BCRUA_R-11-10-19-6DRESOLUTION NO. R-ll-IO-19-6D WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into a contract ("Contract") with Excel Construction Services, LLC for the BCRUA Interim Floating Intake Facilities Project, and WHEREAS, the BCRUA has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No.4, Now Therefore BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA, Quantity Adjustment/Change Order No.4 to the Contract with Excel Construction Services, LLC for the BCRUA Interim Floating Intake Facilities Project, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that s?ch meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. Z:IBCRUAIBoard PacketsIPacketDocumenIJIIOl91 IIRes BCRUAQA·CO#4 w-Excel Construction(0023S423).DOC/nnc RESOLVED this 19th day of October, 2011. -~.-~~ GEORG~President Brushy Creek Regional Utility Authority ATTEST~:_-------­ '::TC~R,Secretary 2 Page 1 of1 Date: Change OtdetlQu\!lntttv AdjIJSt(nent No. r SUMMMY 0f'iQIr!a\.~ Prtce: PrevIot.ts.QuarltIly ~s): ThIs QuantfW Adjustment: Total Quantity~$): T'*' CDntrac.t Prtce· wIttl QuantIty A<Qustment(s): Amount PAMousChaAge Order(s): ThIs 0le1'lQe Order: T<ltaI 01aflge0rder('$) To Date: 0ItginI.It QJntra.c:t Pfk:e Plus Change Order(s) Plus QUai'lUlY·AdjUstment(s): 0tJgInaI Conb'actTkne: tontracttimePrIorfo··rJ1ls···Olange Order: 0Jntra(t TIme WIth All~Otange Orders: SIgnature ~,,{r<~' 8CkUA ~ 18fT "N' 4 CHANGE ORDER No.4 ==="'='=-~ _-,.=_=_= = =.= = ~=__.-_-_..~.=,--=.._--~================ DATE OF ISSUANCE: 09-15-11 EFFECTIVE DATE: _ OWNER: BCRUA CONTRACTOR: Excel Construction Services, LLC PROJECT: BCRUA Interim Floating Intake Facilities ENGINEER: Jacobs Engineering Group, Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: Change PropOsal Requests 1. Add SCADA system revisions, per CPR #9 and the response to CPR #9 from Excel. dated September 2, 2011. ADD $202,990.00 2. Upgrade treated lumber banding at new barge to composite wood banding, per CPR #12 response from Excel, dated July 12, 2011. ADD $1,665.00 3. Add removal and disposal of existing 16" DIP which extends above ground from the old Twin Creeks barge, per CPR #13 and the response to CPR #13 from Excel, dated September 2,2011. ADD '3.113.00 TOTAL ADD $ 207,768.00 Page I Project: BCRUA Interim Floating Intake Facilities Change Order No.4 CHANGE IN CONTRACT PRICE: Original Contract Price: $ 3.107,99·00 Net increase from previous Change Orders $ 123,822.82 Contract Price prior to this Change Order: $ 3,931,322.82 Net increase from this Change Order: s 207,768.00 Contract Price with all approved Change Orders: $ 4,139Jl9O.82 CHANGE IN CONTRACT TIME: Original Contract Times: Substantial Completion (Days): 334 calendar days Final Completion (Days): 365 calendar daYS Substantial Completion (Date): Noven1ber 5. 2011 Final Completion (Date): December 6, 2011 Net change from previous Change Orders: Substantial Completion (Days): 34M g1ydlr Uys Final Completion (Days): m••,rdm Substantial Completion (Date): Now!r!h!r·19.2OH Final Completion (Date): January 13. 2011 Contract Times prior to this Change Order: Substantial Completion (Days): 34f qJendal' days Final Completion (Days): 400 gIendar days Substantial Completion (Date): NQY!!DUr 12,#911 Final Completion (Date): JanOW 13.2011 Net increase this Change Order: (See Note 1 below.) Substantial Completion (Date): November 19,2911 Final Completion (Date): January U,20U Final Completion (Date): Japuary 11,2912 (for SCADAwork only) Contract Times with all approved Change Orders: Substantial Completion (Days): Final Completion (Days): ==::::Substantial Completion (Date): November 1!.1011 Final Completion (Date): .hpuary13. aU Final Completion (Date): Jaum t L 2912 (for SCApA work ouly) Note l: Final Completion date isextendedonlyfortheSCADAworkincludedinthisChangeOrder. Dateshall be extendedby 140 calendardaysafterthe April 30, 20II Change Directive thatwas issued.whichmakesthenewFinalCompletion date for the SCADAwork to be on January 11. 20 J2. Page 2 CHANGE ORDER #4 ITEMl 2705 Bee cave R~. Suite300 Auslln. Teus 78746U.S.A .JACOBS' 1.512.31".3100Fall 1.512.314.3135 September 7, 20) 1 Miehael f. 'fhtttIs; P.Ii. ) RE(SlVfQ COUSlNetWn Manaaer Brushy Creek Rc=gional Utility Authority (BCRUA) By MiCh_ f:. ~,*$;~ 1906Hur Industrial Boulevard CedarParll:, Texas 78613 He: Michael F.Thuss. P.E.Dear Mr.Thuss: 2011.09.1309:49:03 -05'00' Enclosed is a 2-revised response fromExcel Cons1IUction Services. LLC(Excel),dated September 2, 2011.to CPR fl9. This revision is io ~nse to my letter to Excel,dated CJ8.3Q..ll (copy also enclosed). Cost deductions included in this 2.... revised response are summarized as follows: 1. Totalpricefrom NELTRONICS,LLCisreducedby S15,545. Partof this reductionis the elimination of30% spare capacny for the solar e<plipment at thestandpipe, which wasincluded in the previous version. The reduction attributed to this item was previously showntobe 55,278. The remainiug reductionofS10,267 is not itemized in this version, siDec it docs not include backup information from JTS,wbicbisa subcODtractor to NBLTRONICS, LLC. 2. TotalpricefromT Morales Company is reduced by 511,754. The reduction isattributedtothefact tbat overlappingcostswere identified betweenT Morales,NELnONIes and m,and thefactthat the overhead matkup fromT Morales was reducedtiom 5% to 2.5%. 