GM-11-09-14-019
Page 1 of 1 ��BRUSHY CREEK Contract Quantity Adjustment/Change Order REGIONAL UTIUTY AUTHORM rev.912611 Project Name: BCRUA Interim Floating Intake Facilities Contractor: Excel Construction Services, LLC Date: 9/12/2011 Change Order/Quantity Engineer: Jacobs Engineering Group, Inc. Adjustment No. 3 Justification SUMMARY Amount % Change Original Contract Price: $3,807,500.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $3,807,500.00 Previous Change Order(s): $82,281.82 2.16% This Change Order: $41,541.00 1.090/0 Total Change Order(s)To Date: $123,822.82 3.25% Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): $3,931,322.82 Original Contract Time: 365 calendar days Contract Time Prior to this Change Order: 379 calendar days Contract Time with All Approved Change Orders: 400 calendar days 0. Glenn A. Bridges, P.E,, Project Engineer Prepared By: k&AJacobs Engineering Group, Inc. r �l Signature Printed Name,Title and Company Date Contractor p Approval: M4 Com.. 1'm. Fxct( Signature Printed Name,Title and Company Date BCRUA Approval 'A_ Signature Printed Name,Title Date BCRUA Approval: Signature Printed Name,Title Date :e72 BRUSHY REGIONAL UTILITY AUTHORITY A Partnership of Cedar Park, Leander, and Roved Rock CHANGE ORDER No. 3 DATE OF ISSUANCE: 09-12-11 EFFECTIVE DATE: OWNER: BCRUA CONTRACTOR: Excel Construction Services,LLC PROJECT: BCRUA Interim Floating Intake Facilities ENGINEER: Jacobs Engineering Group,Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: Change Proposal Requests 1. Add a stabilized access drive, per CPR#6 and the response to CPR#6 from Excel, dated July 13, 2011. ADD $22,109.00 2. Add 4 RTD monitors at floating barge, 1 RTD monitor in existing Twin Creeks MCC, 1 pullbox, and associated conduits, mounting hardware, wiring and terminations, etc., per CPR#& response from Excel, dated July 12, 2011. ADD $30,337.00 3. Delete the flexible ball joints at hose connections to the underwater pipe manifold, per CPR#10 and the response to CPR#10 from Excel, dated July 15, 2011. DEDUCT $10,905.00 TOTAL ADD$41,541.00 Page 1 Project:BCRUA Interim Floating Intake Facilities Change Order No.3 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: pfrom rice: Original Contract Times: Substantial Completion(Days): 334 calendar days 00 Final Completion(Days): 365 calendar da- Substantial Completion(Date): November 5,2011 Final Completion(Date): December 6,2011 previous Change Orders Net change from previous Change Orders: Substantial Completion(Days): 348 calendar days Final Completion(Days): 379 calendar days Substantial Completion(Date): November 142011 Final Completion(Date): December 20 2011 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion(Days): 348 calendar days $ 3,889,781.8.2_ Final Completion(Days): 379 calendar days Substantial Completion(Date): November 19,2011 Final Completion(Date): December 20,2011 Net increase from this Change Order: Net increase this Change Order: 21 days(Final Completion only) $41.,541.00 Substantial Completion(Days): November 19,2011 Final Completion(Days): January 13,2012 Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion(Days): 348 calendar days $3,931,322.82 Final Completion (Days): 400 calendar days Substantial Completion(Date): November 19 2011 Final Completion(Date): January 13,2012 Page 2 CHANGE ORDER#3 ITEM 1 2705 See Gave Road,Suite 300 JACOB Austin.Texas 78746 U.S.A. 