GM-16-12-05-068 November 29, 2016 Mr. Tom Gallier, General Manager Brushy Creek Regional Utility Authority 221 East Main Street Round Rock, TX 78664 Reference: Supplemental Amendment No. 5 for BCRUA Regional Water System Phase 2 Deep Water Intake Preliminary Design Dear Mr. Gallier, HDR Engineering, Inc. (HDR)and the Brushy Creek Regional Utility Authority(BCRUA)entered into a professional services agreement approved by the BCRUA Board on November 19, 2014 for preliminary design of the Phase 2 Deep Water Intake. The purpose of Supplemental Amendment No. 5 is to authorize supplemental transient analysis of conveyance from the proposed Phase 2 pump station on Lime Creek Road to the BCRUA Water Treatment Plant. HDR's services will include the tasks described in the accompanying Exhibits. The total compensation for the scope of services will not exceed$16,500. Supplemental Amendment No. 5 redistributes compensation between Task 7.0—Pump Station and Task 13.0—Project Delivery Method to utilize remaining funds from Task 13.0.The total compensation amount of the Agreement remains unchanged at$6,423,300. If it becomes apparent that the compensation amount will be exceeded, HDR will give written notice of thereof for BCRUA's consideration. Please review this proposal at your convenience and contact me if you have any questions or need additional information. If this proposal is acceptable, please sign below and return for our files.We appreciate the opportunity to continue to assist the BCRUA with this important project. Sincerely, HDR Engineering, Inc. Shay Rails Roalson, P.E. Kelly J. Kaatz, P.E. Vice President Senior Vice President Approved: Tom Gallier, General Manager Date Brushy Creek Regional Utility Authority 4401 west Gate Boulevard,Suite 400:Austin,TX 78745 T 512.912.5100 F 512.912.5158 Texas Registered Engineering Firm F-754 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The purpose of Supplemental Amendment No. S is to perform transient analysis of conveyance from the Phase 2 pump station to the BCRUA WTP to evaluate replacement of the existing 24-inch diameter combination air valves (CAVs) installed at STA 68+00 and 163+00 on the existing Phase 1 raw water pipeline on Trails End Road. BASIC SCOPE OF SERVICES Task 7.0—Pump Station Insert Task 7.3.4.1 as follows. 7.3.4.1 Perform simulations for a loss of power to the Phase 2 raw water pump station to determine if the 24" CAVs at STA 68+00 and 163+00 can be replaced with smaller diameter controlled venting vacuum relief valves. The simulations will be performed with the surge control measures recommended in the 2016 surge analysis report titled "Brushy Creek Regional Utility Authority Raw Water Pump Station Hydraulic Transient Analysis' dated May 26, 2016. Simulations will be repeated as necessary to determine the minimum recommended diameter for the replacement valves at these locations. Prepare a brief memorandum summarizing the results of the additional transient analysis. i i i 11/3012016 ADDENDUM TO EXHIBIT C WORK SCHEDULE Supplemental Amendment No. 5 requires four weeks to complete assuming BCRUA returns any comments on the report within one week of delivery. 1'd ryL 11130/2016 ADDENDUM TO EXHIBIT D FEE SCHEDULE The total compensation for services under Supplemental Agreement No. 5 is estimated to be $16,500. Total compensation for the Phase 2 Deep Water Intake Preliminary Design shall not be adjusted based on the below redistribution of compensation between Task 7.0—Pump Station and Task 13.0—Project Delivery Method. Total compensation for Task 7.0 — Pump Station shall be increased by an amount of $16,500. Total compensation for Task 7.0—Pump Station (Paragraph D1.01.A.6)shall be adjusted to be $1,514,200. Total compensation for Task 13.0 — Project Delivery Method (Paragraph D1.02.F.2) will be reduced by$16,500 from $169,000 to$152,500. 11/30/2016 Monique Adams From: Tom Gallier Sent: Monday, December 5, 2016 11:31 AM To: Roalson, Shay Cc: Monique Adams Subject: Signed Phase 2 SA#5 Attachments: HDR Phase 2 SA50001.pdf Hi Shay, I've attached the signed Supplemental Agreement#5, so you (and NHC) are good to go! I did speak to Sam, after you mentioned his concerns, and resolved any questions he had. Please let me know if you need anything else. Thanks, Tom Tom Gall/er, General Manager Brushy Creek Regional Utility Authority(BCRUA) Physical Address: 1906 Hur Industrial Blvd. Cedar Park, TX 78613 Mailing Address; 221 E. Main St. Round Rock, TX 78664 CO.- (512)788-2036 Fax.-(512)218-7097 e-mail.- toallierObcrua.orq 1