GM-20-03-05-085 6e7Z RBUSHYCREEK
REGIONAL UTILITY AUTHORITY
A Part..r.hlp .1 Catlar Park. L.a.d.r. and K. d R..k
SUPPLEMENTAL CONTRACT NO.3
TO CONTRACT FOR ENGINEERING SERVICES
FIRM:WALKER PARTNERS/FREESE AND NICHOLS JOINT VENTURE„{"Engineer")
ADDRESS: 804 Las Cimas Parliway,Suite 150 Austin TX 78746
PROJECT: DCRUA Phase 2 Raw Water Delivery System
This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between
the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called
"BCRUA" and Walker Partners//rreese and Nichols Joint Venture, hereinafter called the
"Engineer".
WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the 28th day of November, 2018 for the BCRUA Phase 2 Raw Water
Delivery System Project in the lump sum amount of$12,518,037.00 for Engineering Services
excluding Task 5.3.1 - Geotechnical Investigation; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 1 on April 24, 2019 to
amend the scope of services, specifically, Task 6.0, and to increase the compensation by
$75,496.00 to a total lump sum amount of $12,593,533.00 for a total project amount of
$13,697,291.00; and
WHEREAS,BCRUA and Engineer executed Supplemental Contract No. 2 on August 7,2019 to
amend the scope of services, specifically, Task 5.0 Special Services, and to increase the
compensation by $42,348.00 to a total lump sum amount of$12,635,881.00 for a total project
amount of$13,739,639.00;and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the
scope of services, specifically, Task 6.0—Agency and Stakeholder Coordination, and to increase
the compensation by$47,000.00 to a total lump sum amount of$12,682,881.00 for a total project
amount of$13,786,639.00;
NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract
is amended as follows:
I.
Article 2 Engineering Set-vices and Exhibit B. Engineering Services shall be amended as set
forth in the attached Addendum To Exhibit B. Exhibit C Work Schedule shall be amended as
set forth in the attached Addendum To Exhibit C.
Supplemental Contract Rev.03/2011
0140.4634-47;00440655 215829
11.
Article 4. Compensation (1) ,Lump Sum and Exhibit D, Fee Schedule shall be amended by
increasing by $47,000.00 the lump sum amount payable under the Contract for Engineering
Services, specifically, Task 6.0 - Agency and Stakeholder Coordination to a total lump sum
amount of $12,682,881.00 for a total Project amount of $13,786,639.00, as shown by the
attached Addendum to Exhibit D.
IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental
Contract in duplicate.
WALKER PARTNERS/FREESE AND NICHOLS JOINT VENTURE
By:
/tom _ a
Date
BRUSHY CREEK jREEGGIONAL UTILITY AUTHORITY,INC.
By: ��rt �J
Karen Bondy, General ager
03/05/2020
Date
APPROV S TO FOR
By: _
Stephan . Sheets, BCRUA Attorney
z
ADDENDUM TO EXHIBIT B
ENGINEERING SERVICES
GENERAL
The purpose of Supplemental Amendment No. 3 is to engage a land use attorney to assist with City
of Austin review and consideration of the site plan for the Phase z pump station located on Lime
Creek Road in the City of Austin 5-mile Extraterritorial Jurisdiction.
BASIC SCOPE OF SERVICES
Task 6.0-Agency and Stakeholder Coordination
Insert Task 6.14 as follows:
6.14 Land Use Attorney Support. Engage support from Jackson Walker, LLP,to develop and
Implement permitting strategies to navigate the City of Austin and/or Travis County site
pian permitting process. The level of attorney involvement will depend substantially on the
issues and concerns raised by the permitting agency or interested parties. Engineer shall
lead the permitting effort and develop permit applications and supporting information as
required.
212512�2a Walker Partners FREESE
engineers * surveyors MMICHOLS
ADDENDUM TO EXHIBIT C
WORK SCHEDULE
No changes to the Work Schedule are required.
r Partners IC# O2/25/2020 OEen4g;nelers + surveyors MAIOS
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
ADDENDUM TO EXHIBIT D
COMPENSATION
Total compensation for services under Supplemental Amendment No. 3 is estimated to be $47,000.
Owner shall pay Engineer for services under Supplemental Amendment No. 3 on the basis of
Standard Hourly Rates as set forth in Exhibit D. The hourly rate of the lead attorney assigned to the
Project is$445.
Total compensation for Task 6.0 — Agency and Stakeholder shall be increased by an amount of
$47,000 to$1,346,941.
Total compensation for the Project shall be adjusted to$13,786,639.
@WAerPartners *
2/25/2020 engineers * surveyorsMFREESEL