1.512.314.3100 Fax 1 512 3143135 APPROVED July 14, 2011 by Mike Thuss via email 7126111 Construction Manager 7-rte�l Brushy Creek Regional Utility Authority(BCRUA) 1906 Hur Industrial Boulevard Cedar Park,Texas 78613 Re: BCRUA Interim Floating Intake Facilities—RW-C3 Change Proposal Request#6 Dear Mr.Thuss: Enclosed is the response from Excel Construction Services, LLC(Excel), dated July 13,2011,to CPR#6. Jacobs Engineering Group,Inc. has reviewed the cost information submitted by Excel. It is our opinion that the total cost submitted for the requested access drive improvements is fair and reasonable for the added scope of work. If this proposed cost addition meets with the approval of BCRUA, a change order will be prepared to add$22,109.00 to the contract amount. If you have any questions or need additional information,please call. Sincerely, JACOBS ENGINEERING GROUP, INC_ Glenn A. Bridges, Senior Project Engi er XC: Jenn Higby, EIT BCRUA Grace Stillman, EIT,BCRUA Dustin Riley,WRM Jim Tolles,P.E. JR Tolles Associates w/enclosures K:\050844\constructionlcontraet 3\CPR's\CPR#6\CPR#6 letter 0714E l.doc Jacobs Engineering Group lnc. ExCE� s Proposal Change Pro p BCRUA Floating Intake Request No. 06 Rev-2-L, JACOBS Project Name: Interim Floating Intake Faciftes Contractor. Excel Construction Services,LLC Project Owner: BCRUA Address: PO Box 2260 Leander,Texas 78646 Address: 221 E.Main Street Round Rock,TX 78664Initiated by: X Engineer F1Contractor Attention; The following change in the contract on this project is proposed. Work shall not commence until authorized by the Owner. Description of the Proposed Change: Excel is pleased to offer the fbilowigg change for the owners consideration by the changes proposed by the engineer in CPR#6. The work will consist of adding an all weather access road along the perimeter fence of the CP WTP. The road will be approx. 625 LF and 15'wide. The road will have a ge22rid placed underneath it as well as approx.80 LF of rock Hp,rap. The engineer has requested we use a quandly of 250 tons of rock and stated that if we do not achieve the s ecifled 6"that it would be acceptable since we are installing a rid with the s stem. By Matthew Cannon-Excel Construction Services,LLC All work shall be in accordance with the terms, Jacobs Recommendation: stipulations,and conditions of the original Contract ❑ Recommend Acceptance Documents. if the work herein provided for is Approved by ❑ Do Not Recommend Acceptance Change Order,the time of completion will be: X Increased ❑ Decreased Unchanged � — By,Jacobs By 3 calendar days, Date This change will; X Add Deduct ❑ No Change Owner's Action: $ 22,109.00 ❑ Accepted ❑ Not Accepted Excel Construction Services,LLC By: BCRUA Date July 13,2011 Date Chun e Proposal Request F011n BURUA lNJERMI FLOATINO IN7AKEFACILIRES cp doc WORK PROPOSAL COST ITEMIZATION: CPR.No.6 Rev2 BCRUA Interim Floating Intake All weather access road July 11,2011 units quantity unit Cost total A Materials 1. ITensar TriAx GeoGrid 1 TX 246LF Roll RL 3 $ 985.00 $ 2,955.00 2 jTensar TriAx GeoGrld (9.8'X 246LF Roll RL 1 $ 777.00 $ 777.00 3 $ _ 4 $ 5 $ - 6 $ - 7 $ - 8 $ - 9 $ 10 $ - B) Labor/Equipment 1. La out HR 6 $ 26.00 $ 156.00 2 Level Transit HR 3 $ 45.00 $ 135.00 3 $ - 4 $ - C Subcontracts 1. 