCT/ON GROUP CHANGE ORDER TO: JSJ LtWls CONSTIIUCTION CONTACT: CURT■O[TRANOtR AOOR[ss: 9869 LOR[NA 8TR[[T Z.at 910.340-9998 SAN ANTONIO.TX 70216 r": 210.680-2878 [MAIL: PRw[CT N—c: TRAIL ENO ROAD rXCAVAT+ON Gro I: CO IBR OJ[CT LOOATION: CCDAR rARK.TX DAT[: 11/4120113 Uw UN •Bmt Aram WarIR OpwrtitTBO [RCAVATION RO&O AY STA 70+50 TO 05+00 047 CY 07.00 05.929.00 [NMNFM[HT W-MA l CY 03.45 00.00 SPOILS NAUL OK 1356 CY 05.65 $7.661.40 imT l MOBM.IZATBON L256.000.00 50.00 ^00MONAL MOBN ZATI9N CA 3130 00.00 TOTAL 013.590.40 SITC RITC CON BT4UCTION OPOYO 408 P-11"AV[ R....Race.Tca..B 0--51 2-394•SA6D r-5 1 2-BS7-1 1 43 BS 2705 Bee Cave Road,S 300 A Austin,Texas 78746 U.S.A. 1.512.314.3100 Fax 1 512 314 3135 February 18,2011 Curtis Ostrander S.J.Louis Construction of Texas Ltd. (S.J. Louis) 9862 Lorene St., Suite 200 San Antonio,Texas 78216 Re: Brushy Creek Regional Utility Authority(BCRUA) Raw Water Pipeline,Phase One-Contract 1 Claim#3 Dear Mr.Ostrander: This is in response to your January 18, 2011 claim for additional costs incurred by the roadway subcontractor, Site Rite Construction Group(Site Rite)associated with the grade changes to Trails End Road. The information from Site Rite that is enclosed with your January 18 letter requests payment for 11 days of down time. Additional information listing the dates of the 11 days being requested was received by Jacobs on February 17. In reference to the dates that were listed,our records show the following: 1. Day 1 --Tuesday,December 14:Field Order#17 was issued to temporarily prevent additional subgrade preparation from Station 69+00 to Station 84+00. However,work was allowed for detour removal, driveway construction and other tasks. 2. Day 2—Wednesday,December 15: Work was allowed for detour removal, driveway construction and other tasks. 3. Day 3—Thursday,December 16: Same as Day 2. 4. Day 4—Friday,December 17: Same as Day 2. 5. Day 5 --Monday,December 20:Field Order#18 was issued,which included revised Sheets R11 and R12. This allowed subgrade preparation to continue to Station 85+00. However, it is recognized that factors such as coordination of new survey cut sheets due to the revised drawings could have resulted in a period of down time for Site Rite. 6. Day 6 --Tuesday,December 21: Same as Day 5. 7. Day 7—Wednesday,December 22: Same as Day 5. 8. Day 8—Thursday,December 23: Same as Day 5. 9. Day 9--Tuesday,December 28: Site Rite not working due to end-of-year break. 10. Day 10—Wednesday,December 29: Site Rite not working due to end-of-year break. 11. Day 11 -Thursday,December 30: Site Rite not working due to end-of-year break. Article 10.5 of the General Conditions of the Construction Contract states:"The Contractor shall receive no compensation for delays or hindrances to the Work. If delay is caused by specific orders given by the Owner to stop work ... then such delay will entitle the Contractor to an equivalent extension of time, the Contractor's application for which shall,however,be subject to approval of the Owner." Based on the above records for the 11 days submitted as down time,it is the recommendation of Jacobs that an extension of time should be granted for a total of 4 days(Day 5 through Day 8,as listed