GM-15-06-29-053 NELtronics QUOTATION
1308 Chisholm Trail Ste. 101
Round Rock, Texas 78681
Brushy Creek Regional Utility Authority Quote No: 052215-1
Quote Date: 5/22/2015
Atm: Mr.Jim Tolles
Prepared By TERMS FOB PROJECT DELIVERY/VALIDITY
S.Nelke Net 30 Round Rock BCRUA Raw Water Intake
Recommissioning
Item No. Qty Description Unit Price TOTAL
I I On-Site Support Labor to Re-Commission the Raw Water Intake Barge Controls $7,500.00 $7,500.00
Scope of Work:
Re-Terminate control wiring from the Raw Water Pump MCC to the Barge SCADA Panel
Perform Loop Checks from the SCADA Panel to the PLC located in the MCC
Check all of the instruments on the Barge for correct operation
Verify UO at the Neltronics supplied Scada Panel in the EST
Verify 1/0 at the Neltronics supplied Scada Panel at the Raw Water Flow Meter
Equipment repairs or replacement by Neltronics will be billed at cost+20%at an hourly
rate of$125/hour.
Exclusions:
Any wiring pulls or conduit installation/repair required.
PLC programming
FIMI Configuration Rol
5�v-
Thank you for this opportunity to quote your requirements.
Should you have any questions or concerns,please
contact Stan Nelke at Neltronics. 1-1/2%per monthe will TOTAL $7,500.00
be added to overdu invoices.
Phone 512-238- 16M �' 0V-2Cj -OS3 1 Fax 512-238-1176