GM-12-03-07-028
Page 1 of 4 ��BRUSHY CREEK Contract Quantity Adjustment/Change Order REGIONAL UTILITY AUTHORITY rev.9/2011 Project Name: Brushy Creek Regional 78-inch Treated Transmission Line Segment 1 Contractor: SJ Louis Construction Date: 1/13/2012 Change Order/Quantity Engineer: Lockwood, Andrews & Newnam, Inc. Adjustment No. 3 Justification Item 1-SCADA Control Panel Modifications(See approved CPR#7 rev 2 for details). SUMMARY Amount % Change Original Contract Price: $8,134,941.13 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total QuantityAdjustment(s): $0.00' Total Contract Price with Quantity Adjustment(s): $8,134,941.13 Previous Change Order(s): $135,581.70 1.67% This Change Order: $7,241.85 0.090/0 Total Change Order(s)To Date: $142,823.55 1.76% Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): $8,277,764.68 Original Contract Time: 550 Contract Time Prior to this Change Order: 550 Contract Time with All Approved Change Orders: 571 41 / l A"�) n--I „ate /'l Page 2 of 4 BRUSHY CREEK Contract Quantity Adjustment/Change Order REGIONAL UTILITY AUTHO RITY rev.9/2011 Signatures and Approvals Prepared By: Julie Hastings, Project Manager, LAN I Signature Printed Name,Title and Company Date Contractor Approval: �l DA -VIP VkCK4L-&� /1"R0 �*IP- Li•J u)Jt S 09/1t- Signature �9/1 t- ' Signature Printed Name,Title and Company Date BCRUA Approval: wzCow.%z /-" fV/f Signature Printed Name,Title Date BCRUA Approval: _ 1 s 3 zz /Z Signature Printed Name,Titl6 Date :e7n BRUSHY CREEK REGIONAL UTILITY AUTHORITY A Parr n.r s hip of Cedar Park. Lc .d— and R..nd R—k CHANGE ORDER No. 3 DATE OF ISSUANCE: 01 / 13 / 12 EFFECTIVE DATE: OWNER: BCRUA CONTRACTOR: S.J. Louis Construction PROJECT: 78-Inch Treated Water Transmission Line Segment One ENGINEER: Lockwood, Andrews, and Newnam, Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: 1. Modifications to SCADA Control Panel ADD $7,241.85 TOTAL ADD$ 7,241.85 Page 1 Project: 78-Inch Treated Water Transmission Line Segment One Change Order No. 3 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price: Original Contract Times: Substantial Completion(Days): 460 $ 8,134,941.13 Final Completion(Days): 550 Substantial Completion(Date): 7/16/11 Final Completion(Date): 10/14/11 Net Increase(Decrease)from previous Change Orders Net change from previous Change Orders No. 1 to No. 2 No. 1 to No. 2 Substantial Completion(Days): 47 70 Final Completion(Days): 0 $ 135,581.13' Substantial Completion(Date): 9/22/11 Final Completion(Date): 10/14/11 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion(Days): 502 $ 8,270,522.83 Final Completion(Days): 550 Substantial Completion(Date): 9/22/11 Final Completion(Date): 10/14/11 Net increase(decrease)of this Change Order: Net increase(decrease)this Change Order: Substantial Completion(Days): 0 $ 7.241.85 Final Completion(Days): 21 Substantial Completion(Date): 09/22/11 Final Completion(Date): 12/21/11 Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion(Days): 502 $ 8,277,764.68 Final Completion(Days): 571 Substantial