GM-11-10-19-020Page 1 of3
Contract Quantity Adjustment/Change Order ~~§lt~tCC~B~o~K
A •• ~ I c: 1, ~.
rev. 9/2011
Project Name: Brushy Creek Regional Water Treatment Plant, Phase 1A (WTP)
Contractor: Pepper-Lawson Construction Date: September 16, 2011
Change
Order/Quantity
Engineer: ...::C;,;;;D..;,.M;.J..,..:;I;,.;.nc;;.;,. _ Adjustment No.
Justification
1
SUMMARY Amount ~
Original Contract Price: $47,323,000.00_
Previous Quantity Adjustment(s):
This Quantity Adjustment: $0.00
Total Quantity Adjustment(s): $0.00
Total Contract Price with Quantity Adjustment(s): $47,323,000.00
Previous Change Order(s): $26,851.81 0.06%
This Change Order: $49,464.00 0.10%
Total Change Order(s) To Date: $76,315.81 0.16%
Original Contract Price Plus Change Order(s) Plus
Quantity Adjustment(s): $47,399,315.81
Original Contract Time: 930 Calendar Days
Contract Time Priorto this Change Order: 940 Calendar Days
COntract Timewith All Approved Change Orders: 940 Calendar Days
Prepared By
(Engineer):
COntractor
Approval:
BCRUA
Approval:
BCRUA
Approval:
L.P.
Se tember 27 2011
Date
Date
&rn .. /J-JD17-02.D
3
CHANGE ORDER No.3
9-16-2011 EFFECTIVE DATE: _DATE OF ISSUANCE: _,.:;........0.."-==-=-=-_
OWNER: BCRUA
CONTRACTOR: Pepper-Lawson Construction (PLC)
PROJECT: Brushy Creek Regional Water Treatment Plant - Phase IA Project
ENGINEER: CDM. Inc.
The Contractor is hereby directed to make the following changes in the Contract Documents:
Change Proposal Requests
1. CPR No. 015 - Check Valve Prior Free Standing FDC (Fire Marshal Request)
ADD $16,859.00
2. CPR No. 018 - future City of Leander Distribution System Take-Point SCADA modifications (Owner
Request)
ADD $7,006.00
3. CPR No. 021 - Section 08700, Finish Hardware Modifications (Vendor Recommendation and Owner
Request)
ADD $1,549.00
4. CPR No. 022 - Gate Revision to Ameristar Picket Gates (Owner Request)
ADD $7,173.00
5. CPR No. 025 -Additional Piers for Booster Pump Station (Unforeseen Change)
ADD $16,013.00
6. CPR No. 026 - Additional Valves in Disinfection Facility (Owner Request)
ADD $864.00
TOTAL (Items 1-5) ADD $49,464.00
No Change to Contract Time
Page I
Project: Brushy Creek Regional Water Treatment Plant -Phase IA Project
Change Order No. 3
CHANGE IN CONTRACT PRICE:
Original Contract Price:
$ 47,323,000.00
Net Increase (Decrease) from previous Change Orders
No. _1-to No. _2_
$ 26,851.81
Contract Price prior to this Change Order:
s 47.349,851.81
Net increase of this Change Order:
s 49.464.00
Contract Price with all approved Change Orders:
s 47.399.315.81
CHANGE IN CONTRACT TIME:
Original Contract Times:
Substantial Completion (Days): 840 Calendar Days
Final Completion (Days): 930 Calendar Days
Substantial Completion (Date): March 21, 2012
Final Completion (Date): Tune 19, 2012
Net change from previous Change Orders No. _I_to No. .1:
Substantial Completion (Days): 10 Calendar days
Final Completion (Days): 10 Calendar days
Substantial Completion (Date): 10 Calendar days
Final Completion (Date): 10 Calendar days
Contract Times prior to this Change Order:
Substantial Completion (Days): 850 Calendar Days
Final Completion (Days): 940 Calendar Days
Substantial Completion (Date): March 31, 2012
Final Completion (Date): Tune 29, 2012
Net increase (decrease) this Change Order:
Substantial Completion (Days): 0
Final Completion (Days): 0
Substantial Completion (Date): 0
Final Completion (Date): 0
Contract Times with all approved Change Orders:
Substantial Completion (Days): 850 Calendar Days
Final Completion (Days): 940 Calendar Days
Substantial Completion (Date): March 31, 2012
Final Completion (Date): Tune 29, 2012
Page 2
APPROVEDCDNI By Michael F. Thuss, P.E. at 2:06 pm, Sep 09,20,11
l2357-l.. Rlali Tra,e Parl<:wllY. ~'Ji!~ 21J
A:Jstlfl. Texas 7875·9 Michael F.Thuss, P.E.
t,"l: 512346·1100 4' . ~2011.09.0914:08:07fax: 512 345-14B} ~ //t- -05'00'
September 8, 2011
Mr. Mike Thuss, P.E.
Construction Manager
Brushy Creek Regional Utility Authority (BCRUA)
221 East Main Street
Round Rock, Texas 78664
Subject: Brushy Creek Regional Water Treatment Plant - Phase lA Project
Change Proposal Request No. 15 - Letter of Recommendation
File No.: L-EO-D045
Dear Mr. Thuss:
CDM received Pepper-lawson's Change Proposal No. 15 (i.e., Free Standing Fire
Department Connection, Check Valves, and Concrete Vault). This additional work was
directed by the Fire Marshal and is associated with the response to RFI-025. We have
reviewed this change proposal and find it reasonable. Accordingly, this letter shall serve
as CDM's recommendation that Change Proposal No. 15 be included in an upcoming
change order to the Contract for $16,859.00 with no additional Contract time.
If you have any questions, please do not hesitate to contact me at (512) 346-1100.
z~
Steven V. Lynk, P.E., BCEE
Associate
Project Manager
Camp Dresser & McKee Inc.
TBPE Firm Registration No. F-3043
xc: Chris Lippe, BCRUAGeneral Manager
Jennifer Higby, CDM
L-ED-0045-CPR 15 LOR 09-08-11.doc
Change Proposal
Request No. 15
(Not a Change Order)
Project Name: Brushy CreekRegional Water treatment
PlantPhase 1A
Project Owner: BCRUA
Contractor: Pepper-Lawson Construction Initiated by: cmner
Date: .Iuly19,2011
Attention: The following change inthe contract onthis project is proposed. Please provide your proposed price forthe
costofthis change. •
• A breakdown ofcost SHALL be provided upon request bythe Owner or Engineer.
• Workshallnot commence until authorized bythe Owner.
Description of the Proposed Change:
FreeStanding Fire Department Connection Check Valves and Concrete Vault
Reference the attached:
• Cost breakdown sheet
• Quote anddata from Vikine Suoolv. Hanson & GFK sales
By I Chad Mitchell, Prolect Manaaer
AllworkshallbeIn accordance withthe terms, stipulations, and Camp, Dresser, McKee, Inc. Recommendation:
cond it/ons of the original Contract Documents. If the work o Recommend Acceptance
herein provided foris Approved by Change Order, thetime of o Do NotRecommend Acceptancecompletion will be:
181 Increased [j Decreased 10 Unchanged I-=---=:----:~
By:Steve Lynks, P.Eby_0_ calendar days.
I
Date
o NoChange BCRUA: o Accepted 0 Not Accepted
By: Mike Thuss, P.E.