above). Jacobs Engineering Group Wc. The January 18 letter also includes a request for additional excavation and haul off required for the area between Station 70+50 to Station 85+00. A memo and updated roadway quantity summary table was submitted at the February 7,2011 construction meeting,showing proposed revisions to excavation and embankment quantities for Trails End Road(copy enclosed). If this updated summary table is accepted by the BCRUA and S.J.Louis,a change order will be prepared accordingly. It is the recommendation of Jacobs that the change order should include payment for the additional work from Station 70+50 to Station 85+00,based on quantities shown in the updated summary table. If you have any questions or would like to discuss this further,please call. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A.Bridges, Senior Project Engineer XC: Mike Thuss,P.E.,BCRUA Jeff Bell,City of Round Rock, David Dial,D.L.Dial&Associates Jennifer Higby,BCRUA Natalie Williams,BCRUA KA050844\constructionkontract Ikorrespondence\to SJ Louis\letter re Claim#3 02171 Ldoc Jacobs Engineering Urota)loc JACOBS 1705 Bee Cave Road,Suite 300 Austin,Texas 78746746 U.S.A. 1.512 314.3100 Fax 1.512.314.3135 March 4,2011 Michael F.Thuss,P.E. Construction Manager Brushy Creek Regional Utility Authority(BCRUA) 1906 Hur Industrial Boulevard Cedar Park,Texas 78613 Re: BCRUA Raw Water Pipeline,Phase One-Contract I Change Proposal Request#20 Dear Mr. Thuss: Based on the information submitted by S.J. Louis as Proposal 94(dated 2/21/11,copy enclosed,which is also referred to as CPR#20),Jacobs hereby recommends acceptance of the proposal in the amount of$4,853.45. If you have any questions or need additional information,please call. Sincerely, JACOBS ENGINEERING GROUP,INC. Glenn A.Bridg ,P.E. Senior Project Engineer XC: Jenn Higby,BCRUA Natalie Williams,BCRUA w/enclosures K:1050WCW3Uuclfonlcwt=t 1lcorrespMkMe%L08CRUAVCPR 020 WW 040411 ADc Jacobs Engineering Group Inc PROPOSAL pivect Name Proposal No. Date Raw Water Pipeline Phase One-Contract 1 4 2/21111 Response Requires!By TrariwWttad By Mr.Glenn Bridges,P.E. Curtis A.Ostrander,P.E. Jacobs Engineering Group,Inc. Project Manager 2705 Bee Cave Road,Suite 300 Signature Austin,Texas 78746 Description of Change As requested this proposal addresses additional costs associated with driveway revisions on Sheet R22 as described In Field Order#21 (see attached) 1.Station 4+04:See attached breakdown for details regarding installation of additional 18"CMP 2.Station 4+04:Dimensions of ACP driveway reduced therefore Sid Item# 4.17 will be executed to reflect the appropriate SY when installed. 3.Station 4+25:Additional SY of ACP driveway(48)will not overrun quantity due to reduction at station 21+20 4.Station 21+20:Dimensions of ACP driveway reduced therefore Bid Item# 4.17 will be executed to reflect the appropriate SY when installed. NOTES: Items 2-4 above wIN be paid at established unit price(Bid Item 1114.17)as measured in pace All work/materials not specifically described herein are excluded. 