3. Total price fromExcelis reducedby $) 0,404. This reduction isduo to the revisedtower foundation (drilled piers instead oftbe previous pad foundation), and the fact that the overhead markup from Excel was red\Jced from 5%to2.5%. Bued on the above reductioDS, if this2....revised tapODSC to CPR ##9 is acceptedby BCRUAa changeorder willbe prepared to add$202,990tothecontract amount. In addition,Excelluisrequestedtbat the timeof completion be increasedby 140calendar days,for this added sccpeofworkonly. Allothercontnwt time requirements will remainthesame. Ifyouhaveany questions or need additional infonnation, pleasecall. Sincerely, JACOBS ENGlNEERING GROUP, INC. XC: lenD Higby, BCRUA Grace Stillman, BCRUA Dustin Riley,WRM JimTolles, JR Tolles Associates wi enclosures 1C:'O~0lI~Q1Ct3\CPR"'£PR'J'CPR.3IeUerOSllll.doe JacobS EngiMering Group IIlC, !f~» Change Proposal BCRUA Floating Intake Request No. 09 Rev. 2 JACOBS Address: 221 E. Maln Street Round Roc$t, TX 78664 Initiated b . X ctName: Project Owner: Interim Floatln Intake Facilities BCRUA Contractor: Address: Attention: The following change In !tie contract on this project Is proposed. • Wor\(shall not commence untR authorized by theOwner. Description of the Proposed Change: ExceIIa Ie.sed to offer the follow#n ehtln • for the own.,. conald8t7ftlon bthe eha Plene note this sal ,. based 0"of the .,foundation for the antenna at the CP WJP. By MatthewCannon-Excel COll$tructlon Services LLC All w.>Itc shaH be In aocordance with !tie terms, Jacobs Recommendation: stipulations,and conditionsof the orfglnal Contract o RecommendAcceptance Documents. If the worf( herein prcMded for is Approved by o 00 Not Recommend Acceptance ChangeOrder. the time of completionwill be: X Increased o Decreased Unchanged By: Jacobs By 140 calendar days. Thhl does not Include time allotted for submittalreview. Date This change will: X Add Deduct 0 No Change Owner's Action: o Accepted 0 Not Accepted $ 202,990.00 I. /1'//h~1P /1'";,;,,,. 1~B;::-y-:-;:B:-;:C:=R~U:-;'A----------------Excel Construction Services, LLC I Date September2, 2011 1 Date OIange Proposal RequestForm BCRUA INTHRIM FLOATING INTAKE FACILITIES cpr.doc WORK PROPOSAL COST ITEMIZATION: CPR No.9 Rey 2 BCRUA interim Floating Intake Revised Scada September 2,2011 ~ quantity I unitcost CI total \A) Materials 1 F()rmina (credit for basebid tower) SF 199 s (3.00 $ 3.00 $ (875.00 $ 875.00 $ (72.00 $ $ $ $ $ $ $ $ (597.00 108.00 (2.975.00) 1,312.50 (2.520.00 1512.00 125.00 - 2 Formlna for DfOOOsed tower SF 36 3 Rebar (credit for base tower) TN 3.4 4 Rebar for proposed tower TN 1.5 5 Conerete (credit for base tower) CY 35 6 Concrete for propOSed tower CY 21 s 72.00 $ 125.007 Forming material/rebar/concrete tor aX6 pad LS 1 8 IB) LaborlEqul"",ent 1. Excavation (creditfor base bid tower) CY 75 $ (25.00) $ (1,875.00 2 Drill Piers for DrooO$ed tower LS 1 $ 7,050.00 $ 7,050.00 3 Backfill (credit for base bid tower CY 43 $ (10.00 $ (430.00 4 Backfill for tower CY 0 $ 10.00 $ - 5 Place Forms (creditfor basebid tower) SF 199 $ (4.00 $ (796.00 a Place Forms for proposed tower SF 36 $ 4.00 $ 144.00 7 Place Rebar (credit for base tower) TN 3.4 $ (400.00) $ (1.360.00 8 Place Rebar for proposed tower TN 1.5 $ 600.00 $ 900.00 9 Place Concrete (creditfor basetower) CY 35 $ (20.00) $ (700.00 10 Place Concrete for proposed tower CY 21 $ 20.00 $ 420.00 11 Form/Place Rebar/Pour Pad LS 1 $ 750.00 $ 750.00 12 Pump Truck LS 1 $ 1.200.00 $ 1,200.00 IC) Subcontracts 1. T.Morales LS 1 $171.117.00 $ 177,117.00 2. s - 3. $ - IC) Administration 1. M.Cannon HR 8 $ 75.00 $ 75.00 $ $ $ $ 600.00 450.00 - - 2. o.Henderson HR 6 3. 4. Sub-Total $ 180,435.50 12.5% OHP $ 22.554.44 TOTAL I $ 202,990 I FHed: 12-02 Cc: 02-4A Project: Interim Floating Intake Facilities Date: 8etiteffttilt:a;t20'l1 TMC Change #: COR-07 ,.(02 Owner: Brushy Crk Regional Utility Authority Project Change #: CPR9 Change Order Request Morales Company is pleased to provide change pricing in response to the engineers CPR-9: This quotation includes the following services and materials: • Conduits with associated fittings, mounting hardware as required. • Wiring and tenninations for power and control. • Subcontractor services for instrumentation procurement and installation (see attached). • Equipment costs for small tools (benders, drills, saws). • Equipment costs for high work (ladders, scaffolds, platform lift, snorkel 11ft, bucket truck). • The quote below includes the credit amount to change the antenna conduits at the WTP site as discussed in the meeting from (2) 2" conduits to (1) 1" conduit (valued at <$2,850:». This quotation does not include any of the following: • Concrete base for the tower at the Cedar Park WTP site. • Geotech studies I bores to determine existing soil conditions at tower location. • Concrete pad for the solar power equipment at the standpipe site (need 6ft x 6ft). This quotation is qualified upon the following assumptions: • Our quote for the tower states that any increase in metals cost between the time of quotation and the point of release will be passed onto the Contractor, in the event we experience an increase in the metals cost for the tower, we reserve the right to pass that expense onto the Owner. • ".lI_iiliil"ll".II.i:pliO,"j;,l":_i:~.i(••:.!.liJ".~t. :':,!f;:~:ioll~i::"'1Ii'J;,~~~:,;,..a;I1"'!t.'I;;".t'.··':.'~d".··iii•.;lIl:illnA;"'iii:~~i" .• '''il,~,~''P~I' l.1Y·I!\".ll""J;'II~ .. ~l"~"'.""':'Y' .