Completion(Date): 09/22/11 Final Completion(Date): 12/21/11 IL KAWJXK0201\execution\change orders\draft change order template.doc Page 2 Lockwood,Andrews &Idewnam,Inc. Lan A LEC A DALY COMPANY November 29, 2011 Mf. Mieilfte!441t-ss' PE > APPROVED Brushy Creek Regional Utility Authority By Michael F. Thuss, P.E. at 10:59 am, Nov 30, 2011 221 E. Main Street Round Rock, TQC 78664 Michael F.Thuss,P.E. 01 2011.11.30 10:53:11 -06'00' P•E: Brushy Creek Regional Utility Authority Treated Transmission Line Segment One Change Proposal #7 rev 2—Modificatio.ns to Metering Station SCADA System Control Panel Mr. Thuss: LAN has reviewed BCRUA Change Proposal#7 rev 2 (SJ Louis Proposal#12) regarding modifications to the Metering Station SCADA System. This change was requested by 13CRUA and City of Cedar Park. The modifications address changes to the control panel. The change order is for the amount of$7,241.85 and an additional 21 calendar days. The proposed additional. cost is consistent with the anticipated effort. LAN recommends BCRUA approve the change order in the amount of$7,241.85. Regarding the time extension, LAN recommends that the final competition date for the Metering Station be extended by 21 days from approval of CPR#7 rev 2 or approximately December 20,2011. If you have any questions feel free to contact Julie Hastings, PE or ine at 512-:i 8-4212. Sincerely, Ixot-11IL- Alisa Gruber,PE Project Engineer Attach: Proposal #12 dated I 1/17/11 10101 Rounion Place, SuRa 200 San Antonio,Texas 78216-4165 - 210.499.5082 Fax:210.0.99.5157 wwwJan-ine.com Proposal Project Name Proposal No. Date 78"Treated Water Transmission Line-Segment 1 12 11/17/11 Response Required By Transmifted By Alisa Gruber,P.E. Samuel D. Montoya Lockwood,Andrews&Newnam, Inc. Project Coordinator 10801 North MoPac Expressway Signature Austin,Texas 78759 �•G��vz-1�.�/�OD�GL Description of Change As requested this proposal addresses costs associated with SCADA system control panel modifications as requested by LAN and described in Field Order#5 Revision 2(attached). See attached proposal/letter and shop drawings from Merrigan Electric. NOTES: -All work/materials not specifically described herein are excluded. -This proposal includes addition of 21 days to final completion date of the project. Commencement of additional days is not to start until a fully executed change order is received by S.J. Louis Construction. Breakdown of Proposal Item Description unit Qty. Unit$ Total Cost NEW SCADA CONTROL PANEL MODIFICATIONS AS DESCRIBED ABOVE 1 LS $ 6,897.00 $ 6,897.00 5%OH&P $ 344.85 Net Contract Change $ 7,241.85 REQUESTED ADDITIONAL CALENDAR DAYS 21 S.J.Louis Construction Action xc Les V.Whitman, S.J. Louis Construction of Texas,Ltd. When,QHaltty Change Order Request:#003 Date: 11/10/2011 TO: S.J Louis Construction of Texas, LTD FROM: Merrigan Electric,LLC 520 South 6th Street 1115 Antelope Ridge Mansfield,TX 76063 Cedar Park,TX 78613 Attn: Sam Montoya Attn: Chad Merrigan (210)340-9998 (512)944-3216 Project; Brushy Creek Regional Utility Authority 78"TW