GM-20-03-20-086 :e7Z BRUSHY CREEK REGIONAL UTII_ITYAUTHORITY A Partnership of COO- Park. Lender. and hound Rock SUPPLEMENTAL CONTRACT NO.4 TO CONTRACT FOR ENGINEERING SERVICES FIRM:WALKER PARTNERS/FREESE AND NICHOLS JOINT VENTURE("Engineer") ADDRESS: 804 Las Cimas Parkway,Suite 150,Austin,TX 78746 PROJECT: BCRUA Phase 2 Raw Water Delivery System This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the BRUSIIY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA" and Walker Partners//Freese and Nichols Joint Venture, hereinafter called the "Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the"Contract", on the 28th day of November, 2018 for the BCRUA Phase 2 Raw Water Delivery System Project in the lump sum amount of$12,518,037.00 for Engineering Services excluding Task 5.3.1—Geotechnical Investigation;and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 1 on April 24,2019 to amend the scope of services, specifically, Task 6.0, and to increase the compensation by $75,496.00 to a total lump sum amount of $12,593,533.00 for a total project amount of $13,697,291.00;and WHEREAS,BCRUA and Engineer executed Supplemental Contract No. 2 on August 7,2019 to amend the scope of services, specifically, Task 5.0 — Special Services, and to increase the compensation by $42,348.00 to a total hunp sum amount of$12,635,881.00 for a total project amount of$13,739,639.00;and WHEREAS,BCRUA and Engineer executed Supplemental Contract No. 3 on March 5, 2020 to amend the scope of services,specifically, Task 6.0—Agency and Stakeholder Coordination, and to increase the compensation by $47,000.00 to a total hunp sum amount of$12,682,881.00 for a total project amount of$13,786,639.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services, specifically, Task 6.0—Agency and Stakeholder Coordination,and to increase the compensation by$18,155.00 to a total lump sum amount of$12,701,036.00 for a total project amount of$13,804,794.00; NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: Supplemental Contract Rev.03/2011 0140.4634-47;00441484 215829 (J' Al, zv-03-2-D -CJ� I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Il. Article 4, Compensation (1) Lump Sum and Exhibit D, Fee Schedule shall be amended by increasing by $18,155.00 the lump sum amount payable under the Contract for Engineering Services, specifically, Task 6.0 — Agency and Stakeholder Coordination to a total lump sum amount of $12,701,036.00 for a total Project amount of $13,804,794.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. WALKER PARTNERS&RE,ESE AND NICHOLS JOINT VENTURE By: Drew Hardin $ March 20, 2020 Date BRUSHY CREEK REGIONAL UTILITY AUTHORITY,INC. By. a.e.,to Karen Bondy, General Manager 03/20/2020 Date APPROV D tS TO FO By: Lt'd . Ste'MrGj. Sheets,BCRUA Attorney 2 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The purpose of Supplemental Amendment No. 41s to complete additional hydrologic modeling requested by the Fort Worth District of the U.S.Army Corps of Engineers(USACE)at a meeting on January 12, 2020. The evaluation will be documented in a report that will supplement information previously submitted in the Tier 1 Hydrologic Modeling Guidelines report to the USACE. The analysis will employ a spreadsheet model of Lake Travis using the following assumptions: ■ Historical hydrology(inflows and evaporation)from 2000 to 2016(includes drought-of- record from 2010 to 2015) ■ Historical and adjusted demands for BCRUA and customers reflecting the following conditions: a. Historical demands, which ranged from 8,388 ac-ft/yr inf 2000 to 23,058 ac-ft/yr in 2016. b. Historical demands with estimated demands during the period from September 2013 to September 2015 when the BCRUA intake was shut down. The estimated demands assume that there was no shut down due to low lake levels. The estimated demands will be interpolated based on historical trends from 2000 to 2018. c. Expected demands just prior to construction of the Phase 2 intake. This is assumed to be 46,521 ac-ft/yr with a peak diversion rate of 70.5 MGD(Section 1.B.1.1 of the HMG Tier 1 Supplemental Report). The expected demands scenario will be run with(1)a full or partial shutdown of BCRUA and customer city diversions around a Lake Travis elevation of 623 feet and(2)no shut down for low lake levels. d. Maximum theoretical demands from the existing intakes, which is assumed to be 76,469 ac-ft/yr(Section 1.B.1.1 of the HMG Tier Supplemental Report). This demand scenario assumes a near constant diversion of 70.5 MGD. e. Full expected demands with the proposed Phase 2 intake. This is expected to be 95,397 ac-ft/yr with a peak diversion rate of 144.7 MGD. Higher maximum diversion rates(up