Loading...
GM-12-04-18-030 �'�BRUSW CREEK Contract Quantity Adjusbnent/Change Order • + •` a REGIONAL U TILITY AU I HORITY ttY.912011 , Project Name: Raw Water Pipeline, Phase One-Contract 2(Underwater Pipeline) Contractor: W.L. Hailey&Company, Inc. Date: 4/9/2012 Change Order/Quantity Engineer: Jacobs Engineering Group Adjustment No. 4 3ustification This change order describes the deductive quantity adjustments for the roadway recosntruction and the additional grading and restoration required by LORA during the final inspection. SUMMARY Amount %Change Original Contract Price: $5,511,774.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $5,511,774.00 Previous Change Order(s): -$137,667.41 -2.50% This Change Order. -$47,553.20 -0.86% Total Change Order(s)To Date: -$185,220.61 -3.36% Original Contract Price Pius Change Order(s) Plus Quantity Adjustment(s): $5,326,553.39 Original Contract Time: 425 Calendar Days Contract Time Prior to this Change Order 425 Calendar Days Contract Time with All Approved Change Orders: 425 Calendar Days 11154AP14w . ba lotoa s Prepared By: lis • • o s - Signature Printed Name,Tide and Company Date Ashley Quinn,District Manger Contractor W.L. 1-iailey&Company, Inc. 4/9/12 Approval: Signatuk Printed Name,Tide and Company Date BCRUA sem' Approval: M9 c H/�CL is T3�ss PA1GM meq-/Z Signature Printed Name,Tide Date BCRUA App al: Signature Printed Name,titleDate �� I DA04-�9-C :e=A BRUSHY CREEK REGIONAL UTILITY AUTHORITY A Parrn rship of Cedar Park. Le .der. and Rand Rock CHANGE ORDER No. 4 DATE OF ISSUANCE: 04/09/2012 EFFECTIVE DATE: OWNER: BCRUA CONTRACTOR: W.L. Hailey &Company, Inc. (WL Hailey) PROJECT: BCRUA Raw Water Pipeline,Phase One—Contract 2 ENGINEER: Jacobs Engineering Group, Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: 1. Quantity Adjustments to reflect Actual Quantities of Bid Items 4.13,4.14,4.15 and 4.16. DEDUCT $49,899.20 2. Add grading and restoration at south end of Trails End Road right of way, south of the southern end of the pavement, per site meeting between J.R.Tolles and Matoka Construction on April 6, 2012. ADD $2,346.00 TOTAL DEDUCT $ 47,553.20 Page 1 Project: BCRUA Raw Water Pipeline,Phase One—Contract 2 Change Order No. 4 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price: Original Contract Times: Substantial Completion(Days): 425 calendar days $ 5,511,774.00 Final Completion(Days): 460 calendar days Substantial Completion(Date): November 25,2011 Final Completion(Date): December 30,2011 Net(Decrease)from previous Change Orders Net change from previous Change Orders No. 1 to No.2: No. 1 thru No. 3: Substantial Completion(Days): 0 Final Completion(Days): 0 $ (137.667.41) Substantial Completion(Date): November 25,2011 Final Completion(Date): December 30,2011 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion(Days): 425 Calendar Days $ 5.374,106.59 Final Completion(Days): 460 Calendar Days Substantial Completion(Date): November 25,2011 Final Completion(Date): December 30,2011 Net(decrease)of this Change Order: Net increase(decrease)this Change Order: Substantial Completion(Days): 0 $ (47,553.20) Final Completion(Days): 0 Substantial Completion(Date): November 25,2011 Final Completion(Date): December 30,2011 Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion (Days): 425 calendar days $ 5,326,553.39 Final Completion(Days): 460 calendar days Substantial Completion(Date): November 25,2011 Final Completion(Date): December 30,2011 Page 2