I Date July19.2011 I Date
Change Proposal Request Form Brushy Cleek Regional WaterTreatment PlantPhase lA
Pepper-Lawson Coosttuction, L.P. JobNo. 19981 19.IuI.1I
Brushy Creek Regional WaterTreatment PlantPhase IA
CPR 15
F.... Standing Fire Departmmt Conneetion &:CheckValves
11=
Labor
Unit Total
Non·Taxad
Material Subcontract
Unit Total
Equipment/l'oxed Material
Unit Total Unit Total
No. Description Qtv Unit Coat Cost Co.t Cost Cost Cost Cost Cost
1 4' Swing Checl< Valve FXF 250psi 1.00 BA 937.00 937.00
2 8' Swing CheckValve FXF ~Opai 1.00 BA 2,625.86 2,625.86
3 4' x 2112' x 2112" -FDC 500G.P.M6510 1.00 BA 1.270.00 1.270.00
4 72"x 72' x 74' -Conactc Vaultwi32' accesscovor 100 BA 3,012.00 3,012.00 2,504.88 2,504.88
A
B
C
D
E
F
G
H
1
Direct CostSubtotal
Labor Burden@55%
Tax@8.~%
ConlnlCtcr'. Fee [15%for labor, mat'!, md equipment &:5% forllIlbs]
Subtotal 2 (A+B-+c+D)
Liability 8< Insurance @ 2.00%or F (0.02x F)
Bonds@.65%(.0065 x F)
Subtotal (F+<:l+H)
Total orall co1W1111S (CI+C2-+C3TC4)
7,844.86
4,314.67
nil
1,176.73
13,336.26
266.73
86.69
13.689.67
16.858.75
nla
nla
nla
nla
2,504.88
nil
206.65
375.73
3,C87.26
61.75
20.07
3,169.08
Other nla
Con'ent Total Cost $16,859
9991013
Viking Supply Net QUOTATION
1536 Hutton Drive, Suite 120 Date: 06127/11'ItKIN(;Carrollton TX 75006 Order Number: 366131 saTel: 877-684-5464 Fax: 972-466-0853SupplyNee Page: 1 of 1 ~ ExplraUon Date:
Job Reference: QUOTE
Ship To: PEPPER LAWSON CONSTRUCTION
1906 HUR INDUSTRIAL BLVD
SAM GIDE 512-382-{;207 FAX 512-382-6218
CEDAR PARK TX 78613
Freight Terms: Socond Party Billing
Payment Terms: Payment In Advance
Delivery Instructions:
Steel pipe prices held for 24 hrs, otherwlse pipe will be repriced when shipped.
Line LT Item
Sold To:
143255
Branch Plant:
Tel J Fax: (972 ) 466-0033
Viking SupplyNet Carrollton
Cash or CC Sales
1536 Hutton Drive
Suite 120
Carrollton TX 75006
3501013
Description
Requested By: SAM
Taken By: WWILSON
Carrier:
Qty
Ordered Unit Price UM
Extended
Price
1.0001 NS I08538 4 SWING CK VLV FXF 250psi VIKING 08538-250psi 937.8000 I EA 937.80
2.0001 NSI 08546 8 SWING CK VLV FXF 250psi VIKING 08546-250psi 2625.8600 I EA 2,625.86
Sub-Total Loose: 3,563.66
Net Weight
185 LB
Material
3,563.66
Labor Freight Misc. Tax
294.00
Total
3.857.66
Terms: Quote varod for 30 days unlessindicatedotherwise. Malerial and prices BUbject to specificalion6. Please check your plans. Not responsiblelor erfOl1I or omissions. We Alservethe right to COrAlcl clerical errors.
Commodities, technologies.or software clqJOrted by VikingGroupfrom the UnIllld States are In accordance with the Export Admlnlstrallon RegulatJons. Any elqJOrt or re-8Xport contrary to U.S. law Is prohibited.
USD
Worldwide Fire Protection Visit us online at www.vlklnggrouplnc.com I
1
HANSON PIPe AND pReCAST-S." AntonloISeg,,'n
Prer:tlst PIpe & Precast
501 E.Baxter 402 N.WVV WhiteRolld
Segutn, TeXlls 78155 SanAntonio, TI< 78219
Phone: 83D-40H)555 210-661-2351
Fax; 830-379-2719 210-661-5393
Quotation QUOTATION" IL...-06-08-65 _
communications & I:lectrical Stom Drainage Traps & Interceptors Water & Waste wal6/' Special Design
$ubmltted To: PEPPER LAWSON Cont8cu
Addre..: Fax: 21 0-661-5393
PlIOne, :l1 U-tj~1-:l;jO'
BID DATe
ENG
Terms MapNo. IPrOJect:
locatlon: 30 days net Lett Fontenet
Description
8X8 VAULT WITH 32" F&C
.. ALL RETURNS ARESUBJECT TOA 20%RESTOCKING FEE
NORETURNS ONSPECIAL CASTrrEMS.
'Prlce does not InclUde tax.
ACCEPTANCE OF PROPOSAL·1I£ ~ PROPOSAL MUST SE
SIGNED AND RETUIlNED TO HANSON PIPE AND PRECAST
INORDERTO BEBINDING,
Proposal Accepted By
Date
.
PriceDEPTH
8,2' $ 3,012.00
Per Amount
$ 3012.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$ ·
$ ·
$
$
$
$
$
$
$
$
$
$
$ ·
$
$
$
TOTAL $ 3,012.00-
lHAHKYOUFORTllE OPPOIlTUNITY OFSUBMlmHG OUR
PROPOSAL FORYOUR !&HE REQUIREMENTS. WlEN FAVORED
WITH YOUR ORDER, ITWILLRECEIVE PROMPT AND CAREFUL
ATTENTION. PROPOSAL VAUDFOR311 DAYS.
Proposal SUbmltled By:
Matt Fontenc 2100681·2351
Date: 02/0912011
--
10
04/27/2011 03:22 8175450055 PAGE 01/01
GFK SALES
'IfP.o. Box 1169
J L J -
Mess. TX. 7m39 ..
DIta 4-'l7-If
Pepper Lawso"
,aD Fiac:,t9~ _
ATlI/: . ~ha .ZctFn I J
00lW!1)' 1 W~e. K
-0
W! are plated tQ·Slbnlt UB fol Odlu qwtatJera
•
..
D!srlpUa1dPruU;tQ81ti1tY
1:t(05'fO-PB. L/'rZwa~ X
Fre~5+4NJ;~ Fl>c
l
. 'As' , N 5 T fhreaJ.$
pol. br~s.s
./
I
~ <tJes not 1ncJooa : 1) instal1Qtlcn 2) aocOOr.s or
fast.eners. Prices are·.bas$i CJ1 quantity ~ ar&'
. aetUt1als or dalet1CJlS will be at trlJt price. Qd:e
rYYVi rJnH 1 •
ttJTE
l:hlt Price: lUL'L
.
I), ,7q·0.2 6...
+
fre.le/,~t.
,
.
.
I:ny taxes will be in add1tion By la';£', :rAo~E LDMBAe.J> to~ prices. t7c?'
I
,, ----------.. ~ -----" .. ----...--~--~--~ .-r~--~~-----[~K~ (FIRE DEPT. INLET CONN. FREESTANDING TYPE) ~
~-',... ~/\ /~ ~-~ '----''---,--~_.._-------,_.,--, ._---,-----/ '--' -~,--
DOUBLE CLAPPER TWO-WAY INLET
Brass Body .. Overall Height: 24
~ 500 G.P.M. minimum inlet capacity
auxiliary inlet connection.
STANDARD EQUIPMENT: Cast brass bottom outlet
body with double clappers, outlet and Inlet sizes as
selected by figure nl,lmber, 18" high brass seamless "UIL LfSTED
tubing; brass branded plate; cast brass plugs and
chains. BrandIng as selected.
SPECIFY THREAD AND BRANDING.
, BRANDING: "StandpIpe·, "Auto Spkr."
Special lettering available.
OPTIONAl. FINISHES: '
PB - Polished Brass
RC• Rough Chroma Plated OVERALL HEIGHT; 24"
BODY SWING RADIUS:71/4"
Figure No. Size
'"6510 4 X2112 X2112
6512 6X2112X2112
6513 4X3Xa
6514 5X3X3
6515 6X3X3
PC • Polished Chrome Plated
FigureNo. 6510
I
.\ , ,
TRIPLE CLAPPER THREE-WAY INLET
Brass Body • Overall HeIght: 24"
750 G.P.M. minimum inlat capacity
auxlllary Inlet connection,
STANDARD EQUIPMENT: Cast Brass bottom outlet
body with triple clappers, outlet sIze as selected by
figure number; 18" hIgh brass seamless tubing
brass branded plate; cast brassphjgs and chaIns.
