GM-12-07-10-038Page 1 of4 Contract Quantity Adjustmentl Change Order rev. 9/2011 Project Name: Brushy Creek Regional 78-inch Treated Transmission Line Segment 1 Contractor: Engineer: S3 Louis Contruction Lockwood, Andrews & Newnam, Inc. Date: Change Order/Quantity Adjustment No. 7/2/2012 4 Justification Item 1 -Credit for Gann Ranch Tunnel Grout Defidency. Item 2 -16 Credit for Quantity Adjustments. SUMMARY Original Contract Price: Previous Quantity Adjuslment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Amount % Change $8,134,941.131. $0.00 -$58,047.00 -$58,047.00 $8,076,894.13 $142,823.55 1.76% -$36,307.27 -0.45% $106,516.28 1.31% 550 571 571 Page 2 of 4 Contract Quantity Adjustment/Change Order rev. 9/2011 Date Date Date -3· '2 7{j','L Da 0.M-(2..-01-(O-Dsg • (VI 10 Printed Name, Title Printed Name, TItle Contractor Approval: BCRUA Approval: BCRUA Approval: Page 3 of4 Contract Quantity Adjustment/Change Order ~:JImt~t!YTY~~£~ ................. 1 ~ o,~ c.".-•• ,~ rev. 9/2011 h rei Contract Time Adjustment 0.00 1 Proposal 13 Rev 1 -Gann Ranch Credit 1 -$36,307.27 -$36,307.27 0 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 J~~" TOTALS: -$36,307.27 0 Page 4 of 4 Contract Quantity Adjustment/Change Order 11!'i. 9/2011 GEN-X2 GEN-XS EC-X2 EC-X3 WW-X2 PAV-X8 PAV-XlO PAV-Xll DRN-X2 DRN-X3 DRN-X6 DRN-X7 DRN-X8 DRN-XlO R/R EX. ROCK WALL PROJECT SIGNS FILTER CURB INLET PROT ROCK BERM PIPE, 8" DIP OR PVC TV 1 PC CONC DRIVEWAY ASPHALT DRIVEWAY GRAVEL DRIVEWAY ENERGY DISS, 18" PIPE HEADWALL, STD 18" PIPE INLET, STD PIPE, 18" CMP PIPE, 18" RCP PIPE, 42" RCP SF LS EA LF LF SF SF SF EA EA EA LF LF LF -218 -1 -5 -4 -35 -485 -5244 -622 -1 -1 -2 -120 -35 -29 10.00 1500.00 50.00 $20.00 $55.00 $7.00 5.00 $1.00 600.00 2000.00 $7,000.00 $20.00 20.00 75.00 -2180.00 -1500.00 -250.00 -$80.00 -$1925.00 -3395.00 -26220.00 -622.00 -$600.00 -$2000.00 -14000.00 -2400.00 -$700.00 -$2175.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CHANGE ORDER No.4 DA TE OF ISSUANCE: 07/02/12 EFFECTIVE DA TE: _ OWNER: BCRUA CONTRACTOR: SJ. Louis Construction PROJECT: 78-lnch Treated Water Transmission Line Segment One ENGINEER: Lockwood, Andrews, and Newnam, Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: 1. Credit for Gann Ranch Tunnel Grout DEDUCT $36,307.27 2. Unused quantity 10 SF ofRlR Rockwall DEDUCT $2,180.00 3. Unused quantity I LS Project Sign DEDUCT $1,500.00 4. Unused quantity 5 EA Filter Curb Inlet DEDUCT $250.00 5. Unused quantity 4 LF Rock Berm DEDUCT $80.00 6. Unused quantity 35 LF 8" Sanitary Sewer, DIP or PVC DEDUCT $1,925.00 7. Unused quantity 485 SF Ty I PC Concrete Driveway DEDUCT $3,395.00 Page 1 8. Unused quantity 5,244 SF Asphalt Driveway 9. Unused quantity 622 SF Gravel Driveway 10. Unused quantity I EA Energy Dissipaters for 18" Pipe I I. Unused quantity I EA Headwall 12. Unused quantity 2 EA Storm Inlet 13. Unused quantity 120 LF 18" Storm Sewer, eMP 14. Unused quantity 35 LF 18" Storm Sewer. RCP 15. Unused quantity 29 LF 42" Storm