T L 41 We hereby propose to make the following changes as per Field Order No.005 Revision 2 dated 10/31/11: Additional Equipment and/or Services: Lot of modifications to the BCRUA SCADA panel that is provided such that the Cedar Park SCADA Panel will share discrete and analog signals as well as the control of the Flow Control Valve. Provide field terminations in supplied SCADA panel for the wiring between the SCADA panel and the Marshalling Cabinet that is supplied by others. Modifications to Rack and Installation of Mashalling Cabinet;Supply and Install additional circuitry for Marshalling Cabinet;Provided(2)2"Conduit and associated cabling from BCRUA SCADA to CPUSA Marshalling Cabinet Change Order Price$6,897.00 Nate: Please have Engineer review attached drawings to insure that the supplied Neltronics BCRUA SCADA Panel has all of the required dicrete and analog signals required per this field order. Thank You. v►i-J AT� SttcP PtzawE�a,,S I IMS {�rlu�Ac►7 Td ORDyIL qlA ReGlErurcut�:— Z GlEi3 `[ltM6 yo t+JSrALL f4dtP.: -i wE�t� This price is good for 30 days. If conditions change,this price is void. We are requesting a time extension of 0 days in conjunction with this change. 1 ------- ryI --- �•�•••����� 1---------------------------' CI�AnO6011 UGIT (1 0 REll7t& 1 �j 1 11 0 RASE ' r( � II li I� 1 11 ❑ P ' 1 F II 1 1� 1 11 MO 1 1� I Iii 1 11 1 II 1, 1 AAnamiv 1'<Ils 1, 1 n t 11 11 Nfl CaNlA710NER 1 6D7 COLOR 17x1(H 1, 1 II 1 It r 1 SaT@1 1RNRHAI 'i AR CpI011AlER ; A71 Ixx1a111011Eq 11 - 11 RNR p5c ❑ !� Y 1 11 Sr6TCR 1 II ® 1 1 11 _ 9 Jt 1 n _- � r u 1 I 1 1 ' 1 II - ' 1 ❑ 1 I II ' ❑ 1 I II 1 ' II 1 1 11 1 11 1 A 11 I 11 1 � 1 11 1 11 1 � 1 II -- 11 I I 11 I II 1 I 1 1 11 A e�A ---- II i 60"x36"x16'Mema 4.12 Onuga Aluminum Enclosure with 21"Legs d 3-Point Latching Handle 5 Full Length Inleriiar Panel `��- One Cool Primer Inside/Out Interior Fed.Sid.Odor 27880 While Exterior Fed.Std.Color 26306 Gray lip Spore Quart of Finish Point to be Provided Nameplates 3-Ply Laminated Black With While Lettering Attached with Two Sell Tepphq 316 SS Sheet Metol Screws.Minimum Text Height 3/16` INTERNAL BACKPANEL FRONT ELEVATION ENCLOSURE FRONT ELEVATION ENCLOSURE SIDE ELEVATION R e SCHEMATIC LEGEN➢ Rev DATE err o[s:ATrnmA — a,we -"--"'—'- •--- REED'ARINC PANEL MIRING NELtronics '"` BRUSHY CREEK REGIONAL A MERRIGAN ELECTRIC, LLC 78-INCH 1RANSMONE LINE I rA ��To 1a 1115 ANTELOPE RIDGE SEGMENT ONE p IN LOC L L PANEL PLC CONTROL PANEL- DETAILS IN LOGO PANEL CEDAR PARK, TEXAS 78613 SCA➢A k PLC SpacieTht, 512-944-3217 Fe�20m--m n CP-1 CD w1RE LABEL(LOCATED ON BOTH ENDS) 2003 Norm R y2 sone 105 A io/Yso 1.