·$ll! ..!lQ,;.,.;"S!!t:~. Total cost for the additional work associated with this change is Please see attached pricing summary breakdown. Change Initiated By: Matt Cannon I Excel Const Change Prepared By: Farrell R Prewitt I TMC Change Delivered To: Matt Cannon I Excel Const Response Rqst'd By: wA~SuA!....P _ PO Box 859 601 South Patterson Avenue Florence. Texas 76527 Florence. Texas76527 Phone: 254-793-4344 Fax:254-793-3044 ~--~~-_.""\01."'.' "c.\I.""'twil~Vt GI._".CUlvr.'~ 011 pmjects change orders T Morales Company electric .~Controls Ltd (MaRIng) PO Box 859 11 projects change orders (Pyslcal) 601 South Pat1el'llOn Ave Florence, Texas 76527 118:54:45AM 254-793-4344FP WTP Commlndust TSCITP .., FAX: 254-793-3044 .com .54686 1 0 MATERIALSI QUOTES: 0.01 2 0 Mise Materials: Material Total 2,789.00 1.00 2.789.01 3 0 Quote #1 Calculated 0.00 1.00 0.01 4 0 Quote 112 Calculated 0.00 1.00 0.01 5 0 SUBTOTAL t-.. 6 0 .UO""MU,"jMNN"UMMMH# 0.01 7 0 SALESTAX: Material Tolal 2,789.00 % 0.01 8 0 SUBTOTAl 0.01 9 0 HNMfm#MN#"ffi#"Nn~N### 0.01 10 11 12 0 0 0 LABOR: StraightTtrneLabor OveItime Labor Labor Calculated Total 136.86 0.00 35.80 47.55 0.01•••0.01 13 0 Ie Tech S-T1me Calculated 0.00 40.42 0.01 14 0 Ie Tech 0-TIme Calculated 0.00 58.80 0.01 15 0 Gen Foreman Hours Labor Total 136.86 % 8.00 10.9! 16 0 Gen Foreman Rate Component 15 10.95 41.84 458.1~ 17 0 Material Hneller Hrs Labor Tolal 136.86 % 3.00 4.1 18 0 Material Hndler Rate Component 17 4.11 24.24 99.6: 19 0 Update As Built Dwgs Calculated 1.00 41.84 41.8­ 20 0 Programmer Calculated 0.00 70.00 0.01 21 0 SUBTOTAL 5.499.21 22 0 #N~Mtt~#Ht;NNNI"#H 0.01 23 0 DIRECT JOe EXPENSES: 0.01 24 0 ExpendableTools Material Total 2,789.00 % 3.00 83.~ 25 0 Equipment Calculated 150.00 1.00 150.01 26 0 Warrantyon Material Component 5 2.789.00 0/0 0.01 27 0 Warrantyon Labor Component 21 5,499.26 % 0.0l 28 0 SUBTOTAl 233.6' 29 0 #~Nn"Na»"#n#Y"#H#n"# 0.01 30 0 SUBCONTRACTS; 0.0l 31 0 N8ItronicsQte Calculated 147,095.00 1.00 147".01 32 0 Credit for 2" conduit LM Calculated -2.850.00 1.00 -2,850.0l 33 0 SUBTOTAL 144,245.01 34 0 NNUfi#HGflnn#NNn.#U_U# 0.01 35 0 JOB SUBTOTAl 152,766.9: 36 0 II#lI#tlt#'IiJIi#fIIUMImt/# O.()( 37 0 MARKUPS: 0.01 38 0 LiabilltylBldrs RIsk Component 35 152,766.93 % 2.00 3,055.3­ 39 0 WrtComplSSlUnmplymnt Component 21 5,499.26 % 25.00 1,374.8: U) 0 Overhead @ 2.5% Component 35 152,766.93 % 2.50 3,819.1' H 0 JOB TOTAL 161.016.2! ~2 0 #UnN#"an##~H##N9#### 0.01 ~3 0 Proflt@10% Component 41 161.01625 % 10.00 16.101.6: W 0 JOB TOTAL + PROFtT Component 43 16.101.63 1.00 177.117.81 ~ 0 Perf Payment Bond Component 44 177.117.88 % 0.0l 16 0 AODBONO Component 45 0.00 1.00 177,117.& i7 0 #N'####N#ff####fl###H# 0.01 48 0 BIDTOTAL ~nii17.B1 CHANGE ORDER REQUEST NELTRONICS, LLC Change Order Request #: 003 (Rv3) 41SC TexasAvenue Date: 09/01/2011 RoundRock,Texas 78664 Project No.: 2010-034 Project: Brushy Creek Regional Interim Floating Intake Facilities Change Proposal Request #9 (CPR#9) To: T. Morales Company Electric & Controls, Ltd, From: Neltronics, LLC P.O.80x859 41SCTexas Avenue Florence, Texas 76527 Round Rock, Texas 78664 Attn: Farrell Prewitt Attn: John McClanahan Phone: 254-793·4344 Phone: 512·844-0710 E-Mail: f rewitt moralescom an .eom E-Mail: .hmc10trnl.et We propose to provide the following eqUipment and services as per Change Proposal Request #9: Additional EquipmentasRequiredPer Change ProposalRequestfI9 (CPRfI9} Lot Wireless Backhaul System at Trails End Rd. <-->Cedar Park WTP <-->Standpipe <--->Brushy Creek WTP asProvided and Installed By JTS, Inc. Lot Radwln Spare Parts Lot Trails End Road· 15' antenna mast/hardware, stainless steel white polyester finish enclosure for PLC/radio equipment, aluminum hood/shields & enclosure heater/thermostat Lot Elevated Tank-provide and Install PLC (CompactLogix 1769-L32E), 8 port ethernet switch & increase size of enclosure for additIonal equipment Lot Standpipe - stainless steel white polyester finish enclosure for radio's/ethernet switch, aluminum hood/ shields & Radwin inverter DCPOE's lea Solar Power Products 100 watt solar equipment to include (12) 135 watt solar panels in an array, (12) 265 amp/hour batteries, 60 amp solar controller and (2) quad enclosures Solar Power Products Model SS-G56D-12-1620-24 lea 200' World Tower Company self supporting tower with climbing and coax ladders, safety climb cable (no harness), dish mounts for antenna's, E1dual strobe tower light kit, assemble and erect tower Total Pricefor Change ProposalRequest#9 (CPR#9} Note 1: "'~"'" """"""'h~%.,'.','\ ·'·.'I~n._.~.•~,d""'.~"~ '~.~.': .. " ·",'r',· '·'M~~~".*~ .....,.••tf...~.ltou••__g.~: Note 2: All concrete work for tower structure and antenna mast by others (GC). Core drill samples by others. Not responsilbe for damage to parking lots, sidewalks, sprinkler systems, etc. This price is good for 30 days. If conditions change, this price is VOid. John P.Mcdanahan 09/01/2011 Author Date The above prices and specifications of this Change Order request are satisfactory and are hereby acepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise specified. 0 Accepted AUTHORIZED SIGNATURE COMPANY DATE 2705 BeeCaveRoad. Suile300 Austin, rIP" 78746 us A-JACOBS 1512.314.3100 FSk 1.512.3143135 June 24, 2011 Matt Cannon ExcelConstruction Services, LLC 120I Leaoder Drive Leander, TX 78641 Re: Brusby Creek JleIional Utility Authority (BCRUA) Interim Ji1oatJn,lntab Ji'acl1ltJef Chanae ProposalRequest tI9 Dear Mr. Cannon: Pleaseprovidea cost proposal forthe following proposed revisions to the subjectproject: ReferellCe Sheet 7m J. Delete six (6)VaSi anteDDas atTrail. End R.oad, CedarPart WJ'P, Standpipe, and BCRUA Water Treatment Plant :Elevated StorageTankand replace with nine (9)RadioWave HPD2-4.7 antennas, or approvedequal 2. DeI.8te six (6) OB radios atTrailsBndR.oad,Cedar Parle WTP, Standpipe, and BCRUA Water Trea1lDCDt Plant Blevated Storage Tank and replace with nine(9) Radwin C-2000Seriesradios (Outdoor end Indoor units). or approved equal. 