Branded as selected. SPE:;CIFYTHREAD AND BRANDING.
PLATE BRANDING: "Standpipe". "Auto Spkr",
"Standpipe-8prinkler".
Speclallettenng
available.
OPTIONAL FINISHES:
FI ureNo. Size
6526 4 X2112X21/2X 21/2
6527 6 X21/2X2 f/2X 21/2 FIgureNo.6527PB- PolfshedBrass .
RC • Rough Chrome Plated OVERALL HEIGHT: 24"PC-Polished Chrome Plated BODY SWING RADIUS: 8"
FOUR-WAY CLAPPER SNOOT STYLE INLET
Brass Body* Overall Height: 24"
A free standIng auxiliary Inlet connectlon 1t\t(!h 1,000 G.P.M.
mInimum Inlet capacity to supplement fire protection water ,..---:-,.--_--:--:--_
water supply. ' 16 X21/2 X 2112 X 2112X 21/21
STANDARD EQUIPMENT: Cast Brass bottom outlet body
with clapper snoots on each Inlet; 18" high brass seamless:
brass branded plate; cast brass plugs and chains. Branding
as selected, SPECIFY THREAD AND BRANDING.
PLATE BRANDING: "Standpipe·, "Auto Spkr",
"Standplpe-8pririkfer'".
SpE!ciallenering
available•.
FINISH: Cast Brass Body. Polished Brass Trim
OPTIONAL FINISH: PC-Polished Chrome Plated trim,
Rough Chrome Body FIgure No.6530 FIgure No.6532
Page6-17
CHANGE ORDER NO. 15 ATTACHMENT
EXCAVATION FOR CONC. VAULTS
LABOR AND EQUIPMENT CALCULATIONS (WORKTO DATE)
July. 19,2011
LABOR No. HRS HOURLY RATE
Supervisor 1 3 $51.00
Foreman 1 3 $38.25
Excavator Operator 2 3 $29.00
Loader Operator 1 3 $29.00
Pipelayer & Valve Installer 3 3 $23.75
EQUIPMENT
CAT385 Exc. 1 3 $331.25
Cat 320 Exc. 1 3 $100.00
Cat 938 Loader 1 3 $65.00
WaterTruck 1 3 $42.75
Small Tools 1 3 $48.45
TOTAL
AMOUNT
$153.00
$114.75
$174.00
$87.00
$213.78
$993.75
$300.00
$195.00
$128.25
$145.35~...;.;:;.:;:~
$2,504.88
Change Proposal
Request No. ~
(Not a Change Order)
Project Name: BrushyCreek Regional Waler treatment
PlantPhase 1A
Project Owner: BCRUA
Contract:)r, Pepper-Lawson Construction Initiatedby: Owner
I Date: July 18, 2011
Attention: The following change in the contract onthis project is proposed. Please provide your proposed price forthe
costof this change .
• A breakdown ofcost SHALL be provided upon request bythe Owner or Engineer .
• Workshallnot commence until authorized bythe Owner.
Description ofthe Proposed Change:
Additional Electrical for EST.
Reference the aftached:
• Cosl breakdown sheel
• Quoteanddata from T·Morales
By I Chad M'rtchell. Project Manager
NI wort< shallbeIn accordance wi'.h theterms,stipulaUons, and
conditions ofthe original Contract Documents. If thework
hereinprovided for Is Approved by Change Order,thetimeof
completion will be:
Increased ID Decreased
by _0_ calendar days.
ID Unchanged
Deduct 0 No Change
IDate July 18, 2011
c~p, Dresser, McKee, Inc. Recommendation:
0'Recommend Acceptance o Do Not Recommend Acceptance
~F\---kg~
By:leve Lynks, P.E
I
Date
BC~A:
[J" Accepted 0 Not Accepted
11Ihu~/
By: MikeThuss,P,E.
I Date
Change Proposal RequestForm Brushy CreekRegional WaterTreatment PlantPhase1;\
Pepper-Lawson Construction,L.P.JobNo. 19981 19-Jul-1l
Brushy CreekRegional Water Treatment PlantPhaselA
CPR#18ESTBlectrical Change
Item
Labor
Non-Taxed
Matorial Subcontract EauiJ)lllCllt/Taxed Material
Unit Total tAUt Total Unit Total tAUt Total
No. Description Qty Urit Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost Cost
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Cost Cost
6,500.00 6,500,00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Cost Cost
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
1 SeeT-Morales Scope 1.00 LS
A
B
C
D
E
F
0
H
I
Direct Coat Subtotal
Labor Burden@55%
TBX@8.25%
Contractor's Fee [15% for labor. mat'l, andequipment & 5%forsubsJ
Subtotal 2 (A+B+c+D)
Liability & Insurance@2.00% ofF (0.02x F)
Bonds@ .65%(.0065 x F)
Subtotal (F+O+H)
Total of allooltums( Cl +C2+C3+C4 )
nla
7,005.86
nil
nla
6,500.00
nla
nla
325.00
6,825.00
136.50
44.36
7,005.86
rJa
Other nla
Current TotalCost $7,006
I'
1·....;1_
Project: BrushyCreekRegionalWTfl Phase 1A
Owner: BrushyCreekRegionalAuthorlty
Date: 4121/11
mc Chlll1liJ8 tI: COR.Qe
PI'llJec;t Change t#: CPR·18
Chanae OrderBeauest
T. Morula Compmy k pleueli to offer 1blachange proposal far the lIddltlollll1 conduit. nameplate,
cedarpoat, pn1lltrlngs IIJlCl aJllucluded in key Dotes1,2,aud10 of drawlup £p·11A.Be adl'bed that
eODdults must be run accordlD~to attach" drawlnp. AD condaltl mteriJlllututol' of elented taak
mlllt be I'IID through an ~blockoDt In the perimeter beam. Note !I wUlDot be lueluded due 10 the
clwlge Deeeaary on l'OutlJlC the coDdult.
Work eonakb of:
• Suppl)'lDa ne.r trench par attached dnmlng
• RullDloa-ran eoudult with pu1IItrlng pi!' specificatlonl with fiber enforced concreto
CIlcaae_t
• Poarlug 12XUXU concrete pad 1I'bh cedar poat centered bI pad
• Add ph.aIle DlUDCplate to bll8eof pad mOIiDted with SS hanJware
Total adcl1tkmal eoltfor full Pl'Opoll1: $6.590.00
ChangeInitiatedBy: .2SteY=.'!ei!.Jl;~ynkJJl1. _
ChangePreparedBy: ...R..onLL.WIl el TMC'-..................._
Change Delivered To: Chadl PeeDer Lawson
ResponseRqat'dBy: .........._ASAP
Carbon Copy To: J.:!Non,.....e<--_
POBOlC859 601 SoulI1 P.lter8oIlAwnue
FIDnlnoII.T_711527 FIorIlnae,T_7lI527
Phone; 2Il4-7e3-4344 FlIlC: 2S4·T93-3044
EXHIBIT No
CPRNoLOCATIONSHEET No
P-EST-MP21-10
ET-EST-PLCRW-l
C-EST-PLCRW-l
YARD ELECTRICAl MOOIF1CATIONS
fUTURE ClTY OF' I..EANOER TAKE-POINT
SCADA TI£-IN
CDIlII DAlE 03/24/11 EE-1 ElEVAlEO
STORAGE TANK 018 EE-1A
0SEE KEY NOTE 10 ON EE-1.
@INSTALL A PHENOLIC tW.4EPLATE ON A 4- X 48"L
CEDAR POST SET IN GROUND AT A 12-DEPTH WIlH
CONCRETE USING STAINUSS HARDWARE AND READING
"FUTURE lEANDER COMMUNICATION TIE-IN TO WJP
SCADA SYSJnl-. NAMEPlATE SHALl BE 9-W X S-H
REO BACKGROUND AND WHITE lETTERS. ENGRAVED
LETTERS SHlIlL BE 1/2-HIGH.
,/,
I /', ,
I ' I I
I I
I I
I I
1)j~~:P"'"t-n I ::
j tJ I ) II I 'I I
I / \i I , :
I --~ , : r--'' I
ElEVATED STORAGE TANK
SHEET SERIES -rr
=-__'kJ
i
I
I
I
!!