3.R. Schneider L5 1 $ 13,942.03 $ 13,942.03 2. Haul-Off HR 8 $ 45.00 $ 360.00 3. $ - C Admin' tration 1. M.Cannon HR 4 $ 75.00 $ 300.00 2. D. Henderson HR 8 $ 75,00 $ 600.00 3. $ - 4. $ - Sub-Total $ 19,225.03 15% OHP $ 2,883.75 TOTAL $ 22,109 J. R. Schneider Construction, Inc. P.O. Box 50325 Austin,TX 78763 Phone:(512)327-5517 Fax:(512)327-5535 Change in Work- Cast Analysis Form Date: July 13, 2011 Contractor; Excel Construction Project: Cedar Park WTP-access road Change Proposal No: 1 Description of Change: Add access road. ITEM Quantity Unit Unit Cost AMOUNT 1 Mobilize Equipment 6 ea $450.00 $2,700.00 2 Cat D4G 24 hrs. $90.00 $2,160.00 3 Cat 2368 32 hrs $65.00 $2,080.00 4 Roller 2 days $425.00 $850.00 5 Larger Rock Material 18 tns $22.00 $396.00 6 Rock gravel base materia! (I 1l2"max.size) 250 tns `515.75 $3,937.50 $0.00 8 $0.00 9 $0.00 10 $0.00 it $0.00 12 $0.00 Sub-Total $12,123.50 Overhead& Prolit $1,818.53 TOTAL $13,942.03 TOTAL FOR THIS CHANGE ORDER" $13,942.03 **price valid for 30 days from date Comments: 2705 Bee Cave Road,Suite 300 JACOB Austin,Texas 78746 U.S.A. 1 512 314.3100 Fax 1 512.314 3135 May 18, 2011 Matt Cannon Excel Construction Services,LLC 1201 Leander Drive Leander,TX 78641 Re: Brushy Creek Regional Utility Authority(BCRUA) Interim Floating Intake Facilities-Change Proposal Request#6 Dear Mr. Cannon: Please provide a cost proposal for the following proposed additions to the subject project: Reference the enclosed portion of Sheet ICO2. Construct 625 LF of stabilized access drive(15' wide)from Lime Creek Road,extending generally parallel to the south and west sides of the existing Cedar Park WTP security fence,as shown on the enclosed drawing. Access drive cross-section shall consist of compacted subgrade, geogrid layer and aggregate fill as follows: • Width: 15' • Subgrade preparation: Grade existing ground to level out high and low areas. Suitable excess on- site fill material may be used in subgrade(Note:Rocks greater than 6"in diameter shall be removed from material to be used in subgrade.). Subgrade shall be compacted to 90%standard density. Cross slope shall be approximately 2%, from high side along north and east edges of access drive to low side along south and west edges of access drive. Longitudinal slope varies as required to follow approximate existing ground elevations adjacent to fence. • Geogrid material:Tensar TriAx TX5-475,as manufactured by Tensar International. (No substitutions.) Local representative:GeoSolutions,Inc.Contact:Grant Crawford-Mobile: 350.6598 Office: 330.0796 email: Grant@GeoSolutionslnc.com • Aggregate thickness: 6" • Aggregate gradation: Less than 10%passing#200; 100%passing 1-112". • Additional requirement for erosion.control: From approximately Station 1+50 to Station 2+30, place approximately 5' width of loose rock rip-rap(3"— 12"diameter)to a minimum thickness of 18"in area between edge of fence mow strip and access drive,to prevent erosion due to tank overflows. Existing construction entrance rock may be used, along with suitable excess on-site rocks andlor imported rocks. If the cost proposal is accepted,a change order will be prepared for the work. If you have any questions,please do not hesitate to contact me at 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP,INC. Glenn A. Bridges,P.E. Senior Project Engineer XC: Mike Thuss,P.E.,BCRUA Grace Stillman,BCRUA Dustin Riley,Water Resource Management Jim Tolles_,JR Tolles Associates w/enclosures K:IWJXK02011contract 3lchange proposal requestskhange proposal