Loading...
GM-16-03-18-064General Manager03/18/2016 Attachment A—Scope of Work  Brushy Creek Regional Utility Authority  Water Treatment Plant (BCRUA WTP)  Pre‐treatment Discharge Permit to City of Cedar Park  Wastewater Collection System and Wastewater Treatment  Plant  CH2M HILL Engineers, Inc. (CH2M) has received a request from Brushy Creek Regional Utility Authority  (BCRUA) to assist in the development of information required for a City of Cedar Park Pretreatment  Discharge Permit for the BCRUA water treatment plant and to package the information into the  application for the permit. This Scope of Work will be performed as an Amendment to the Standard  Agreement for Professional Services dated July 21, 2015.  Scope of Work for Assistance in Pre‐Treatment Permit Application  Task 1 Data Gathering and Plant Inspection   CH2M staff engineer (Engineer‐in‐Training (EIT)) will gather data at WTP for two days (16 hours)   Gather Administrative information required by application with assistance from  Plant Superintendent and General Manager   Review plans and inspect plant facilities   Develop inventory of plant discharges and drains into sanitary sewer system –  both type of discharge and potential volume   Staff engineer to revisit plant for a half day to inspect any remaining items (4 hours)  Task 2 Develop Required Drawings   Assume 12 hours to develop drawings (12 hours)   Use AutoCad files provided by BCRUA staff to create sketches and drawing  highlighting the plant piping and drain system related to the plant’s sanitary  system discharge   Copy record drawing set as needed for the application  Deliverable for this task will be included in Task 4.  Task 3 Develop Sampling Plan   Assume 8 hours effort (8 hours)  Based upon information gathered, develop a sampling plan and discuss and receive approval  from City of Cedar Park. Sampling and Sample cost are not included in this Scope of Work. Requirements  are not known until inventory completed. CH2M will recommend potential laboratories that can assist in  the sampling and analysis or as additional service can hire a laboratory to complete the task.  Deliverable for this task will be included in Task 4.  Task 4 Finalize, Submit, and Obtain Pre‐Treatment Permit   Once the sample analysis is complete, the application will be finalized and  submitted to BCRUA for signatures. BCRUA will pay any application fees.  Application will be submitted.   CH2M will address any application comments with BCRUA staff.  This effort is assumed to require a day (8 hours).  Deliverable will be sent to client during this Task.  Task 5 Project Management   CH2M Project Manager and contract assistant to work with BCRUA on contract  document (4 hours)   CH2M Project Manager to set up project for tracking and invoicing based upon  contract terms and conditions (2 hours)   CH2M Project Manager to provide quality control review of work (1 hour)   CH2M Project Manager to invoice client (1 hour)    Compensation  Compensation will be on a lump sum basis not to exceed $9,500.00 without  written authorization.    Schedule  Application to be submitted within 45 days of notice to proceed provided  laboratory can turn analysis around within 3 weeks.