BCRUA_R-10-10-20-7D RESOLUTION NO. R-10-10-20-71) WHEREAS, the Brushy Creek Regional Utility Authority ("BCRUA") desires to enter into an Interlocal Agreement with the Cities of Cedar Park and Leander regarding Use of Construction Cost Savings from Phase 1A of the BCRUA Regional Water Treatment and Distribution Project,Now Therefore BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA an Interlocal Agreement with the Cities of Cedar Park and Leander regarding Use of Construction Cost Savings from Phase IA of the BCRUA Regional Water Treatment and Distribution Project, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 20th day of October, 2010. MITCH F LLER, Sident Brushy C ek Re io Utility Authority ES 10,Cowman, Secretary Z:�BCRUA1Board PackeuTacket DowmentsU02010Vtes.BCRUA-iLA w-Cities of Cedar Park Leander(00205515).DOC1rmc INTERLOCAL AGREEMENT REGARDING USE OF CONSTRUCTION COST SAVINGS FROM PHASE 1A OF THE BCRUA REGIONAL WATER TREATMENT AND DISTRIBUTION PROJECT THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § THIS INTERLOCAL AGREEMENT REGARDING USE OF CONSTRUCTION COST SAVINGS FROM PHASE 1A OF THE BCRUA REGIONAL WATER TREATMENT AND DISTRIBUTION PROJECT ("Agreement") is entered into between the Brushy Creek Regional Utility Authority (`BCRUA"), the City of Round Rock, Texas, a Texas home-rule city ("Round Rock"); the City of Cedar Park, Texas, a Texas home-rule city ("Cedar Park"), and the City of Leander, Texas, a Texas home-rule city ("Leander"). In this Agreement, BCRUA, Round Rock, Cedar Park and Leander are sometimes individually referred to as "Party" and collectively referred to as "Parties". In this Agreement, Round Rock, Cedar Park and Leander are sometimes collectively referred to as"Cities." Recitals WHEREAS, on the 2nd day of September, 2008 the Parties entered into that one certain Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project (the "Contract"), that provides terms and conditions for the financing, construction and operation of the first phase of the new regional system consisting generally of upgrades to Cedar Park's raw water intake, a raw water intake line, new water treatment plant, and water transmission mains; and WHEREAS, Exhibit D to the Contract sets out the estimated cost of the components of the Project, the allocation of said costs among the Cities, and the Cities' reserved capacity in the Project components; and WHEREAS, since the date of the Contract, several of the construction projects shown on Exhibit D have been bid and the bids have been significantly below the original estimates and there is new information available that has resulted in reducing the estimated cost of other projects; and WHEREAS, on the day of . the Parties entered into that one certain Second Amendment to the Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project ("Second Amendment") for the purpose of approving an updated Exhibit D to reflect the reductions in actual costs, as well as future estimated costs, such updated Exhibit D being renamed "Revised Exhibit D, August 2010", referred to herein as the"Revised Exhibit D"; and EXHIBIT "A„ WHEREAS, the aforesaid reduction in costs reflected on the Revised Exhibit D results in a significant amount of money being available to spend towards items and projects in addition to those specifically listed in the original Exhibit D; and WHEREAS, the purpose of this Agreement is to set forth the terms and conditions for the expenditure of said cost savings by the Parties towards other items and projects Now Therefore, the