BCRUA_R-10-10-20-7C RESOLUTION NO. R-10-10-20-7C WHEREAS, the Brushy Creek Regional Utility Authority (`BCRUA") desires to enter into a Second Amendment to the Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project,Now Therefore BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA a Second Amendment to the Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project, a copy of same being attached hereto as Exhibit"A"and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 20th day of October, 2010. MITCFULLE esident Brush ee Regional Utility Authority ES T: 01 Cowman, Secretary Z1BCRUA\Bosrd Packets\Packet Documents\102010\Rea.BCRUA-2nd Amendment to the Master Cotrtntt(00205534).DOGrmc SECOND AMENDMENT TO THE MASTER CONTRACT FOR THE FINANCING, CONSTRUCTION AND OPERATION OF THE BCRUA REGIONAL WATER TREATMENT AND DISTRIBUTION PROJECT THIS SECOND AMENDMENT TO THE MASTER CONTRACT FOR THE FINANCING, CONSTRUCTION AND OPERATION OF THE BCRUA REGIONAL WATER TREATMENT AND DISTRIBUTION PROJECT (the "Second Amendment") is dated and entered into as of the _ day of , 2010, by and among Brushy Creek Regional Utility Authority, Inc. (`BCRUA"), a non-profit corporation of the State of Texas (the"State"), created and existing under the laws of the State, including Subchapter D of Chapter 431 as amended, Texas Transportation Code, and the City of Cedar Park, Texas ("Cedar Park"), the City of Leander, Texas ("Leander"), and the City of Round Rock, Texas ("Round Rock") all home-rule municipalities and political subdivisions of the State (individually, the "City"; collectively, the "Cities"). The BCRUA and the Cities are collectively referred to herein as the"Parties." RECITALS WHEREAS, on the 2nd day of September, 2008 the Parties entered into that one certain Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project (the "Contract"), that provides terms and conditions for the financing, construction and operation of the first phase of the new regional system consisting generally of upgrades to Cedar Park's raw water intake, a raw water intake line, new water treatment plant,and water transmission mains; and WHEREAS, on the 22nd day of January, 2009 the Parties entered into that one certain First Amendment to the Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project to postpone the date on which the BCRUA Project is to be operational from April 1, 2011 to April 1, 2012; and WHEREAS, Exhibit D to the Contract sets out the estimated cost of the components of the Project, the allocation of said costs among the Cities, and the Cities' reserved capacity in the Project components; and WHEREAS, Cities now wish to update the estimated costs shown in Exhibit D with actual cost numbers, as well as revised estimated costs; NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained, the sufficiency of which are hereby conclusively acknowledged, and subject to the terms and conditions hereinafter set forth, the Cities and the BCRUA mutually agree as follows: EXHIBIT „ » 00198196.DOC Q ARTICLE 1 DEFINITIONS Section 1.1 All terms used herein shall have the meanings assigned to them in the Contract, unless the context clearly requires otherwise. ARTICLE II AMENDED EXHIBIT D Section 2.1 The document entitled "Revised Exhibit D, August 2010" attached to and incorporated herein replaces the original Exhibit D attached to the Contract. Everywhere the