Sewer. RCP DEDUCT DEDUCT DEDUCT DEDUCT DEDUCT DEDUCT DEDUCT DEDUCT $26.220.00 $622.00 $600.00 $2.000.00 $14.000.00 $2.400.00 $700.00 $2.175.00 TOTAL DEDUCT $ 94,354.27 Page 2 Project: 78-Inch Treated Water Transmission Line Segment One Change Order No. _4~ CHANGE IN CONTRACT PRICE: Original Contract Price: S 8,134,941.13 Net Increase (Decrease) from previous Change Orders No._ I-to No. _3_ $ 142,823.55 Contract Price prior to this Change Order: $ 8,277,764.68 Net increase (decrease) of this Change Order: $ (94.354.27) Contract Price with all approved Change Orders: $ 8,183.410.41 CHANGE IN CONTRACT TIME: Original Contract Times: Substantial Completion (Days): 460 Final Completion (Days): 550 Substantial Completion (Date): 7/16/11 Final Completion (Date): 10/14/11 Net change from previous Change Orders No. _I_to NO.l : Substantial Completion (Days): 47 Final Completion (Days): 0 Substantial Completion (Date): 9/22/11 Final Completion (Date): 10/14/11 Contract Times prior to this Change Order: Substantial Completion (Days): 502 Final Completion (Days): 550 Substantial Completion (Date): 9/22/11 Final Completion (Date): 10/14/11 Net increase (decrease) this Change Order: Substantial Completion (Days): 0 Final Completion (Days): 21 Substantial Completion (Date): 09/22/11 Final Completion (Date): 12/21/11 Contract Times with all approved Change Orders: Substantial Completion (Days): 502 Final Completion (Days): 571 Substantial Completion (Date): 09/22/11 Final Completion (Date): 12/21/11 K:\WJXK0201'4lxecution\change orders\draft change order template.doc Page 3 xc Proposal Project Name Proposal No. Date 78" Treated Water Transmission Line -Segment 1 6/11/1213 Rev-1 Response Required By Transmitted By Alisa Gruber, P.E. Samuel D. Montoya Lockwood, Andrews & Newnam, Inc. Project Coordinator Signature10801 North MoPac Expressway Austin, Texas 78759 S~M~a- Description of Change As requested, this proposal addresses a credit to BCRUA regarding grout installed in the Gann Ranch tunnel and investigation expenses incurred by the Engineer (see attached detailed breakdown). Breakdown of Proposal Item Description Unit Qty. Unit $ Total Cost NEW CREDIT FOR 70% OF TUNNEL GROUT MATERIALS AND LABOR, EQUIPMENT AND FUEL (SEE ATTACHED) 1 lS $ (14,487.27) $ (14,487.27) NEW CREDIT FOR ENGINEERING COSTS ASSOCIATED WITH INVESTIGATION 1 lS $ (21,820.00) $ (21,820.00) SUBTOTAL $ (36,30727) 10% OH&P N/A Net Contract Change $ (36,307.27) REQUESTED ADDITIONAL CALENDAR DAYS 0 S.J. Louis Construction Action Les V. Whitman, S.J. Louis Construction of Texas, Ltd. SUMMARY SHEET. 480.38 TOTAL $ $ $ $ $ $ $ $ $ $ ;'~~Im $ "f::; I I % _. 'IlH '~'lHlIp"i ,"::;"':-, "--' ' ..' COST 480.38 425.57 au.nllly " •• TIme. Total Hours $ $ $ $ $ $ $ $ $ $ $ $ $ A I B r c 1 Rate Times OH&P I OH&P BENEFIT I BENEFIT r TOTAL T~Hou", % AMOUNT % I AMOUNT A+B+C $ 486.00 25% $ 121.50 55.00% $ 26730 $ 874.80 $ 1 701.00 25% $ 425.25 155.00% $ 2.636.55 $ 4.762.80 $ 504.00 25% $ 126.00 55.00% $ 277.20 $ 907.20 $ 504.00 25·'" $ 126.00 55.00% $ 277.20 $ 907.20 $ 567.00 25% $ 141.75 55.00% $ 311.85 $ 1020.60 $ 504.00 25% $ 126.00 55.00·'" $ 277.20 $ 907.20 $ 504.00 25% $ 126.00 55.00% $ 271.20 $ 907.20 $ 567.00 25% $ 141.75 55.00% $ 311.85 $ 1,020.60 ~~ "J'-~':~ft~~' S 11.337.00 I.,'111"" ....'