-_-_-_-++-,-t---~~...
I I -11, 'II
1-------1 i~l-~. ----r Ii riA
EXHIBIT
No
CPRNoLOCATIONSHEET No
ARD aECTRICAl.. MODIFlCAllONS
FUTURE CIlY OF' LEANDER TAKE-POINT
llE-IN
CDM DATE 03/24/11 EP-11 018 EP-11A
CDM
APPROVED
By Michael F. Thuss, P.E. at 11:02 am, A1!' 12,2011
12357-A Rl,ltiTrace Plrl.w~'1, S'~i"! 210
Auu,n, Texas /87S9
tel ~12 3-16·1100
~a:" SI23-1S-148J
April 4, 2011 ~
Michael F. Thuss, P.E.
. ~2011.04.1211:03:52
-05'00'
Mt. Mike TIlUSS, p.E. > RCVD: MFT 4/4/11
Construction Manager
Brushy Creek Regional Utility Authority (BCRUA)
221 East Main Street
Round Rock, Texas 78664
Subject: Brushy Creek Regional Water Treatment Plant -Phase 1A Project
Change Proposal Request No. 18 - Yard Electrical Modifications; Future City
of Leander Take-Point SCADA Tie-In
File No.: L-EO-0037
Dear Mr. Thuss:
As a follow-up to recent construction progress meetings, attached please find the drawing
modifications depicting yard electrical modifications that are necessary to accommodate a
future City of Leander Distribution System Take-Point SCADA tie-in as requested by the
Owner. Assuming that this change is still requested by the Owner, COM recommends
that this change proposal request (Change Proposal Request No. 18) be issued to Pepper
Lawson (PLC) to include all work described herein. Due to the time sensitivity of this
work being completed while the yard electrical work is being completed, COM
recommends that the Owner authorize a formal authorization for Pepper-Lawson to
proceed with this work with a maximum not to exceed of $8,500. This amount will be
negotiated as a lump sum change to the Contract that is mutually agreeable between
Pepper-Lawson and the Owner/Engineer. This work should be considered as part of the
directed work described in the Bid Form (Section 00300), Bid Item 7, and Section 01026
(Measurement and Payment).
If you have any questions, please do not hesitate to contact me at (512) 346-1100.
~1IIi
Steven V.Lynk, TXP.E.82706,BCEE
Associate
Project Manager
Camp Dresser & McKee Inc.
TBPEFirm Registration No. F-3043
ATTACHMENTS
xc: Chris Lippe, BCRUA General Manager
Jennifer Higby, COM
L-ED-0037-CPR184-{l4.1'.doccans'll ling 'l:ngln~e,ln9' conslluCllon . opelatl~ns
~INSTALL A SPARE 1-1/2" CONDUIT WITH PULL \:JSTRING FROM EST -PLC-DC TO THE EXTERIOR
WALL OF THE ELEVATED STORAGE TANK AND
, STUB AND CAP CONDUIT 6" ABOVE FINISHEDahI' -. GRADE.
Z1-~ """,-' ~INSTALL A SPARE 1-1/4" CONDUIT -, '\.JWITH PULL STRING FROM
, , EST -PLC-DC TO THE EDGE OF THE
FENCE AND STUB AND CAP CONDIT
8" ABOVE FINISHED GRADE.
EST ~MPZ-001(!Xi)
\
MPZ1-13~\CATHODIC PROTECTION0
C-EST-BL1-1 POWER UNIT 7
\
\
FAA BEACON CONTROLLER
REFER TO DETAIL 'EG' 0
\ ON SHEET EZ-5 FOR
\ ADDITIONAL INFORMATION
o a~ \MPZ1-5~~11
b>E;'U
B MPZ1-6~'
II o$ I
ET-EST-PLCDC
P-EST-MPZ 1-8
C-EST-ANT-1
P-EST-MPZ1-9
FO-EST-PLCDC-1
MPZ1-5)b~
S \1..1\2.1
1-5 :=§MPZ1-4 ~~a~@Jt"",,-E1 ~P/GFI
'f-EST-SEC-010
P-EST-MPZ1-1 0
ET-EST-PLCRW-1 RADIO RACK0
C-EST-PLCRW-1 r--....---. """"...~
YARD ELECTRICAL MODIFICATIONS
FUTURE CITY OF LEANDER TAKE-POINT
SCADA TIE-IN
BRUSHY CREEK REGIONAL
WATER TREATMENT PLANT -PHASE lA
SHEET No LOCATION
CPR
No
EXHIBIT
No
ClIVI DATE 03/24/11 EE-1 ELEVATED
STORAGE TANK 018 EE-1A
o SEE KEY NOTE 10 ON EE-1.
@INSTALL A PHENOLIC NAMEPLATE ON A 4" X 48"L
CEDAR POST SET IN GROUND AT A 12" DEPTH WITH
CONCRETE USING STAINLESS HARDWARE AND READING
"FUTURE LEANDER COMMUNICATION TIE-IN TO WTP
SCADA SYSTEM". NAMEPLATE SHALL BE g"W X 5"H
RED BACKGROUND AND WHITE LETTERS. ENGRAVED
LETTERS SHALL BE 1/2" HIGH.
j----------j j----------j t---t+..~ r------------j 1---------1 1-----1{ j------{[}--
\
\
BRUSHY CREEK REGIONAL
WATER TREATMENT PLANT -PHASE 1A CPR EXHIBIT
No NoLOCATIONSHEET No
EP-11 018 EP-11A
YARD ELECTRICAL MODIFICATIONS
FUTURE CITY OF LEANDER TAKE-POINT
SCADA TIE-IN
DATE 03/24/11COM
CDM APPROVED
12357-." Rial. Trate Parkw~, Sllil~ 21"
Au>tin.Texas 737S9 By Michael F. Thuss, P.E. at 2:03 piri>Sep09,2011
1~1: ~12346·1100
. ".
tax: Sll345-14Sl
Michael F. Thuss, P.E . ~. ~2011.09.0914:04:48
September 8, 2011 --05'00'
Mr. Mike Thuss, P.E.
Construction Manager
Brushy Creek Regional Utility Authority (BCRUA)
221 East Main Street
Round Rock, Texas 78664
Subject: Brushy Creek Regional Water Treatment Plant -Phase 1A Project
Change Proposal Request No. 21 -Letter of Recommendation
File No.: L-EO-0047
Dear Mr. Thuss:
CDM received Pepper-lawson's Change Proposal No. 21 (i.e., Section 08700, Finish
Hardware Modifications). This change was both Vendor-recommended and Owner
requested based on several discussions and email correspondence. We have reviewed
this change proposal and find it reasonable. Accordingly, this letter shall serve as CDM's
recommendation that Change Proposal No. 21 be included in an upcoming change order
to the Contract for $1,549.00 with no changes to the contract time.
If you have any questions, please do not hesitate to contact me at (512)346-1100.
SZ/I4l
Steven V. Lynk, P.E., BCEE
Associate
Project Manager
Camp Dresser & McKee Inc.
TBPE Firm Registration No. F-3043
xc: Chris Lippe, BCRUA General Manager
Jennifer Higby, CDM
L·EO-OO47-CPR21 LOR os-oe-rr.eec
Change Proposal~ !:!!!c~!!.~AWSON Request No. 21
(Not a Change Order)
Project Name: Brushy Cre
Plant Phase 1A
ek Regional Water treatment Project Owner: BCRUA
Contractor: Pepper-Lawson Construction Initiated by: Owner
Date: July 19,2011
Attention: The following change inthe contract onthis project is proposed. Please provide your proposed price forthe
costof this change .
• A breakdown of cost SHALL be provided upon request bythe Owner or Engineer.
• Workshallnot commence until authorized bythe Owner.
Description of the Proposed Change:
Chance Door Hardware Locksets From Storeroom Function to Office Function.
Reference the attached:
• Cost breakdown sheet
• Quote anddatafrom Hull Supplv Co.