Contract refers to "Exhibit D," it is agreed that henceforth it will be understood to refer to the attached "Revised Exhibit D,August 2010." ARTICLE III MISCELLANEOUS Section 3.1 To the extent necessary to effect the terms and provisions of this Second Amendment, the Contract is hereby amended and modified. In all other respects, the aforesaid Contract is hereby ratified and confirmed. Section 3.2 This Second Amendment may be executed in counterparts, each of which shall be an original and all of which together shall constitute but one and the same instrument. IN WITNESS WHEREOF, the Parties hereto acting under authority of their respective governing bodies have caused this Second Amendment to be duly executed as of the day and year first above written. (SIGNATURES ON FOLLOWING PAGES) 2 BRUSHY CREEK REGIONAL UTILITY AUTHORITY,INC. By: Mitch Fuller, President Attest: By: John Cowman, Secretary 3 CITY OF CEDAR PARK,TEXAS By: Bob Lemon,Mayor Attest: By: LeAnn Quinn, City Secretary 4 CITY OF LEANDER,TEXAS By: John Cowman,Mayor Attest: By: Debbie Haile, City Secretary 5 CITY OF ROUND ROCK,TEXAS By: Alan McGraw,Mayor Attest: By: Sara White, City Secretary 6 EXECUTED DOCUMENT FOLLOWS SECOND AMENDMENT TO THE MASTER CONTRACT FOR THE FINANCING, CONSTRUCTION AND OPERATION OF THE BCRUA REGIONAL WATER TREATMENT AND DISTRIBUTION PROJECT THIS SECOND AMENDMENT TO THE MASTER CONTRACT FOR THE FINANCING, CONSTRUCTION AND OPERATION OF THE BCRUA REGIONAL WATER TREATMENT AND D1 RIBUTION PROJECT (the "Second Amendment") is dated andd entered into as of the ay of , 2010, by and among Brushy Creek Regional Utility Authority, Inc. (`BCRUA"), a non-profit corporation of the State of Texas (the "State"), created and existing under the laws of the State, including Subchapter D of Chapter 431 as amended, Texas Transportation Code, and the City of Cedar Park, Texas ("Cedar Park"), the City of Leander, Texas ("Leander"), and the City of Round Rock, Texas ("Round Rock") all home-rule municipalities and political subdivisions of the State (individually, the "City"; collectively, the "Cities"). The BCRUA and the Cities are collectively referred to herein as the"Parties." RECITALS WHEREAS, on the 2"d day of September, 2008 the Parties entered into that one certain Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project (the "Contract"), that provides terms and conditions for the financing, construction and operation of the first phase of the new regional system consisting generally of upgrades to Cedar Park's raw water intake, a raw water intake line, new water treatment plant, and water transmission mains; and WHEREAS, on the 22nd day of January, 2009 the Parties entered into that one certain First Amendment to the Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project to postpone the date on which the BCRUA Project is to be operational from April 1, 2011 to April 1, 2012; and WHEREAS, Exhibit D to the Contract sets out the estimated cost of the components of the Project, the allocation of said costs among the Cities, and the Cities' reserved capacity in the Project components; and WHEREAS, Cities now wish to update the estimated costs shown in Exhibit D with actual cost numbers, as well as revised estimated costs; NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained, the sufficiency of which are hereby conclusively acknowledged, and subject to the terms and conditions hereinafter set forth, the Cities and the BCRUA mutually agree as follows: 00198196(2).DOC 9-- (O-to- 14--q r(,7 —9-P, )C-0. 