?iliU llll ".. ~ _ A ". I 0.0 00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 31.5 31.5 Total To!!! 9.0 31.5 31.5 ill 31.5 3f5 31.5 31.5 fI0.0I I ..,,,,~~:: ~. I 11~I1U:I:i.~hi'~.:~,!~~Jtl'it., 's eou~' '8l.~·,,,~~~liitr-·:;:,:::;:·.;;mijll;l,... =.: . I A L'.: "Illihld I I 1 I I I '.,.-:-JI"~:'''::' _.,jl,i"··· Description i~num~•. ,::llli't,>;;: ; ':ll\li" ", .,' ''II~" ..''''::tIJ,!ft:1I ' I I I I I I I I I I Hours Wotl<ed I I I I I I I I I I I 3.0 3.0 105 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 I I UNIT 6500 I 95.00 I s ut:'~; :~~!'~lt~" Is Is ::~~::~~I!Ii.ilUlliilIHi::i:·=-~~;,:;, '·:'~~;U·· ".!Millls 'Misc. Cosls EqUipment Rate rJOB BOX WI TOOLS S 37.30 lAIR COMPRESSOR S 16.69 GENERATOR S 13.03 WELDER S 8.60 BLOWER S 19.17 MOTOR GRADER s 67.50 HYD.HAMMER S 15.63 PAVEMENT BROOM s 24.89 IMSG. BOARD $ 3.04 GROUT PUMP S 15.25 I 10.51 10.51 10.5 F150TRUCK s 13.51110.51 10.5110.5 F250TRUCK $ 13.51 I •• "1 ....' ;" Pi ··... ~ .. "~'~t;;~;~. :..:<t~'1.!;;. ~U't.l ...;.:': ~t~~ :'.:-u.lo'I"h .. ,aiiii.':~·~" ~'". 'f ~~~l."tlll": ..••~.H· ~ ~ .. _...,.... iJ~r'~fJt" Hours Worked CONC. FINISHER I S 115.00 I 10.5 CONC. FINISHER I S 16.00 I 10.5 OPERATOR I S 1800 I 10.5 GABRIEL MARQUEZ I S 5400 I 10.5 CONC. FINISHER I S 16.00 I 10.5 OPERATOR Is 18.00 I 10.5 CONe. FINISHER I s 16.00 I 10.5 KEN GLOVER I S 54.00 I 3.0 I MaNlgement r~~'-:- l'm;;;,.:d;~~" ·.. ~:~·~tl'irnrmmp~·i~:~!Hi~i.~~·~~~'m!i.;ii;:. ''!I!!m,i'l'''.'· ''''''li miii,; ~"""lUlm\i;i;~~;, :... ····,'·'··,0; $ ., ".,. 'l("'\;;~?':.~:;~:~!:1f'..~!~~~~t'lr:~'iiJ ;:: ~;~~~~a~tl,~~~~ili~ ..~(;~~·~ ...;i"~;~'il_,~ ,..rr~;:;~~I~l ,~i~" I,~.a~:f.ififfl:: ~l~:'; IA..eManager Iprojecl~ KEN GLOVER I GABRIEL MARQUEZ CREW I Vendor or Item no. r La...... 1 Rate 1­I 70% CREDIT[T]8.549A8I\ JOB NAME: BCRUA TREATED WATER TRANSMISSION LINE SEGMENT 1 JOB No: 19025 TASK: ANNULAR SPACE GROUT CALCULATIONS LINER LINER 01A. 108 RIFT.) 4.50 RSQ. 20.25 PI 3.1415 L 1 CF 63.62 CY 2.36 CARRIER CARRIER 0.0. 80 RIFT.) 3.33 RSQ. 11.11 PI 3.1415 L 1 CF 34.91 CY 1.29 GROUT UNERVOL. 2.38 CARRIER VOL. 1.29 oIFF. 1.07 ANNULAR SPACE = 1.07 CY ILF TUNNELS DIA LF CYILF CY ! GANN RANCH! 108 215 [ 1.07 1------=2=..=3..::..:0.=05:......­ TOTAL CY 23005 EXPANDING AGENT FACTOR OF 2 FOR CELLULAR GROUT I 11503 UNIT $ OF GROUT FROM CENTEX MAT~ $ 70.00 I TOTAL VALUE OF GROUT MATERIALS! $ 8,051.75\ AO.S. (EXPANDING AGENT) = 10 GAL AO.S./240 GAL. H20 MIX (AO.S. & WATER) = 50 GAL 15 CY GROUT CY GROUT TREATED 1250 GAL. BATCH = 25 CY AO.S.I BATCH = 10 GAL TOTAL BATCHES = 4.60 TOTAL A.O.S. = 46.01 GAL BARREL SIZE = 50 GAL BARRELS = 0.92 ROUND UP TO NEXT FULL BARREL =1 BARRELI COST OF EXPANDING AGENT PLUS SHIPPING I $ 430.81 I SUBTOTAL $ 8,482.56 70% CREDIT $ (5,937.79) -- -- -- ..L:-U~-.;--'r7"",-,-.........._-,-,-,-,-,-,-~ , I C~MMENTS: 1Oltt­ TIME SHEET __ /C/(\,' c:' ~__\1 ..... WEATHER ( !