—1w Rmnd Rack Te.o1 78664 512.738.1176 Submittal ,Ts 1 Or 6 A 120 VAC N G SP-H SP-N SW-i UPS RECEPTACLE SW-1 0100 T FRNpt5p UPS OYPASS 0101 1BMI PNL-P?.NL-PP,IXT H 'TgA-6 784-7 O _ Q moi` f4-a 1HA_It OI51 DEEICATID RECEPTACLE 0102 1Nw 14ARC a 11Aa9 i 1N G TOP!UPS m52 _ —L 20 AMP — — 0167 RECEPTACLE 0153 _ tw 0104 °AAbIM- APC UPS ism VA Luh 0151 HMO 1 POKER IIA!ECTOR(POE-1) 11 11 mps Hlss 1�AAIiD mua CMR p ARE Ipl 11 0106 Rw mE rRae Om VA m LM10Ar4 0155 0�10�7 ENCLOSURE -3000 811 M+clv.19 TaA grml p Aa p157 120 YAC OZ tAN- IX-ws 0107 T 17DAAC TROT/ 7 0159 IBtl-1 ® 951 IBB-5 TBA4[ PNL-PP,IX1 IZ luc Tl O 1{ LPS FAILURE 0110 Dice IME P A EN RADLEY [ CP x RELAY N-100 011[ RID-2 © 193-N ills-6 0112 20 AMP GFCI 0161 1% xA lye UI756-PA722 IY,F PIL P011FA 91Ff1.Y IBA-3 RECEPTACLE 0152 DO 0117 0163 =lnE fxt 0111 WK 11 ILAF {71_1OP 21 W,PORFR SUPPLY(Srilding Type) 0141 780-7 Q Q UFrp 1Bp-) 0115WV+ CABINET USHI OILS TIAL 5A wR6 e5=1 � PflMARY NbOC HOFFAW1 ALF1607BR x{Wc,mA,xwr PRIS SUPPLY 0116 OlG5 MA-1 O Owl p° 0118 MCC N-102 Z{We POKR SUPPLY(SeNd,iq Type) C-a 0119 (MEDTDB-t � W Nebo 0149 �-H CABINET HEATFA 5A $TAT u �1 0110 0170 IML: 1 6G 14YECR5=210k 210r iMm FXODHOARY 24% OffA SUPPLY DC 010 ® n n n ]OeWRI J 0171 � fY1 Ilm-Meta— � TOC-5 VAF nMAI°L II�Q PVF 012] 0172 0121 120 YAC N U17J ® lBc-c a� 01x1 T HOVE?PROM TPA-5 PM- ,IX119 PMA-12 m74 YI,I vN col 0115 pi)S BY=7 24 We FOSSR SOJRCE A V4 REOUNWNGY MUDJ REBUM1DNIT 00DUIE 0126 0175 ` C 0127 LA 91 ttN OI77 PID We0 Pro1Ma 11ARC POYE77 LITE iMt flFx00 METNET SHIMS 0126 EtI NSP-1710T-1RU SUttF FNORCIAT C170 Tac-ITw-7 1BF7 0129 OUT O 01)9 leAiO IA 1e.nc aN-PROM 700Tx ° ERbrIET 111RELE4S wllic I n1WnE puD 016066NCMCATION HJDO sEUO COPPER @ AWG TO OND BAR — pm -m 10A-6 p.M CQ-PLA mel IOUOI SGREEN IERMIWL IS O N-IDl 01]x Il CR 11 1 ■ttTNJING PORA 0192 t Aa IA AB]711P-T6CIm PMrc PD+ELYEIY IRII$aOl Cfl7 TOSS RESP? 0193 COUIR TO)DI SCREEN 0134 SP-H SP-N 0194 UPS-II 26WC =� 24VDC-COU UPS-N 7 a_ SCHEM1Vj'jC LLYGEND REV LATE I APP I DISCRIP7Xk) BRUSHY CREEK REGIONAL INTERNAL PANEL WRING — Nr Ol IICS w e. MERRIGAN ELECTRIC, LLC 78-INCH TRANSMISSION LINE B —• FIELD WRING a mW a�1p x110 1115 ANTELOPE RIDGE SEGMENT ONE p TERMINAL LOCATED PLC CONTROL PANEL-DIAGRAMS IN LOCAL PANEL CEDAR PARK, TEXAS 76613 6p scAnA t PLc,S--10 512-944-3217 �:010-026 EL-1 ® N1RE LABEL(LOCATED ON OOTN ENDS) xp73 NwiN W ys Sulie 105 _ ? A 1°/bp Fob PM[Y Rand RceL 1EFAR 76661 512178.1176 SUDIOIll01 NIS Z LF 6 A 24%1)C 24VDC-COM 0200 mF9 0150 0201 17.16-1016 24V DC �^ 0251 INPUT MODULE ozoz RA"1 0252 SGOT-1 O ,1?�r,f p SCODA-2 SOMA-3® , ®SCADA-1 SLOT: a,.•uA�c ' 7e-ie6.c'-- x'11 I203 7u-201 AI 1 0253 SC A PATO NFI. ��,� -..i�, CADATO PAN Tn��n7 -1 PAN �. mC-2 2froc z9w I LSC m-17 x MOV-1 CLOSE STATUS' '•71� MOV^i OPEN STATUS - 0101 In�G IA Atm 23I. - -oca- � Vi D 1 MW-1 CLOSE STATUS 0751 •,.,:. 0205 2 SCAD-B 2501 2'IlS SCALAR-6 SCIDI-7 Mf am SL1DA-8 AI Lw m-B 0255 6 Q ry 11/ C ❑ �, - lb r' ❑ �? IN 1 2 MOV-1 OPEN STATUS �1; I PEM;1D 0206 PE/u01E AI 0256 STO FUPANEL I.I:,CMi1_Gi SCADAFUTUREL 0207 - MOV t9 II° IN 2 3 MOV-1 REMot(Amm, MOY- PAN I REMOTE MODE MOV-1 PHASE FAILURE ALARM A, STATUS(REMOTE) 0257 0206 a1j0-ZD 4 SCAOA-9® ar1 ®SCAOA-10 SCAOA-11(] SC'M,A-12 -^)f— IN 3 1 MOV-1 PHASE FAILURE �� Q My ❑ ��1e ....... rA AI tR ALARM 02W TO FUTURE 110 FUTURE tt-FAt 1O-71 5 fRWP 0 0259 SCADA PANEL STO F PANEL 9210 _gyp... p11, 5 ROW TRARSMITm FALLLTE FLOW TRANSMITTER FAILURE ALARM CL2 ANALYZER WARNNG ALARM 0260 0211 M-Nc 76-2 6 SCIllA-IS riQix U�1, L'U SCADA-11 SCADA-1S U 1 Q SADA-I6 Ru IN 5 6 CHLO441 ANALYZER U261 -j1 {] ❑.X11.