parties hereby agree as follows: L DEFINITIONS 1.01 All terms used herein shall have the meanings assigned to them in the Contract, unless the context clearly requires otherwise. II. USE OF COST SAVINGS 2.01 The cost savings reflected in the Revised Exhibit D may be used by the Cities only for the projects and purposes as set forth in more detail on Exhibit A, attached hereto and incorporated herein for all purposes. M. GENERAL PROVISIONS 3.01 Authority.This Agreement is made in part under the authority conferred in Chapter 791, Texas Government Code and Section 402.001, Texas Local Government Code. 3.02 Severability. The provisions of this Agreement are severable and, if any provision of this Agreement is held to be invalid for any reason by a court or agency of competent jurisdiction, the remainder of this Agreement shall not be affected and this Agreement shall be construed as if the invalid portion had never been contained herein. 3.03 Payments from Current Revenues. Any payments required to be made by a Party under this Agreement shall be paid from current revenues or other funds lawfully available to the Party for such purpose. 3.04 Cooperation. The Parties agree to cooperate at all times in good faith to effectuate the purposes and intent of this Agreement. 3.05 Entire Agreement. Except as otherwise expressly provided herein, this Agreement contains the entire agreement of the Parties regarding the use of construction cost savings from Phase lA of the BCRUA regional treatment and distribution project and supersedes all prior or contemporaneous understandings or representations, whether oral or written, regarding the subject matter. The Parties confirm that further agreements regarding the Regional Project are contemplated and shall not be affected or limited by this Agreement. 2 3.06 Amendments. Any amendment of this Agreement must be in writing and shall be effective if signed by the authorized representatives of the Parties. 3.07 Applicable Law; Venue. This Agreement shall be construed in accordance with Texas law. Venue for any action arising hereunder shall be in Williamson County,Texas. 3.08 Notices. Any notices given under this Agreement shall be effective if(i) forwarded to a Party by hand-delivery; (ii) transmitted to a Party by confirmed telecopy; or (iii) deposited with the U.S. Postal Service, postage prepaid, certified, to the address of the Party indicated below: CEDAR PARK: 600 North Bell Blvd. Cedar Park,Texas 78613 Attn: Brenda Eivens Telephone: (512)401-5020 Facsimile: (512)401-5021 Email: roberts(o_),ci.cedar-park.tx.us with copy to: Charles Rowland 600 N. Bell Blvd. Cedar Park,Texas 78768 Telephone: (512) Facsimile: (512) Email: Charles.Rowland@cedarparktx.us ROUND ROCK: 221 East Main Round Rock,Texas 78664 Attn: Jim Nuse Telephone: (512) 218-5410 Facsimile:(512) 218-7097 Email:jnuseground-rock.tx.us with copy to: Steve Sheets 309 E. Main Street Round Rock,Texas 78664-5264 Telephone: (512) 255-8877 Facsimile: (512) 255-8986 Email: slsheets@sheets-crossfield.com Leander: P.O. Box 319 Leander,Texas 78646-0319 Attn: Wayne Watts Telephone: (512) 259-1178 Facsimile: (512) 259-1605 Email: w.wattsQci.leander.tx.us 3 with copy to: Barney Knight Austin, Texas 78752 Telephone: (512) 323-5778 Telecopy: (512) 323-5773 Email: attomey(a-)cit atY tomeZexas.com 3.09 Force Majeure. Parties shall not be deemed in violation of this Contract if prevented from performing any of their obligations hereunder by reasons for which they are not responsible or circumstances beyond their control. However, notice of such impediment or delay in performance must be timely given, and all reasonable efforts undertaken to mitigate its effects. 