Loading...
BCRUA_R-11-02-23-7B RESOLUTION NO. R-11-02-23-713 WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into an Agreement for Construction Phase Observation Services for the BCRUA Phase 1, Contract 2, Regional Water System, Raw Waterline/Underwater Pipeline Project with JR Tolles and Associates, LLC, and WHEREAS, JR Tolles and Associates, LLC has submitted Supplemental Agreement No. 1 to the Agreement to modify the description of the Project; to add an alteration in the amount of $50,000.00 to the original amount of$117,000.00, bringing the total to $167,000.00; and without alteration to timeframe, and WHEREAS, the BCRUA desires to enter into said Supplemental Agreement No. 1,Now Therefore BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA Supplemental Agreement No. 1 with JR Tolles and Associates, LLC, a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. Z:\BCRUA\Board Packets\Packet Documents\022311 Utes.BCRUA-SA-1 w-JR Tolles Associates(00215001)[I].DOC/—c RESOLVED this 23rd day of February, 2011. MITCHULLER, resident Brushy C k Regio al Utility Authority TE T: IrCowman, Secretary SUPPLEMENTAL AGREEMENT NO. 1 TO "BRUSHY CREEK REGIONAL UTILITY AUTHORITY(BCRUA)AGREEMENT FOR CONSTRUCTION PHASE OBSERVATION SERVICES FOR THE BCRUA PHASE 1, CONTRACT 2,REGIONAL WATER SYSTEM,RAW WATERLINE/UNDERWATER PIPELINE PROJECT WITH JR TOLLES AND ASSOCIATES,LLC." I FIRM: JR Tolles and Associates,LLC ADDRESS: 13505 Byrd's Nest Drive, Austin,Texas 78738 PROJECT: Phase 1,Contract 3,Floating Intake Barge Project This Supplemental Agreement No. 1 to `Brushy Creek Regional Utility Authority (BCRUA) Agreement for Construction Phase Observation Services for the BCRUA Phase 1, Contract 2, Regional Water System, Raw Waterline/Underwater Pipeline Project with JR Tolles and Associates, LLC," (hereinafter referred to as "Supplemental Agreement No. 1") is made by and between the Brushy Creek Regional Utility Authority, a Texas local government corporation (hereinafter referred to as the "BCRUA"), and JR Tolles and Associates, LLC (hereinafter referred to as "JR Tolles"). WHEREAS, the BCRUA and JR Tolles executed the original agreement entitled "Brushy Creek Regional Utility Authority (BCRUA) Agreement for Construction Phase Observation Services for the BCRUA Phase 1, Contract 2, Regional Water System, Raw Waterline/Underwater Pipeline Project with JR Tolles and Associates, LLC" on the 19"' day of July,2010,in the original amount of$117,000,00;and WHEREAS, it has become necessary to amend the original agreement via this Supplemental Agreement No. l to modify the description of the Project; to add an alteration in the amount of $50,000.00 to the original amount of $117,000.00, bringing the total to $167,000.00; and without alteration to timeframe; NOW THEREFORE, premises considered, the BCRUA and JR Tolles agree that said Agreement shall be amended as follows: I. The description of the Project on Page 1 of the original Agreement immediately preceding Article 1.l is hereby amended to read as follows: a) BCRUA Phase 1, Contract 2, Regional Water System, Raw Waterline/Underwater Pipeline Project (the "Project"), which Project is owned by the BCRUA. A properly-constituted selection committee composed of representatives from the City of Round Rock, the City of Cedar Park,the City of Leander, and the BCRUA selected JR Tolles as the proposer offering the best value for the entity. 211843/jkg Consulting services to be performed by JR Tolles include provision of industry standard third- party quality assurance construction phase observation services, certain related administrative services, performance observation support, and field site representation related to the constriction of the Project (the "Services"), such Services being delineated in Exhibit `B" entitled "JR Tolles' Responsibilities," said Exhibit "B" being attached hereto and incorporated herein by reference for all appropriate purposes. All such Services shall be on the site of said Project or at other locations as necessary. All such Services shall be non-engineering services. b) BCRUA Phase 1, Contract 3, Floating