10- zo-lel- dGelc/4 ARTICLE 1 DEFINITIONS Section 1.1 All terms used herein shall have the meanings assigned to them in the Contract, unless the context clearly requires otherwise. ARTICLE II AMENDED EXHIBIT D Section 2.1 The document entitled "Exhibit D, BCRUA Regional Water Project, Capacity and Cost Allocation, Phase IA, Amended: October 20, 2010," attached to and incorporated herein replaces the original Exhibit D attached to the Contract. Everywhere the Contract refers to "Exhibit D," it is agreed that henceforth it will be understood to refer to the attached "Exhibit D, BCRUA Regional Water Project, Capacity and Cost Allocation, Phase IA, Amended: October 20, 2010." ARTICLE III MISCELLANEOUS Section 3.1 To the extent necessary to effect the terms and provisions of this Second Amendment, the Contract is hereby amended and modified. In all other respects, the aforesaid Contract is hereby ratified and confirmed. Section 3.2 This Second Amendment may be executed in counterparts, each of which shall be an original and all of which together shall constitute but one and the same instrument. IN WITNESS WHEREOF, the Parties hereto acting under authority of their respective governing bodies have caused this Second Amendment to be duly executed as of the day and year first above written. (SIGNATURES ON FOLLOWING PAGES) 2 BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC. By: Mitch uller, P 'dent Attest: By: Jo n Cowman, Secretary 3 CITY OF CEDAR PARK, TEXAS By: Bob Lemon 'Mayor Attest: LeAnn Quinn, City Secretary 4 CITY OF LE DER, TEXAS By: O - &VW,,4 / J n Cowman, Mayor Attest: By: ItQ� XA& Debbie Haile, City Secretary 5 CITY OF ROUND ROCK, TEXAS By: Y'll A an McGraw, Mayor Attest: By: 4'Wl . ua6bu Sara White, City Secretary 6 Exhibit D BCRUA Regional Water Project Capacity and Cost Allocation,Phase 1A Amended:October 20,2010 CEDAR PARK LEANDER ROUND ROCK CONSTRUCTED ESTIMATED CEDAR PARK LEANDER ROUND ROCK DESCRIPTION CAPACiTY(MGD) COST RESERVED COSI RESERVED COSI RESERVED COSI CAPACITY(Y.) CAPACITY(%) CAPACITY(%) BCRUA PROJECT Operational April 1,2012) FLOATING INTAKE BARGE Preliminary Engineering 30.9 $ 287,709 14.18 $ 40,797 47.26 $ 135,971 38,56 $ 110,941 Final Engineering(thru Bidding) 30.9 $ 458,610 14.18 $ 65,031 47.26 $ 216,739 38.56 $ 176,840 Construction 30.9 $ 3,807,500 28.8 $ 1,096,560 45.31 $ 1,725,178 25.89 $ 985,762 Construction-Contingency 30.9 $ 837,480 28.8 $ 241,194 45.31 $ 379,462 25.89 $ 216,824 Total Construction(Includes Construction and Contingency) 30.9 $ 4,644,980 28.8 $ 1,337,754 45.31 $ 2,104,641 25.89 $ 1,202,585 Construction Phase Services 30.9 $ 128,414 28.8 $ 36,983 45.31 $ 58,184 25.89 $ 33,246 FLOATING INTAKE BARGE SUB-TOTAL $ 5,519,713 $ 1,480,565 $ 2,515,5351 i $ 1,523,612 Coat Allocation Percentages 1 1 26.82%1 45.57%1 1 27.60 RAW WATER LINE-FROM BARGE,UP TRAILS END ROAD TO REGIONAL WATER TREATMENT PLANT Preliminary Engineering 105.8 $ 570,089 14.18 $ 80,839 47.26 $ 269,424 38.56 $ 219,826 Final Engineering(thru Bidding) 105.8 $ 2,784,016 14.18 $ 394,773 47.26 $ 1,315,726 38.56 $ 1,073,517 Environmental.Permit,and Habitat Mitigation 105.8 $ 413,000 14.18 $ 58,563 47.26 $ 195,184 38.56 $ 159,253 Construction-Contracts 105.8 $ 19.371,138 14.18 $ 