3.10 Counterparts. Effect of Partial Execution. This Agreement may be executed simultaneously in multiple counterparts, each of which shall be deemed an original, but all of which shall constitute the same instrument. 3.11 Authority. Each Party represents and warrants that it has the full right, power and authority to execute this Agreement. SIGNATURES APPEAR ON FOLLOWING PAGES. 4 CITY OF ROUND ROCK: ATTEST: By: Sara White, City Secretary Alan McGraw, Mayor Date: 5 CITY OF CEDAR PARK: ATTEST: By: LeAnn Quinn, City Secretary Bob Lemon, Mayor Date: 6 CITY OF LEANDER: ATTEST: By: Debbie Haile, City Secretary John Cowman, Mayor Date: 7 BRUSHY CREEK REGIONAL UTILITY AUTHORITY By: Mitch Fuller, President Attest: By: John Cowman, Secretary 8 Exhibit A BCRUA Regional Water Project Use of Construction Coat Savings from Phase 1A Updated:September 23,2010 CONSTRUCTED I ESTIMATED CEDAR PARK ICEDARPARKILEANDER LEANDER ROUND ROCK I ROUND ROCK DESCRIPTION CAPACITY(MGD) COST RESERVED COST RESERVED COST RESERVED COST CAPACITY(%) CAPACITY X CAPACITY Y. PHASE II-DEEP WATER INTAKE Deep Water Preliminary Engineering(Completed) $ 525,000 14.18 $ 74,445 47.26 $ 248,115 38.56 $ 202,440 Deep Water Preliminary Engineering $ 475,000 27.45 $ 130,388 43.76 F$-207,860 28.79 $ 136.753 Deep Water Due Diligence Stud $ 600,000 27.45 $ 164,700 43.76 $ 262,560 28.79 $ 172,740 Deep Water Site Purchase $ 3,300,000 27.45 $ 905,850 43.76 $ 1,444,080 28.79 $ 950,070 Easements Assumes Worst Case-Site 4 $ 7,500.000 27.45 $ 2,058,750 43.76 $ 3,282,000 28.79 $ 2,159,250 PHASE II-DEEP WATER INTAKE SUB-TOTAL $ 12,400,000 $ 3,334 133 $ 5,444,615 $ 3,621,253 Coat Allocation Percentages I I 1 1 26.89% 43.91% 29.20% PHASE 1B-WATER TREATMENT PLANT RE-RATING WTP Re-Ratio Filters 1-5 $ 500,000 26.67 1$ 133,350 1 46.66 $ 233,300 1 26.67 $ 133,350 PHASE 18-WATER TREATMENT PLANT RE-RATING $ 500,000 1 1$ 133,350 1 1$ 233,300 1 1 $ 133,350 Cost Allocation Percentages I 26.67%j 1 46.66%1 1 25.67% SEGMENT 2A&2B TRANSMISSION LINES-LCRA OVERHEAD Segments 2A&28-LCRA Overhead New Hope Water Line $ 1,106,793 1 $ $ 1,106,793 $ - SEGMENT 2A&28-LCRA OVERHEAD SUB-TOTAL 1 $ 1,106,7931 1 $ $ 1,106,7931 1$ LEANDER RESERVE FUND Reserve Funding 1 $ 6,184,000 $ 1$ 6,184,000 1 1$ LEANDER RESERVE FUND SUB-TOTAL 1 $ 6,184,000 $ $ 6,184 000 1 1 $ UN-ALLOCATED CONSTRUCTION SAVINGS BALANCE Un-Allocated Construction Savings Balance 1 $ 10,099,175 1 J$ 262 221 $ 1,357.2391 $ 8,479,132 UN-ALLOCATED CONSTRUCTION SAVINGS BALANCE SUB-TOTAL 1 $ 10,099,175 1 J$ 262,221 1 1$ 1,357,239 $ 8,479,132 BCRUA RE-ALLOCATED PHASE 1A CONSTRUCTION SAVINGS 1 1 $ 30,289,968 1 J$ 3,729,7041 J$ 14,325,947 1 $ i2,233,735 Note:The Construction Savings Identified herein ars from the Amended Master Contract Exhibit D dated September 2010. EXECUTED DOCUMENT FOLLOWS INTERLOCAL AGREEMENT REGARDING USE OF CONSTRUCTION COST SAVINGS FROM PHASE IA OF THE BCRUA REGIONAL WATER TREATMENT AND DISTRIBUTION PROJECT THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § THIS INTERLOCAL AGREEMENT REGARDING USE OF CONSTRUCTION COST SAVINGS FROM PHASE 1A OF THE BCRUA REGIONAL WATER TREATMENT AND DISTRIBUTION PROJECT ("Agreement") is entered into between the Brushy Creek Regional Utility Authority ("BCRUA"), the City of Round Rock, Texas, a Texas home-rule city ("Round Rock"); the City of Cedar Park, Texas, a Texas home-rule city ("Cedar Park"), and the City of Leander, Texas, a Texas