� 0712 M CUR WAIMG ALARM 0261 TO FUTURE TO FUTURE TAL 7p_23 SCADA PANEL SCADA PANEL 0211 eu0 Ik 6 7 O'LORNE ANALYZER FAILURE CL2 ANALYZER FAILURE AURAL POWER FAILURE MARIA CR ALARM 0163 0211 a�mI-4 R 5CA0A-17f� 11n1 SCAOA-1B SCADA-19 25,a d'1� 25N SLUM-20 IID IN 7 8 PLC PANEL PORER FAILURE 0264 u KO-,eu9 ' KF ]ffJ o-lug ❑ ❑ Lm-,uF A�RU'l c❑ 9213 ALARM 10 amCAADAAPPANEa Tsc°ADA PAiEL IT.ENE!;1:E: 0216 Go 9 0 mC-6 UPS FAILURE ALARM VAULT HIGH LEVEL ALARM Ar1s[9L 0260 MA1A: 0217 scAO-n0 «e (�sc n-zs s AD-2s® sin-z+ pO 1D 0267 KtrliAw ' MOn4vC 0216 1flF3 C� fF202 O m-9 •w9 181-25 Al 0268 SCADA PTO ANE STCAD4UPANEL - PANEL DOOR INTRUSION ALARM SUMP PUMP FAILURE ALARM 0219 uKq 1A ADN INR Il UPS FAILURE ALARM CR 0209 eAK 10 'r Q1zu -10 R-,m mi-6 I 9CADA-75M-1 vi 1gNf ®SCA}OA-26 W 9 12 VAULT HER lEM1 ALARM 0270 E]—qy-1 SIU�J 9:21 MI-11 9m s.70-27 „1 u o271 TO PANEL 0222 N 10 13 10.11111.FAR.ID. 9CRA LOW SYSTEM PRESSURE ALARM CR 0272 9:73 1-12 7p_za 1 cIMIr 1 --.�p-- ANV IN 11 14 SUMP PUMP TALVRE ALARM 0273 PM1 1-13 M-em m-29 13 0271 BIAIIA LON$Y-IFN 0225 1 PRESSURE&ARM 0275 0226 9'NLE161- MA IN 13 I6 SPATS 0176 0227 1-15 m-31 0277 9775 SPARE �i1 u IN 14 17 eSP� 0278 m1-32 K 0129 16 SPARE III IS 1B SPARE 0779 0230 0260 OLID 19 0211 D231 0252 END 20 0417 02M 0z" 0234 PLC DIGITAL INPUT WIRING 0284 uwC 244c-coM SCHEMATIC LFGEND REV DATE APP OESCRPt*N BRUSHY CREEK REGIONAL INTERNAL PANEL N1R(NC NELtronics A1ERRIGAN ELECTRIC, LLC 78-IIJCH TRANSMISSION DALE - FIELD M,R1N0 ..e. Mfr-1p zolp 1115 ANTELOPE RIDGE SEGUENI ONE ❑ TERM0IAL LOCATED ALC CONTROL PANEL-DIAGRAMS HI LOCAL PANEL — CEDAR PARK, TEXAS 78613 scADA A<FLC SPLs 0 512-944-3217 'zmo-Dxe EL-2 ® WIRE 1.AOEL(LOCATED ON DOTH ENDS) AItR 2EMlA F-4R.L Tu.76684 11312336.117fi jr— ^ SubTl(101 NTS 1 3 a 6 A 24VUC 24VDC-COM 0300 24VOC 244D-COM 1,6 I6 CRICfi11EL ` OSD PSIIR ANALOINPUT N' !� K oSJRoCE0.01 BCRUA 'ClNl 0-7 X-25 wSTP 1756-(1116 15 Ml°sK WE- (LI p3O3 PRESSURE TRANSMITTER SFa ♦I/�I ® � LTEfVsl1`3 Q-TM P°HES 0 •' AKaiaAaSTP 0702 AK -� � RACK I AOI] O7Z Pn , 9 0303 ITST-- SPARE7- PIT-10 VH• STP A-27 e5QZoI nA_ P 03" O (UPSTREAMPRES2 Sc20CEmSTP IRRI STPD A-]t�'Y'M 0355 i05-2d SIPPSURGE RES STP SPARE 0306 FLOW TRANSMITTER T63-4A SURGE ( 1 AL SP M I ftiR _ HK STP �+µOPPRESSOR 1 yl •°�' 0356 19 I6 AOd— SP6�-�x STP C )° 0]57 STARE ns-ee� 10 ® HSTPSTP 22 O70b FE/f7T-100SCA' SP�LJ y0309A-11 <�� II I: n Ir��ua0310 CHLOR��NE RESIDUAL = L'N Ivxta •SORRA-]/'29h TMM-3-3.1• 5>A:PRUR%R STP ANALYZER 1RANSROTTER TOT-/ ^'A � 6 •' 03OU ram °t Ir N AY, STP ,^m SUPPRESSOfl M STP w RU/•rt, Sp 24 0311 �il- -`__�__ 1ry,t oSP Yll9 1 fliN ) Sootf U361 SPARE T]n ll ® SPAR" 0312 I 11 T,,3_Bb 3 MI STP 0 STP O *' f ftRi 23 AC/AR-100 WH,._ __ 0 „' i —o13G0 R6��A-b Ra:1 OxT n r 071 _ res-�5" 0313 SHTTO-2 ° (� d en _ _ SCADA-76 SIP alO- ❑- �4`_d 1`=n' h?X Y'{', A 1 FT 26 0711 1 M 21 VA;-oAl „SCAOA-Si�Si ZT,� 107-74 mA SURGE CONTROL VALVE POSIR011 - ® 0 p36A SIAHi�SGFi STP TARE REFERENCE SIGNAL 1&3-10 A SURCE T M DL r4�' RN ss 0315 9R STP �.n.. SUPPfl�.'