Intake Barge Project: Provide construction phase observation services, liaison, and coordination with respect to the existing plant and plant site, and existing plant operations by and between representatives of the City of Cedar Park, the BCRUA, and Water Resources Management, Inc.; review plans; coordinate construction with ongoing plant operations; observe existing plant and new facility tie-ins and interfaces; present plant issues and problems at progress meetings; and coordinate with Water Resources Management,Inc. personnel. II. Section 1.2.1 of the original agreement is hereby amended to read as follows: 1.2.1. The objective or use is: Objectives include, but are not limited to, obtaining consulting services from JR Tolles including JR Tolles' provision of industry standard construction phase observation services, certain related administrative services, performance of observation support, and field site representation (the "Services") on the site of the BCRUA Phase 1, Contract 1, Raw Water Pipeline Project, and BCRUA Phase 1, Contract 3,Floating Intake Barge Project. III. Section 1.2.5 of the original agreement is hereby amended to read as follows: 1.2.5 The financial parameters are as follows: The total fee for JR Tolles' services shall be in a not-to-exceed amount of One Hundred Sixty-Seven Thousand and No/100 Dollars ($167,000.00). Such not-to-exceed amount shall be full compensation for all Services performed and to be performed by JR Tolles under this Agreement, including without limitation any overtime compensation and reimbursement for gavel, copying, etc. as set forth in more detail in Sec. 1.2.6.3. The foregoing not-to-exceed amount may not be revised in any fashion other than by written Supplemental Agreement as provided for herein. The BCRUA shall pay JR Tolles on a "time and materials"basis, JR Tolles agrees to accept payment from the BCRUA on such basis, and the patties expressly agree that only work actually performed by JR Tolles will be paid for by the BCRUA. 2 i i IV. f� Section 1.2.6 of the original agreement is hereby amended by adding a subsection (1), and f shall read as follows: 1.2,6 The Scope of Services parameters are as follows: The above-recited fee for A Tolles' Services is generally comprised of the following: (a) Construction Observation (b) Daily Reports (c) Review of Contractor Pay Applications (d) Change Orders and Requests for Information(RFIs) (e) Construction Testing (f) Project Meetin&s (g) Project Documentation (h) Construction Deficiencies (i) Design Conflicts 0) Coordination of Stakeholders (k) Personnel and Equipment (1) Special Floating Intake Barge Services JR Tolles shall provide construction phase observation services, liaison, and coordination with respect to the existing plant and plant site, and existing plant operations by and between representatives of the City of Cedar Park, the BCRUA, and Water Resources Management,Inc.; review plans; coordinate construction with ongoing plant operations; observe existing plant and new facility tie-ins and interfaces; present plant issues and problems at progress meetings; and coordinate with Water Resources Management,Inc. personnel. V. Section 1.2.6.3 (h)of the original agreement is hereby amended to read as follows: Time Commitment and Estimated Rate Projections: Non-Dive HOUI'S: 1,755 hours during contract term at$90/hr = $1$8,000.00 Dive Hours: (50 hours X$180/hr during contract term at contract term = $ 9,000.00 TOTAL NOT-TO-EXCEED AMOUNT $167,000.00 3 VI. Exhibit "B" of the original agreement is hereby amended to read in conformity with this Supplemental Agreement No. 1, IN WITNESS WHEREOF,the BCRUA and JR Tolles have executed this Supplemental Agreement No. 1 in duplicate. BRUSHY CREEK REGIONAL UTILITY AUTHORITY By: Mitch Fuller,President Date Signed: ATTEST: By: John Cowman,Secretary JR TOLLES AND ASSOCIATES,LLC By: Printed Name of Principal: Title: Date Signed: ATTEST: By: Corporate Secretary 4 I EXECUTED DOCUMENT FOLLOWS SUPPLEMENTAL AGREEMENT NO. 1 TO "BRUSHY CREEK REGIONAL UTILITY AUTHORITY(BCRUA)AGREEMENT FOR CONSTRUCTION PHASE OBSERVATION SERVICES