3. Add the required Cat6l!themct cables, coaxialcables and HubSite SynchroniZlrioD (HSS)units, network switches,swge arrestorsand JlOWld kits.as shown OIl the enclosed revised Sheet ?Y03. 4. ModifY power,eoMrOl and teJemctty wiring in the appropriate panels. 5. SupplyadditionalData Concentrator in diepaoelat theBCRUA EST,as shownon the enclosed revisedSheet7Y03. Reference SpeciWiation §ection 13400 -Part6 6. Delete original towerdata sheet and replaceit with the enclosed revised tower data sheet lfthe costproposal is accepted. a change order willbe preparedfor the worle. If you bave any questions, please do DOt hesitate to cantacl me at 5J2·314·3182. Sincerely, JACOBS ENGINEERING GR.OUP, rNC. GlennA. Bridles. P.B. Senior Project Enalneer XC: Mike 1hun,P.B.,BCR.UA Jema Hiaby, 1nT, BCRUA Grace StiDman. Err, BCRUA Dustin lUley, Water llesource Management J.R. Tolles, P.E. wi enclosures K.\WJXK02011ContJaCl)'ChInp Proposal R.equaII'CPR WCPR fI9 I1nal.doc Jacobs Eng/fleerl/19 Group tnc 2705 Bee cave Road, Suite 300 Austin. T8lf88 7674$U.S.A .JACOBS" 1,5123143100 Fax 1.512314.3135 August 12,201 I Matt Cannon Bxeel Construction Services, LLC ]201 Leander Drive Leander, TX 78641 Re: BnuJayCreek -eatonll uunty Autborlty (BCRUA) Interim FloatlDelntake 'atiUties Cbaop Propoul ReqUflt."9 and t#9A (Revised 08-12-11) DearMr. Cannon: Baaed on the meeting held yesterdayat BCRUA's offICe, pleaseincorporatethe following items in revised responses to the subject CPR.'s: 1. Revise CPR #9 mponse to include all credit amounts for installation labor,etc.for items from originalcontractthatare being deletedby CPR#9. 2. Revisetablesshowins Additional EquipmentItems 1-9 and Deductions (Credit) Items ]-3 to includecosts for eachindividual item. in addition to Total(Additions)andTotal (aedit). 3. Revise Change Order Summary Sheet &omNBLtronies. LLC so that madcup amounts apply to the netamountadded,after creditS havebeen deducted. 4. DeleteUPS at Standpipe and provide a solar panel with backup to match the existing installation at the stlndpipc. The new equipment (which incl. the radio panel and the solarpaneland associated batteries)should be separate&omthe existing equipment at lbe Standpipe 5. IDstaU IUD shield cover for encJoaure at Standpipe. 6. 1na..11 sun shield cover for enclosure atTrails End Road. 7. ProtectCAT5 cable with Rexible conduitwhere it is exposedon tops of tanks.(Alsoappliesto CPR#9A) 8. Revisematerialforantennasupportsfrom galvanized steelto aluminum (AlsoappliestoCPR tJ9A) Note:ForItems 4, 5and6 above,pleaserefertotheenclosedrevisedSheet7Y03,whichshall replace the previous sheet If you have any questions or needadditional information, pleasedonot hesitateto contactmeat 512-314­ 3182. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. Bridges,P • Senior Project Engineer XC: Mike 1'huss, P.E.,BCRUA JeM Higby,EIT,BCRUA Grace Stillman, EIT,BCRUA Dustin Riley, WaterResource Management J.R.Tolles,P.E. wi enclosures K:\WJXK0201 \ConlTa<:\JlCbange Proposal RequeslS\cPR N9\cPR#9andtiM ~jsions.doc J8CObs Engineering GroupInc II) Id.L HI J • )} I 5 Ii ! QnfUh Jp I I Ij ~ iPul II I .... J I J.... .! . . . I I f I Ii J Ih I II ( ! j 11 tq I. I II hili!.­..... - I IIJ .411 ! i iiiJ itu· UltlII 1111 i t -III IIfllU .1if ~~hJJu ~ .mlJj, htl' ... ,., ..-r-----. hj!H,f.' , i.' •• I"•• I I f~!" Illilhif 14 1111,1 IH II lIiMl1 Iff)J HitJh UuJhlt ulln.... , . =. , If d'. 5 li~ll 'll 1 I IhJ!II a'i • IiII1, I1'1 I' lulJdaUf hJ!.II! It j ••••••••• I ! III :!I I j ,. I II I, iI n ~ilf I ,id f J IIII• I g J 11;1 j •hI; ~III I I ...... I '! 1 .i iI JI ! ~ • I Q f J U J II 111 I i! I • J IIl..-.L ....H.._JUlLJL__...J CHANGE ORDER #4 ITEM 2 2705 Bee Cave H<J8« SUfie 300 Austin Texas 787413 USA.JACOBS' 1512,314 31QO Fax 1 512314 3nS APflROVm By Michael F. ThIlSS, p~ .')"~~~"j ,1 September 8, 2011 ' , Michael F. Thuss, P.E . . ~2011.09.09 15:14:57Michael F. Thuss,P.E. ~ "" -05'00'Construction Manager Brushy Creek Regional Utility Authority (BCRUA) 1906 Hur Industrial Boulevard Cedar Park, Texas 78613 Re: BCRUA Interim Floating Intake Facilities - RW-C3 Change Proposal Request #12 Dear Mr.Thuss: Enclosed is the response from Excel Construction Services, LLC (Excel), dated September 2, 2011, to MFT CPR #1~. Jacobs Engineering Group, Inc. has reviewed the cost information submitted by Excel. It is our opinion that the total cost for the proposed material change is fair and reasonable and we hereby recommend acceptance of CPR #12. If BCRUA accepts this cost proposal, a total of $1,665.00 will be incorporated into the next change order. If you have any questions or need additional information, please call, Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A.Bridges, .E. Senior Project Engineer XC: Jenn Higby, BCRUA Grace Stillman, BCRUA Dustin Riley, WRM lim Tolles, JR Tolles Associates wI enclosures K:'0S0844\construction'conlral:l 3\cPR's\('PR 1/3\CpR lIl2 Ic1ler 090811.doI: Jacobs Engineering Group Inc ~Qi.L» Change Proposal BCRUA Floating Intake Request No. 12 JACOBS Prolect Name: Interim Roatlng Intake Faclmtes Contractor: Excel