.Ctl1 IW oWMrt_ /2y,� SP ;•._�_ -- - 12 M oRiR )r y OSGS I�J 12 M I 7 0316 ��, 1 I 1 / sP (2-a) SPARE MOV_I vH:` 1T'�ir n9-R 4 o ID 4Ao ST�9f:A0A-38 37 0J66 I6A• ° M 76 0317 -v M__ ry ° ®STP R1N M1 _ _ OAOk-]0 j - ° 6 L a � IrE r�t`a R,N 27 p31d CEDAR PARK P - c O @M'SDA-10���w 107-37 _;,AA,`U�R350R STP 0319 PRESSURE TRANSMITTER K STP 1113-13 WrPAESSCR 17 w w/,nn_ Oxy I� « SP° 30 )aGEF) 222(�� TARE °SP I/1 0370 SPARE ra3-30 13 29 0321 PT-101 VH: I I STP ADA-Il n M • • i RIR (COWSIREAM PRESSURE) 'I,T �3E ©320321 'Sf 11 E rA 51RGE R 0323 - I IN SPARE TB3-/0 Sd'PPESSOR STP TARE 103-16 SIPPRFSSL9STP U = 0373 I_. °t T9 ICED 1f? 31 0324 �W Ss�-^J 1 OSIS SPARE IM-41 E SPARE , SP O O 632s CHANGE FF�DM SRAfj .TQj T T oM o 6 0 Is D]ls ra5-Ad Ae SPARE anfi I7EI�17'FLAWSETIPOINTI rn�-IC�° ° I IN Is SPAR[ 0376 - -Fo o_ I u "�T N10NITORIIJG F!![1CTlDN,_,! = pp mn �sRPAFSCR STP mA RH[E 7 037A m �SUPNOSTpgTP 10 0378 733I/15P �® 5 3G 0779 SPARE 1(1A— SP ! i DI SPARE TARE In-44 15 Q TARE TAT-24 T 17 OSA ° wl ISM 35 03]0 T6]IS r" Tni°-2114' MIT17__ 0331 2 = ° 0332 _a A 0.741 7&7-46 9Om!!!� • STP 1'A' In ISTP 032 U 18° 0777 IhA sP 0363 TAA[ „a-4) §i SPARE (_7 03N T6a-6] B r 49 0 )R 076+ ° ° 22- T O o = 24VOC 24VDC-COM 24VDC 24VDC-COM 3�Srf�' AT[C� ..CRNI) DESCRIPTION L E4swer x REV VAIL APP „ INTERNAL PANEL x+Awc BRUSHY CREEK REGIONAL ---- FICLD VARINc NELtronics " MERRIGAN ELECTRIC, LLC 78-INCH TRANSMISSION LINE 2 0 TM INAL LOCATED r.11'N +0 a 1115 ANTELOPE RIDGE SEGMENT ONE IN LOCAL PANEL ` CEDAR PARK, TEXAS 78613 PLC CONTROL PANEL-OIAGRAMS C� ME LABEL LOCATED CN BOTH ENDS SCADA I PLC�¢•ndcls ou, y„c s„ 512-444-3217 zmo-D7e EL-3 ( ) 2003 Norm LC'nId+OS ID/Am0 N1 rfvPY Rc9"d R,.d T.-MET 51ME 1176 Subn1ld NIS 4 M 6 A DIM 0401 1750-ORS 8 MN4NM ANA GG OSMT 1100WE 0402 RAM 1 003 SWT 2+wc zawc—cou 0404 o' t ie10c-ae 0405 tt4u n0/WO 0106 2 mA SURGE STP S CGRTRGL VALVE PPOSITION7, la-I STP COUNAND SIGNAL 0107 SmA SURCER c '1 9R i I IX 1/1A aoe ? 5P srr O 17 ® s I ® i i i I/2A -0 1410 \ TH-e 0404 SPARE rAu 1 ® 21 ® 1 l e'STP ro-A _S' _ NOV-t 0110 - _ �-__— aN Q o W2 RN Out 7 TO FUTURE ainV au caALVE 0419 S ° mA suacE CONTROL SLN srr s G- TNI`.�': R lRw 0416 DA SURGE s R SP STP 3mx is O t/xA SPARE 0417 eF o . pur W. Tx a am SPARE 1/2A ® 22 C� 3 to en 6 CHAN.GEs FF3OM SPARE rA4-17 E�I 70;L'fi�Mt6��C�(ZlJA 11VTP : 04tH o 3041 �C I' a T4,6 "" � " _ = TAtJK,�EVE�;FUNGTI'GN,,:;• 04M _ - Fill u rM SURGE 0421 STP S 11 lOH7 0422 mA SURGE lour w ea 78h19 S R -0 S1' t/2A 042] STP 1u� 19 © Tt1_x SPARE 1/2A -0 SP X61 11 t1 -0 0424 SPARE ® 2.3 t 4-VEA r Q -0 RTU Is ass ra.-a •' "� 0426 I6 an 0428 F65 ff 1 17 0429 wuT to n1A SURGE 0430 STP S rPRFSc R T34-10 0431 IA SURGE ue[ 76,1.