Loading...
GM-23-11-13-111GM-23-11-13-111 2023128398 Page 2 of 4 access and workspace easement property interests described herein and otherwise identified in Exhibit "A" attached hereto without express or implied warranty, and all warranties that might arise by common law and the warranties in Section 5.023 of the Texas Property Code are excluded. When the context requires,singular mins and pronouns include the Plural. By execution of this Assignment document Assignee acknowledges, consents to and accepts the Assignment as set out herein. ASSIGNOR: CITY OF ROUND ROCK, TEXAS A By: Laurie Hadley, City Manager U ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF WILLIAMSON § This instrument was acknowledged before me on ow. 2-2-, 2023 by Laurie Hadley, City of Round Rock City Manager, in the capacity and for the purposes and consideration recited herein. W MONIQUEADAMS My Nota} 19 9 126257913 Of Expims Ma mh 22,2D26 Notary Publi tate of Texas 2 2023128398 Page 3 of 4 1 BRUSHYACCEPTED AND ACKNOWLEDGED: CREEK REGIONALUTILITY AUTINC., domestic government corporation of the State of Texas Y e. �iP G®t Its: ` ^� qOWLEDGMENT STATE OF TEXAS § COUNTY OF his instru nt was cknowledged before me on , 2023 y _ _, in the capacity an for the ® and cofiidti®n ci he i ,•••gip..,,, - �.eDAVMTAEDWARDS ® ., ? Y ID#12676&M otary Public,State of Texas OFFICEDO=FeWbhyrvu q 25.WaMfy X. PREPARED IN THE Sheets& Crossfield, PLLC 309 East Main Round Rock,Texas AFTER RECORDING 3 2023128398 Page 4 of 4 EXHIBIT "A" CRUA Raw Water Delivery System(Phase 2) rcelrante o Ease ent Tras ain cial Records en Number 001,002,016,106MW City of Round Rock Subsurface raw water line 2020064738 +temp monitor well 202 064739 022,22TCE City of Round Rock Subsurface raw water line 2019021216 +temp construction 2022071395 026 City of Round Rock Subsurface raw water line 2019162807 033 City of Round Rock Subsurface raw water line 2019099511 034 City of Round Rock Subsurface raw water line 2018191709 035 City of Round Rock Subsurface raw water line 2018163625 036 City of Round Rock Subsurface raw water line 20190 1007 037 City of Round Rock Subsurface raw water line 2021071973 038 City of Round Rock Subsurface raw water line 2018121527 039 Ci of Round Rock Subsurface raw water line 2018158728 041 City of Round Rock Subsurface raw water line 20201 815 045,45MW,046,049 City of Round Rock Subsurface raw water line 2023091421 +temp monitor well+ temp access 048 City of Round Rock Subsurface raw water line 2021110357 058 City of Round Rock Subsurface raw water line 2018166219 059 City of Round Rock Subsurface raw waterline 201 163627 062,063,067 City of Round Rock Subsurface raw water line 2021253416 riser facility+temp 2021253415 construction 068 City of Round Rock Temporary construction 2022078220