~Cl ,y .", .'. \ .. ) ~ __.!-Q,-,-,(I'-O.\l,-'.........L.f--ii--"-~f--l.(-_-_--,-r~. k'i f J;;) l,I.)o btt L ~ll( ('till d &v..a ADDn., WORt< I CHANGES I CONPLlCTS: ML START ITOI' 6WR JT EMPl.Oyee EQUIP UNIT It TIME TIME 101 TM GABRIEL MARQUEZ PIckup P1F55 :.x, itl~CiC, CF PEDRO BENAVIDES ;(1(.;, :...CCJ CF JUAN G MONTOYA ;co Ot'. OP ANTONIO GUTIERREZ In~" ,,~or, CF HUGO AGUILAR {, (' CF MAGDAcENO RUIL ~t)o It::Cj{~ OP JOSE ROD"lGUEZ '00 ~~Ot f--f------ I j-I----'---- ! r-------------------, BIDIT&M ITA. TOS 'A. - ~f-' tJ --I i MI.. WTR 602 .l cbllrJnYI7tI('/__IIGNA'NkE (: GA8R&. MMQUIIZ' "enlal !!quIp," 1ft! SWlIlllop !ft(01III atlon CLEAN PAY BOR COMe waD UP p~it 104 li06 507 S08 GIO DIEM IC. '5 ~0 In....':' Its f', I()~C; I~<;('; In. <':' Its (' --1---"r, '. -' l 1m, ti =+---t2/ i 110,5 --------,..--~ --. ! I -----l­ i I I i kJ.:to $0 QUANT. lIII'O, ~ J IDescription 01 Eaulo. Conlaet Name I Ccmoal1Y PON Time Call 00# PhoJ1<ll# I !Start .. j-------,---_.._---­ I : , '---­---._----~ ! , I '________________ .-J or I Stop PLI!A8E FILL IN EQUIP_1fT HOURS ON LAST DAY OF W&I( WEf:r: ENDING 412,1' ----- -- ---- -- TIME SHEET :> /'2(']1 q 1'J -."' C_~AT1!: ... -li _JV! I JOb ·l.....(...)r....c_-'.) _ DAY r)' (. ,..j n ':' '>i f1 "./ WEATHER ~.• :. '/jY IHSP .I " COMMENTS; ! {,f/I"I ( -I' rT '" j i ;/o'Vd:'2 ADorL WORK I CHANOES I COHI'LlCT8: -----------.-.. -.------..._--.-------­ ML ML CL6AH STOP PAYSTAIn 8WR 80R PERWTR CONe wm.o I.IP EtM'L.O'fEal 501JT EQUIP UNfT# TIME TIME 502 f04 507 &08 lIlIO DIEM501 . HI ~; i~~PickupGABR:EL MARQUEZ P1F55 l{).!i,"'{' t:Jo J;CC'. {·rtf. (J",..W1l' :;D;). !iD,SCF PEDRO BENAVIDES n:nr $$0 11S(,JUAN G MONTOYA i 1.:nCF D~OCI If}. S , :t>CJOP ANTONIO GUTIERREZ Ii $(\;{' c· 110 ..<. I dlDHUGO AGUILAR CF 0:00 1i..~6In~ S • ;,:\<:1 Jr).SCF MAGDALENO R.Ug 16S-':'" 'tln ~. t'1 (" lh c:;) .. (' rJOSE RODRiGUEZ iOP I:i-.sC\ I .. i Ii Y:).., so alDJTaI T08STA­'A. QUANT. INFO.t# II ._---------: -----~ In JUk c11 / '-?'S1GNATUR.t: IllvG:t BAIltlI!I.. MAIIlQUR IDescriDllon of EQUip. COnlact Name I Comparw PO# Time Call ott # Start orl StoP ft.~ I!!quip/III/lt lltWCI5lop Inlonnallon Phone ~ ~ PLEAS8 FlU. IN l!QU1I'Ml!MT HOURS ON LAST DAY 01' WdK I -- -- TIME SHEET OA Tt!' 2. . /? I J ~" )... 1__' .. OAY-r j-,.,: r e , dl'} 1/ INSP 1 JOBII J 9 oJ.,) WEATHER .:-t-l'';''!·-,"(iL.L't_~ _ Aoon. ~RK I CHANG"/ CONFLICTS: Cl.eANMl. ML 8TART aTOP 80RWT'JIl. PAV CONe UP PERSWR WELD JT eMPLOYEES 506 507EQUIP nME TlME 501 &04 508 510 DIEM TM 502UNIT' IC, ~ ~,r_-, !1t.J.:GABRIEL MARQUEZ Pickup P1F55 t'')f "'k ;.; .II ;f'lr'. JIj C'CF PEDRO BENAVIDES rsS(if->...IY "l/1/l\I ' ~C t iln. ,­"OnCF ~()OJUA/Il G MO~rrOYA ~s, fl.5, :)'f'o f)OP II tl, ,C}AN10NIO GUTIERREZ .:nG '--_. CF '1:0t,HUGO AGUILAR $::.0::1;OC ';"', .5- II t'l .., : tlr)CF MAGDAlENO IWIl 1:00 l1.lsc- '1;00OP