By I Chad Mitchell, Proiect Manacer
All wor1<:shall be in accordance withthe terms, stipUlations,and
conditions ofthe original Contract Documents. Ifthework
herein provlded for Is Approved by Change Order, thetimeof
completion will be:
o Increased
by _0_ calendar d
ICJ Decreased
ays.
ID Unchanged
duct 0 No Change
Camp, Dresser, McKee, Inc. Recommendation:
IJ Recommend Acceptance
o DoNot Recommend Acceptance
I--=----=-=--~
By:Steve Lynks, P.E
Date
BCRUA: o Accepted 0 Not Accepted
By: MikeThuss, P.E.
I Date July19,2011 I Date
Change Proposal Request Form Brushy CreekRegional WaterTreatment PlantPhaselA
Pepper-Lawson Construction, L.P. JobNo. 19981 19·Iul·1I
Brushy CreekRegional Water Treatment PlantPhaselA
CPR 21
0Jans.Door Hardware 1.o<betlFromStoreroomFunctionto Olli... Function
I1lm
No. De.oriJ>tion Otv Unit
Labor
Non-Taxod
Material SubcontI1let Eaui=tfl'oxad Materi.l
Unit
Colt
Tatal
Collt
Unit Total
Coo ColIt
Unit ratal
Cast Coo
1,436.96 1,436.96
Unit Total
Co.t Coot
1 Deduct-Storeroom Function& Add-oflil:. FunctionLoc;kwall 1.00 LS
A DireotCoo 9ubtotal 1,436.96
B LaborBurdon@ 55140 nI. nI. nI.
C TIX@8.2S~ 01. nI. nil
D Contractm'lFee [15\i forlabor,mnt1, endequipmeI'.t &; 5% for lub,] 71.85
B Subtota12(A+B-tOID) 1,5OS.81
F Liability & Imuranoe @ 2.00'~ ofF (0.02x F) 30.18
G
H
Bonda@ .65%(.0065"F)
Subtglal(!1-t<HH)
9.81
1,548.79
I Totalof ill collll\lllll ( CI +C2+C3+C4 ) 1,548.79
Other nil
Cllrt'ent Total Cost $1,549
7
H uu
5117E..tC..orCIJ..., -AuJlln,1)( 78702 PII. (512)385-12f2 Fox(512)385-0225SUPPLY
CO. Cost Proposal
DATE: 611612011
PROJECT: Brushy Creek· WTP J08#: 0184
CONTRACTOR: Pepper·Lawson HULL SUPPLY C/O#:
SHIP TO STREET: 1906 Hur Indusb1al Park FM 1431 PROPOSAL BY:
CITY, STATE, ZIP: Cedar Park, TX.,78641
CONTACT NAME: SamGlde
PHONE: (512)382-6218
CELLULAR:
FAX:
QTY MATERIAL TYPE PRODUCT DESCRI~TION UNIT COST +1·
$0.00
8 HDW Deduct -Storeroom FuncUon Locksets -$77.31
8 HDW Add-Ofljce Function L0ck5els $231.93
$0.00
MISC Pick up and delivery of locksets· $200.00
$0.00
$0.00
Deduct amounts are penellng acceptance by Falcon, $0.00
oflockset condition. $0.00
$0.00
$0.00
·Pick up and delivery charges can be avoided if $0.00
locksets are brought to and exchanged atour 100000tlon. $0.00
$0.00
$0.00
$0.00
Mike Fitzwater AHC
TOTAL COST +/.
$0.00
-$618.48
$1,855.44
$0.00
$200,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
$0,00
$0.00
$0.00
$0.00
$0.00
Total ADD/DEDUCT for Material $354.62 $1,436.96
HMF ALUM HMO WD HOW LABOR Mise
$0.00 $0.00 $0.00 $0.00 $1,236,96 $0.00 $200.00
NOTES: Reference 9I11ail sent 618111 kx field order for hardware changes.
Please advise if locksets are tobe brought to our locaDon orif we are to deliver/pick up product
Tax not Included
We will require your authorizaUon to proceed with formal change order tofollow
(1)IMTERlAI. BlD F.O.S. POINT OFSHPIBITWIllI (cIIIICl """I [,I FUllFREIGHT AWM'EDTOJOBS/TE OcmBSlDE, OR [] FRElGllTWlll BEAN
ADDlT1OfW. CHARGE AND PAID BYPURCHASER. (2J NO TAXES ORBOND COlI" /lIE IIlCI.UDED. n£Y WILlBEADDED IFNECESSARY.
(3)NO INSTALlAnON ISINCl~. (4)THIS PRa'OSAL WST BE ACCEPlEl> IN 'MlITVlGWTHIN 30DAYS FROM THE DATE OF PRa'OSAl. AIlCM:.
(5)PIICES SUBJECT TO CHAlG:AFTER 30llAY3 FROM DATE a' PROP03AL (8)THill AClREEM:NT ISCONTINClENT UPON STRlKEli. WAR, T~ST
ACTMTIES, ACTS a'GOD, PR<DJCT AVAILAlIlJlY AIIlJIal0T1ER D8.A'IS UNAVOIDABLE OR BEYOHD OUR CONlROL [7)AU. ACCOlIlTE DUE
AND PAYABLE IN AUSIlN, lRAl'IS COUNlY, TEXAS,1MlERE VENUE SIWl. ue. (!JPRICE &TERMS OOH APPRO\IBl CREDIT; TERMS lET30DAYS
UNPAID BALANCE ON PAST WEACCOUNTS 8UIl.ETTO18'16ANNUAL Slr.t'lEINTEREST PER t.aITH. (9)NO MIoTERIA1.S 'MIL BE SlIPPED UNLESS
I'lEHAVE IIOI1lA SIGNED PIO'OllALANOA PURCHASE ORDER PROPERl.YEXECUTED. (10) BID ISPER PlAN3 &SPECIFlCAnONS-OEVIAnONS TO
THE PWlSANDSPECSAREEHlHRATED MOVE. (11)HlllSLm.Y CO, tic. WILL NOT ENROlL tl ORREBATE IIONES FORAIn'
CCPOR OCIP tlSURANCE flIlOOIWI9.
Hull Supply Co., Inc.
Purchaser:
Accepted:
Date:
CDIVI
1 ].31j1·AR~HiIi Tri({-r-Mk:>.-..~Y. ~\,;l':t'" ~ i:'
P,..;·::;.tin. r(:X~5 7!S759
tel 512346·110']
June 30, 2011
Mr. Mike Thuss, P.E.
Construction Manager
Brushy Creek Regional Utility Authority (BCRUA)
221 East Main Street
Round Rock, Texas 78664
Subject: Brushy Creek Regional Water Treatment Plant - Phase 1A Project
Change Proposal Request No. 21 - Section 08700, Finish Hardware
Modifications
File No.: L-EO-0041
Dear l\1r. Thuss:
As a follow-up to COM's recent email to Pepper-Lawson (PLC) and previous discussions
in construction progress meetings, attached please find the changes to Section 08700,
Finish Hardware, which include both vendor-suggested and Owner-requested changes,
as more fully described below.
• In the following door locations within the Administration Level of the Treatment
Structure Central (TSC), provide credit for deleting storeroom function locksets
and provide an office function locksets instead:
- Door 204.2
- Door 204.3
- Door 209.1
- Door 212.2
- Door 213
- Door 214
- Door 215
- Door 216
- Door 220
Assuming that this change is still requested, CDM recommends that this change proposal
request (Change Proposal Request No. 21) be issued to Pepper-Lawson (PLC) to include
all work described herein. When received, PLC should distribute this change proposal
request to all subcontractors and suppliers in order to expedite the change order process
as much as possible. If PLCs proposal is deemed acceptable, CDM recommends that this
change proposal be included in an upcoming change order to the Contract.
L·EQ-0041-ePR21 6·3Q·ll.doc
CONI
Mr. Mike TI1USS, P.E.
June 30, 2011
Page 2
If you have any questions, please do not hesitate to contact us at (512) 346-1100.
~!/I,t
Steven V. Lynk, TX P.E. 82706, BCEE
Associate
Project Manager
Camp Dresser & McKee Inc.