home-rule city ("Leander"). In this Agreement, BCRUA, Round Rock, Cedar Park and Leander are sometimes individually referred to as "Party" and collectively referred to as "Parties". In this Agreement, Round Rock, Cedar Park and Leander are sometimes collectively referred to as "Cities." Recitals WHEREAS, on the 2"d day of September, 2008 the Parties entered into that one certain Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project (the "Contract"), that provides terms and conditions for the financing, construction and operation of the first phase of the new regional system consisting generally of upgrades to Cedar Park's raw water intake, a raw water intake line, new water treatment plant, and water transmission mains; and WHEREAS, Exhibit D to the Contract sets out the estimated cost of the components of the Project, the allocation of said costs among the Cities, and the Cities' reserved capacity in the Project components; and WHEREAS, since the date of the Contract, several of the construction projects shown on Exhibit D have been bid and the bids have been significantly below the original estimates and there is new information available that has resulted in reducing the estimated cost of other projects; and �,� WHEREAS, on the ?D _day of Vd-MOthe Parties entered into that one certain Second Amendment to the Master Contract for the Financing, Construction and Operation of the BCRUA Regional Water Treatment and Distribution Project ("Second Amendment") for the purpose of approving an updated Exhibit D to reflect the reductions in actual costs, as well as future estimated costs, such updated Exhibit D being renamed "Exhibit D, BCRUA Regional Water Project, Capacity and Cost Allocation, Phase IA, Amended: October 20, 2010," referred to herein as the "Amended Exhibit D"; and IL-to00204921. C JC4D--I 0-ZO--7 WHEREAS, the aforesaid reduction in costs reflected on the Revised Exhibit D results in a significant amount of money being available to spend towards items and projects in addition to those specifically listed in the original Exhibit D; and WHEREAS, the purpose of this Agreement is to set forth the terms and conditions for the expenditure of said cost savings by the Parties towards other items and projects Now Therefore,the parties hereby agree as follows: I. DEFINITIONS 1.01 All terms used herein shall have the meanings assigned to them in the Contract, unless the context clearly requires otherwise. IL USE OF COST SAVINGS 2.01 The cost savings reflected in the Revised Exhibit D may be used by the Cities only for the projects and purposes as set forth in more detail on Exhibit A, attached hereto and incorporated herein for all purposes. III. GENERAL PROVISIONS 3.01 Authority. This Agreement is made in part under the authority conferred in Chapter 791, Texas Government Code and Section 402.001, Texas Local Government Code. 3.02 Severability.The provisions of this Agreement are severable and, if any provision of this Agreement is held to be invalid for any reason by a court or agency of competent jurisdiction, the remainder of this Agreement shall not be affected and this Agreement shall be construed as if the invalid portion had never been contained herein. 3.03 Payments from Current Revenues. Any payments required to be made by a Party under this Agreement shall be paid from current revenues or other funds lawfully available to the Party for such purpose. 3.04 Cooperation. The Parties agree to cooperate at all times in good faith to effectuate the purposes and intent of this Agreement. 