If), ,<\JOSE RODRIGUEZ ':0 c, It"o --"-' ~to_ i $0 BID rEM 'It. QUANT. !NFO./I aTA. TOa I -f-­l I SIONATURK (~ ~~ nJ fYltl'Y'{U{C oAiItlEl MARQWZ Ramll i:ll\llPllatll Stllfll stGPlftfe"UtiOA I IDescriDllon of EQuiD, Contact Namill COInDaIW PO# Time Call 0fI1I proOlle II I --=1 Start 0' I Stop PLI!ASl! FIt.L IN tl!QUIPUEHT HOURS ON LAST DAY 01' WI!Ek WEEK ENDit'G 4n/11 Nfjv. 8, 2010 3:13PM CEN-EX 512 4449809 ~o,4328 p, 1 q: 5 cy min for grout -105025 8 cy min for all other concnte EnvittallJDental Fee Flben MaWR BRWR vBNTI!X MAT!!RlALI LLg 3019 AlVin DeVane :Blvd., Suite lflll, Au.tlo, letts 78741 (511) 460-3003 Fax (512) 444-9809 DATE: November 8, 2010 216-34..9997 S58.80/cy $65.00 ley S5UOIcy S62.00Jqo Add $5.00 Per Load Add 55.50 Per Cuble Yani Add $2.00 Ptr Cubic Yard Add SS.!O Per Cubic Yard AU tlODerete wfll be wltbout air e.lltrl1lnmsnt Sales Till. will be charged in addition to the above prices where applicable. Please .ote that we ",lIl no longer be able to pro"lde concrete services on Saturday except In exceptlo.al cbumstanetS. AI Saturday POUI'i will be at • premiwn of $!.OO per e,bic y.rd. Co~erete pricin& does Dot Illclude temperature control for below 95 degree concrete temperature. PriCle protected UDtD March 31.2Vll. TempeWUrt Conqpl ke 50.35 per lb. as necessazy Chilled or Hot Water $2.00 Per CUbic Yard Spedl1 Agrwt, 3/r Size Coarse Aareaate $3.00 Per Cubic Yard SIS" Size Come Aggregau, (when available) $5.00 Por Cubic Yard Unless otherwise slated or included In a speclflc quoce, High Range and Medium Range water reducers are available at an additional cost. Please call tor quotes. Additional charges may apply to deliveries made outside of nannal operating honrs (5:00 am -6:00 pm Monday to Friday) and environmental costs associated with returned concrete. Short load charges for original orders of 6 cubic yards or less IIII1Y apply. Unloading time ohll'FS may apply for cxcocdina 6 minutes pol' yard to unload truck. Call your sales representative to inquire about when these fees ans !1pplicable and the associated 1'Ilte9. 1)iIotfer at the IIR gpoted _ IN!"'"Ip wrUI" wttIdp 30 daD or the Or lIlax be witIld1U'!l. Tbe atbIdled Ceutes T..,.. ad Coaditlou of sale apply ud a CGIltnd of We .b.Il he made wbal a eopy of this fIII""IIleut "ped by 11Ie b..,... 'IuIJI be delivered to Coutu Mflert••LLC. Thank you for inquiring about OUt product. We hope you will favor us with yOUf order.;~n~~ Contex Materials LLC BY: §1 ~YA- Wayne Smith,# Sales Representative Lockwood, Andrews &Newnam, Inc.ISln A LEO A DALY COMPANY May 25/ 2012 Mike Thuss Brushy Creek Regional Utility Authority Program Manager 1906 Hur Industrial Boulevard Cedar Park, Texas 78613 Re: BCRUA Treated Water Transmission Line Segment 1 Gann Ranch Tunnel Annular Grout Resolution Recommendations Mr. Thuss: As you are aware in April of 2011 testing results indicated that the tunnel grout installed in the Gann Ranch Tunnel did not meet the specified 28 day strength requirements. In May 