TBPE Firm Registration No. F-3043
xc: Chris Lippe, BCRUA General Manager
Jennifer Higby, COM
L·EQ-0041·CPR21 6.3Q-11.doc
Change Proposal
Request No. 22
(Not a Change Order)
Project Name: BrushyCreek Regional Water treatment
Plant Phase1A
ProjectOwner: BCRUA
Contractor: Pepper-Lawson Construction Initiated by: Owner
Date: July 19,2011
Attention: The following changeinthe contract onthis project Js proposed. Please provide your proposed priceforthe
cost of this change .
• A breakdown ofcostSHALLbe provided upon request bythe Owner or Engineer.
• Wort<shallnot commence until authorized bythe Owner.
Description of the Proposed Change:
Changing Gatesfrom Chain link to AmeristarPicketGates-Submittal
Reference the attached:
• Cost breakdown sheet
• Quote and data from Empire FenceCo.
• Submittal ResDonse # 02831-OO1·A Comment #3.
By I ChadMitchell,ProjectManager
All wort shall be in accordance with theterms,stipulations,and Camp,Dresser,McKee,Inc.Recommendation:
conditions oftheoriginalContractDocuments. If thework
l::KI Recommend Acceptance
hereinprovided for is Approved byChangeOrder,thetimeof
o Do Not Recommend Acceptancecompletion will be:
o Increased [) Decreased [J Unchanged I This was requested by the DOC.
By: Steve Lynks, P.E
by _0_ calendardays.
I 8/15/2011
Date
o NoChange BCRUA: ex Accepted 0 NotAccepted It+-J 14.V.1v. ~ Digitallysigned by J.nn~er L.
'" . 0<... 0 O· Higby
Oat.: 2011.08.15 09:18:14·05'00' for
By: Mike Thuss,P.E.
I Date July 19, 2011 I Date 8/15/2011
DOC approval received via email from
CORR (8/15/11) and COCP (8/12/11)
Change Proposal Request Form Brushy Creek Regional Water Treatment PlantPhase lA
Pepper.Lawson Cons1nJction,L.P.JobNo. 19981 19·]ul-1l
BrushyCreekRegional WaterTreatmentPlantPhaseIA
CPR 22
Changing Galea from Cluinlink to Ameri&tar PicketGales -Submittal 02831.QO I-A Commentli3.
Ittm
Labor
Non-Taxed
Material Subcontract IB<JuiDment!l'axed Material
Unit Total Unit Total Unit Total Unit Total
No. Description Qty Unit Cost Cost Cost Cost Coot Coot Cost Cost
1 Deducl-Chainlink & Add·Ameristar PicketGales )00 LS 6,655.00 6,655.00
A
B
C
D
E
F
G
H
I
DirectCoat Subtotal
Labor B1D'den @ 550/0
T8X@8.2S%
Contracto~s Fee [15% for labor, mat'!, and equipmcll1 & 5%frr subs]
Subtol.1 2 (A+B+C+D)
Liability &Insurllnce@2.00% ofF (0.02x F)
Bends@ .6.5% (.006.S x F)
Subtotal <F+<l+H)
Tal.1of oilcclumns ( Cl +C2+C3+C4 )
nI.
7,172.93
n/a
nla
6,655.00
nla
nla
332.75
6,9B7.75
139.76
45.42
7.172.93
nla
Other ilia
Current Total Cost $7,173
1731 C.R.269 Leander, TX 78641
(512) 259-0693 (512)259-0708Fax
June 3, 2011
Pepper-Lawson Construction
2050 E. Hwy 290, SuiteD
Dripping Springs, Texas 78620
(512) 858-1508 Office
(512) 848-4156 Fax
Attn: SamGide
RE: BrushCreek Regional Water Treatment Plant-Gates
Thisletteristo makea proposal to provide laborandmaterialsto complete the following:
5' Chain Link WalkGate (1) <$426.00>
6' Chain Link Walk Gate (1) <$490.00>
20' Double Chain Link Gate(l) <$820.00>
5' Ameristar WalkGate (1) $1,927.00
6' Ameristar WalkGate(1) $1,933.00
20' AmeristarDoubleDriveGate (l) $4,531.00
GRAND TOTAL $6,655.00
We appreciate the opportunity toprovide these quotes. Weare available immediately to
takecare of your fencing needs.
Thank you,
ScottBuckley
Empire Fence Co.
SUBMITTAL REVIEW TRANSMITTAL
1 Submittal No. 02831·001·A
Project Name: BRUSHY CREEK REGIONAL WATER TREATMENT PLANT, PHASE 1A
Engineer: Camp Dresser & McKee Inc•. Contractor. Pepper-Lawson Constructron, L.P.
Address: 12357·A Rlata Trace Parkway
Suits 210
AusUn, TX 78727
Address: 2050 E.Hwy290
SuIte 0
Dripping Springs, TX 78620
Attn: Gage HarrisAttn: Steven V. Lynk, P.E., BCEE
Date Received from Contractor: 04/22/2011 Date Returned to Contractor: OS/26/2011
No. of
Copies Descriotion Manufacturer Code Taken*
1
Metaf Security Fencing & Gates 1.5x3, 8
ga Intill, Slide Gate, Personnel Gate &
lmoasse Fencina
Ameristar 3 6
The Code Taken" above isIn accordance withthe following Legend:
Code 1-Approved Code5-Not ApprovedIResubmlt
Code 2 " Approved asNoted Code 6-Comments:l8IBelow DAttachedDNone
Code 3-Approved as Noted/Confirm Code 7-Receipt Acknowledged (Not SUbject to
Code4-Approved as Noted/Resubmit Engineer's Review or Approval)
Comments:
1. Extent of Metal Security Fencing,as clouded In Shop Drawing sheet AM-i, is not accurate.
Contractor and supplier shallverifythatall metal security fencing Is provided as indicated onthe
Contract Documents.
2. Ownerhas requested a material substitution by same manufacturer tothe -Montage Commercial
Style. Classic" alsoin 8' height:
http://www.ameristarfence.com/commerciaUndustriaVMontagePlusStyles
a. ItIsour understanding thatthis materIal change will be a nocost change.
-.. 3. Note:Ownerhasalso requested that same material I style defined above beusedforall gates
located within precast concrete fencingandshallnotbe chain linkas submitted In 02830 Chain
link FencIng. -~e6 A TrA-~HcZ> C-P~ .
COM Pllge1
SIGNATURE SIGNATURE
By: David Boren, RA
Date:0512512011
By: Michael F. Thuss, P.E.
Brushy Creek Regional UUlity Authority
Date: 05/26/2011
The Engineer's review 011 this shop drawing Is Jimilad to the review of the dimensionS. equipment, and materiais as presentsd in the
Contract plans, specJficstionB, end for design concept This revfew does not relieve 1M Contractor from errerB Or omissions InthissubmJtlal
or from the Contractor's responslbUity of addressing any deviations ffO!P ...'" "oClJl7l6irts. The Contractor Is responsible for the
detsils end dimensions of fabrlcetlon and manufacture, tile means, m5thods, ~. ,';1CIJiancfjf or procedures of conslroctlon end
performing Its workIn It Bafe manner. CDM /JZ.:"• . .' DetB 05125/2011
L ..~ A1 . SUbrnl~~ 831-601·A
cc: Don Rundell, Cityof Round Rock Wayne Watts, Cityof Leander
Kenneth Wheeler, CItyof Cedar Park Jo Zunker, Water Resources Management (Inspector)
-=-===---------_._._----_._----_._--_.-------_._---
COM Page 2
I n57-A P'j~li Tfa<e Par~w.", Sd:~ 210 APPROVED
AU!!;fI, Texas 7~7S9
t~l: St2 34G, 1100 By Michael F. Thuss, P.E.at 2:o~im>sip()9,'~011
fax: 512345-148;
Michael F. Thuss, P.E .
September 8,2011 . ~2011.09.0914:06:02~ -05'00'
Mr. Mike Thuss, P.E.