3.05 Entire Agreement. Except as otherwise expressly provided herein, this Agreement contains the entire agreement of the Parties regarding the use of construction cost savings from Phase IA of the BCRUA regional treatment and distribution project and supersedes all prior or contemporaneous understandings or representations, whether oral or written, regarding the subject matter. The Parties confirm that further agreements regarding the Regional Project are contemplated and shall not be affected or limited by this Agreement. 2 3.06 Amendments. Any amendment of this Agreement must be in writing and shall be effective if signed by the authorized representatives of the Parties. 3.07 Applicable Law; Venue. This Agreement shall be construed in accordance with Texas law. Venue for any action arising hereunder shall be in Williamson County, Texas. 3.08 Notices. Any notices given under this Agreement shall be effective if(i) forwarded to a Party by hand-delivery; (ii) transmitted to a Party by confirmed telecopy; or (iii) deposited with the U.S. Postal Service,postage prepaid, certified, to the address of the Party indicated below: CEDAR PARK: 600 North Bell Blvd. Cedar Park, Texas 78613 Attn: Brenda Eivens Telephone: (512) 401-5020 Facsimile: (512) 401-5021 Email: roberts&ci.cedar-park.tx.us with copy to: Charles Rowland 600 N. Bell Blvd. Cedar Park,Texas 78768 Telephone: (512) Facsimile: (512) Email: Charles.Rowland@cedarparktx.us ROUND ROCK: 221 East Main Round Rock, Texas 78664 Attn: Jim Nuse Telephone: (512) 218-5410 Facsimile:(512) 218-7097 Email:Inuse&round-rock.tx.us with copy to: Steve Sheets 309 E. Main Street Round Rock, Texas 78664-5264 Telephone: (512) 255-8877 Facsimile: (512) 255-8986 Email: slsheetsLsheets-crossfield.com Leander: P.O. Box 319 Leander, Texas 78646-0319 Attn: Wayne Watts Telephone: (512) 259-1178 Facsimile: (512) 259-1605 Email: w.watts(&ci.leander.tx.us 3 with copy to: Barney Knight Austin, Texas 78752 Telephone: (512) 323-5778 Telecopy: (512) 323-5773 Email: attorneys(i�cityattorneZexas.com 3.09 Force Majeure. Parties shall not be deemed in violation of this Contract if prevented from performing any of their obligations hereunder by reasons for which they are not responsible or circumstances beyond their control. However, notice of such impediment or delay in performance must be timely given, and all reasonable efforts undertaken to mitigate its effects. 3.10 Counterparts. Effect of Partial Execution. This Agreement may be executed simultaneously in multiple counterparts, each of which shall be deemed an original, but all of which shall constitute the same instrument. 3.11 Authority. Each Party represents and warrants that it has the full right, power and authority to execute this Agreement. SIGNATURES APPEAR ON FOLLOWING PAGES. 4 CITY OF ROUND ROCK: ATTEST: Ali o.". By: 07 Sara White, City Secretary Alan McGraw, Mayor Date: Lo (�- 1040. /CLIPS' 5 CITY OF CEDAR PARK: ATTEST: By: LeAnn Quinn, City Secretary Bob Lem n, Mayor Date: 6 CITY OF LEANDER: ATTEST: 1AAJ *11 � /A, IZi=G 4 k Bu � ,y: Deb ie Haile, City Secretary Cowman, Mayor Date: f0 7 BRUSHY CREEK REGIONAL UTILITY AUTHORITY By: Mit Fuller, esident Attest: 064 By: ` J "'— hn Cowman, Secretary 8 Exhibit A BCRUA Regional Water Project Use of Construction Cost Savings from Phase 1A Updated:September 23,2010 CEDAR PARK LEANDER ROUND ROCK CONSTRUCTED ESTIMATED CEDAR PARK LEANDER ROUND ROCK DESCRIPTION CAPACITY(MGD) COST RESERVED COST RESERVED COST RESERVED COST CAPACITY % CAPACITY(%) CAPACITY PHASE II-DEEP WATER INTAKE