request 06.doc Jacobs Engineering Group Inc CHANGE ORDER#3 ITEM 2 BS Ausl Bee Cave Read, 5ui13l}0 Austin,7exas 76'746 U S A- 1,5123143100 Fax 1512314.3135 APPROVED August 15,2011 By Michael F. Thuss, P.E. at 4:44 pm, Aug 23, 701? Michael F.Thuss,F.E. Michael .Thuss,P.E. Construction Manager Brushy Creek Regional Utility Authority(BCRUA) !', ' ' 'y� 2011.08.23 16:45:52 1906 Hur Industrial Boulevard -05'00' Cedar Park,Texas 78613 Re: BCRUA Interim Floating Intake Facilities—RW-C3 Change Proposal Request#S Dear Mr.Thuss: Enclosed is the response from Excel Construction Services, LLC (Excel),dated July 12,2011,to CPR##8. Jacobs Engineering Group,Inc.has reviewed the cost information submitted by Excel. It is our opinion that the total cost submitted for the RTD monitors,pullbox and associated conduits, fittings etc. is fair and reasonable for the added scope of work. If this proposed cost addition meets with the approval of BCRUA,a change order will be prepared to add$30,337.00 to the contract amount. If you have any questions or need additional information,please call. Sincerely, JACOBS ENGINEERING GROUP, INC. WMW ' Glenn A.Bridges,P. Senior Project Engineer XC: Jenn Higby, EIT BCRUA Grace Stillman, EIT,BCRUA Dustin Riley,WRM Jim Tolles,P.E.JR Tolles Associates w/enclosures KA0508441constructionlcontract 31CPR's1CPR#81CPR#8 Ictter 08151 Ldoc JACOBS 2705 Bee Cave FcSuite 304 Austin,Texas 7874545 U.S.A. 1-512.314.3100 Fax 1.512 314.3135 June 16, 2011 Matt Cannon Excel Construction Services,LLC 1201 Leander Drive Leander,TX 78641 Re: Brushy Creep Regional Utility Authority (BCRUA) Interim Floating Intake Facilities Change Proposal Request 0 #$ Dear Mr.Cannon: Please provide a cost proposal for the following proposed revisions to the subject project: 1. Add electrical pullbox,as detailed in RFI#13 (copy enclosed). 2. Provide a multi-channel stand alone RTD monitor for installation on the floating intake barge. One RTD monitor is required for each motor on the barge and for the Twin Creeks Pump motor. For the Twin Creeks motor,the RTD monitor shall be installed in the MCC cubicle. RTD monitor shall be Blue Peter Series Model KMD-SR, or approved equal. a. Channels—Stator Windings: Minimum of 3 channels. Bearings: Minimum of 2 channels. b. Outputs--One alarm output and one trip output minimum. c. Control Power— 120 VAC d. Note: Monitor must be compatible with the RTD's provided by the motor vendor. e. installation: RTD monitors shall be installed in a NEW 4X enclosure and protected from environmental conditions. If the cost proposal is accepted, a change order will be prepared for the work. if you have any questions,please do not hesitate to contact me at 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. Bridges, E. Senior Project Engineer XC: Mike Thuss, P.E., BCRUA Grace Stillman,EfT,BCRUA Dustin Riley, Water Resource Management J.R.Tolles, F.E. w/enclosures KA050844lconstructionlcontract 3lchange proposal requestslchange proposal request#7.doc i,;cobs Eng;neentig Group arc. EXCEL. Change Proposal BCRUA Floating Intake Request No. 08 JACOBS Project Name: Interim Floating Intake Facilities Contractor: Excel Construction Services,LLC Project Owner: BCRUA Address: PO Box 2260 Leander,Texas 78646 Address: 221 E.Main Street Round Rock,TX 78664 Initiated by: Engineer ® Contractor Attention: The following change in the contract on this project is proposed. ■ Work shall not commence until authorized by the Owner. Description of the Proposed Change: The work for this change consist of the installation of 4 RTA monitors at the floating barge and 7 RTD monitor in the existing 480V MCC for the twin creeks motor. Also,installation of a ullbox to facilitate routing of branch control conductors to the various pieces of a of meat at the electrical switchgear house reference RFl#1?J. The proposal includes the following: conduits and associated Fittings,mounting hardware,wiring and terminations for power and control,installation of a pullbox, and subcontractor services to install/ ro ram RTA monitors. The proposal excludes PLC programming to monitor the 5 DI alarm contacts of the RTD monitors. Note that the PLC will be providing a digital output to each of the 5 motor controllers. CH2M Hill will need to provide the programming needed to facilitate monitoring the 5 di ifal inputs and program the associated outputs to facilitate pump shutdown in the event of a high temperature condition. There will be a$6,000 credit to delete the MultiLens relays due to the fact the RTD's will eerForm the same task. By Matthew Cannan-Excel Construction Services,LLC All work shall be in accordance with the terms, Jacobs Recommendation: stipulations,and conditions of the original Contract ❑ Recommend Acceptance Documents. If the work herein provided for is Approved by ❑ Do Not Recommend Acceptance Change Order,the time of completion will be: X Increased ❑ Decreased Unchanged By:Jacobs By 21 calendar days. Date This change will: X Add Deduct ❑ No Change Owner's Action: $ 30,337.00 ❑ Accepted ❑ Not Accepted Excel Construction Services,LLC By: BCRUA 4 Date July 12,2011 Date Changc Proposal Rcquest Form BCRUA INTERIM FLOATING INTAKE FACILITIES cprAoc WORK PROPOSAL COST ITEMIZATION: CPR No. 8 BCRUA Interim Floating Intake Install (5) RTD monitors and electrical pullbox July 12, 2011 units quantity unit cost total A Materials 1. $ - 2 $ - 3 $ - 4 $ - 5 $ - 6 $ B Labor/E uipment 1. $ - 2 $ - 3 $ - 4 $ - 5 1 $ - C) Subcontracts 1. IT.Morales (see attached breakdown) LS 1 1 $ 26,155.00 $ 26,155.00 2. $ 3. $ - G Administration 1. IM.Cannon HR 3 $ 75.00 $ 225.00 2. $ - 3. $ 4. $ Sub-Total $ 26,380.00 15% OHP $ 3,957.00 TOTAL $ 30,337 . Morales Company Filed: 12-02 Cc: 02-4A Project: Interim Floating Intake Facilities Date: July 12, 2011 TMC Change #: COR-06 Rev 00 Owner: Brushy Crk Regional Utility Authority Project Change #: CPR-08 Change Order Request Morales Company is pleased to offer change pricing for consideration by the Owner to provide electrical modifications detailed under engineers CPR-08. The work for this change consists of the installation of (4) RTD monitors at the floating barge and (1) RTD monitor in the existing 480V mcc for the twin creeks motor. Also, installation of a pullbox to facilitate routing of branch control conductors to the various pieces of equipment at the electrical switchgear house (see engineers RFI-13). This quotation includes the following services and materials: • Conduits with associated fittings, mounting hardware as required. • Wiring and terminations for power and control. • Installation of the pullbox flush with concrete sidewalk. • Subcontractor services to install/program RTD monitors (see attached Neltronics scope). • Equipment costs for small tools (benders, drills, saws). This quotation does