Construction 8etvIces. LLC ProjectOwner. BCRUA Address: PO80x 2260 Leander. Texas 1~ Address: 221 E. Main Street RoundRock TX 18664 Initiated by: X Engineer 0 Contractor Attention: The followlng Change In the contracton thlsprotectIs proposed. • Worl(shell not commence until authorized by !he Owner. Description of the Proposed Change: Excel i. Diea" to QIfw the followlmJ ehalJlle for the owners cons/de,.tlon Iw tm, cha ed bVfhe enom--In CPRlfl. ThIs DIODOSal t. for uDfH'8dlffQ Ih. bandInD materialfrom treated lumber to a comDoslte manufacwt'8(/ bv SHr SOlrd. _ .. By !Matthew Cannon-Excel Consttudlon Servlce&. LLC Allwork shaU be In accordance withthe terms, Jacobs Recommendation: stipulations, and COnditions of the original Contract o Recommend Acceptance Documents. If the wor\( herein provided for Is Approved by o 00 Not Recommend Acceptance Change Order.!he time of completion will be: Increased o Decreased X Unchanged By: Jacobs By 0 calendar days. Date This change will: X Add Deduct 0 No Change Owner's Action: o Accepted 0 Not Accepted$ 1,665.00 l.".::C:;';:R:-:-U:7ExcelConstructionSeNices. LLC A---------------- I Date september2. 2011 I Dale WOBKPRQPQSAl COST ITEMIZATION: CPRNo. 12 BCRUA Interim Floating Intake Use ComposIte wood In !feu of treated lumber to band barge August 3D, 2011 I units I quantity I unit cost 0 total rA) "'aterla/s 1. COMP08ite Wood (2)<4} LF 104 $ 2.76 $ 3.65 $ (0.44 s (0.53 $ $ s $ $ $ $ s $ $ 287.04 1,058.50 (45.24) (152.83) - -- - -- 2 ComDOsite Wood (2X61 LF 290 3 Credit for U$ing treated lumber (2X4) LF 104 4 Creditfor usina trli*)ted lumber (2X6) IF 290 5 6 7 8 9 10 IB) LalJorlEquJ"",ent 1. $ · 2 $ · 3 $ · 4 $ · 5 s · Ie) SUbconfra;;.;·;;..;;c~ts::.....-~ ...., ~ Ili Ie) Administration 1. M.Cannon HR 4 $ 75.00 $ $ $ $ 300.00 -. - 2. 3. 4. Sub-Total $ 1,447.47 15% OHP $ 217.12 TOTAL l $ 1,6651 .JACOBS~ 2705 Bee cave Road, Sulle300 Austin,Texas78746 U.S.A. 1.512.314.3100 Fax 1.512.314.3135 September 1, 2011 Matt Cannon Excel Construction Services, LLC 1201 Leander Drive Leander, TX 78641 Re: Brushy Creek Regional UtiUty Authority (BCRUA) Interim Floating Intake Facilities -Change Proposal Request #12 Dear Mr. Cannon: Please provide a cost proposal for the following revision to the scope of work: 1. Upgrade treated lumber banding at the new barge to composite wood banding. Quantities required: 104 LF of2" x 4" boards and 260 LF of2" x 6" boards. Ifthe cost proposal is accepted, a change order will be prepared for the work. If you have any questions, please do not hesitate to contact me at 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP, INC. ~ Glenn A. Bridges, P.E. Senior Project Engineer xc. Mike Thuss, P.E., BCRUA Grace Stillman, BCRUA Dustin Riley, Water Resource Management Jim Tolles, JR Tolles Associates wI enclosures K:\WJXK020I\conll'8Ct3\change proposal mjuests\change proposal request #12.doc Jacobs Engirw8ring Group Inc. CHANGE ORDER #4 ITEM 3 2705Bee CaveRoad, Suite300 Au$lln. Tell8. 78746 V.S.A .JACOBS 1.512.314.3100 Fax 1.512314.3135 September 1. 2011 Matt Cannon Excel Construction Services, LLC 1201 Leander Drive Leander. TX 78641 Re: Brusby Creek Regional Utility Authority (BCRUA) Interim Floating Intake Facilities· Change Proposal Request #13 Dear Mr. Cannon: Please provide a cost proposal for the following addition to the scope of work; 1. Remove and dispose of approximately 200 LF of existing 16" ductile iron pipe. which extends above ground from the old Twin Creeks barge. Pipe shall be removed at the sleeve where it transitions from above ground installation to buried installation. Note: Abandonment in place of buried portion is included in original scope of work (see note on Sheet 1C02). If the cost proposal is accepted. a change order will be prepared for the work. If you have any questions, please do not hesitate to contact me at 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP. INC. Glenn A. Bridges, Senior Project Engineer XC: Mike Thuss, P,E., BCRUA Grace Stillman, BCRUA Dustin Riley, Water Resource Management Jim Tolles, JR Tolles Associates wi enclosures K:\WJXK0201\contract 3\changeproposal requests\change proposalrequesttll3.doc Jacobs engineering Group Inc. 2705Bee Ca....e Road, Swte300 AlJstln, Texas 78746 USA.JACOBS" 1512314,;~1O(Jra~ 1,512,314,3135 APPROVED By Michael F. Tit"•• P.E. .':1,~'·.".zm;1 September 8, 2011 . "MiChael F. Thuss, P.E. Michael F. Thuss. P.E. , ~201 1.09.0915:11:50Construction Manager ~ -05'00'Brushy Creek Regional Utility Authority (BCRUA) 1906 Hur IndUstrial Boulevard Cedar Park, Texas 78613 Re: BCRUA Interim Floating Intake Facilities- RW·C3 Change Proposal Rfquest #13 DearMr.Thuss: Enclosed is the response from Excel Construction Services, LLC (Excel), dated September 2, 2011, to CPR #13. Jacobs Engineering Group, Inc. has reviewed the cost information submitted by Excel. It is our opinion that the total cost for the added scope of work is fair and reasonable. IfBCRUA accepts this cost proposal. a total of $3,113.00 will be incorporated into the next change order. Excel also states that 2 calendar days will be required for the added scope of work. However, the additional days will not be included in the change order, and the substantial completion date for the overall project will not change. If you have any questions or need additional information, please call, Sincerely. JACOBS ENGINEERING GROUP, INC. Glenn A. Bridges, .E. Senior Project Engineer XC: Jenn Higby, BCRUA Grace