2011 a letter of deficiency was sent to the contractor, 5j Louis (SjU, notifying them that the product was considered deficient and further investigations would be required to determine the impact and potential corrective action. In June of 2011 LAN contracted with Brierley Associates to review the tunnel conditions. In the June 27, 2011 report, Brierley provided an opinion regarding potential long term impact of the insitu-tunnel annular grout strength performance, impact on the surface, and possible mitigation options. As noted in Brierley's report, using a conservative arch tunnel loading consistent with the tunnel design loading previously provided by SJL, there may be a long term potential for the grout within the annular space to crush over time which in turn has the potential to lead to settlement at the surface. 5jL subsequently contracted with a consultant, Lachel & Associates, seeking to determine the same long term affects. In a letter dated February 22, 2012, 5jL provided an alternative analysis utilizing the same approach to settlement as Brierley, but accounting for round tunnel configuration loading. Furthermore, the sealed calculations provided by Lachel conclude the existing tunnel grout will support the typical loading while still providing a factor of safety of 1.65. The letter and calculations from Lachel present a tunnel loading scenario significantly different than the one used in SJL's original tunnel support design. The original tunnel support design from SJL assumed a worst case loading approach to the design. For consistency, Brierley's long term analysis also utilized SJL's loading assumptions. In contrast, according to 5jL and Lachel, the typical loading used in their analysis is more representative of actual conditions encountered on this project. Brierley reviewed the contractor's calculations and, although they note a "minor disagreement" with Lachel, Brierley does not feel the disagreement has an effect on the controlling load used by Lache!. LAN has reviewed the calculations and we have no objection to the alternative analysis. 10B0l Nor1h MaPac E"I"',UWIlY, Building 1, Suile 120 • Aullin, Texa. 18159 • 512336 4212 • Fax: 512 336 4942 • WNWIan-tnC com Mr. Mike Thuss BCRUA May 25,2012 Page 2 In conclusion, SJL is not providing BCRUA and the City of Cedar Park with a product that meets the requirements of the specification for which they were contracted. SjL agrees the grout installed does not meet the specifications. Because of the installation of less than specified grout, additional investigation and engineering effort has been required by BCRUA, City of Cedar Park and LAN. Therefore LAN recommends the following restitution for the less than specified tunnel grout strength: 1. Reduce the unit price paid by BCRUA for the Gann Ranch tunnel by a dollar amount equal to the grout material and installation costs; and 2. A credit of $21,820 is owed to BCRUA for additional engineering cost to evaluate and determine