Construction Manager
Brushy Creek Regional Utility Authority (BCRUA)
221 East Main Street
Round Rock, Texas 78664
Subject: Brushy Creek Regional Water Treatment Plant -Phase 1A Project
Change Proposal Request No. 25 -Letter of Recommendation
File No.: L-EO-0046
Dear Mr. Thuss:
CDM received Pepper-Lawson's Change Proposal No. 25 (i.e., Additional Piers for
Booster Pump Station). This additional work was unforeseen since the contractor
proceeded with their excavation plan with the understanding that the piers and footings
could be installed on compacted select fill as noted on page 18 of the Geotechnical
Investigation report by Fugro Consultants, Inc. found in Specification 01170A. The
structural engineer of record, Jose I. Guerra, Inc., has recommended that the piers be
taken down to bedrock, which will provide a more stable foundation at the Booster Pump
Station and avoid any potential for differential settling as noted in their response to RFD
046. We have reviewed this change proposal and find it reasonable. Accordingly, this
letter shall serve as CDM's recommendation that Change Proposal No. 25 be included in
an upcoming change order to the Contract for $~O with no increase in Contract
time. 'l~IOI~ c::fV
If you have any questions, please do not hesitate to contact me at (512)346-1100.
sz~
Steven V. Lynk, P.E., BCEE
Associate
Project Manager
Camp Dresser & McKee Inc.
TBPE Firm Registration No. F-3043
xc: Chris Lippe, BCRUA General Manager
,o:-mv\(ln", 'engln~,in9 • ccns(luction. operalion~ L-EO.jJ048-CPR25 LOR 09.jJ8-11.doc
Jennifer Higby,COM
L·E().{)046-CPR25 LOR 09-0B-11.doc
Change Proposal
Request No. 25
(Not a Change Order)
ProjectName: BrushyCreek RegionalWater treatment
Plant Phase 1A
Project Owner: BCRUA
Contractor: Pepper-Lawson Construction Initiatedby: Owner
Date: July 20, 2011
Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the
cost of this change.
• A breakdown of cost SHALL be provided upon request by the Owner or Engineer.
• Work shall not commence until authorized by the Owner.
Description of the Proposed Change:
Add 6 Piers -36"121 x 30' deep for BoosterPump Station- RFD046
Reference the attached:
· Cost breakdown sheet
• Quote and data from March Construction, Inc.
· RFD 046 & Attached Details.
By 1 ChadMitchell.ProjectManager
All work shall be in accordance with the terms. stipulations, and
conditions of the originalContract Documents. Ifthe work herein
provided for is Approvedby ChangeOrder.the timeof completion will
be:
lit Increased 01 Decreased 0 Unchanged
by _0_ calendardays.
Add 0 Deduct o No Change
I. Dale July 20, 2011
Camp,Dresser, McKee,Inc. Recommendation: o Recommend Acceptance
o Do Not Recommend Acceptance
I~.,------;---=-:
By: Steve Lynk, P.E
Date
BCRUA: o Accepted o Not Accepted
[--::--:---=::--=------=:-=-----------By: MikeThuss,P.E.
I Date
Change Proposal Request Form BrushyCreek Regional Water Treatment Plant Phase 1A
Pepper-Lawson Construction, L.P. Job No. 19981
BrushyCreekRegionalWaterTreatmentPlantPhase IA
CPR 25
36'0>.30' deepPierFoundationforBoosterPump Station- JUTI046
Itern
No. Description Oty unit
Labor
Non-Taxed
Material Subcontract Ecuiement/TaxedMaterial
Unit
Cost
Total
Cost
Unit Total
Cost Cost
{}niL Totol
Cost Cost
Zl.507.00 21,507.00
-6,650.00 -6,650.00
Uni! Total
Cost Cost
I
2
Add 6-36'111.30' deep pierfoundation
Credit for eontrat specifiedspread footing6-5X5'xZ'
w124"0 colUITU'IJ
100
1.00
LS
LS
A
B
C
D
E
F
(l
H
DirectCost Subtotal
Labor Burden @ 55%
Ta.x@825%
Contractor. Fee [15% for labor. rnat'l,and equipment &; 5% for subs]
Subtotal 2 (A+B+C+D)
Liability& lnIunmc.@ 2.00% off (0.02>< F)
Bonds @.tS50/0 (.0065 x F)
Subtollll(F-+<l+H)
Toto!of all columns( CI+C2+C3+C4 )
n/a
16,013.25
nla
n1a
14,857.00
Ilia
nfa
742.85
15,599.85
312.00
·10140
16,013.25
n'a
Other
Current Total Cost S16,013
MARCH CONSTRUCTION, INC.
18833 REDLAND ROAD
SAN ANTONIO, TEXAS 78259
(210 490-8198Fax(210) 490-2201
July 12,2011
Proposalsubmittedto: Pepper Lawson Construction
Re: Brushy Creek WTP add piers
March Construction, Inc.proposesto furnishthe following
INCLUSION:
1. Concretematerials
2. Labor to place and finish concrete
3. Drill truck
4. Rebarmaterials
5. Labor to tie steel
Exclusions
1. All pre cast concrete
2. Waterproofing
3. Testing labs
4. All cost of permits and fees.
5. Chippingandgrindingunlesscausedby March Construction, Inc.
6. Backfillat structures
7. Site or grade preparations.
8. Excavationof the structures
9. Sheetpilingand dewatering
10. Specialworkinghours
II. Locating existing utilities
12. Haul off of beam spoils.
Allofthe aboveto be performedinaccordancewiththeplans and specs,except wherenoted, fortotal
Sum of:
$ 21,507.00
Credit for footings and stub columns $ 6,650.00
Add to contract $ 14,857.00
Thisproposalissubjectto changeor be withdrawn ifnot acceptedwithin30 daysofthe abovedate.
Respectfully submitted,
Butch Murray
Butch@marchconstruction.com
8'-3'
.
'" I
io
1:>,
Tnr
1055.50
1:>,
N
'"
1,35'. DRILLED )
S>lAfl-lYP )
"./
Tnr
IO~.25~
SLOPESLOPE
v
-l------I------J.+--E) V
HP ? Tnr. V
1055.25v
b,
.r>.;
/ ....\ -4-+-----+
~/
I
In
jI
1
7'-g' 9'-9' IklDESoc;w.1ED CONTROl. V
POINT SEE SHEET C-1D-
J·-s·-,:I-:;:......j.. ~:!!.-_22'-&'
SLAB PLAN
1/16" -,'-0· RESPONSE RFD #46
BRUSHY CREEK REGIONAL
WATER TREATMENT PLANT -PHASE 1A ADDENDUM EXHIBIT
No NoLOCATIONSHEET No
SE1-BSE-1DATE 07/07/11CONI
26'-0'
8'-3'
~
'" I.' ....
N
I~
I
I
I
I
I
'I
I
l
I
!rOUTl.INE or r sv.e AllOYE
I
I
I
1
!ft...
I
I
I
!
I
"-,
~
I
~
I
I '-l-t------=1
! II'::J'~'\ ..'
I
I
-+----t_f0J
I
I
I
I
I
I
!e
I
i
'0
I
,
'" I
.. I ;,.
,
"?
.
OIl
:,.
I
N
I ~
I ~ /~ ~~,~9_4"."_4· 9
Ii V !.TOC El '029.75' j::j
+-r1---+-+--H+-S' V I
'1' I -c:.::J I2 ;"l!--jL-~_L.!::::=:!.J'., ~ .... 1 rr=:=; 0' J~"\.
~'L I ~ Vi;'e'.'1' I CONe rro ... I 5'-0"'20'-4'."-4'f--r---[Q] I TOC a, 1035.08' !