to 150 MGD)or higher annual volumes(144.7 MGD maximum but with a lower peaking factor)will be considered as well. !f there are no appreciable impacts, a higher diversion amount may be suggested. ■ No changes in pumping capacity due to low lake levels. This is a conservative assumption that will overestimate potential impacts during critical times. This will be stated in the final memorandum. ■ Historical demands for all other users, including direct diversions from Lake Travis as well as water released for downstream use(firm,interruptible and environmental flows) 3/11/2020 Eenine9lker Partners IFN FREESE ers* surveyors INICHOLS ■ Flood releases may be adjusted to reflect changes in flood operation due to additional empty storage ■ The analyses will use a calibrated Lake Travis model based on historical inflows, evaporation, demands(lakeside and releases), and flood releases from previous authorization. BASIC SCOPE OF SERVICES Task 6.0-Agency and Stakeholder Coordination Insert Task 6.4.9 as follows: 6.4.9 Supplemental HMG Tier 1 Modeling for Section 404 authorization. 6.4.9.1 Run five scenarios to identify and quantify the impacts associated with the Phase 2 intake based on the demand scenarios discussed in the assumptions section. 6.4.9.1.1 Historical demands. Per USACE guidance,this scenario is the baseline to which all other scenarios will be compared. 6.4.9.1.2 Adjusted historical demands assuming Owner was able to keep diverting during low lake levels.This scenario will quantify the portion of the impacts of the Phase 2 intake associated with the increased reliability during low lake levels. 6.4.9.1.3 Adjusted Owner and customer demands to reflect expected Owner operations just prior to construction of Phase 2, both with and without loss of the Owner's floating intake during low lake levels.This scenario will quantify the impacts based on conditions with the expected level of demands that will be encountered before initiating the project. Unlike the two prior scenarios, Owner and customer demands will be assumed constant for every year in the simulation period. 6.4.9.1.4 Adjusted Owner and customer demands to reflect maximum use of existing floating intakes.This scenario reflects the theoretical maximum use of the existing intakes as described in Section 1.13.1.1 of the HMG Tier 1 Supplemental Report.These demands will be assumed constant for every year in the simulation period. 6.4.9.1.5 Adjusted Owner and customer demands to reflect full expected use of the Phase 2 intake. This scenario reflects the ultimate development of the Phase 2 project.The demands will be assumed constant for every year In the simulation periods.This scenario will consider potential increases in maximum diversion rate or annual amount for inclusion in the final USACE submittal. 6.4.9.2 Analyze changes in diversions, reservoir outflows, and evaporation associated with each scenario to quantify the source of water for the new diversions associated with the Phase 2 intake.This will meet the USACE requirement to identify how the new project changes the use of w Menlker Partners ra FRE E 3/11/2020 ineers* surveyors flows from current conditions. It will also quantify changes in reservoir outflows. 6.4.9.3 Write a draft technical memorandum describing the analyses.The memorandum will include model files and model documentation. Provide to Owner and counsel for review.Address comments and finalize.Technical memorandum to be provided in PDF file format for both draft and final deliverables. Provide technical memorandum to the USACE for review and comment. 6.4.9.4 Meet with USACE to discuss memorandum and next steps in the permitting process.This task will only be performed if authorized by Owner. WEen lkerPartnersU00,42FREESE' 3/11/2020 ineers* surveyors CHOLS ADDENDUM TO EXHIBIT C WORK SCHEDULE The draft technical memorandum will be submitted within two weeks of execution of this supplemental amendment. The final technical memorandum will be submitted within two weeks of receiving Owner comments. @)ja�icer Partners rmREES 5 3/11/2020 eers* surveyors ADDENDUM TO EXHIBIT D FEE SCHEDULE Total compensation for services under Supplemental Amendment No. 4 is estimated to be $18,155. Owner shall pay Engineer for services under Supplemental Amendment No. 4 on the basis of Lump Sum as set forth in Exhibit D. Total compensation for Task 6.0 — Agency and Stakeholder shall be increased by an amount of $18,155 to$1,365,096. Total compensation for the Project shall be adjusted to$13,804,794. Task Description Fee Task 6.4.9.1—6.4.9.3(Modeling and TM) $15,394 Tasl<6.4.9.4(USACE Meeting) $2,761 Total $18,155 @1�ker PartnersNJ7FREE E3/11/2020 neers* surveyors