-22 S R STP �— SPa 1/2A 0432 T u �' °1 T 20 e.N 20 ® SPARE x4-n SP d 0433 SPARE n4-z0 '�—om"� 24 � uec = 0471 ass y • _ _ SCHI3MA'1'IC LEGEND P£7 DATE APP DESCRIPTOR ORUSITY CREEK REGIONAL INTERNAL PANEL MRmO NELtronics RIC, LLC7TRANSMISSION LINE FIELD PARING "1 —71�w IDGE SEGMENT ONE p IN LO AL PANELLOCATEO — XAS 78613 PLC CONTROL PANEL- DIAGRAMS IN LOCAL PANELSCADA&PLC SPaidl mis 2010-028 EL-4 WIRE U9EL(LOCATED ON BOTH ENGS) OZ Note 11"1D3 ear �— .TSI— SOFF�]�ARsk,Temf 78681 712238.1170 Su0mi1101 It awo 0501 Y 003 0501 ALLEN BRADLEY CONTROLLOGIX PLC a q 0505 pp ' >yF 0606 ES 5�' �' i vci 1156-PA72/C 3�X T� mG TAKE POINT SUBSCRIBER RILOIO PCKR SWPLY ASd gp3 ii .�F n`.. WAN70TVIEb ANTENNA 0507 � "'� C: �N �� = RADMN HSU520 o'a6 05D7 ' a ��a r-_�v Oslo DSII ° } s 0512 •— -- 1756-A1 7-SLOT OIASSS WA��ay(O.tb•'Aq,Q 0511 051{ 2 �9 OSIS 7 O O PF...E.ALLEN BRADLEY 2711P-T6C200 EW PW5 .1 600 I 111 v317 COLOR TOUCH SCRECN TEPIUfunlosis - 9P9 QSIP 0520 0521 0522 0521 0524 N—TRON708TX 0525 ®3 5 7 PIAlY AWJAGFD INWSTRIAL If�7�Pf�i�f�11 0626 ETHERNET SWITCH fFIIIFIHr1 of 0. 0527 L Z A G U 0526 052° US]0 IA[liwnn c.n MDIO 1"C"m OYER RMIO 1-1 DATA/SIGNAL 0537 0 EIHERNEt POWER INJECTOR SO PROTECTION(IN PANED O APC LFIOIf vn�n un-aur aw 0553 n�z Lw.n nn. r�[w°°•I ou.lau..u.q APC 153DIA vo UPS 4515 SCHEMATIC i.FGEND IIEY DATE APP DEcatrrlON BRUSHY CREEK REGIONAL INIERNN.PANELWWHO NELtronics FI LU MERRIGAN ELECTRIC, LLC 78—INCH TRANSMISSION LINE -- wOtlllG .A W e 1v my 1115 ANTELOPE RIDGE SEGMENT ONE TER AlINP1 LOCATED tet°°C CEDAR PARK. TEXAS 78613 LC CONTROL PANEL - PLC LAYOU IN LacaL PgeEl SCADA A PLC Sp°dd'als ..c° 512-944-3217 zDIO-Oze EL-5 WIRE LABEL(LOCATED ON BOTH ENDS) zoo3 u>n u°n sou°tas , A w/�No im MI[t Round Red,ivm 76E61 De 10 Submittd NTS 6 lK G Mr. A i ;BRUSHY CREWE. :+ tr:rr'rtrr.nry ax Gs.1rr fart_4car5ar. •.:8 i�cv.e Ot�(a FIELD ORDER To: S.J. Louis Construction of Texas Ltd. Field Order No.: F665 rev 2 9862 Lorene Street Date: 10/31/11 Suite 200 San Antonio,Texas 78213 Attn: Sam Montoya Owner: BRUSHY CREEK REGIONAL UTILITY AUTHORITY Project: 78"TWTL#1 Subject: Metering Station SCADA System modifications This Field Order is issued to interprei/cladfy the Contract Documents, or order minor changes in the work. The work described by this Field Order is to be accomplished without change in Contract Time, and/or Clalms with other costs. DESCRIPTION: Modifications are required in the BCRUA control panel in order for the Cedar Park SCADA panel to share the Cedar Park Metering Station discrete and analog signals as well as pass the control of the Flour Control Valve to the Cedar Park SCADA panel. CPUSA will provide a marshalling cabinet for the Contractor to mount between the BCRUA SCADA panel and the Cedar Park SCADA panel on the equipment rack. MPC will provide the Cedar Park SCADA panel and interconnecting wiring to the marshalling cabinet.Provide the modifications noted on the attached page to the BCRUA SCADA panel and provide interconnection wiring in conduit to the CPUSA Marshalling Cabinet. Please piovide total cost break down for these revisions. ATTACHMENTS: Description of modifications (2 pages) REFERENCES: CONTRACTOR ENGINEER By: By: Date: j Date: CC: �•CF �J Form FizldQrdsr 1��3UOtt BCRUA Treated Water Transmission Line Segment 1 Field Order#5 rev 2 Modifications to SCADA Control Panel 1. Provide discrete