2,746,827 47.26 $ 9,154,800 38.56 $ 7,469,511 Construction-Contract 2 105.8 $ 5,511,774 26.67 $ 1,469,990 46.67 $ 2.572,345 26.67 $ 1,469,990 Contingency 105.8 $ 3,649,300 14.18 $ 517,471 47.26 $ 1,724,659 38.56 $ 1,407,170 Total Construction(Includes Construction and Contingency) 105.8 $ 28,532,212 14.18 $ 4,734,288 47.26 $ 13,451,804 38.56 $ 10.346,671 Easements 105.8 $ 1,481,798 1 14.18 1 $ 210,1191 47.26 1 $ 700,2981 38.56 1 $ 571,381 Construction Phase Services 105.8 $ 802,8461 14.18 $ 113,844 1 47.26 $ 379,425 38.56 $ 309,577 RAW WATERLINE SUB-TOTAL $ 34,583,961 $ 5,592,426 $ 16,311,861I I $ 12,680,225 Cost Allocation Percentages 16.17%1 11 1 36.87 REGIONAL WATER TREATMENT PLANT WTPLand Ac uisitton 105.8 $ 3,324,022 14.18 $ 471,346 47.26 $ 1,570,933 38,56 $ 1,281,743 Preliminary Engineering 105.8 $ 703,112 14.18 $ 99,701 47.26 $ 332,291 38.56 $ 271,120 Final Engineering 17 $ 3,457,493 14.18 $ 490,273 47.26 $ 1.634,011 38.56 $ 1,333,209 Supplemental Engineering 17 $ 581,395 14.18 $ 82,442 47.26 $ 274,767 38.56 $ 224,186 Construction Phase Services 17 $ 1,185,500 14.18 $ 218,398 47.26 $ 557,878 38.56 $ 409,225 1.0 Raw Water Conveyance 1 Ot 72"/54"Raw Water Line,Isolation Valves,and Chemical Injection 105.8 $ 1,081,911 14.18 $ 153,415 47.26 $ 511,311 38.56 $ 417,185 Vaults 2.0 Treatment Structure 2.01 54'Raw Water,Raw Water Pipe Gallery 43 $ 215,897 26.67 $ 57,573 46.67 $ 100,752 26.67 $ 57,573 30"Raw Water Venturi Meter and Rate of Flow Control Valve,and 22 $ 222,366 26.67 $ 59,298 46.67 $ 103,771 26.67 $ 59,298 2.02 H draulic Rapid Mix 1C 2.03 Flocculators 1AAC thru 4A4C(12 total)and Flocculated Water 22 $ 1,309.128 26.67 $ 349,101 46.67 $ 610,926 26.67 $ 349,101 Channel Basin Inlet Channels,Sedimentation Basins 1 and 2,nth Sludge 2.04 Collection Equipment and Basin Outlet Channel,Sealed Water 22 $ 3,029,835 26.67 $ 807,956 46.67 $ 1,413,923 26.67 $ 807,956 Channel with Valves and Gates 2.05 Sludge Vault 1C and 12"Sludge Pipe 22 $ 593,515 26.67 $ 158,271 46.67 $ 276,973 26.67 $ 158,271 2.06 Filter Inlet Channel 43 $ 833,670 26.67 $ 222,312 46.67 $ 389,046 26.67 $ 222,312 Fitters 1-4(underdrains,media,troughs,effluent vanturi meters, 2.07 rale of How control valves,piping and rniscellanecus valves)and 1Z8 $ 2,045,765 26.67 $ 545,537 46.67 $ 954,690 26,67 $ 545,537 Fillers 5-6(structure,wall spools and blind flanges only) 2.08 Filter 5(underdrains,media,troughs.effluent venturi meters,rate of 4.2 $ 233,686 26.67 $ 62,324 46.67 $ 109,061 28.67 $ 62,324 flow control valves,pipingand miscellaneous vales) 2.09 24"Backwash Water Venturi Meter and Rate of Flow Control Valve. 105.8 $ 216,706 14.18 $ 30,729 47,26 $ 102,415 38.56 1$ 83,562 and 30"Backwash Water Pi in 2.1 36"Waste Backwash Water Piping and Valving 105.8 $ 276,542 1 14.18 $ 39,214 47.26 $ 130,694 38.56 1 $ 1 06 ,635 2.11 2 Air Scour Blowers 105.8 $ 110,779 14.18 $ 15,708 47.26 S 52,354 38.56 $ 42.716 09/23/2010 Page 1 of 4 Exhibit D BCRUA Regional Water Project Capacity and Cost Allocation,Phase 1A Amended:October 20,2010 CEDAR PARK LEANDER ROUND ROCK CONSTRUCTED ESTIMATED CEDAR PARK LEANDER ROUND ROCK DESCRIPTION RESERVED COST RESERVED COST RESERVED COST CAPACITY(MGD) COST CAPACITY l%) CAPACITY I%) CAPACITY I%) 2.12 Air Scour/Backwash/Waste Backwash piping and vaives 22 $ 110,779 26.67 $ 29,541 46.67 $ 51,697 26.67 $ 29,541 2.13 84"Filtered Water Pipe 90 $ 269,265 14.18 $ 38,182 47.26 $ 127,255 38.56 $ 103,828 2.14 Administration Level,Mezzanine(Electrical Room,and Storage). 