Loading...
GM-23-01-06-107 6e7ZBRUSHYCP1EK REGIONAL UTILITY AUTHORITY A 1h 4n...rl• of C.a,r v.ra_ Fri# kcr.4 lh — SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WALKER PARTNERS ("Engineer") ADDRESS: 804 Las Cimas Parkway, Suite 150,Austin,TX 78746 PROJECT: BCRUA Phase 1D Water Treatment Plant Expansion This Supplemental Contract No. I to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AI;THORITY, INC., hereinafter called "BCRUA" and Walker Partners, hereinafter called the "Engineer." WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 15th day of December, 2021 for the BCRUA Phase 1 D Water Treatment Plant Expansion Project in the amount of$1,375,848.00; and WHEREAS, it has become necessary to amend the Contract to add the provisions for Time and Materials and to increase the compensation by $49,722.00 to a total Time and Materials amount of$49,722.00 for a total project amount of$1,425,570.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $49,722.00 to a total of$1,425,570.00, NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineerinp, Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. I1. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by adding a $49,722.00 time and materials amount payable under the Contract for Engineering Services, to a total maximum amount of $49,722.00 for a total Project amount of $1,425,570.00, and shall be amended to read as follows: Supplemental Contract Rev.03.."2011 0140.4634-55;4874-4071-4568 215829 Time and Materials. Engineer shall be paid on the basis of actual hours worked by employees performing work associated with this Contract, in accordance with the Fee Schedule attached hereto as Exhibit D. The maximum amount payable under this Contract for time and materials services is Forty-Nine Thousand Seven Hundred Twenty-Two and No/100 Dollars ($49,722.00). Payment of monies due for the Engineer's subconsultant's services shall be based on the actual amount billed to the Engineer by the subconsultant. Payment of monies due for direct cost expenses shall be based on the actual costs. Engineer shall prepare and submit to City monthly progress reports in sufficient detail to support the progress of the work and to support invoices requesting monthly payment. Any preferred format of City for such monthly progress reports shall be identified in Exhibit B entitled "Engineering Services." Satisfactory progress of work shall be an absolute condition of payment. The maximum amount payable reference in this Section may be adjusted for additional work requested and performed only if approved by written Supplemental Agreement. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] 2 WALKER PARTNEod �y: A on Arger, Vice President 01/06/23 Date BRUSHY CREEK REGIONAL UTILITY AUTHORITY,INC. By: a -. Karen Bondy,Ge al anager 01/06/23 Date APPROVF S TO/FOR By: __ ^ Stepha L. Sheets, BCRUA Attorney ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The purpose of Supplemental Amendment No. 1 is to provide the following bid phase services for the Phase 1D Water Treatment Plant(WTP)Expansion Project. The Project increases the treatment capacity of the Owner WTP from approximately 32.5 million gallons per day(MGD)to approximately 42 MGD. BASIC SCOPE OF SERVICES Task 1.0-Project Management 1.1 Project Administration. 1.1.1 Manage and coordinate staff resources, subconsuitants, and project planning. Conduct weekly team coordination meetings in person or by teleconference. 1.1.2 Prepare monthly invoices and project progress reports. Task 2.0-Bidding Phase. Assist Owner in advertising and obtaining proposals for the Work. Prequalifying prime contractors and subcontractors is not included in this effort. 2.1 Assist Owner in advertising for and obtaining proposals for the Work and,where applicable, maintain a record of prospective proposers to whom Bidding Documents have been issued, conduct one pre-Proposal conference, attend one site visit, and attend two rock core reviews. Owner shall pay for advertisement of the Work and make the Contract Documents available on CIVCAST. 2.2 Respond to Proposer questions. Issue Addenda as appropriate to clarify, correct, or modify the Bidding Documents. Task 3.0-Additional Services The following Additional Services are not included in the Scope of Services and will not be performed unless specifically authorized by the Owner: 3.1 Preparing additional Bidding Documents or Contract Documents for alternate bids or prices requested by Owner for the Work or a portion thereof. 3.2 Assistance in connection with Bid protests, rebidding, or renegotiating contracts for construction, materials, equipment, or services. 3.3 Other services performed or furnished by Engineer not otherwise provided for in this Agreement. 11/30/2022 @),Fenalker Partners gineers + surveyors ADDENDUM TO EXHIBIT C WORK SCHEDULE The schedule duration for the scope of services is two (2) months. 11/30/2022y�,z Walker Partners engineers * surveyors ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page ADDENDUM TO EXHIBIT D COMPENSATION Total compensation for Basic Services set forth in Addendum to Exhibit B under Supplemental Amendment No. 1 is estimated to be$49,722. Total compensation for the Project shall be adjusted to $1,425,570. Owner shall pay Engineer for Basic Services set forth in Supplemental Amendment No. 1 on the basis of Standard Hourly Rates as described in Paragraph 1.0. Engineer's labor and fee summaries are attached as Appendix 1. 