Loading...
GM-17-11-07-075 le"MBRUSHYCRIEK REGIONAL UTILITY AUTHORITY 5 F.r.-rr.•rr of C.I.r P4.L t...dir ..4 A...0 ►..L SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WALKER PARTNERS ("Engineer") ADDRESS: 804 Las Cimas Parkway,Suite 150 Austin TX 78746 PROJECT: Phase 1C Water Treatment Plant Expansion and Phase 2 Land Rights and Stakeholder Coordination This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA"and Walker Partners, hereinafter called the"Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the"Contract", on the 19th day of April, 2017 for the BCRUA Phase 1C Water Treatment Plant Expansion and Phase 2 Land Rights and Stakeholder Coordination Project in the amount of $3,776,500.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. I on July 19, 2017 to amend the scope of services and to increase the compensation by $226,100.00 to a total of $4,002,600.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $19,600.00 to a total of$4,022,200.00; and NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: 1. Article 2 Enpineering Services and Exhibit B. En ig neering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4 Compensation and Exhibit D Fee Schedule shall be amended by increasing by $19,600.00 the lump sum amount payable under the Contract for a total of$4,022,200.00, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev.0312011 0140.4634AO,,00367904 2131129 �M-1-7-11-o-1-�5 IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. WALKER PARTNERS By: Date BRUSHY CREEK GIONAL UTILITY AUTHORITY,INC. �A By: Tom Galller,General Manager Date APPROY S TO FO M: By: N Stephan Shcets,BCRUA Attorney Supplemental Contract Rev.03/2011 0140.463440,00387904 215829 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The purpose of Supplemental Amendment No.2 is to perform a limited site survey of the water treatment plant(WTP)to field verify the location of key structures and utilities for comparison to record drawings information. BASIC SCOPE OF SERVICES Task 1.0-Phase 1C WTP Expansion Insert Task 1.2.1.5 and Task 1.2.1.6 as follows: 1.2.1.5 Phase 1A Record Drawings Field Verification and Update. 1.2.1.5.1 WTP site survey. Provide a limited two-day field survey of the WTP site to field-verify the location of key structures and buries!utilities. The survey will support and inform design activities and will be utilized to confirm the accuracy of Phase lA record drawings prepared by others. Buried utilities will be exposed and surveyed with support by David Dial and the City of Cedar Park. 1.2.1.5.2 Record drawing updates. Review and compare the updated record drawings to the Phase 1A general contract as-built plans. Replace Phase 1A record drawings files being utilized for Phase IC design with new record drawings files prepared by others as required. It is assumed that the new record drawing reference file names will match the existing record drawing file names and revisions to the ' original flies will be identified. A maximum of three days of CAD ' drafting time is assumed for this update. 9/15/2017 @)'S lker P=ners ineers * surveyors ADDENDUM TO EXHIBIT C WORK SCHEDULE No changes to the Work Schedule are required. 9/15/2017 macer Partners engineers . surveyors ADDENDUM TO EXHIBIT D Fee Schedule I Attached Behind This Page I I I I I Supplemental Contract Rev.03/2011 0140.4634-40;003&7904 215929 A005NDUM To EXHIBIT D COMPENSATION Total compensation for services under Supplemental Amendment No. 2 is estimated to be$19,600. Total compensation for Task 1.0—Phase IC Woter Treatment Plant Expansion shall be Increased by an amount of$19,600. Total compensation for the Project shall be adjusted to$4,022,200. Total compensation for Task 1.0--Phase 1C Water Treatment Plant Expansion shall be adjusted to be $.1,797,600. 9/16/2017 Walker Partners engineers . surveyors Brushy Clack Regional URINY Aulhadly Phase IC NRA Espanslon and Ahim 2 Land Rights and Stakeholder Coordination•Supplemental Amendment No.2 Labor and fu Summary M.O.. ..•w.n.+w.w...r rl■w a...ww.l c... r.�r tiller e� rlrwl /„rr //.[. wrlr Trrl« rr.l a...l Jr.. lrrry r.... r..... r.....1 [.w.r µl � fi.»r ■h/ .. Tw/rr. Irrl»I M MM■.M y■ M■r � I/1/11.r11ui le Y1r111MM■ 11 ■••'11 ■I«.1•■�IP.••111�1\Nw�.w IIr. 11111 n1rf1.3y.F en: a..a..a rw« i � � . 1 a u 1. prl 1.: j�1•o iii f..•�Yt..ar» i• r I •1 1 I • Il Iry !Ir /Ja i■MK1YlYf J J ■ M • ■ N r ■1 Ili W 11■a14fo /r 1r IIJr pr uf■ MW s;r 1 Ir 11» 1111 r Ia141MY1 1 J ■ M ! ! 11 p 11 11 fal4 rf! IM luN µW 1 1W M lY IIM IJ■11 er Partners engineers * surveyors 804 Los Cimas Parkway.Suite 150 Auslin,texas 78746 September 15,2017 Mr.Tom Gallier,General Manager i Brushy Creek Regional Utility Authority 221 East Main Street Round Rock,TX 78664 Re: Supplemental Amendment No. 2 for BCRUA Phase 1C Water Treatment Plant Expansion and Phase 2 Land Rights and Stakeholder Coordination Project Dear Mr.Gailier. Walker Partners and the Brushy Creek Regional Utility Authority(BCRUA)entered Into a professional services agreement approved by the BCRUA Board an April 19,2017 for the Phase 1 C Water Treatment Plant(WTP) Expansion and Phase 2 Land Rights and Stakeholder Coordination Project. Supplemental Amendment No. 1 was executed on July 19,2017 to expand the scope of the Phase 2 electrical upgrades design. Supplemental Amendment No, 2 includes a limited site survey of the BCRUA water treatment plant to field verify the location of key structures and utilities impacted by the Phase 1 C expansion for comparison to record drawing Information. Supplemental Amendment No.2 Is required due to discrepancies between the Phase to as-builts prepared by the general contractor and the record drawings prepared by the engineer-of-record. It Is assumed that a new set of record drawings will be prepared by others and will replace the existing set of record drawings being utilized for design of the Phase 1 C expansion. The services to complete Supplemental Amendment No.2 are described In the accompanying Exhibits. The total compensation for Supplemental Amendment No.2 will not exceed$19,600. Supplemental Amendment No.2 Increases the total compensation amount of the Agreement to$4,022,200. If It becomes apparent that the compensation amount will be exceeded,Walker Partners will give written notice of thereof for BCRUA's consideration. Please review this proposal at your convenience and contact me If you have any questions or need additional Information to support your review. Sincerely, Aaron Archer,P.E. Project Manager �fy Lt's' Attachments l�I www.WalkerPariners.com EW TBPEReglstroiion No 8053 1 TBPLS Regislrolion No.10032500