105.8 $ 6,324,892 14.18 $ 896,870 47.26 $ 2,989,144 38.56 $ 2,438,878 and Maintenance Room 3.0 Chemical Feed Facility 3.01 Chemical Feed Area 105.8 $ 77,626 14.18 $ 11,007 47.26 $ 36,686 38.56 $ 29,933 3.02 2 Alum Metering Pumps.2 Alum Storage Tanks,Valves and Piping 22 $ 168,998 26.67 $ 45,066 46.67 $ 78,866 26.67 $ 45,066 3.03 2 Fluoride Metering Pumps,1 Fluoride Storage Tank.Valve and 43 $ 97,032 26.67 $ 25,875 46.67 $ 45,282 26.67 $ 25,875 Pipin 3.04 2 Polymer Metering Pumps,1 Drum Scale,Valves and Piping 22 $ 88,946 26.67 $ 23,719 46.67 $ 41,508 26.67 $ 23,719 3.05 Bulk Chemical Secondary Containment Structure 105.8 $ 130,185 14.18 $ 18,460 47.26 $ 61,525 38.56 $ 50,199 4.0 Disinfection Facility 4.01 Disinfection Facility Building 105.8 $ 1,470,849 14.18 $ 208,566 47.26 $ 695,123 38.56 $ 567,159 4.02 3 Sodium Hypochlorite Metering Pumps,2 Sodium Hypochlorite 22 $ 304,035 26.67 $ 81,076 46.67 $ 141,883 26.67 $ 81,076 Storage Tanks,Control Valve and Piping 4.03 Bulk Sodium Hypochlorite Chemical Secondary Containment 105.8 $ 61,454 14.18 $ 8,714 47.26 $ 29,043 38.56 $ 23,697 Structure 4.04 2 LAS Metering Pumps,2 LAS Storage Tanks,Control Valves and 22 $ 158,486 26.67 $ 42,263 46.67 $ 73,960 26.67 $ 42,283 Piping 4.05 Bulk LAS Chemical Secondary Containment Structure 105.8 $ 61,454 14.18 $ 8,714 47.26 $ 29,043 38.56 $ 23,697 4.06 2 Potassium Permanganate Metering Pumps,1 Feed Unit 43 $ 139,888 26.67 $ 37,304 46.67 $ 65,281 26.67 $ 37,304 5.0 Disinfection Basin 5.01 Disinfection Basin,Weir Plate,Sample Pump,Isolation Valves and 43 $ 692,973 26.67 $ 184,793 46.67 $ 323,387 26.67 $ 184,793 Pi in 6.0 Ground Storage Tank 6.01 78'Inlet/Outiet Piping and Valves 43 $ 186,787 26.67 $ 49,810 46.67 $ 87,167 26.67 $ 49,810 6.02 4 MG Precast Storage Tanks with Baffle Walls 43 $ 2,508,286 1 26.67 $ 668,876 46.67 $ 1,170,534 26.67 $ 668,876 7.0 Booster Pum Station 7.01 78"Discharge and Suction Piping and Isolation Valves 105.8 $ 2,475.133 14.18 $ 350.974 47.26 $ 1,169,748 38.56 $ 954,411 7.02 3 Booster Pumps&Motors,Cans,Discharge Piping.Control and 43 $ 1,613,971 26.67 $ 430,392 46.67 $ 753,187 26.87 $ 430,392 Isolation Valves,and 3 Cans with Covers 7.03 2 Plant Water Pumps&Motors,Cans,Discharge Piping,and 43 $ 186,787 26.67 $ 49,810 46.67 $ 87,167 26.67 $ 49,810 Valves 7.04 2 Backwash Water Pumps&Motors,Cans,Discharge Piping,and 105.8 $ 831,244 14.18 $ 117,870 47.26 $ 392,846 38.56 $ 320,528 Valves 8.0 Sludge Dewaterin Facility 8.01 Sludge Dewatering Facility Building 67 1 $ 1,215,330 1 14.18 $ 172.334 47.26 $ 574,365 38.56 $ 468,631 8.02 1 Balt Filler Press,2 Belt Press Feed Pumps.2 Polymer Feed 67 $ 780,302 14.18 $ 110,647 47.26 $ 368,771 38.56 $ 300,884 Systems,2 Screw Conveyors:Valves and Piping 9.0 Sludge Thickening and Handling Facilities 9.01 1 Sludge Thickener with Collector,Piping,Valves 31 $ 449,583 26.67 $ 119,889 46.67 1 $ 209,805 26.67 $ 119,889 9.02 Sludge Pump Station Wet Well 105.8 $ 214,280 1 14.18 $ 30,385 47.26 1 $ 101,269 38.56 $ 82,626 9.03 2 Sludge Pumps,with Valves and Piping 43 $ 73,583 1 26.67 $ 19,622 46.67 $ 34,339 26.67 $ 19,622 10.0 Washwater Recovery&Recycle 10.01 2 Washwater Settling/Decant Decant Basins with Sludge Collectors 105.8 $ 2,225,275 14.18 $ 315 544 47.26 $ 1 051,665 38.56 $ 858,066 10.02 Recycle