GM-12-07-02-037Page 1 of 1 Contract Quantity Adjustment/Change Order =":JI!~tlYT~~£~ ,. ,•.• ~ •.• h, •• ~.,l • ..... l .•• ,,~ ."J .,,_4 .~ •• rev. 9/2011 Project Name: BCRUA Interim Aoating Intake Facilities Contractor: Excel Construction services, LLC Engineer: Jacobs Engineering Group, Inc. Justification1'---­ SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Date: 6/14/2012 Change Order/Quantity Adjustment No. 9 (final) _ Amount ....::.=:. $3,807,500.00_ $0.00 $0.00 $3,807,500.00 $603,628.84 15.85% $1,192.00 0.03% $604,820.84 15.88% $4,412,320.84 365 calendar days 448 calendar days 448 calendar days Contractor Approval: Signature BCRUA Approval: BCRUA Approval: Glenn A. Bridges, P.E., Project Engineer Jacobs Engineering Group, Inc. Printed Name, Title and Company Date , /ClII1. Printed Name, Title and Company Date Printed Name, Title Date (L Printed Name, Title Date A Partnership of Cedar P.J.rk. leander. and Round Rock CHANGE ORDER No.9 (FINAL) DATE OF ISSUANCE: 06-14-12 EFFECTIVE DATE: _ OWNER: BCRUA CONTRACTOR: Excel Construction Services, LLC (Excel) PROJECT: BCRUA Interim Floating Intake Facilities ENGINEER: Jacobs Engineering Group, Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: I. Add trenching and covering of intake electrical conductors, per attached Change Proposal Request #24, dated June 1, 2012. ADD $9,835.00 Unit Price Quantity Adjustments 2. Deduct 16 days -Initial operation of floating intake facilities (Alternate Bid Item A6.2) @ $2oo/day. DEDUCT ($ 3,200.(0) 3. Deduct 22.91 % of Lump Sum Bid Allowance for Temporary Controls (Alternate Bid Item A5.1) @ $2,200.00 per LS. DEDUCT ($ 504.00) Correction of Change Order #7 amount 4. Deduct $4,939 to correct number of calendar days added to date of substantial completion in Change Order #7 (see Note 1 below). DEDUCT ($4,939.00) TOTAL ADD $1,192.00 Note I: Change Order #7 added 51 calendar days to substantial completion, at a total additional carrying cost of $18,000.00. Actual substantial completion was achieved in 37 calendar days, so the $18,000 amount added in Change Order #7 is hereby pro-rated and reduced by 14 calendar days x $352.791 day = $4,939.00. Page I Project: BCRUA Interim Flouting Intuke Fucilitie~ Change Order No.9 CHANGE IN CONTRACT PRICE: Original Contract Price: $ 3,807,500.00 Net increase from previous Change Orders $ 603,628.84 Contract Pricc prior to this Change Order: $ 4,411,128.84 Net increase from this Change Order: $1,l92.oo Contract Price with all approved Change Orders: $ 4,412,320.84 CHANGE IN CONTRACT TIME: Original Contract Times: Substantial Complction (Days): 334 calendar days Final Completion (Days): 365 calendar days Substantial Completion (Date): November 5, 2011 Final Completion (Date): December 6, 2011 Net change from previous Change Orders: Substantial Completion (Days): 448 calendar days Final Completion (Days): 448 calendar days Substantial Completion (Date): February 27, 2012 Final Completion (Datc): February 27, 2012 Contract Times prior to this Change Order: Substantial Completion (Days): 448 calendar days Final Completion (Days): 448calendar days Substantial Completion (Date): February 27, 2012 Final Completion (Date): February 27,2012 Net increase this Change Order: ocalendar days Contract Times with all approved Change Orders: Substantial Completion (Days): 448 calendar days Final Completion (Days): 448 calendar days Substantial Completion (Date): February 27, 2012 Final Completion (Date): February 27, 2012 Page 2 CHANGE ORDER #9 ITEMl • ~l:>-• ~ •• From: Michael Thuss [mthuss@bcrua.org] Sent: Wednesday, June 06, 2012 4:25 PM To: Bridges, Glenn A.; Matt Cannon; Jim Tolles; jzunker@wrmlp.com Cc: mgilfilla n@kfriese.com; w. watts@leandertx.gov; Kenneth.Wheeler@cedarparktx.us; Michael Thane; Jason Brian; Chris Lippe Subject: TO FIB CPR#24 Trench & Cover Raw Water Intake Conductors +$9,835 Approved mft 120606 Attachments: BCRUA Intake cable headwall.jpg; BCRUA Intake cables.jpg; FIB CPR #24 Approved mft 120GOG.pdf Glenn -FYI -please include in the final project change order -how are we coming with close out? Thanks Mike Michael F. Thuss, P.E. BCRUA 512-215-9151 From: Jim Tolles [mailto:jrtolles@austin.rr.com] sent: Tuesday, June OS, 2012 11:58 AM To: Jason Brian; Jennifer Harrison; Michael Thuss Cc: Glenn Bridges; Kenneth Wheeler Subject: FW: Trench & Cover Raw Water Intake Conductors Cedar Park and Leander are considering burying the exposed electric cables that power their intakes on Sandy Creek. In prior years the exposed cables have been submerged, but in drought years the cables are exposed to weather, potential vandalism or theft. I asked Excel to provide a quote to BCRUA to do the same scope on its cables. Excel would move the cables out of the way, dig a 12" deep trench wide enough for the power and control cables, lay the cables in the trench, cover with plastic, then fill the trench with W' gravel, then 3x5 ballast rock on top. The cables would be buried from the headwall to the cliff. There is adequate cable length under water for the lake to rise to overflow level and not pull the cables out of the trench. Doing all three projects together is the most efficient as there would be only one mobilization charge. I've included all three proposals so you can see the relative costs. I've also included a couple of pies taken today of the existing conditions. We would like to start this project in the next two weeks, while Excel is wrapping up the Cedar Park underwater pipeline project. Please let me know as soon as you've had time to review. Thanks, Jim Tolles 512/784.7909 file:IIK:\WJXK0201 BCRUA Construction Phase\Contract 3 Execution\Change Orders\C... 6/1412012 WORK PROPOSAL COST ITEMIZATION: BCRUA RAW WATER INTAKE Trench & Cover Raw Water Intake Electrical Conductors June 1, 2012 I units I quantity I unit cost 0 total IA) MA TERIALS 11. 13/4" Minus Washed Rock I tns I 62 I $ 15.25 I I $ 945.50 12. 13 x 5 Ballast Rock I tns I 62 1$ 15.35 I I $ 951.70 IB) LABOR 12. ISuperintendent I hr I 20 1$ 65.00 I I $ 1,300.00 13. ISkilled labor I hr I 80 1$ 21.50 I I $ 1,720.00 jC) EQUIPMENT 11. IMini -Excavator 12. IBackhoe/Loader 10) SUBCONTRACTORS 11. IT Morales-Identify & Document Conductors I I I day day Is I I I 2.5 1$ 2.5 1$ 1 1$ 315.00 I I $ 560.00 I I $ 1,040.00 I 1 $ 787.50 1,400.00 1.040.00 sub-total $ 8,144.70 5% Small Tools S 407.24 15% OHP $ 1,282.79 TOTAL I $ 9,835 1 EXCEL CONSTRUCTION SERVICES, LLC