6rwkdown of proposal Item DosewIption unit Qty. unki TofalCost NEW ADDITIONAL COSTS AS DESCRIBED ABOVE LS 1 $ 3,882.76 $ 3.88276 SUBTOTAL S 3,882.76 25h6 OH3P $ 97069 Net Conbast Change $ 4,863.46 REQUESTED ADDITIONAL CALENDAR DAYS 1 S.J.Louis Construction Action c Les V.Whitman S.J.Louis Construction of Texas,Ltd SUMMARY SHEET-LASM.EQUIPMENT,MATERIALS(3TATKNi 4+04) A 8 Hours WorkW Rete T MM :. t' -�.;: 111"Ret senew TOTAL Tool Tobi Moe •" `� - +, Anwmt A+D JUAN LUNA CREW CLEAN UPC 1. JUAN LUNA i 64.00 10.0 100 $ 540.Q0 : rr 59AM 323.48 883.48 S 23.00 tO.D 10"0 S 230.00 "s ;`I� 46.80% 105.34 335.34 Traaw I swe s 16-OD 10.0 10.0 S 150.00 L} - 'Y 4 ' ''. 50.5096 75.7'5 225.75 t is 16.00 I 10.0 I I I 1 18.0 s 150 00 , � , ','ii,' 50.50% 75.75 1 225.75 nwnt Alas S 95.00 0.0 S S x5.00 0.0 $ 1.070.00 : 1�osr A Hou*Wort" Rab Thaw "t, ,.`.s-�_ TOTAL 6quiymant Rate_ TOW TOW A CAT 416 TRACT 3 35.73 10A 1 D.0 S 357 30 ; } '; _° ; 357. BOX BLADE TRACTOR s 31 73 10.0 10.0 31730 { 317.30 F25D TRUCK s t3.s1 w 0 X10 Q 135.'0 ~• 135 •iC- ,, S 1L`�~.7C .10 s cos s 60l.f0 maleealeIMac.costs A ' f �uqJ Vendor or Mm no. s M Description Quan*yr$ 6 l� ' {'' 1 A HILL COUNTRY CUL $ 15.55 LF 18"CMP 70 $ ` ." , �k� 'I s 1,068.'50 HILL COUNTRY CULVE $ 31.50 EA 16"SETS 2 S 63.00 FULL.COUNTRY CUL S 23.32 EA 18"CONNECTION BANDS 5HO SUPPLY S 3.50 LF 2"POLY PPE 10 35.00 116.60 HD SUPPLY S 5983 EA2'COMPRESSION COUPLINGS 2 ? L $ 1 966 S i �: $ - S $ �q. j$ 1,422.76 Is 1,417.7! TOTAL Cm S 5,6�2.7s HILL CaU NTRY 1209 AuMn,LaTX 78734 CULVERTS, INC Phone: 5;2-33�•0�563 Quotation QUOTE t q92-8-11 BID DATE. 21912011 PROJECT: BCRUA Raw Water Pipeline CUSTOMER SJ Louis LOCATION: Ceder ParK Texas ATT: Sam DUAMETER DPs.SCRj"— ON ou, UN(T PRICE i - 18' Glav CMP 18 GA 2 213"x112" 70 a 15.55 a 1,088.50 W/4-1 Bevel Cut CheW 2 a 31.50 a 83.00 Banda 5 i 2332 i 118 W s - Delivery Included i a a - s - s - s - s - s - a - a - s - s - a - s - s - a - a - a - a - s - s - TOTAL s 1,Z io PRICE INCLUDES DELIVERY TO J06SITE PLEASE ALLOW ONE TO TWO WEM FOR DELIVERY PRICE GOOD FOR 30 DAYS AFTER QUOTE DATE PRICES ARE BASED UPON LOCAL MINIMUM STANDARDS ONLY, CONTRACTOR TO VERIFY WITH PUNS AND SPECIFICATIONS GARRETT GEORGE-SALES REPR MWATIVE 834-832-4987 phone/512-57-1258 Elax l&=ABRLSHYaS( Fidd Order#21 P GIOnAI tfTa rlr AUTHOrtrlrlr Project Name:SCRUA Raw t VOW Pipakee,Phase One—CarArW 1 Contractor. S.J.Louis Cotlstruaion of Texas Ltd. Address: 9862 Lorene Street,#= Sart Anbnic,Texas 78218 Apr: Curtis ChirwK*.P.E. Revise the driveways surtlma y on Wiest R22 as 1. At Station 4+04(RTJ add apprrndrrtid*80 LF of 18-Inch CMP(Bid Item 4.41),extending from exisdnp 1 e-tnch culvert at ct wa"at Statba 4+40 to south"of driveway at Station 4+04. Field locale existing w@W tine,which mmy need to be retocwted to acorn nodde Mlstal add of 18-nch CMP. 2. At Station 4+40(RT),revise the bngth of the concrete drivevray tram 29 Fr b 18 FT.and rorise the area from 62 8Y to 27 SY. AO 3. At Station 4+25(in add one(1)ACP ddvewa r with wkhh of 14 Fr,Nngth of 20 FT and saw of 48 SY, 4. At SWion 21+10(RT),revise driveway station to 21+20,revise width from 30 FT to 12 FT and rrAn area from 122 SY to 47 5Y. By Gilson A.Bridges. .E. JaooW Enginesdng Group.kr— DAL02-01-11 D gkalty signed by hnniisr '}4t L Hig* Date:201102.01120= -WW By WhaN F. .E. SCRUA Dab: By:Curtis .6. S.J.Lonia Construction of Tions,Lid. Dabs