terminal blocks to interconnect the following discrete functions to the CPUSA Marshalling Cabinet interposing relays: a. Valve open status from the Flow Control Valve. b. Valve closed status from the Flow Control Valve. c. Valve in remote status from the Flow Control Valve. d. Valve phase failure status from the Flow Control Valve. e. Vault high water level status from the High Level Float Switch in the valve vault. Note:The remaining discrete signals from the meter station will terminate to the BCRUA PLC as before. 2. Provide discrete terminal blocks to interconnect discrete functions(from 1.above)from the CPUSA Marshalling Cabinet interposing relays back to the BCRUA PLC. 3. Provide analog terminal blocks to interconnect the following analog functions to the CPUSA Marshalling Cabinet signal splitters: a. Chlorine reading from Chorine Residual Analyzer. b. Station flow reading from the Flow Transmitter. c. Valve position reading-from the Flow Control Valve. d. Pressure in reading from the Inflow Pressure Transmitter. e. Pressure out reading from the Outflow Pressure Transmitter. 4. Provide analog terminal blocks to interconnect the analog functions(from 3.above)from CPUSA Marshalling Cabinet signal splitters back to the BCRUA PLC. 5. Provide analog output terminal blocks to interconnect the BCRUA PLC to the Cedar Park PLC for a valve control permissive function to the analog output port previously used to control the Flow Control Valve. 6. Provide analog output terminal blocks to interconnect the BCRUA PLC to the Cedar Park PLC for a BCRUA WTP tank level function.Provide internal wiring to connect this function to a spare analog output port. 7. Provide analog input terminal blocks to interconnect the BCRUA PLC to the Cedar Park PLC for a flowsetpoint monitoring function.Provide internal wiring to connect this function to a spare analog input port. 8. Provide two 20A/1P circuit breakers in the power panel and route 3/4"C,4412,2-#12 Gnd to CPUSA Marshalling Cabinet. Provide a tee-condulet at the marshalling cabinet.Provide slack 2- #12, 1-#12Gnd in the CPUSA Marshalling Cabinet for extension at a later date by MPC to the Cedar Park SCADA Panel. 9. Provide 2"C,8-TP cables(5 used&3 spare)from the BCRUA SCADA Panel to the CPUSA Marshalling Cabinet for discreet signals. 10. Provide slack 8-TP cables(5 used&3 spare) in the CPUSA Marshalling Cabinet for extension at a later date by MPC to the Cedar park SCADA Panel for discreet signals. 11. Provide 2"C, 12-STP cables(8 used&4 spare)from the BCRUA SCADA Panel to the CPUSA Marshalling Cabinet for analog signals. 12. Provide slack 12-STP cables(8 used &4 spare)in the CPUSA Marshalling Cabinet for extension at a later date by MPC to the Cedar Park SCADA Panel for analog signals. 13. Neltronics will provide wiring terminations at the BCRUA SCADA Panel. 14. CPUSA will provide wiring terminations in the CPUSA Marshalling Cabinet and PLC/HN1I programming in the BCRUA SCADA Panel. 15. MPC will provide wiring terminations and PLC/HMI programming in the Cedar Park SCADA Panel.