not include any of the following: • PLC programming to monitor the (5) DI alarm contacts of the RTD monitors. Note that the PLC will be providing a digital output to each of the (5) motor controllers. CI-12M Hill will need to provide the programming needed to facilitate monitoring the (5) digital inputs and program the associated outputs to facilitate pump shutdown in the event of a high temperature condition. Total cost for the additional work associated with this change is $32,155.00. Please see attached detailed pricing summary breakdown. Due to the fact that these proposed RTD monitors are performing the function of the MultiLin relays indicated on the plans, we contacted Siemens and asked them to provide a credit to delete the (4) MultiLin relays from the MCCs, they offered a credit amount of<$6,000, to delete them. This credit amount can be applied to the quoted amount above if acceptable to the engineer. Extension in Time Request: Submittals and approvals: nla. Lead time for procurement: 3 weeks. Approx time for installation: 2 weeks. Change Initiated By: Matt Cannon 1 Excel Const Change Prepared By: Farrell R. Prewitt 1 TMC Change Delivered To: Matt Cannon 1 Excel Const Response Rgst'd By: ASAP PO Box 859 601 South Patterson Avenue Florence, Texas 76527 Florence, Texas 76527 Phone: 254-793-4344 Fax: 254-793-3044 JOB NAME 2011 projects change orders T Morales Company Electric Controls Ltd EST.#01:ID 0.54686 (Mailing)PO Box 859 ESTIMATE 2011 projects change orders (Pysical)601 South Patterson Ave DATE/TIME 7/12/2011 1:50:37 PM Florence,Texas 76527 DATA SET#5: FP WTI'Commindust TSCITP ... 254-793-4344 FAX:254-793-3044 fprewitt@moralescompany.com dex Phas... DescriptionReference Type Refere... Ref Amount Operation Rate Amoun 1 0 MATERIALS 1 QUOTES: O.0( 2 0 Misc.Materials: Material Total 2,829.32 1.00 2,829.3: 3 0 Quote#1 Calculated 0.00 * 1.00 0.01 4 0 Quote#2 Calculated 0,00 1.00 0.01 5 0 SUBTOTAL 2'829'3' 6 0 tnwffff##### 0.01 7 0 SALES TAX: Material Total 2,829.32 % 0.01 8 0 SUBTOTAL 0.0( 9 0 ##### 0.01 10 0 LABOR: 0.0( 11 0 Straight Time Labor Labor Total 97.97 35.80 3,507.11 12 0 Overtime Labor Calculated 0.00 * 47.55 0.0( 13 0 IG Tech S-Time Calculated 0.00 * 40.42 0.01 14 0 10 Tech O-Time Calculated 0.00 58.80 0.01 15 0 Gen Foreman Hours Labor Total 97.97 % 8.00 7.8, 16 0 Gen Foreman Rate Component 15 7.84 41.84 328.0: t7 0 Material Hndler Mrs Labor Total 07,97 % 3 00 2.9- 18 0 Material Hndler Rate Component 17 2.94 24.24 71.2. 19 0 Update As Built Dwgs Calculated 1.00 * 41.84 41.8, 20 0 Programmer Calculated 0.00 70.00 0.0( 21 0 SUBTOTAL 3,948.3- 22 ,948.322 0 0.0( 23 0 DIRECT JOB EXPENSES: 0'01 24 0 Expendable Tools Material Total 2,829.32 % 3.00 84.81 25 0 Equipment Calculated 150.00 1.00 150.0( 26 0 Warranty on Material Component 5 2,829.32 % 0.01 27 0 Warranty on Labor Component 21 3,948.31 % 0.0( 28 0 SUBTOTAL 234'81 29 0 ###### 0.0( 30 0 SUBCONTRACTS: 0.0( 31 0 Neltronics Qte Calculated 19,385.00 1.00 19,385.Ot 32 0 Sub#2 Calculated 0.00 * 0.0( 33 0 SUBTOTAL 19,385.0( 34 0 0.0( 35 0 JOB SUBTOTAL 26,397.5: 36 0 ##I################## 0.0( 37 0 MARKUPS: p.p1 38 0 Liability/Bldrs Risk Component 35 26,397.52 % 2.00 527.9: 39 0 WrkCompISS[Unmplymnt Component 21 3,948.31 % 25.00 987.0 40 0 Overhead @ 5% Component 35 26,397.52 % 5.00 1,319.8 41 0 JOB TOTAL 29,232.4, 42 0 0'Q 43 0 Profit @ 10% Component 41 29,232.42 % 10.00 2,923.2 14 0 