FOR THE BCRUA PHASE 1,CONTRACT 2,REGIONAL WATER SYSTEM,RAW WATERLINE/UNDERWATER PIPELINE PROJECT WITH JR TOLLES AND ASSOCIATES,LLC." FIRM: JR Tolles and Associates,LLC ADDRESS: 13505 Byrd's Nest Drive, Austin,Texas 78738 PROJECT: Phase 1,Contract 3,Floating Intake Barge Project This Supplemental Agreement No. 1 to "Brushy Creek Regional Utility Authority (BCRUA) Agreement for Construction Phase Observation Services for the BCRUA Phase 1, Contract 2, Regional Water System, Raw Waterline/Underwater Pipeline Project with JR Tolles and Associates, LLC," (hereinafter referred to as "Supplemental Agreement No. 1") is made by and between the Brushy Creek Regional Utility Authority, a Texas local government corporation (hereinafter referred to as the "BCRUA"), and JR Tolles and Associates, LLC (hereinafter referred to as"JR Tolles"). WHEREAS, the BCRUA and JR Tolles executed the original agreement entitled "Brushy Creek Regional Utility Authority (BCRUA) Agreement for Construction Phase Observation Services for the BCRUA Phase 1, Contract 2, Regional Water System, Raw Waterline/Underwater Pipeline Project with JR Tolles and Associates, LLC" on the 19th day of July,2010,in the original amount of$117,000.00; and WHEREAS, it has become necessary to amend the original agreement via this Supplemental Agreement No. 1 to modify the description of the Project; to add an alteration in the amount of $50,000.00 to the original amount of $117,000.00, bringing the total to $167,000.00; and without alteration to timeframe; NOW THEREFORE, premises considered, the BCRUA and JR Tolles agree that said Agreement shall be amended as follows: I. The description of the Project on Page 1 of the original Agreement immediately preceding Article 1.1 is hereby amended to read as follows: a) BCRUA Phase 1, Contract 2, Regional Water System, Raw Waterline/Underwater Pipeline Project (the "Project"), which Project is owned by the BCRUA. A properly-constituted selection committee composed of representatives from the City of Round Rock, the City of Cedar Park, the City of Leander, and the BCRUA selected JR Tolles as the proposer offering the best value for the entity. 6MIA,ill 62.23•-7Q 211843/jkg Consulting services to be performed by JR Tolles include provision of industry standard third- patty quality assurance construction phase observation services, certain related administrative services, performance observation support, and field site representation related to the ' construction of the Project (the "Services"), such Services being delineated in Exhibit "B" entitled "JR Tolles' Responsibilities," said Exhibit "B" being attached hereto and incorporated herein by reference for all appropriate purposes. All such Services shall be on the site of said Project or at other locations as necessary. All such Services shall be non-engineering services. b) BCRUA Phase 1, Contract 3, Floating Intake Barge Proiect: Provide construction phase observation services, liaison, and coordination with respect to the existing plant and plant site, and existing plant operations by and between representatives of the City of Cedar Park, the BCRUA, and Water Resources Management, Inc.; review plans; coordinate construction with ongoing plant operations; observe existing plant and neiv facility tie-ins and interfaces; present plant issues and problems at progress meetings; and coordinate with Water Resources Management,Inc. personnel. Il. Section 1.2.1 of the original agreement is hereby amended to read as follows: 1.2.1. The objective or use is: Objectives include, but are not limited to, obtaining consulting services from JR Tolles including JR Tolles' provision of industry standard construction phase observation services, certain related administrative services, performance of observation support, and field site representation (the "Services") on the site of the BCRUA Phase 1, Contract 1, Raw Water Pipeline Project, and BCRUA Phase 1,Contract 3,Floating Intake Barge Project. III. Section 1.2.5 of the original agreement is hereby amended to read as follows: 1.2.5 The financial parameters are as follows: The total