Pump Station Wet Well 105.8 $ 178,701 1 14.18 $ 25,340 47.26 $ 84,454 38.56 $ 68,907 10.03 3 Recycle Pumps,with Valves and Discharge Piping 43 $ 121,290 26.67 $ 32,344 46.67 $ 56,602 26.67 $ 32,344 11.0 Electrical Building 11.01 Electrical Building 105.8 $ 542,573 14.18 $ 76,937 47.26 $ 256,420 38.56 $ 209,216 11.02 5KV Motor Control Center&480V Motor Control Center with Swtch 43 $ 414,813 26.67 $ 110,617 46.67 $ 193,580 26.67 $ 110,617 Board,Transformer and Circuit Breaker 12.0 Yard Piping 12.01 96'/84'160'Filtered Water Piping with Valves and Chemical 105.8 $ 1,024,500 14.18 $ 145,274 47.26 $ 484,179 38.56 $ 395,047 Injection Vaults 12.02 72"Finished Water Piping with Valves.Finished Water Meter Vault 105.8 $ 1,921,240 14.18 $ 272,432 47.26 $ 907,978 38.56 $ 740,830 with 48'Venturi and Valves 12.03 36"Waste Backwash Piping with Valves,and Chemical Injection 105.8 $ 625,859 14.18 $ 88,747 47.26 $ 295.781 38.56 $ 241,331 Vault 12.04 30'Backwash Water Piping with Valves 105.8 $ 253,093 14.18 $ 35,889 47.26 $ 119,612 38.56 $ 97,593 09/23f2010 Page 2 of 4 Exhibit D BCRUA Regional Water Project Capacity and Cost Allocation,Phase 1A Amended:October 20,2010 CONSTRUCTED ESTIMATED CEDAR PARK CEDAR PARK LEANDER LEANDER ROUND ROCK ROUND ROCK DESCRIPTION CAPACITY(MGD) COST RESERVED COST RESERVED COST RESERVED COST CAPACITY(%) CAPACITY I%) CAPACITY(%) 12.05 36"Waste Washwater Piping with Valves 105.8 $ 308,078 14.18 $ 43,685 47.26 $ 145,598 38.56 $ 118,795 12.06 20'Washwater Recycle Piping with Valves.and Recycle Meter 105.8 $ 306,460 14.18 $ 43,456 47.26 $ 144,833 38.56 $ 118,171 Vault with 16"Venturi and Valves 12.07 12"Sludge Line,Drain Line and Potable Water Line with Valves 105.8 $ 884,612 14.18 $ 125,438 47.26 $ 418,067 38.56 $ 341,106 12.08 8'Fire Water Line.Double Check Valves 105.8 $ 190,830 14.18 $ 27,060 47.26 $ 90,186 38.56 $ 73,584 12.09 Additional Piping and Appurtenances 105.8 $ 740,680 14.18 $ 105,028 47.26 $ 350,045 38.56 $ 285,606 13.0 Wastewater Lift Station 13.01 Wastewater Lift Station Wet Well,480VAC Utility Service 105.8 $ 151,209 1 14.18 $ 21,441 47.26 $ 71,461 38.56 $ 58,306 13.02 2 Submersible Motors.Force Main,Piping,Valves and Relocation 43 $ 484,353 26.67 $ 129,161 46.67 $ 226,031 26.67 $ 129,161 14.0 Civil I Site 14.01 Rook Berm,Silt Fence,Tree Protection,Seeding and Topsoil 105.8 $ 48,516 14.18 $ 6,880 47.26 $ 22,929 38.56 $ 18,708 14.02 Water Quality Pond 105.8 $ 444,732 14.18 $ 63,063 47.26 $ 210,180 38.56 $ 171,488 14.03 Roads-2'HMAC with 10 Base,Concrete Pavement 105.8 $ 1,779,735 14.18 $ 252,366 47.26 $ 841,103 38.56 $ 686,266 14.04 E'Coated Chain Link Fence,IT Concrete Fence and Gates 105.8 $ 462,521 14.18 $ 65,585 47.26 $ 218,587 38.56 $ 178,348 14.05 Landscaping and Irrigation with Lines and Sprinklers 105.8 $ 388,938 14.18 $ 55,151 47.26 $ 183,812 38.56 $ 149,974 14.06 Yard Electrical 105.8 $ 3,569,982 14.18 $ 506,223 47.26 $ 1,687.173 36.56 $ 1,378 585 Total Construction Cost $ 47,929,935 $ 8,829 858 $ 22,555,074 $ 16 545,026 Cost Allocation Percentages-Construction Only 18.42% 47.06% 34.52% Construction $ 47,929,935 $ 8.829,858 $ 22 555,074 $ 16,545 026 Contingency $ 4,864,661 $ 896,189 $ 2289,233 $ 1679,242 O&M Manual $ 523,975 $ 96,529 $ 246,574 $ 180,872 REGIONAL WTP SUBTOTAL $ 62,570,093 $ 11,184,735 $ 29,460,761 $ 21.924,823 Cost Allocation Percentages 17.88% 47.08% 35,04% TRANSMISSION WATER