Deep Water Preliminary Engineering(Completed) $ 525,000 1418 $ 74,445 47.26 $ 248,115 38.56 $ 202,440 Deep Water Preliminary Engineering $ 475,000 27.45 $ 130,388 43.76 $ 207,860 28.79 $ 136,753 Deep Water Due Diligence Stud $ 600,000 27 45 $ 164,700 43.76 $ 262,560 28.79 $ 172,740 Deep Water Site Purchase $ 3,300,000 2745 $ 905,850 43.76 $ 1,444,080 28.79 $ 950,070 Easements Assumes Worst Case-Site 4) $ 7,500,000 2745 $ 2,058,750 43,76 $ 3,282,000 28.79 $ 2,159,250 PHASE II-DEEP WATER INTAKE SUB-TOTAL $ 12,400,000 $ 3,334,133 $ 5,444,615 $ 3,621,253 Cost Allocation Percentages I 1 1 26.89% 43.91% 29.20% PHASE 1B-WATER TREATMENT PLANT RE-RATING WTP Re-Rating Filters 1-5 $ 500,000 1 2667 1$ 133,3501 46.66 1$ 233,300 1 26.67 1$ 133,350 PHASE 18-WATER TREATMENT PLANT RE-RATING 1 $ 500,000 1 1$ 133,350 1 1$ 233,300 1 J $ 133,350 Cost Allocation Percentages 26.67%1 46.66%1 1 26.67% SEGMENT 2A 8 213 TRANSMISSION LINES-LCRA OVERHEAD Segments 2A&2B-LCRA Overhead New Hope Water Line $ 1,106,793 $ $ 1,106,793 1 $ - SEGMENT 2A&213-LCRA OVERHEAD SUB-TOTAL $ 1,106,793 1 $ $ 1,106,793 1 $ LEANDER RESERVE FUND Reserve Funding $ 6,184,000 $ $ 6,184,000 $ LEANDER RESERVE FUND SUB-TOTAL $ 6,184,000 1 $ $ 6,184,000 1 $ UN-ALLOCATED CONSTRUCTION SAVINGS BALANCE Un-Allocated Construction Savings Balance $ 10,099,175 $ 262,221 $ 1,357,239 $ 8,479,132 UNALLOCATED CONSTRUCTION SAVINGS BALANCE SUB-TOTAL $ 10,099,175 1$ 262,221 1 J$ 1,357,239 1 $ 8,479,132 BCRUA RE-ALLOCATED PHASE 1A CONSTRUCTION SAVINGS $ 30,289,968 1 $ 3,729,704 1 J$ 14,325,947 1 $ 12,233,735 Note:The Construction Savings identified herein are from the Amended Master Contract Exhibit D dated September 2010. DATE: October 15,2010 SUBJECT: BCRUA Board Meeting—October 20,2010 ITEM: 7D. Consider a resolution authorizing the President to execute an Interlocal Agreement regarding Use of Construction Cost Savings from Phase 1A of the BCRUA Regional Water Treatment and Distribution Project with the Cities of Cedar Park, Round Rock,and Leander,subject to the approval of the Participating Cities. Presenter: Michael Thane Director of Infrastructure Management City of Round Rock Justification: Amendment No. 2 to the Master Contract for the Brushy Creek Regional Utility Authority(BCRUA) was necessary to revise the actual cost necessary to complete Phase 1A of the regional water project. There are six construction contracts to be awarded as part of Phase 1A. Five of these projects have already awarded construction contracts to the lowest responsible bidder. Because these construction contracts are coming in lower than the construction cost estimate that was included in Exhibit D of the Master Contract,the BCRUA is updating Exhibit D to show these construction cost savings. To date,the BCRUA has saved $30,389,968 in cost for the five projects that have been recently awarded or are under construction. This Interlocal Agreement between the BCRUA and the Cities of Round Rock,Cedar Park,and Leander is to set forth the terms and conditions for expenditure of the cost savings. The expenditure of the savings as presented in Exhibit A to this Interlocal Agreement is proposed to be used for Phase 2 Deep Water Intake preliminary engineering and analysis as well as intake site and easement acquisition. In addition,savings are proposed to be used for Phase 113 of the Water Treatment Plant,Segment 2A and 2B costs, and for funding the Leander Reserve Fund. Prior to being able to spend these savings for the proposed uses, it will require approval from the Texas Water Development Board.