GM-12-04-09-036A ',rtnerlh&, or Cedar 'ark. le.lnder, and Round Roel: SUPPLEMENTAL CONTRACT NO.1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: JACOBS ENGINEERING GROUP, INC. ("Engineel''') ADDRESS: 2705 Bee Cavc Road, Austin, TX 78746-5688 PROJECT: HCRUA Regional Water Supply Projcct -Pbasc 2 Dccp Watcr Intal(c Environmental Assessment & Planning Level Enginccl'ing {Ol' TWDn Funding This Supplemental Contract No. I to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA" and Jacobs Engineering Group, Inc., hereinafter called the "Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 22nd day of February, 2012 for the HCRUA Regional Water Supply Project -Phase 2 Deep Water Intake EnvirolUnental Assessment & Planning Level Engineering for TWDB Funding Project in the amount of$426,776.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $4,742.00 to a total of $431,518.00; and NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. II. A11icle 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $4,742.00 the lump sum amount payable under the Contract for a total of $431 ,518.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, HCRUA and the Engineer have executed this Supplemental Contract in duplicate. 8M.-.-lZ-DLf-Dq--D~(P Supplemental Contract Rev. 031201 I 0140.4634-30;00247518 215829 NC. BRUSHY CREEK REG ONAL UTILITY AUTHORITY, INC. o. By: ---':~--:'-"==---==---==~--J~~~"--_ Chris Lippe, P.E., Gen Date Supplemental Contract Rev. 03/2011 0140.4634-30;00247518 215829 ADDENDUM TO EXHIBIT B Engineering Services I. GENERAL The objective of this Supplemental Agreement is to perform additional geotechnical services related to development of Planning Level Engineering Reports and an Environmental Assessment (EA) Supplement for the Phase 2 Deep Water Intake. Specific services included in this Scope of Work are described herein: II. SCOPE OF WORK A. Additional geotechnical investigation will be performed to determine the soil conditions on the Gross property in the area of the deep water cliff where the top intake screen will be located. This investigation includes: a. Perform one (1) boring drilled to a depth of about 50 feet each near the "cliff' close to the lake. b. Geotechnical laboratory testing will be performed on samples of bedrock to obtain characteristics such as strength and hardness as it applies to tunnel and shaft excavation technologies. Prior to submitting samples to the laboratory for testing, Jacobs will submit a list of the proposed laboratory tests for review and approval by (Client). The actual type and quantity of laboratory tests will depend upon the material encountered and the sampling method used. Laboratory tests and the standard to be used for testing may include, but are not limited to, the tests listed below: • Unconfined Compression -ASTM 02938 • Split Tensile Strength -ASTM D3967 • Mohs Hardness c. Amend limited engineering report to include general subsurface conditions, boring logs, stability recommendations for: Allowable bearing pressures and provisions to resist uplift • Excavation potential • Drilled pier foundation for intake screen B. Remove "Site Clearing" from original Scope of Work (2 days at $2,500 == $5,000). ------ --------------- -------- --- ------- ADDENDUM TO EXHIBIT 0 -FEE SCHEDULE Scope Item Suppl~~en~!AgreemE:!nt ~o. A --­-­ S --­ --­-­ ---. ..­....­ Total Jacobs Description 1 -,.---­ $772~dditional_Geot~_chnica' Inyesti9.ation Re!floval of ~i_te C;!~aring froJ!lOrig. Scope .-_. .. _-. ....• _. Total -Supplemental Agreement No.1 -­ $712 _.-. .•.. -­._.­ ....• -_."" .. ------.--.-..---_....... Original Contract $147,971 .._-­ •.•.... -_." -.­ Overall Contract Value $148,743 -­ --­ ._.... ... ­ ., ....•­ -- Subconsultant Expenses Total Services Total Sub _._.. -.. ­ $8,970 $9,742-_..•...-'-'"'' -$5,000 -_.... -$5,000 ~- ---..._----.._-----­ $3,970 $0 $4,742 ... _. ...• ------_"_0. --­ -'-'" $271,455 $7,350 $426,776 ------_.-•...' .. -­------'-­ ..._----.•.. $275,426 $7,350 $431,518 4/4/2012 Page 1 Proposal No. 04.30111102-1 April 4, 2012 Cost Estimate Additional Geotechnical Investigation BCRUA Deep Water Intake Site 4 Intake Tunnel, Pump Station, and Raw Water Tunnel Shaft Volente, Texas 1. Field Exploration -Additional SO·ft Borina Quantity Unit Rate Subtotal 1.1 Mobilization / Demobilization 0 mi $4.25 $0.00 1.2 DrillinQ and SamplinQ -Soil 0 feet $15.00 $0.00 1.3 Standard Penetration Test 0 each $25.00 $0.00 1.4 Rock CorinQ 50 feet $34.00 $1,700.00 1.5 Packer Test Equipment Mob and Set Up 0 perborinQ $900.00 $0.00 1.6 Packer Inflations 0 each $150.00 $0.00 1.7 Hourly Charges for Water Hauling, Packer Testing 0 hr $175.00 $0.00 1.8 BackfillinQ Boreholes 50 feet $9.00 $450.00 1.9 Limited Site Clearing (credit back from original cost estimate) (2 davs $2,500.00 ($5,000.00\ 1.10 Senior Proiect ManaQer 2 hour $165.00 $330.00 1.11 Graduate Engineer 8 hour $90.00 $720.00 Subtotal ($1 BOO.OOl 12. Site Cleanup and Restoralon -Haulina of Drillina Fluids I Quantitv I Unit Rate I Subtotal I 2.1\ Hourly Charges for Barreling Fluids and Hauling off-site 1 10 I mi $175.00 I $1,750.00 Subtotal $1,750.00 3. Laboratory Investigation Quantity Unit Rate Subtotal 3.1 Moisture Contents 5 0 0 5 0 0 0 0 0 each $15.00 $75.00 3.2 AtterberQ Limit Determinations each $65.00 $0.00 3.3 Sieve Analvsis each $65.00 $0.00 3.4 Unconfined Compression Tests, rock each $65.00 $325.00 3.5 Point Load Test each $115.00 $0.00 3.6 Brazilian Tensile Strength each $150.00 $0.00 3.7 Cerchar Abrasivity Index (CAl) each $210.00 $0.00 3.8 Slake Durability each $260.00 $0.00 3.9 Corrosion TestinQ (Soluble Sulfate, Chloride, pH, Box Resistivity) suite $500.00 $0.00 I 3.10 Lab Manager/Engineer 2 hour $90.00 $180.00 Subtotal $580.00 I 4. Technical Services f--­Logging, Laboratory Assignment, Drafting, Report Preparation, and BorinQ Data Assembly 4.1 Administrative 4.2 Professional GeoloQist 4.3 Drafter Quantity Unit 2 hour 6 hour 4 hour Rate Subtotal $55.00 $95.00 $65.00 $110.00 $570.00 $260.00 5. Ene ineerlna Services· Geotechnical Report 5.1 Principal Review 5.2 Senior Proiect ManaQer 5.3 Project Engineer 5.4 Graduate EnQineer Quantity 2 4 6 8 Unit hour hour hour hour Subtotal $940.00 Rate $185.00 $165.00 $125.00 $90.00 Subtotal Subtotal $370.00 $660.00 $750.00 $720.00 $2500.00 Total Estimated Costl $3970.00 Page 1 of 1