LINES Segment I Preliminary Engineering 105.8 $ 211,215 14.18 $ 29,950 47.26 $ 99,820 38.56 $ 81,445 Final Engineering 105.8 $ 1,173.931 14.18 $ 166,463 47.26 $ 554,800 38.56 $ 452,668 Easements 105.8 $ 250,000 14.18 $ 35,450 47.26 $ 118.150 38.56 $ 96,400 Construction 105.8 $ 8,134,941 14.18 $ 1,153,535 47.26 $ 3,844,573 38.56 $ 3,136,833 Contingency 105.8 $ 1,633,254 14.18 $ 231,595 47.26 $ 771,876 38.56 $ 629,783 Total Construction Includes Construction plus Contingency) 105.8 $ 9,768,195 14.18 $ 1,385,130 47.26 $ 4,616,449 38.56 $ 3,766,616 Construction Phase Services 105.8 $ 359.316 14.18 $ 50,951 47.26 $ 169,813 38.56 $ 138,552 SEGMENT I SUB-TOTAL $ 11,762,657 53 $ 1,667,945 $ 5,559,032 $ 4, 5,681 Cost Allocation Percentages 14.18% 47.28% 38.56% SEGMENT 2A Transmission Water Line,Segment 2A,construction is complete. Cost albcations based on Interlocal Agreement Regarding Construction or Regional Water Line dated March 2006 and amended April 2006. Engineering/Project Mana emenUlns ectioNAdministration 105.8 $ 55,971 3.90 $ 2,183 46.34 $ 25,937 49.76 $ 27,851 Easements 105.8 $ - 14.18 $ 47.26 $ 38.56 $ Construction 105.8 $ 858,980 IC 18 $ 121,803 47.26 $ 405,954 38.56 $ 331,223 Construction-Cedar Park Additional Connection Payment $ 38.690 $ 38,690 Construction-Leander Additional Valve Payment $ 22,207 $ 22,207 SEGMENT 2A SUB-TOTAL $ 975,848 $ 162,676 $ 454,098 $ 359,074 Cost Allocation Percentages 16.67% 46.53% 36.80% SEGMENT 2B Transmission Water Line.Segment 28,construction is complete. Cost allocations based on Intedocal Agreement Regarding Construction o/Regional Water line dated March 2006 and amended Apr#2006 E ineerin/Project Mana ement/Ins ecaordAdministration 78.8 $ 754.029 0 $ 48.22 $ 363,593 51.78 $ 390,436 Easements 78.8 $ - 0 $ 48.22 $ 51.78 $ Construction 78.8 $ 8,678,440 0 $ 4822 $ 4,184,744 51.78 $ 4,493,696 SEGMENT 2B SUB-TOTAL $ 9,432,469 $ $ 4,548,337 $ 4,884,132 Cost Allocation Percentages 0.00% 48.22% 51.78% 09/23/2010 Pape 3 or 4 Exhibit D BCRUA Regional Water Project Capacity and Cost Allocation,Phase 1A Amended:October 20,2010 CONSTRUCTED ESTIMATED CEDAR PARK CEDAR PARK LEANDER LEANDER ROUND ROCK ROUND ROCK DESCRIPTION CAPACITY(MGD) COST RESERVED COST RESERVED COST RESERVED COST CAPACITY(%) CAPACITY(%) CAPACITY(%) SEGMENT 2C Preliminary Engineering 78.8 $ 191,919 14.18 $ 27,214 47.26 $ 90,701 38.56 $ 74.004 Final Engineering 78.8 $ 627,561 0 $ 48.22 $ 302,610 51.78 $ 324,951 Easements Based on 25%of Fee Simple Value for 50'Perm.Esmt.) 78.8 $ 330,000 0 $ 48.22 $ 159,126 51.78 $ 170,874 Construction-Estimate 78.6 $ 6,800,000 0 $ 48.22 $ 3,278,960 51.78 $ 3,521,040 Contingency 78.8 $ 477,507 0 $ 4822 $ 230,254 51.78 $ 247,253 Allowance for Materials and Labor Fluctuations 78.8 $ 955,015 0 $ - 48.22 $ 460,508 51.78 $ 494,507 Total Construction Includes Const.,Conte enc,&Allowance 78.8 $ 8,232,522 0 $ 48.22 $ 3,969,722 51.78 $ 4,262,800 Construction Phase Services 78.8 $ 219.653 0 $ 48.22 $ 105,917 51.78 $ 113,737 SEGMENT 2C SUB-TOTAL $ 9,601,656 $ 27,214 $ 4,628,076 $ 4,946,366 Cost Allocation Percentages 0.28% 48.20% 51.52% CONSTRUCTION MANAGEMENT SERVICES AND INSPECTION Includes estimated construction cost for Floating Barge,Raw Water Line,WTP,and Transmission Mains i and 2C CONSTRUCTION MGMTJINSPECT.SUB-TOTAL $ 4,043,593 $ 630,283 S 1,906,784 S 1,506,526 Cost Allocation Percentages 15.59%1 1 47.16%1 