Stillman, BCRUA Dustin Riley, WRM Jim Tolles, JR Tolles Associates wi enclosures K:\050844\constJUCliunlc'lnlraCl 3\CPR'sICPR 1131CPR 1/13 letter O9OR Il.doc Ji;lcobs EngilJef!fillg Group Ifle Change Proposal BCRUA Floating Intake Request No. 13 JACOBS ProJect Name: Interim FIoatlna lmake Facilities Contractor: ExcelCo~C/Jon Services llC Project Owner: Address: BCRUA 22t E. Main Street RoundRock. TX 78664 Address: Initiated by: X PO Box 226Q leander. Texas7~ Enalneer D Contractor AttentIon: The following cnange Inthe contracton this projectIs proposed. WOI1l shallnot commence until authorized by the Owner. Description of the Proposed Change: Excel I. I1IQsfid II) 0'"(be following change for fhe ow".,." con./denJtJon by (he ch8nf1a propoH(/ bY the e"gIn.., In CPRI13. The wort wDl e<rnsI$tof """'01(11111 and dlsl!JO$lng of al'lNOKlnJlde/Y 200' of 16" DIP dl5ChV!Jfl line that runs UP the hIli towanfs the CPW7J'. The plDe Will be rerIIovetl UP to file "ratJoInt undertllOUnd. By I MatthewCannon-Excel Construction Services. LLC All work shall be in accordance WIth the terms, Jacobs Recommendation: stipulations, and conditions of the orIglnai Contract o Recommend Acceptance Documents. If the work hereinprovidedforIs Approved by o Do NotRecommendAcceptance Change Order, the lime of compleUon wlH be: X Increased o Decreased Unchanged By: Jecobs By 2 calendar days. Date This change will: X Add Deduct C No Change Owner'sAction: o Accepted 0 No1 AcceptedS 3,113.00 ~-_._-------------Excel ConstrucllonServices.LLC IDale September 2, 2011 I Date WORK PROPOSAL COST ITEMIZATION: CPR No. 13 BCRUA Interim Floating Intake Remove approx 200' of 16" DIP from hili (old TC discharge pipe) September 2, 2011 I units I quantity I unit cost 0 total IA) Materials 1. $ - 2 $ - 3 $ · 4 $ - 5 $ · 6 $ · 7 $ - 8 s - 9 $ - 10 $ - IB} LaborlEaulDm8tlt 1. Removeapprox. 200' of restrained 16" DIP HR 48 s 26.00 s 55.00 $ 1,248.00 2 Excavator HR 16 $ 880.00 3 $ $ $ - - - 4 5 lc} Subcontracts ~;;;.,,;.;..;.~---------------+---+----m IC) AdmlnlWatJon 1. M.Cannon HR 2 $ $ 75.00 75.00 $ $ $ $ 150.00 300.00 . - 2. O. Henderson HR 4 3. 4. Sub-Total $ 2.578.00 5% Small Tools $ 128.90 15% OHP $ 406.04 TOTAL 1$ 3,1131 DATE: October 14/ 2011 SLlBJECT: BCRUA Board Meeting -October 19/ 2011 ITEM: 6D. Consider a resolution approving Change Order No.4 with Excel Construction Services, LLC for the BCRUA Interim Floating Intake Facilities. PRESENTER: Michael F.Thuss, P.E. Program Manager Justification: This change order is required to transition the entire BCRUA Raw Water Telecommunications System to a 4.9 GHz frequency. This will also alleviate any interference with other telecommunication systems in the area. This change order also upgrades the lumber banding for the new barge to composite wood banding, as well as removing and disposing of 200 LF of existing 16"ductile iron pipe that was originally to be abandoned in place at the request of City of Cedar Park. Funding: This change order is for an additional $207/768.00/ revising the total contract amount to $4/139/090.82. Funding for this change order is from the project's contingency. EXECUTED DOCUMENTS FOLLOW Page 1 of 1 Contrad: Quantity Adjusbnent/Change Order Project Name: BCRUA Interim Aoatlng Intake Facilities COntractor: Excel ConstructIon 5ervices, U.C Date: 9/15/2011 Change Order/Quantity Engineer: Jacobs Engineering Group, Inc. Adjustment No. Justification1'---_ SUMMARY Amount ~ Original Contract PrIce: $3,807,500.00_ PrevIous Quantity Adjustment(s): ThIs Quantity Adjustment: $0.00 Total Quantity AdJustment(s): $0.00 Total Contract PI1ce with Quantity Adjustment(s): $3,807,500.00 Previous Change Order(s): ThIs Change Order: Total Change Order(s) To Date: OrIgInal Contract PrIce Plus Olange Order(s) Quantity Adjustment(s): OrIgInal Contract Time: Contract Time Prior to this ellange Order: Contract TIme with All Approved Change Orders: $123,822.82 $207,768.00 Plus 365 calendar days '400 calendar days 400 calendar days 331590.82 Glenn A. BrkIges, P.E., Project Engineer ~ Prepared By: ~ Jacobs EngIneer!ng Group, Inc. Printed Name, TItle and Company ,r/f/t.1I=~- BCRUA Approval: Printed Name, TItle and Company '1. /~./I CHANGE ORDER No.4 """~==~ '_J)~JiI,_t ~.•_,_,~.......", _ DATE OF ISSUANCE: 09-15-11 EFFECTIVE DATE: _ ~~~ L""_.._.'__........._ ......... _ OWNER: BCRUA CONTRACfOR: Excel Construction Services, LLC PROJECT: BCRUA Interim Floating Intake Facilities ENGINEER.: Jacobs Engineering Group, Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: Change Proposal Reguests t. Add SCADA system revisions, per CPR #9 and the response to CPR #9 from Excel, dated September 2, 2011. ADD $201,990.00 2. Upgrade treated lumber banding at new barge to composite wood banding, per CPR #12 response from Excel, dated July 12,2011. ADD $1,665.00 3. Add removal and disposal of existing 16" DIP which extends above ground from the old Twin Creeks barge, per CPR 41 13 and the response to CPR 41 13 from Excel, dated September 2, 20 II. ADD $3,113.00 TOTAL ADD $ 207,768.00 Page I Projcct: 8CRUA Interim Floating Intake Facilities Change OrderNo.4 CHANGE IN CONTRACT PRICE: OriginalCon1nlct Price: $ 3JJ17.5QOM Net incrase from previous Change Orders SW.m.81 Contract Price prior to this Change Order: $ 3,931.3n.81 Net increase rrom Ibis Olange Order: $111,761.. Contract Price with all approved Change Orders: $ 4,139.190.82 CHANGE IN CONTRACT TIME: Original ContractTimes: Substantial Completion (Days): 334 calendar days Final Completion (Days): 365calendar daYS Substantial Completion (Date): NOYember 5, 2011 Final Completion (Date): D«ember6,2011 Net change from previous Change Orders: Substantial Completion (Days): 348 cale!dar dIIys Final Completion (Days): 400 gImdar daYS Substantial Completion (Date): Nm....l'.2011 Final Completion (Date): .Januan 13.1011 Contract Timesprior to this Change Order: Substantial Completion (Days): 348 calendlir daD Final Completion (Days): 400 caIeadar daYS Substantial Completion (Date): Nov""ber 19.2011 Final Completion (Date): Japua" 13.1011 Net increase this Change Order: (See Note 1 below.) Substantial Completion (Date): Nownber 19,2011 Final Completion (Date): January 13.1011 Final Completion (Date): JanDa" 17.2011 (for SCADA work ODIyl Contract Times with all approved Change Orders: Substantial Completion (Days): 341c.....r davs Final Completion (Days): 400 caleadar dIIvs Substantial Completion (Date): November 19.1011 Final Completion (Date): JaDUl" 13. 2011 Final Completion (Date): January 17.1011 «or SCADA work oply) Note I: Final Completion date isextendedonlyfor the SCADAworkincludedinthisChangeOrder. Dateshall be extendedby 140 calendar days aftertheApril30,2011Change Directive that wasissued,whichmakesthenewFinal Completion date for the SCADAwork to be on January 17,2012. Page 2 CHANGE ORDER #4 ITEMl 2705 BeeCave Road.SUIte 300 Austin.Texas 76746U.SA. .JACOBS 1512.314.3100 Fax 1.512.314.3135 MM....F.•••, P.S: ) RECEIVED HFT CoastnJctioD Manager By Michael F. Thuss, P.E. at 3:34 pm, Sep 12, 2011 BIUIby Creek Regional UtilityAuthority (BCRUA) 1906Bur ladustrial Boulevard Cedar Park,Texas 78613 APPROVED Re: BClWA Intennal10atlnc Intake "aelUdes -RW-c3 By Michael F. Thuss, P.E. at 9:48 am, Sap 13, 2011 C.....e Proposal Requat tI9 Rev. 1 Michael F.Thuss, P.E.DearMr.Tbuss: 2011.09.13 09:49:03 -05'00' Eacloscd is a zII4 revised response from Excel Construction Services" UC (Excel), datedSepte.mcr 2.2011. to CPR #19. This leVision is in re,spODSe lo my letter to Excel, dated 08·30-11 (copy also enclosed). Cost cIedw:tionI iDcluded in dris 2" revised response are sUDUnlrized as follows: J. Tolal pricefrom NELTRONlCS,LLC is reduced byS15,545. Part olthis reduction is the elimiaation of~" &pare capacity for the sollr equipmentat lite standpipe,wbicb was included in the previous vasion. The reductiOllattributed to this item was previously shownto be $5,278. The remai Di... reduction ofS10;2.67 is notitemized in this versiollt since it does not include backup information &om 1I'S, which is a subcontractor to NELmONICS, LLC. 2. Totalprice from T Morales C~y is reduced by SII.754. The reduction is attributed to the fact that overlapping costs were identified between T Morales, NELTRONICS andITS,and tbe fact that the overbead markup&om T Moraleswas reduced &om S% to 2.5%. 3. Tolalprice from Excel is Jeduced by S10,404. This reduction is due to the revised tower foundation (drilled piers instead orlile previouspad foUDdation). and the fact that the overhead _rkup from Excelwas reduced from S% to 2.5%. Basedon the above reductioDS. if this r revised response to CPR #19 is accepted by BCRUA a change order will be prepared to add $202.990 to the CGIltraet amount. In addition. Excelhas requested that the time of completion be increased by 1.-0calendardays. for this added scope of work. only. Allother contract time requirements will remain thesame. Ifyou have any questioos orneed additional information. please:call. Sincerely, JACOBS ENGINEERING GROUP. INC. Glenn A. Bridges, P.E. Senior Project Engineer XC: Jenn Higby, BCRUA Grace Stillman, BCRUA Dustin Riley. WRM Jim ToRes, JRToUes Associates wI eDl;losures K:";0S0844\consIructiOll\conntl 3\CPR's\CPR.KPR 'lleUa'OSl8ll.doc Jacobs Engineering Group file. ~~}> Change Proposal BCRUA Floating Intake Request No. 09 Rev. 2 JACOBS Prolect Name: Interim AoatIng Intake Fac:IIlIes Contractor. Excel ConatrucIIon SeMc:es, LlC ProjectOwner: BCRUA Address: PO Box 2260 Leander, Texas 78648 Address: 221 E. MainStreet Round Rock, TX 78864 Initiated bY: X Enaineer D CoIlIrador AIIentIon: The foIawIng dlange In the contracton this project Ia proposed. • Work shaH not commence until authorized by the Owner. Description of the ProposedChange: Excel,. to ottw the follow/, _L fw Ute 0WfNQ conaldelatJon by ",. clNl-ftrftftOHd bY the 1nCI'RII. ~.notethls lis baaed ott 01 the • fbundaflon for the .ntenna et the CP WlP. By I MatthewCannon-Excel Construction Servk:es LLC All WOI'k shall be In accordance with the tenns, stipulations, and conditions of the original ConIract Documents. If the work herein provided for 18 Approved by Change Order,the Ume of completion will be: X Inaeased 0 Decreased Unchanged By 140 calendardays. Thisdoes not Include timeallottedfor submittal review. This changewill: X Add De $ 202,990.00 <k.Ict 0 No Change I. II:///,'", /""'H" ExcelConstruction Services, LLC I Dale September 2. 2011 Jacobs RecommendaUon: o Recommend Acceptance o DoNot Recommend Acceptance By: Jacobs I'-:08:--:'"te------------------ Owner's AcUon: o Accepted 0 Not Accepted , -:B=-y:-.