GM-15-11-09-061 FYZ November 3, 2015 Mr.Tom Gallier, General Manager Brushy Creek Regional Utility Authority 221 East Main Street Round Rock, TX 78664 Reference: Supplemental Amendment No. 3 for BCRUA Regional Water System Phase 2 Deep Water Intake Preliminary Design Dear Mr. Gallier, HDR Engineering, Inc. (HDR)and the Brushy Creek Regional Utility Authority(BCRUA)entered into a professional services agreement approved by the BCRUA Board on November 19, 2014 for preliminary design of the Phase 2 Deep Water Intake. The purpose of Supplemental Amendment No. 3 is to prepare easements for two monitoring wells installed on private property during the geotechnical data collection program. The easements will require metes and bounds surveys. HDR's services will include the tasks described in the accompanying Exhibits. The total compensation for the scope of services will not exceed $27,000. Supplemental Amendment No. 3 increases the total compensation amount of Task 3.0—Right-of-Way and Land Acquisition to $76,100 and Task 11.0—Surveying and Mapping to$131,800 thereby increasing the total compensation amount of the Agreement to$6,393,600. If it becomes apparent that the compensation amount will be exceeded, HDR will give written notice of thereof for BCRUA's consideration. Please review this proposal at your convenience and contact me if you have any questions or need additional information to support your review. Sincerely, HDR Engineeri Inc. Aaron Archer, P.E. lelly J. Kaatz, P. Project Manager Senior Vice President w Approved:Tow 6& r 11/09/2015 hdrinc,com 4401 West Gate Boulevard,Suite 400,Austin,TX 78745 T512912.5100 F512912,5158 Texas Registered Engineering Firm F-754 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The purposes of Supplemental Amendment No. 3 negotiate, survey, and obtain two easements for monitoring wells. BASIC SCOPE OF SERVICES Task 3.0— Right-of-Way and Land Acquisition Insert Task 3.4 as follows: 3.4 Monitoring Well Easements. Obtain two monitoring well easements at the locations of borings LB-1 (Attwood) and 1-13-7 (Trails End Road Homeowners Association). 3.4.1 Negotiate terms of conveyance, provide comparative market analysis for BCRUA approval as needed, and maintain a log of contract with the property owners. 3.4.2 Obtain services of Title Company to provide lien reports, review the reports, restrictive covenants, and other land restrictions, remove non- pertinent abstracts of judgment and M&M liens, if any. 3.4.3 Prepare request for and delivery of funds for the conveyance. 3.4.4 Record conveyance instruments with the County Clerk. Task 11.0—Surveying and Mapping Insert Task 11.5 as follows. 11.5 Easement Descriptions for LB-1 and LB-7. Survey two easements and prepare final survey documents signed and sealed by a Registered Professional Land Surveyor. 11.5.1 Recover project survey control and establish two additional project control points (5/8" iron rods) and tie to the primary project control. 11.5.2 Draft plats for two easement descriptions. The plats will be prepared on 8.5" x 11: pages at scales to be determined based on the easement size. A closure computation will be prepared for the plats. 11.5.3 Prepare a field note (metes and bounds) description for the proposed easements. A closure computation will be prepared for the descriptions. 1113/2015 J v ADDENDUM TO EXHIBIT C WORK SCHEDULE No changes to the overall Work Schedule are required. Task 3.4 and 11.5 will be completed with 60 days of Notice-to-Proceed. 11/3/2015 ��� ADDENDUM TO EXHIBIT D FEE SCHEDULE The total compensation for services under Supplemental Agreement No. 3 is estimated to be $27,000. Total compensation for the Phase 2 Deep Water Intake Preliminary Design shall be adjusted to be$6,393,600. Total compensation for Task 3.0— Right-of-Way and Land Acquisition shall be increased by an amount of $15,500. Total compensation for Task 3.0 — Right-of-Way and Land Acquisition (Paragraph D1.01.A.3) shall be adjusted to be$76,100. Total compensation for Task 11.0 — Surveying and Mapping shall be increased by an amount of $11,500. Total compensation for Task 11.0 — Surveying and Mapping (Paragraph D1.01.A.11) shall be adjusted to be$131,800. 11/3/2015 FN Monique Adams From: Tom Gallier Sent: Thursday, November 05, 2015 4:02 PM To: / Sam.Roberts@cedarparktexas.gov,wwatts@leandertx.gov; Michael Thane; Kenneth Wheeler;Jeff Bell Cc: Steve Sheets; Monique Adams Subject: Supplemental Amendment No. 3 for HDR Phase 2 Pre-Design Contract Attachments: BCRUA Phase 2 - Supplemental Amendment No. 3.pdf All, Please see below, and the attached Addendum for Supplemental Amendment#3 from HDR for out of scope assistance that was needed by LAN to provide surveying, mapping and easement development/negotiations for monitoring well easements LB-1 (owner: Attwood), and LB-& (owner: Trails End Road Homeowners Association. You may recall we had extended internal discussions about these complex and difficult negotiations which were required in order to gain access for critical test well boring sites. Given the cost of$27,000, I'll proceed to authorize this supplemental amendment on my authority, assuming Steve Sheets has no objections, and assuming the OC concurs. Please contact me soon if you have any questions or concerns about this SA. Thanks, Tom Tom Gallier, General Manager Brushy Creek Regional Utility Authority(BCRUA) Physical Address: 1906 Hur Industrial Blvd. Cedar Park, TX 78613 Mailing Address: 221 E. Main St. Round Rock, TX 78664 Cell.• (512) 788-2036 Fax. (512)218-7097 e-mail.• tc7allierftcrua.ora From:Archer, Aaron D. <Aaron.Archer@hdrinc.com> Sent:Wednesday, November 4, 2015 8:51 AM To:Tom Gallier Subject: Supplemental Amendment No. 3 Tom, 1 Supplemental Amendment No. 3 is attached for your consideration. I have owed you SA3 for some time. SA3 is for the development of easements for monitoring wells placed at LB-1 (Attwood) and L13-7 (TER HOA). It covers additional out- of-scope work performed by LAN to negotiate and develop the easements as well as additional survey work by SAM to prepare metes and bounds descriptions for the easements. The survey work to develop the metes and bounds descriptions is rather difficult despite the small size of the easements because the surveyor will need to tie to property corners and the Attwood property in particular is very large. Please let me know if you have any questions. Thanks, Aaron Aaron Archer, P.E. Associate HDR 4401 West Gate Blvd, Suite 400 Austin,TX 78745 D 512.912.5183 M 512.587.0882 aaron.archer@hdrinc.com 2