corrective actions for Gann Ranch Tunnel. If you have questions regarding this information, please contact julie Hastings or me. Thank you. RafaelOrt , .E. ',,"~ VP - Large Diameter Pipeline D~ cc: City of Cedar Park Sj Louis Construction File No. 160-10296-200-5.05 ItIEIlIY ASSOCIrATIS uC. April 18,2012 Alisa Gruber, PE Lockwood, Andrews & Newnam, Inc. 10101 Reunion Place. SUite 2()O 58n Antonio, TX 78216-4165 Re: Review of S.J. Louis Letter O$ted February 22, 20'12, Regarding Annular Grouting for th~ Gann Ranch Tunnel, Brushy Creek Regional Utility Authority Transmission LIne Interceptor, Cedar Park, Texas This letter is in response toe lettler from S.J. Louis dated Febrtlsry 22,2012, "Regarding Annular Grouting forttleGJl:ln Ranch Tunnel, Brushy Cr_ Regjonal Utlllty Authority TransmISsion Line tntereaplor, C$dar Perk, Texas". in this letter, S.J. Louis presentl5 a letter and calculation regaJ'{;iing ttJnnelkiedlng from Lachel & Assodiates (Lachel) to S.J. Louis, dated February 29, 2912. The di$cUS$ioo Involv8f the fact tf:1at sample testing of the annular grout Installed In thl$tunnet did not meet the reqUired trle 300 psI minimum coiTipreaslVe'sfrength'requlre(! bV ttle contract. Th••r andcBlc:wlatlol1$ from ~Ilel present a tunael Ioacfir'lj ecenar:io significantly ~1h8n the _\l$9<f.J" $;J. lOWs' erlgll:1'l tu~ ..pcm submittal. Bothapproaches ......~.ne, T1'Ie.Qrtgrnaltunnehupportw~IttaJfromS.J. Louis u&UIl'IEid a ~...~eedlng ~totheE.lesign. FQr pOAslstel'lG:y, Brierley Assooiates' long term anelySI$ afee utiftle4S"J. Lout.' loading BSSt:n:nI't10ns. In oonttast, Lachel's analysis uses an appraach liJtlfl~ng the averElglJoor:1ditlonsthat might pertain. Inregard$t9Jhe ~~P\;l"Jjons from LaoJ:lelJ 'Wf;l f!Q~~r ttlat tt1e approach used 'S ~~ than; *'htilC8lly,~. lA n,lllor d' '~sntwoutd:;l~J.,.$ctlers U$e of a SO% red~ in the ~rndlo.On9'.ueto the laCk~trQundWitfJr abtOlI'b~ tunnel, The GaR for the nea~y SE!9f:Aent 1 Tunne,I.tt18 ~lAegrou~'~Bt 3 feet abov, the soikook i~, WhtmWQUld .•~.I,~.e,lMttllfliRel.~lnthi$... AdditionalJy, "RoOk T.,~g WIth ~ttel~~.· reoommende deslg,,~~ _wet klMnei conditoA$ reg~:(.·6g.;11),QJ~OORdltiooJ;cantem~~a 'dry' tun'" intp a 'waf tUflftel. so~es. ~c ....utt8. However, th1$ mtAOt" dl8agmement does not 8ffeCt the eontrollJAg Io&(;i ....used by Lache!. 101 Old,CoveRolf. __ 1~ In ~t)tp Ute ~,'" tbelll$lled WQut CiPaoItY ,vs ~en and wheel toad;ng, we U--'NYweD r~ ~ "kl:ulBted ~,~.(jf 1;65 to be on theJow -skte-lor a struetuTeWith 8 3U.~_6 mti'm'lum Ilfe -cyde~y d5Dyears. Fllic 311.ooI&i'-$ 21$ fllllt 8h11;~. Bnertey Associates will be happy 'to assist any additional review or stl:ldiesif requested. C8mbtldge,..1ttllilO With Regards,(l17'-..-e Pax (l17:.e.ela 15808 RsncII RoIdf20 N $uIl!t~n AuslID. 1X 78717 •pa, PhD5-12.218:t7'38 Fax: 512.218.115& Panner J Serti()r; SOC18te ~Assocl~ , lLC 2S2e W. MaInSlftl8l, _iOI TBPE FIrm F~3691L1lIIetcn,ee 1IO~2D 3DS;1'bS.:1405 FIIlC 303.10:to404 c: ~I"lmings. LAN eettow LY_s FIle