Loading...
GM-15-06-29-053 NELtronics QUOTATION 1308 Chisholm Trail Ste. 101 Round Rock, Texas 78681 Brushy Creek Regional Utility Authority Quote No: 052215-1 Quote Date: 5/22/2015 Atm: Mr.Jim Tolles Prepared By TERMS FOB PROJECT DELIVERY/VALIDITY S.Nelke Net 30 Round Rock BCRUA Raw Water Intake Recommissioning Item No. Qty Description Unit Price TOTAL I I On-Site Support Labor to Re-Commission the Raw Water Intake Barge Controls $7,500.00 $7,500.00 Scope of Work: Re-Terminate control wiring from the Raw Water Pump MCC to the Barge SCADA Panel Perform Loop Checks from the SCADA Panel to the PLC located in the MCC Check all of the instruments on the Barge for correct operation Verify UO at the Neltronics supplied Scada Panel in the EST Verify 1/0 at the Neltronics supplied Scada Panel at the Raw Water Flow Meter Equipment repairs or replacement by Neltronics will be billed at cost+20%at an hourly rate of$125/hour. Exclusions: Any wiring pulls or conduit installation/repair required. PLC programming FIMI Configuration Rol 5�v- Thank you for this opportunity to quote your requirements. Should you have any questions or concerns,please contact Stan Nelke at Neltronics. 1-1/2%per monthe will TOTAL $7,500.00 be added to overdu invoices. Phone 512-238- 16M �' 0V-2Cj -OS3 1 Fax 512-238-1176