Loading...
GM-20-10-22-093 'emABRUSHY CREEK REGIONAL UTILITYAUTHORITY A Partnership of Cedar Park, Leander. and Round Rock SUPPLEMENTAL CONTRACT NO. 6 TO CONTRACT FOR ENGINEERING SERVICES FIRM:WALKER PARTNERS/FREESE AND NICHOLS JOINT VENTURE ("Engineer") ADDRESS: 804 Las Cimas Parkway, Suite 150, Austin,TX 78746 PROJECT: BCRUA Phase 2 Raw Water Delivery System This Supplemental Contract No. 6 to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA" and Walker Partners//Freese and Nichols Joint Venture, hereinafter called the "Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', on the 28th day of November, 2018 for the BCRUA Phase 2 Raw Water Delivery System Project in the lump sum amount of $12,518,037.00 for Engineering Services excluding Task 5.3.1 —Geotechnical Investigation; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 1 on April 24, 2019 to amend the scope of services, specifically, Task 6.0, and to increase the compensation by $75,496.00 to a total lump sum amount of $12,593,533.00 for a total project amount of $13,697,291.00; and WHEREAS,BCRUA and Engineer executed Supplemental Contract No. 2 on August 7, 2019 to amend the scope of services, specifically, Task 5.0 — Special Services, and to increase the compensation by $42,348.00 to a total lump sum amount of$12,635,881.00 for a total project amount of$13,739,639.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 3 on March 5, 2020 to amend the scope of services, specifically, Task 6.0 —Agency and Stakeholder Coordination, and to increase the compensation by $47,000.00 to a total lump sum amount of$12,682,881.00 for a total project amount of$13,786,639.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 4 on March 20, 2020 to amend the scope of services, specifically, Task 6.0 — Agency and Stakeholder Coordination, and to increase the compensation by $18,155.00 to a total lump sum amount of$12,701,036.00 for a total project amount of$13,804,794.00; and Supplemental Contract Rev.0312011 0140.4634-47;00457871 215829 6tn,2P-1P- 2,2,-NS WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 5 on May 28, 2020 to amend the scope of services, specifically, Task 5.3.1 — Geotechnical Investigation, by reducing the compensation by $256,761.00 and adjusting the total Time and Materials amount to $846,997.00; and to reallocate $256,761.00 to Task 5.0 — Special Services and Task 6.0 — Agency and Stakeholder Coordination, and to modify the provisions for the scope of services for Task 5.0 by increasing the compensation by $24,212.00 to a total lump sum amount of $12,982,009.00 for a total project amount of$13,829,006.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services, specifically, Task 5.0 — Special Services, and to increase the compensation by $27,985.00 to a total lump sum amount of $13,009,994.00 for a total project amount of $13,856,991.00; NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation (1) Lump Sum and Exhibit D, Fee Schedule shall be amended by increasing by $27,985.00 the lump sum amount payable under the Contract for Engineering Services, specifically, Task 5.0— Special Services to a total lump sum amount of$13,009,994.00 for a total Project amount of$13,856,991.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] 2 WALKER PARTNERS/FREESE AND NICHOLS JOINT VENTURE By: C .� 22 Oct 2020 Date BRUSHY CREEK REGIONAL UTILITY AUTHORITY,INC. By: Karen Bondy,General anager 10/22/2020 Date APPROVE A TO FORM: By: A, Stephan Sheets,BCRUA Attorney 3 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL Numerous utilities for the Phase 2 Raw Water Delivery System are proposed to be routed in proximity to the Leander Sandy Creek Raw Water Electrical Building and Cedar Park Water Treatment Plant. To reduce the potential for disruptions to the operation of these facilities during construction of the Phase 2 Raw Water Delivery System, Subsurface Utility Engineering(SUE)is recommended to locate existing, buried utilities.SUE services will be performed in general accordance with the recommended practices and procedures described in ASCE publication CI/ASCE 38-02 "Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility Data."As described in the publication,four levels have been established to describe and depict the quality of subsurface utility information. The four quality levels are as follows: ■ Quality Level D(QL"D")—Information obtained from existing utility records. ■ Quality Level C(QL"C")—Surveyed data depicting visible above-ground features supplemented with QL"D"information. ■ Quality Level B(QL"B")—Two-dimensional horizontal information obtained through the application and interpretation of non-destructive surface geophysical methods. Also known as "designating,"this level incorporates QL"C"information and provides horizontal positioning of subsurface utilities to within approximately 1.0 foot. ■ Quality Level A (QL"A")—Three-dimensional horizontal and vertical information obtained through non-destructive vacuum excavation equipment to expose utilities at critical points. Also known as "locating,"this level incorporates QL"B"information and provides horizontal and vertical positioning of subsurface utilities to within approximately 0.05 feet. SUE QL"A"will be performed under Supplemental Amendment No. 6. The following assumptions have been made with regard to the proposed QL"A"test holes: ■ The general work area is outlined in red in Attachment A to Exhibit B. ■ A total of twelve(12) QL"A"SUE test holes will be provided. ■ All test holes will be accessible to truck-mounted vacuum excavation equipment. ■ OWNER will provide right of entry to the facilities as required. ■ Right-Of-Way(ROW)permits of any kind will not be required. ■ Designed traffic control plans will not be required. ■ Non-routine traffic control measures will not be required. ■ The coring of pavement will be required at no more than two locations. ■ Excavation in rock or to a depth greater than 18 feet is not included. 