~ I V I '"
;.. j IIQ I
, .fl 1~2J jl
'f I I -H------# '., b,------~,--------'-+'-
~~~~V 7'-9' 14'·_-!:9·........."'-I",.A".......""'-"'.....................I
3'-6".1--22'-6'
FOOTING PLAN
1/16" = 1'-0'
RESPONSE RFD #46
r------'-
I f'Y
BRUSHY CREEK REGIONAL
WATER TREATMENT PLANT -PHASE 1A
SHEET No LOCATION
ADDENDUM
No
EXHIBIT
No
DATE 07/07/11 SE-1 SE1-A
22~-1".. .. 1
'-0" 13'-0"'-0" "-S"5'-""
STl
OOER
SECTION
3)18 • i -6
RESPONSE RFD #46
BRUSHY CREEK REGIONAL
WATER TREATMENT PLANT -PHASE lA ADDENDUM
1---------,--------1 No
SHEET No LOCATION
5E-4DATE 07/07/11
EXHIBIT
No
5E4-A
SECTION
3)18 .1-0
I. COORDINATE CONCRETE COlLAfl
MEIGHT WITH PUll" ",rR.
2. ROUGMEN COI«:IlET£ PRIOR TO
UPPER CONCRETE P/.AC[\lENT.
RESPONSE RFD #46
BRUSHY CREEK REGIONl\L
WATER TREATMENT PLANT -PHASE 1A ADDENDUM EXHIBIT
No NoLOCATIONSHEET No
SE3-A5E-3DATE 07/07/11COM
20'-0·
O· 5"· O· 14'-3'
.llQI£S;
1. CooROINATE CONCRETE COllAR
HEIGHT WITH PUijP IIfR.
2. ROUCHEN CONCRETE PRIOR TO
UPPER CONCRETE PLACEIIENT.
I
1
j
I
I
j
1
I
II
II
I BO PUMP CAN El
1026'-1 l'
B'-4', 63'-,'
------______L ....f-L--r-L...,~l-J--r---L...,---l..-,-.l
SECTION
3715 • i -0
RESPONSE RFD #46
BRUSHY CREEK REGIONAL
WATER TREATMENT PLANT -PHASE 1A
SHEET No LOCATION
ADDENDUM
No
EXHIBIT
No
COM DATE 07/07/11 SE-2 SE2-A
Change Proposal
Request No. f§
(Not a Change Order)
Project Name: Brushy Creek Regional Water treabnent
PlantPhase 1A
Project Owner: BCRUA
Contractor: Pepper-Lawson Construction Initiated by: Owner
Date:September 12, 2011
Attention: The following change inthe contract onthis project is proposed. Please provide your proposed price forthe
costofthis change. .
• A breakdown ofcost SHALL be provided upon request bythe Owner or Engineer.
• Work shall not commence until authorized by the Owner.
Description of the Proposed Change:
Additional Valves
Reference the attached:
• Cost breakdown sheet
• QuoteanddatafromHD Supply
By , Chad Mitchell, Project Manager
Allworkshallbein accordance withthe terms, stipulations, and
conditions of the original Contract Documents. If thework
herein proVided for is Approved by Change Order,thetimeof
completion will be:
o Increased ID Decreased E Unchanged
by _0_ calendardays.
o NoChange
I Date September 12, 2011
BCRUA Requested Change ~ecommend Acceptanceo~ Not Recommend Acceptance
I Jason Brian, Plant Superintendent
By:
Date
BCRUA:
I]X Accepted 0 Not Accepted
. ff .....p;/ Michael F. Thuss, P.E. ~~4";U-2011.09.1215:45:35-05'00'I~=--=-----=-=---__----By: Mik.e Thuss, P.E.
I Date 9/12/11
Change Proposal Request Form Brushy Creek Regional Water Treatment PlantPhase IA
Pepper-Lawson Construction.l..P. JobNo. 19981
Brushy Creek RegiODBI Water Treatment Plant Phase IA
Item
No. Description Otv Ulrit
Lobar
Non-Taxed
Matorial
Unit Total
Cost Cost
488.00 488.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Unit
Cost
0.00
60.00
45.00
0.00
0.00
0.00
0.00
Total
Cost
0.00
120.00
45.00
0.00
0.00
0.00
0,00
1
2
3
SeelID Supply Scope
InstallCopper Valves
Install Ga~ Valve •
1.00
2.00
1.00
LS
EA
EA
A DirectCostSubtolal
B LaborBurden@ 55"
C Tax@8.25%
D Controctor'.Fee [IS%far labor,mal'!, end equipment & 5% forsubs}
E Subtotal 2 (A+B+C-tD)
F Liability&: llllftnllCe@2.00%ofF (0.02x 11)
G Bonds@ .65%(0065 x F)
H Subtotal (F:<i+H)
I Total of all colwnns (CI+C24C3+C4 )
Ot.1Cl'
Subcontract
Unit Total
Cost Cost
0.00 0.00
000 0.00
0.00 0.00
0.00 0.00
0,00 0.00
0.00 0.00
0.00 0.00
165.00 488.00
12·Sep-11
IBauiDlllcntlI'axed Material
Unit Total
Co.t Cost
0.00 0.00
0.00 0.00
0.00 000
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
90.75 nla niB niB
nla nla niB
24.75 73.20
280..50 561.20
5.61 11.22
1.82 3.65
287,93 576.07
864.oI
DIe
Current TotalCost $864
Run Date 9/09/11 HD SUPPLY WATERWORKS, LTD.
78630TX
512-858-1508
512-388-2612
PEPPER LAWSON CONSTRUCTION
STOCK-ROUND ROCK #160
PO BOX 2979
CEDAR PARK
Telephone:
Fax:
HDSWW -AUSTIN TX - N
1800 Royston
Round Rock TX
Telephone: 512-990-8470
Fax: 512-990-0069
78664
9/09/11 Bid ID: 2875421 GLEN Page 1
Line Quantity
Sell
Per Description
Net
Price
Extended
Price'
10
20
30
40
1
1
1
1
EA
EA
EA
EA
2" WATT BALL VLV FBV-3C
3" WATT BALL VLV FBV-3C
4 AFC 2504FF FLG RW GV OL HW
AMERICAN FLOW CONTROL
4Xl/8 FLG ACC RR FF
36.29
127.97
315.75
8.54
36.29
127.97
315.75
8.54
Run Date 9/09/11 HD SUPPLY WATERWORKS/ LTD.
HDSWW -AUSTIN TX - N
1800 Royston
Round Rock TX
Telephone: 512-990-8470
Fax: 512-990-0069
78630TX
512-858-1508
512-388-2612
PEPPER LAWSON CONSTRUCTION
STOCK-ROUND ROCK #160
PO BOX 2979
CEDAR PARK
Telephone:
Fax:
78664
9/09/11 Bid ID: 2875421 GLEN Page 2
special Instructions
BALL VALVES IN STOCK IN DALLAS
THESE ARE IMPORT. IF YOU REQUIRE DOMEST
PLEASE CONTACT ME FOR ADDITIONAL INFO
AND PRICING
THANKS I
Subtotal: 488.55
Tax:
Bid Total:
~~~~~UTY~F.K: ' ..,e."t" ••• c , ".'iII. 1.'., Ie.:'
September 12, 2011
Chad Mitchell
Pepper-Lawson Construction
12215 Bee Cave (FM 2244)
Austin, TX 78738
Re: Brushy Creek Regional Utility Authority (BCRUA)
Regional 'Vater Treatment Plant, Phase lA
Change Proposal Request #26
Dear Mr. Mitchell:
Please provide a cost proposal for the following proposed revisions to the subject project:
1. 1nsta114" Flange Gate Valve at 4" PTW-DIIF, per attached sketch.
2. 1nsta112" Ball Valve at 2" PTW-CU/S, per attached sketch.
3. Install 3" Ball Valve at 3" PTW-Cu/S, per attached sketch.
1fthe proposal is accepted, a change order will be prepared for the work. 1fyou have any
questions, please do not hesitate to contact me at 512-215-9151.
Sincerely,
Brushy Creek Regional Utility Authority
Jason Brian
Plant Superintendent
XC: Mike Thuss, P.E., BCRUA
Jennifer Higby, EIT, CDM
Steve Lynk, P.E., CDM
Jo Zunker, WRM
I
I
I
I
I e
I t
J tI
,I ' .,I J II,
I ft Ill'jlU,i .
I JIJIJ f
II ~lm,~I
l~
I~ IhHI~I~
'8
I
-t
+
~ "
V)
-'
~
~
~ ~
'.)
~