1 37.26% ANCILLARY SERVICES Environmental Consultant-Barry Allison $ 471,155 14.18 $ 66,810 47.26 $ 222.668 38.56 $ 181,677 Real Estate Acquisition Consultant-LAN $ 470,570 14.18 $ 66,727 47.26 $ 222,391 38.55 $ 181,452 Condemnation Counsel-Kent Sick $ 150,000 14.18 $ 21,270 47,26 $ 70,890 38.56 $ 57,840 Public Relations-Staats Faulkenburg $ 200,000 14.18 $ 28,360 47.26 $ 94,520 38.56 $ 77,120 Public Relations Firm-Group Solutions RJW $ 320,000 14.18 $ 45,376 47,26 $ 151,232 38.56 $ 123,392 Ancillary Services Sub-Total $ 1,611,725 $ 228,543 $ 761,701 1 $ 621,481 OPERATIONAL AND MAINTENANCE EXPENSES General Manager Salary and Su ies 5 ears) $ 425,917 14.18 $ 60,395 47.26 $ 201,288 38.56 $ 164,234 Preliminary Engineering Report Services $ 152,300 15.75 $ 23.987 41.39 $ 63,037 42.86 $ 65,276 Surveying-The Wallace Group-New Hoe Line $ 17,551 15.99 $ 2,806 40.51 $ 7.110 43.50 $ 7,635 Administration Fees-Pre&mina /Final Design $ 84,000 14.18 $ 11,911 47.26 $ 39,698 38.56 $ 32,390 O&M Sub-Total $ 679,768 $ 99,100 $ 311,134 $ 269,534 ANCILLARY SVCSJO&M EXPENSES SUB-TOTAL $ 2,291,493 $ 327,642 $ 1,07246.82%835 $ 891,016 Cost Allocation Percentages 14.30% 38.88% UPDATED BCRUA PHASE 1A PROJECT TOTAL COST $ 140,781 483 $ 21,073,488 $ 66,457 318 $ 53,251,255 Cost Allocation Percentages 14.97% 47.21% 37,83% ORIGINAL BCRUA PHASE 1A PROJECT TOTAL COST $ 171,596,451 $ 24,877,637 $ 61,031,380 $ 65,687,430 TWOB Adjustment for Phase 2 Costs $ 525,000 $ 74,445 $ 248,115 $ 202,440 ADJUSTED ORIGINAL BCRUA PHASE 1A PROJECT COST $ 171,071,451 $ 24,803,192 $ 80,783,265 $ 65,484,990 Construction Cost Savings from Phase 1A $ 30 289,968 $ 3,729,704 $ 114,325,947 $ 12,233.735 Note: Upon completion of the Project,the BCRUA is obligated to deliver up to the following quantities of treated water to each City at the Points of Delivery: Capacity MGD %of Ca aci Cedar Park 4.53 26.67 Leander 7.94 46.67 Round Rock 4.53 26.67 Total 17.00 100 09/23/2010 Pape 4 of 4 DATE: October 15,2010 SUBJECT: BCRUA Board Meeting—October 20,2010 ITEM: 7C. Consider a resolution authorizing the President to execute a Second Amendment to the Master Contract for the Financing,Construction,and Operation of the BCRUA Regional Water Treatment and Distribution Project. Presenter: Michael Thane Director of Infrastructure Management City of Round Rock Justification: On September 9,2008,the Cities entered into a Master contract which provides the terms and conditions for the financing,construction,and operation of Phase 1A of the Brushy Creek Regional Utility Authority(BCRUA) regional water project. On December 18,2008,the Cities amended the Master Contract to delay the issuance of bonds and the commencement of construction of the project. This Amendment No. 2 to the Master Contract is necessary to revise the actual cost necessary to complete Phase 1A of the regional water project. There are six construction contracts to be awarded as part of Phase 1A. Five of these projects have already awarded construction contracts to the lowest responsible bidder. Because these construction contracts are coming in lower than the construction cost estimate that was included in Exhibit D of the Master Contract,the BCRUA is updating Exhibit D to show these construction cost savings. To date,the BCRUA has saved$30,389,968 in cost for the five projects that have been recently awarded or are under construction.