8/14/2020 y Tker Partners �;'NICHO Eineers • surveyors BASIC SCOPE OF SERVICES Task 5.0-Special Services Insert Task 5.13 as follows: 5.13 Subsurface Underground Engineering. Perform QL"B" (designating) utilizing geophysical equipment that includes magnetic and electromagnetic induction to designate conductive utilities. Where access is available, a sonde will be inserted into non-conductive utilities to provide a medium for transmission, which can then be designated using geophysical equipment. Non-conductive utilities can also be designated using other proven methods, such as rodding and probing. Perform QL"A" (locating) utilizing non-destructive vacuum excavation equipment to excavate test holes (12) at the requested locations. Once each utility is located, record the size, type, material, and depth. Test holes will be uniquely marked. Excavations will be backfilled by mechanical means with the appropriate material, and the original surface will be restored. If necessary, pavement can be cored up to a depth of 12 inches. Asphalt surfaces will be repaired with an asphalt cold patch, and concrete cores will be epoxied in place, flush with the surrounding surface. Survey the location of SUE field markings for final development of a utility file in CAD format depicting located utilities. 8/14/2020 y-",t Walker Partners r:'NICHO�S Attachment q1G �__ ■ _ - ��N101afIsfi.W ___—�� _ ..- 9 N'FP WI.V- BVI W.•xG 1 N101a)lW QO - n n n .... - L 3041614.M �•� �E U a pmovlmD BY PEC _ ._♦ - _— _ __-- __ ...._. _ �a rIND Fw GE-- - ELF DFEAJ — III G �•��'� •� xD�PG�a�xDJ ' �' I I I I � U 1 � '!6'3ES�fi HOI /X' 34 1115 H.T �• FOUCEP t �e�.�� 1 .•a)Na Ll ElOfi1'T6956fi � l6�a5'BfND•l - _ � '.♦, •\ — � E�f F3061SaG Viw -� 1 !J I I RISER — — SF SF S ( ANNWC /gl / 'ILi[ E e.I4Yp SF` oECO+YC< u Fl Lrx. � c I - Ew4maap L— x GENERAL NOTES I MUNE (IERpNAI II I l VLa5lV G0] N:I.AVWG �IMPpDVFMfNtt IBJ �E��GI I ; by OFM[Kf WIMa'NG' `EXISTINGxa'Pw I. —N—Al Hal1 OMRF—IL111WIxGS I I111'I .G• L lgCKGIUUNDMAY NOIIMW[If ALLU1LLIiIES-11- UTI---E. MGIIxGU IIITIEGSNOWN qqEACOMPPCRIRN I VFRIfY IDEgTgN OF MISTING UIILITIFG DRroRT0 CONSTRVRroNgRNRiIEi 0 2 dJRING CONLIPUCTroNCOMRARORIO DROVIOf I IEMWMRV ACCESS IO Fl[iiRCAI&IIIdNG PREq. I 3.EIfRRICALBUILdNG AREATO BF RFSNRFDN FUNRIONPREGMI0N6AFTFR CDNSiRu 1 ARI0070ARE[OMPIETEDMSf MATFRML WILLFf I DIKFOTO GRDVroEACCfSSTOFKYS NG FACUTIFSANO 60ETO YGMOEDIO DMIN MISTING]e'WPWILL .ET BE REDVLEO I h PRELIMINARY ��BRUSITYCREE IEIFa� iNf D1pPo4 BRUSHY l.I1CCl� —I.CE NO. FOR REVIEW ONLY � OVERALL engineers+surveyors araD,xalDv _ REGpNNEYiUTYAVT 0l TY 3 of 85 ' ASW J pNtl51ENSEN FREESE CEDAR PARK a KDa¢]sswD«anc PHASE 2 RAW WATER SUPPLY LINE TFG .1R SIaP.li x N0110 bE PLAN OMW ING NO. AD" �NKNOLS Ra RAW WATER DELIVERY SYSTEM S MV. OFLCNPDIIN MTE """'� 3-00570 V40 Fa Las „ yppRC,a DD,a�fpP�fi CE-1 ADDENDUM TO EXHIBIT C WORK SCHEDULE No changes to the overall Project Work Schedule are required. It is anticipated that the work under Supplemental Amendment No. 6 will be completed within 6 weeks of notice to proceed. 8/14/2020 @,Fen alkerSPartners 910111 NICNOt S ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page ADDENDUM TO EXHIBIT D COMPENSATION Total compensation for services under Supplemental Amendment No. 6 is estimated to be$27,985. Total compensation for Task 5.0 — Special Services shall be increased by an amount of $27,985 to $3,507,918. Total compensation for Lump Sum tasks shall be adjusted from 12,982,009 to$13,009,994. Total compensation for the Project shall be adjusted from $13,829,006 to $13,856,991. Q'Fen4gineerser Partners �:'FREESE 8/14/2020 . surveyors ?NICHOLS Brushy Creek Regional Utility Authority(BCRUA) Project Fee Summary Phase 2 Deep Water Intake-Supplemental Amendment No.6 Basic Services(Tasks 1.0-4.0) 8/14/2020 Extra Services(Tasks 6.0 &6.0) $27,985 Detailed Cost Breakdown Total Project $27,985 Special Services Employee Archer Simpson Hannon - Total Labor Total Expense Subconsultant Total Hours Total Effort Task Position. FM ! RPLS I survay7ech survey crew Effort Effort Effort Tasks 1 I Current Hourly Bill Rate . $295 * $21496 $71 5.0 !Special Services 6.13 Subsurface Underground Engineering 4 8 16 28 1$ 4,360 $ 1$ 23,625 $ 27,985 Total Basic Services Hours 4 8 16 28 1$ 4,3601$ 1$ 23,6251$ 27,985 Task Subconsultants Rios Group Total Sub Effort 5.0 Special Services 5.13 Subsurface Underground Engineering 22,500 $ 23,625 Total Subconsuftants Effort $ 23,625 $ 23,625 loft eila/zozo