1.0 Owner shall pay Engineer for Basic Services set forth in Addendum to Exhibit B as follows: A. An amount equal to the cumulative hours charged to the Project by each class of Engineer's personnel times Standard Hourly Rates for each applicable billing class for all services performed on the Project, plus Reimbursable Expenses and Engineer's Consultants'charges, if any. B. The Standard Hourly Rates charged by Engineer constitute full and complete compensation for Engineer's services, including labor costs, overhead, and profit; the Standard Hourly Rates do not include Reimbursable Expenses or Engineer's Consultants' charges. C. Engineer's Standard Hourly Rates are attached to this Exhibit D as Appendix 2. The rate schedule is subject to annual review and adjustments. D. The total compensation for services under Paragraph 1.0 is estimated to be$49,722. E. Engineer shall not exceed the total estimated compensation amount unless approved in writing by Owner. If it becomes apparent to Engineer that the compensation amount for Engineer's services will be exceeded, Engineer shall give Owner written notice thereof for review of the matter. E. The amounts billed for Engineer's services under Paragraph 1.0 will be based on the cumulative hours charged to the Project during the billing period by each class of Engineer's employees times Standard Hourly Rates for each applicable billing class, plus Reimbursable Expenses and Engineer's Consultants' charges. G. The amounts payable to Engineer for Reimbursable Expenses will be the Project-related internal expenses actually incurred or allocated by Engineer multiplied by a factor of 5%. H. Whenever Engineer is entitled to compensation for the charges of Engineer's Consultants, those charges shall be the amounts billed by Engineer's Consultants to Engineer times a factor of 5%. 11/30/2022 @2)WAer Partners engineers + surveyors » »N» W F N gN pM qM �W M M M N M m » M 6 � W 1FW1 W i Appendix 2 to Exhibit D Standard Hourly Rates Schedule Standard Hourly Rates are subject to annual review and adjustment. Hourly rates for services in effect on the date of the Agreement are as follows: Classification Rate Classification Rate Managing Principal $325/hour Professional VII $125/hour Manager VII $300/hour Professional VI $110/hour Manager VI $290/hour Professional V $100/hour Manager V $265/hour Professional IV $95/hour Manager IV $255/hour Professional III $90/hour Manager III $240/hour Professional II $85/hour Manager II $225/hour Professional I $80/hour Manager I $205/hour Construction Manager IX $300/hour Senior Engineer IV $275/hour Construction Manager VIII $200/hour Senior Engineer III $250/hour Construction Manager VII $150/hour Senior Engineer II $225/hour Construction Manager VI $130/hour Senior Engineer I $200/hour Construction Manager V $115/hour Survey Manager $200/hour Construction Manager IV $110/hour Project Manager iX $225/hour Construction Manager III $100/hour Project Manager VIII $215/hour Construction Manager Il $95/hour Project Manager VII $205/hour ' Construction Manager I $80/hour Project Manager VI $195/hour Technician XII $175/hour Project Manager V $185/hour Technician XI $160/hour Project Manager IV $175/hour Technician X $150/hour Project Manager III $165/hour Technician IX $140/hour Project Manager II $150/hour Technician VIII $125/hour Project Manager I $140/hour Technician VII $110/hour Senior Design Engineer III $150/hour Technician VI $95/hour Senior Design Engineer II $135/hour Technician V $90/hour Senior Design Engineer I $125/hour Technician IV $80/hour Project Engineer IV $165/hour Technician III $75/hour Project Engineer III $155/hour Technician II $60/hour Project Engineer II $145/hour Technician I $50/hour Project Engineer I $135/hour Support Staff V $100/hour Project Surveyor VIII $160/hour Support Staff IV $90/hour Project Surveyor VII $150/hour Support Staff III $80/hour Project Surveyor VI $140/hour Support Staff II $70/hour Project Surveyor V $130/hour Support Staff I $60/hour Project Surveyor IV $120/hour 4-Man Crew $240/hour Project Surveyor III $110/hour 3-Man Crew $225/hour Project Surveyor II $100/hour 2-Man Crew $165/hour Project Surveyor I $85/hour 1-Man Crew $145/hour 11/30/2022 IQWAer Partners engineers * surveyors 0140.4634.55 W%bW [RUSHY CREEK REGIONAL UTILITY AUTHORITY A Far rnrr•4YF sl Cadar Ira rt, la ande r. ■od N►Y►,$ Rgft LEGAL DEPARTMENT APPROVAL FOR BOARDIGENERAL MANAGER ACTION Required for Submission of ALL Board and General Manager Items BCRUA Phase 1D Water Treatment Project Name: Plant Expansion ContractorNendor: Walker Partners Board Action: Agenda Wording QGeneral Manager Approval: GMA Wording Consider executing Supplemental Contract No. 1 with Walker Partners for the BCRUA Phase 1 D Water Treatment Plant Expansion Project. Attorney Approval Attorney Date L 23 N otes/Comments C:IUserslldworaczyk\ND Office Echo1VAULT-9131GZHZ2ILAF- BCRUA Phase 1 D Water Treatment Plant Explansion 4876-2461-5752 v.1 Updated 613108