JOB TOTAL+PROFIT Component 43 2,923.24 1.00 32,155.6 45 0 Perf_Payment Bond Component 44 32,155.66 % 110 16 0 ADD BOND Component 45 0.00 * 1.00 32,155.6 17 0 0.0 48 0 BID TOTAL 32,155.6 Page 1 of 1 CHANGE ORDER REQUEST NELTRONICS, LLC Change Order Request#: 002 415C Texas Avenue Date: Round Rock,Texas 78664 Project No.: 2010-034 Project: Brushy Creek Regional Interim Floating Intake Facilities Change Proposal Request#8 To: T. Morales Company Electric& Controls, Ltd. From: Neltronics, LLC P.O. Box 859 415C Texas Avenue Florence,Texas 76527 Round Rock,Texas 78664 Attn: Farrell Prewitt Attn: John McClanahan Phone: 254-793-4344 Phone: 512-844-0710 E-Mail: fprewitt@moralescompany.com E-Mail: johmcc0l@neltronics.net We propose to provide the following equipment and services as per Change Proposal Request#8: 4ea Nema 4x 304 Stainless Steel Enclosure with viewing window that will house a Blue Peter Series Model KMD-8R RTD monitor,AC breaker, heater for environmental protection and terminal blocks lea Blue Peter Series Model KMD-8R RTD monitor for intallation in the MCC cubicle for Twin Creeks motor lea Allen Bradley 1769-OW8 digital output module and interposing relays/bases for the PLC panel to provide high temperature alarm status output to each of the motor controllers Notes: Monitor wil only accept the following RTD's: 100 ohm platinum, 120 ohm nickel & 10 ohm copper. PLC programming by others Electrical pullbox by others Change Order Price $19,385.00 This price is good for 30 days. If conditions change, this price is void. We are requesting a time extension of 0 days in conjunction with this change. John P. McClanahan Author Date The above prices and specifications of this Change Order request are satisfactory and are hereby acepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise specified. 1:1 Accepted AUTHORIZED SIGNATURE COMPANY DATE Page 1 of 1 Farrell Prewitt From: Ron Martin (AUS) <rlmartin@reynco.com> Sent: Wednesday, July 06, 20118:21 AM To: Farrell Brewitt Cc: 'Burrows, David' Subject: Deduct for Multilin relays Brush Creek Farrell, Siemens deduct for the Multilin relays are $6000.00 total for all relays. Please let me know if you want to keep the relays or deduct from the purchase order. Thanks, Ron Martin The Reynolds Company 512-682-8621 512-927-7104 fax 512-589-9558 cell ronmartin re nco.com 1 CHANGE ORDER#3 ITEM 3 J COB 2705 Bae Texas 7 Road,S3110 Austin.7axas 78746 U.S.A.S.A, 1,512 314.3100 Fax 1.512.314 3135 RECEIVED By Michael F. Thuss, P.E. at t?:OZ am, Ju!18, 201'1 Michael F. Muss,P.E. Construction Manager =M!ichjae�IF. Brushy Creek Regional Utility Authority(BCRUA) at 11:14 am,Jul 18,2011 1906 Hur Industrial Boulevard Cedar Park,Texas 78613 Michael F.Thuss,P.E. 2011.07.18 11:15.56-05'00' Re: BCRUA Interim Floating Intake Facilities—RW-C3 Change Proposal Request#10 Dear Mr.Thuss: Enclosed is the response from Excel Construction Services,LLC(Excel),dated duly 21,2011,to CPR#10. As stated in the response from Excel,a credit in the amount of$10,905.00 would be offered for deletion of the flexible ball joints that were originally specified. Based on recent discussions between HDR Engineering,Inc. (barge design subconsultant to Jacobs) and BCRUA's Design Oversight Committee,the decision was made that the flexible ball joints could be deleted from the scope of work It is our opinion that the credit for deletion of the flexible ball