fee for JR Tolles' services shall be in a not-to-exceed amount of One Hundred Sixty-Seven Thousand and No/100 Dollars ($167,000.00). Such not-to-exceed amount shall be frill compensation for all Services performed and to be performed by JR Tolles under this Agreement, including without limitation any overtime compensation and reimbursement for travel, copying, etc. as set forth in more detail in Sec. 1.2.6.3. The foregoing not-to-exceed amount may not be revised in any fashion other than by written Supplemental Agreement as provided for herein. The BCRUA shall pay JR Tolles on a "time and materials"basis,JR Tolles agrees to accept payment from the BCRUA on such basis,and the parties expressly agree that only work actually performed by JR Tolles will be paid for by the BCRUA. 2 i i IV. i Section 1.2.6 of the original agreement is hereby amended by adding a subsection (1), and shall read as follows: i 1.2.6 The Scope of Services parameters are as follows: The above-recited fee for JR Tolles' Services is generally comprised of the following: (a) Construction Observation (b) Daily Reports (c) Review of Contractor Pay Applications (d) Change Orders and Requests for Information(RFIs) (e) Construction Testing (f) Proieet Meetings (g) Project Documentation (h) Construction Deficiencies (i) Design Conflicts (j) Coordination of Stakeholders (k) Personnel and Equipment (1) Special Floating Intake Barge Services JR Tolles shall provide construction phase observation services, liaison, and coordination with respect to the existing plant and plant site, and existing plant operations by and between representatives of the City of Cedar Park, the BCRUA, and Water Resources Management,Inc.; review plans; coordinate construction with ongoing plant operations; observe existing plant and new facility tie-ins and interfaces; present plant issues and problems at progress meetings; and coordinate with Water Resources Management,Inc. personnel. V. Section 1.2.6.3 (h)of the original agreement is hereby amended to read as follows: Time Commitment and Estimated Rate Projections: Non-Dive Hours: 1,755 hours during contract term at$90/hr = $158,000.00 Dive Hours: (50 hours X$180/hr during contract term at contract term = $ 9.000.00 TOTAL NOT-TO-EXCEED AMOUNT $167,000.00 3 i Vl. Exhibit `B" of the original agreement is hereby amended to read in conformity with this j Supplemental Agreement No. 1. IN WITNESS WHEREOF,the BCRUA and JR Tolles have executed this Supplemental Agreement No. 1 in duplicate. BRUSHY CREEK REGIONAL UTILITY AUTHORITY By: Mitch uller,P sident Date Signed: ATTEST: By: _4�— j n Cowman,Secretary JR TOLLES AND ASSOCIATES,LLC 1 By: Printed Name of Principal: JR7�011es-, Title: Date Signed: /-Z7.1/ ATTEST: By: Corporate Secretary 4 DATE: February 18,2011 SUBJECT: BCRUA Board Meeting—February 23,2011 ITEM: 7B. Consider a resolution authorizing the President to execute Supplemental Agreement No. 1 with JR Tolles and Associates, LLC for Phase 1,Contract 2, Regional Water System, Raw Waterline/Underwater Pipeline Project (Floating Intake Barge)in the amount of$50,000. Presenter: Michael F.Thuss, P.E. Program Manager Justification: Water Resources Management is the lead construction phase observer/inspector on the Floating Intake Barge Project. J.R.Tolles is being added because of their extensive knowledge of Cedar Parks' existing water treatment plant. J.R.Tolles will assist with the observation, inspection, and coordination of the electrical facilities and upgrades and various piping tie ins with the water treatment plant. Funding: J.R.Tolles provides construction phase observation and inspection services for the Phase 1,Contract 2, Raw Water Transmission/Underwater Pipe Line Project in the amount of$117,000. Supplemental Agreement#1 adds Contract 3,the Floating Intake Barge Project for an additional$50,000 to JR Tolles'scope of services in the original contact. There is no time extension. The total not to exceed amount increases to$167,000. Funding for this contract is in the BCRUA Program Budget and in the FY 11 Spending Plan. This is eligible for bond proceeds funding.