joints is a fair and reasonable amount. If this proposed$10,905.00 credit meets with the approval of BCRUA,it will be included in a future change order. If you have any questions or need additional information,please call. Sincerely, JACOBS ENGINEERING GROUP,INC. WAVAq\ Glenn A.Bridges,P1. Senior Project Engineer XC: Jenn Higby,ETT BCRUA Grace Stillman,ETI',BCRUA Dustin Riley,WRM Jim Tolles,P.E.JR Tolles Associates wl enclosures K:1osos44`consuuctton\connac1 XPR's1CPR#101CPR#10 lever 071511-doe ass to =ngf(7�ering Group im, EXCEL"" ° Change Proposal BCRUA Floating Intake Request No. 010 B JACOBS PV*Cl game: Interim Fbaft Intake Faclilies Contractor: Excel COrssimctron Services.LLC Project Owner. BCRUA Address: PO Box 2280 Leander,Testas 788+18 Address: 221 E.Main Sb*M RmM Rock TX 78664 Initiated Engin ® Contractor Attention: The k t Wng change in the cont act On this p QJM is ProPOSOd- Work shall not oorrnnenee and1 awed by the Owner. Description of the Proposed Change: excW is i9essed to offer the for the owner's COM Wwokn by d0sti the f exWe aged out on street UK By Matthew Ca>utctn Exsel Constn►stiort SsrAWS Lt-C Ao work shall be in accordance with the terms, Jecobs ReOornnendalton: supulafts,and conditions of the or%OnM COntraet © Recommend Acceptance Uccuments, If to work herein provided for is Approved by Do Not Recommend Accep1mu:a Change Order.the ume of coMPletlon wli tae: tncreased ❑ Oscreased X Unchenged By: faOoba By 0 calendar days. Dow This change wi[I Add X Deduct ❑ No Change Owner's Action: S _ © Accepted ❑ Na Acowed Excel Constnrtsion Bervloss,LLC sy BCRUP, D8 iu 15,2011 DOM - Change Proposal Request Form BCRUA n4TERIM FLOATING INTAKE FACILITIES :P1 dux PROPOSAL O T ITEMIZATION: rdPRN . 1 B BCRUA Interim Floating Intake Delete flexible bail joint July 15,2011 units quantity unit cast tOtal A Materials 1 Credit back Ebaa flexible ball' 'nts EA 3 $ 3,313.75 M9, 1,25 2 3 4 $ _ 5 $ _ 6 $ - 7 $ _ B $ - 9 13 Lobo rlE ul ment 1. Install 13a1I Joints Cha an Marine NR 3 $ 963.75 2 $ - C Subcontracts $ _ 1. $ 2. $ _ 3. C Adminlstratfon $ 1 $ - 2. $ - 3. $ _ 4. Sub Total $ (10,905.00) TOTAL $ (10.905) Date July 7, 2011 HD Supply Waterworks 13790 Judson Roar! San Antonio,TX 78233 Telephone: (210)657-1632 Bid ID 2809921 BCRUA USI-flex Joints Pax: (210)657-2321 Line Qty Descrf tion UOM Net Ptiae Extended Price HD SUPPLY WATERWORKS 7620 GRISSOM ROAD SAN ANTONIO TEXAS 78251 PHONE:210-6841150 FAX: 210-6845521 'AND* 13790 JUDSON ROAD SAN ANTONIO TEXAS 78233 PHONE:210-657-1632 FAX: 210-657-2321 PROJECT:BCRUA FLOATING INTAKE LOCATION:AUSTIN TX BID DATE: ENGINEER' SID PER----SPECIFICATION "*PVC PIPE QUOTED HEREIN'" ****IS OFFERED SUBJECT TO***** —AVAILABILITY. PRICING'"" *****IS SUBJECT TO CHANGE**'" 1 Date July 7,2011 HD Supply Watena fks 13790 Judson Road San Antonio,TX 78233 Telephone: (210)657-1632 Bid ID 2809921 BCRUA Usi-flex Joints Fax: (240)657-2321 Line Qty Description UOM Net Price Extended Price Di Ball Joint 430 3 MOV06 USIFLX SOCX250#FLG EA 2,520.92 6,382.76 DI PRIME/CEMENT LINE 450 3 96X01'06 USIFLX BELX250#PLG FA 2,289.15 6.867.45 DI PRIMEICEMENT LINE 470 6 16 316S$230#HEX BOLUNUT KIT EA 410.14 2,480.84 480 6 16X148 FF CLOTH IN GSKT 30OPSI EA 43.13 25878 #250 DRILLING Dl Ball Joint Sub-Total 15,949.83 Deduct for Ebaa Hall Joint 500 3 16 EBAA FLEX 500 BALL JOINT EA -3,313.75 .9,94125 Ebaa Ball Joint Sub-Total "� Change Order Total 6,00858 2