-=B-::::CR=:U:":':A~--------------- IDate Change Proposal Requcst Fonn BCRUA INTFRIM FLOATING INTAKE FACILITIES WORK PROPOSAL COSTITEMIZADQNi CPR No.9 Rev2 BCRUAInterim Floating Intake Revised Scada september 2, 2011 ~ quantity I unit cost 0 total IA) Materials 1 Forming (credit for base bid tower) 2 Formina for proposed tower 3 Rebar (credit for base tower) 4 Rebar for proposed tower 5 Concrete (credit for base tower) 6 Concretefor proposed tower 7 Formina material/rebar/concrete for 6X6 pad 8 SF SF TN TN CY CY LS 199 36 3.4 1.5 35 21 1 $ (3.00) $ 3.00 $ (875.00) $ 875.00 $ (72.00) $ 72.00 $ 125.00 $ (597.00) $ 108.00 $ (2,975.00 $ 1,312.50 $ (2,520.00 $ 1,512.00 $ 125.00 $ - IB) LaborlEaulmnent 1. Excavation (credit for base bid tower) 2 Drill Piers for proposed tower 3 Backfill (credit for base bid tower 4 BackflU for proposed tower 5 Place Forms (credit for base bid tower) 6 Place Forms for proposed tower 7 Place Rebar (credit for base tower) 8 Place Rebar for proposed tower 9 Place Concrete (credit for base tower) 10 Place Concrete for tower 11 ForrnIPlace Rebar/Pour Pad 12 Pump Truck CY LS CY CY SF SF TN TN CY CY LS LS 75 1 43 0 199 36 3.4 1.5 35 21 1 1 $ (25.00) $ 7,050.00 $ (10.00) $ 10.00 $ (4 00) $ 4.00 $ (40000 $ 600.00 $ (20 00) $ 20.00 $ 750.00 $ 1,200.00 $ (1.875.00) $ 7,050.00 $ (430.00) $ ~ $ (796.00 $ 144.00 $ (1.36000 $ 900.00 $ (700 00 $ 420.00 $ 750.00 $ 1,200.00 IC) Subcontracts 1. T.Moralas 2. 3. LS 1 $1n,117.oo $1n,117.00 $ - $ - IC) Administration 1. M.Cannon 2. D.Henderson 3. 4. HR HR 8 6 $ 75.00 $ 75.00 $ 600.00 $ 450.00 $ ~ $ - Sub-Total $ 180,435.50 12.5% OHP $ 22,554.44 TOTAL I $ 202,990 I Filed: 12-02 Cc: 02-4A i'1l"C1tJ{' Cont r o ls U Iu s t r urrrent an o n Project: Interim Floating Intake Facilities Date: September 2, 2011 TMC Change #: COR..o7 Rev02 Owner: BrushyCrk Regional Utility Authority Project Change #: CPR9 Change Order Request Morales Company is pleased to provide change pricing in response to the engineers CPR-9: This quotation includes the fol.lowing services and materials: • Conduits with associated fittings, mounting hardware as reqUired. • Wiringand terminations for powerand control. • Subcontractor services for instrumentation procurement and installation (see attached). • Equipment costsfor smalltools (benders,drills,saws). • Equipment costsfor highwork (ladders,scaffolds,platformlift,snorkel lift,bucket truck). • The quote below includes the credit amountto changethe antenna conduits at the WTP site as discussed in the meeting from (2) 2-conduits to (1) 1"conduit (valued at <$2,850». This quotation does not includeany ofthe following: • Concrete base for the tower at the CedarParkWTP site. • Geotech studies I boresto detennine existing soil conditions at tower location. • Concrete pad for the solar power equipment at the standpipe site (need 6ft x 6ft). This quotation is qualified upon the following assumptions: • Our quote for the tower states that any increase in metals cost between the time of quotation and the point of release will be passed onto the Contractor, in the event we experience an increase in the metals cost for the tower, we reserve the right to pass that expense onto the Owner. • Note clarification on Neltronics proposal in regard to the sizing of the Solar equipment. We reviewed the scope in detail between TMC, Neltronics, and JTS and were able to identify some overlapping costs. Total cost for the additional work associated with this change is $177,117.00. Please see attached pricing summary breakdown. extension In Time Request for (~ weeks: This extension intimecan run concurrently withCPR9Awork,assuming both changes are accepted. The change in time is contingentupon submittals being returned approved as noted. ChangeInitiated By: MattCannon I Excel Const Change Prepared By: Farrell R. Prewitt I TMC Change Delivered To: Matt Cannon I ExcelConst ResponseRqst'd By: :...,:A=SAP:....::..- _ POBox859 601 SouthPattersonAvenue Florence, Texas 76527 Florence, Texas 76527 Phone: 254-793-4344 Fax: 254-793-3044 ,. JOB NAME 2011 protects change OIders I!IT.J"1:.1D 0.54686 T McInIIes CompanyElectric Controls Ltd (MaIlIng) PO Box 859 ··,EiTIIMTE· 2011 projects change orders (PysicaI) 601 South Patterson Ave ~~_~ 91212011 8:54:45AM Florence. Texas 76527 ':;bATA 'E'I"lji FPWTP CommlnduatTSClTP .•. 254-793-4344 FA)(:254-793-3044 ~]~·;I~;··~tL ' ., -iE­~~8"),oom> ,-'~ , .a ' ;'l~~ ;IlWW.;;·[..... RefAnio~~L_~~' .~). AmcM 1 0 MATERIALS' QUOTES: 0 2 0 MiseMaterials: Material Total 2.789.00 • 1.00 2,789 3 0 Quote 11 Calculated 0.00 • 1.00 0 4 0 QuoIet2 calculated 0.00 • 1.00 0 5 0 SUBTOTAL 2,788 6 0 Mr.........aKN••JIIn 0 7 0 SALESTAX: Material Total 2,789.00 0 8 0 SUBTOTAL 0 9 0 Ennn ......#Nn.JN.,•• 0 10 0 LABOR: 0 11 0 StraightTme Labor Labor ToIIII 136.86 35.80 4,889 12 0 Overtime Labor C81culated 0.00 47.55 0 13 0 Ie Tech S-Time Calculated 0.00 • 40.42 0 14 0 IeTech 0-Time Calculated 0.00 • 58.80 0 I!I 0 Gen Forema,] Hours labor Total 136.86 % 8.00 1( 16 0 Gen ForemanRate Component 15 10.95 • 41.84 ~ vt a Malenal Hndler Hrs labor Tolal 13686 " '0 3,00 18 0 MaterialHndler Rate Component 17 4.11 24.24 9£ 19 0 UpdateAs Bul" Dwgs Calculated 1.00 • 41.84 41 20 0 Programmer C81cu1ated 0.00 70.00 ( 21 0 SUBTOTAL M9E 22 0 ,~nKN#W'#KJWw:rN~N'N ( 23 0 DIRECTJOB EXPENSES: ( 24 0 Expendable Tools Material Total 2,789.00 % 3.00 ~ 25 0 Equipment Calculated 150.00 1.00 15C 26 27 0 0 Warranty on Material Warranty on Labor Component component 5 21 2.789.00 5.499.26 % .. ( ( 28 0 SUBTOTAL 23: 29 0 N.NONNUNIN#KNKNNunNU ( 30 0 SUBCONTRACTS: ( 31 0 Neltronics ate Calculated 147,095.00 1.00 147,09f 32 0 Credit for 2" conduit lM C8k:uIated -2,850.00 1.00 -2.85C 33 0 SUBTOTAL 144,24/ 34 0 n'UR.8acurNn'.UNnN"O I 35 0 JOB SUBTOTAL 152,761 36 0 n'~~I'~"SNNNMlnNNNnN f 37 0 MARKUPS: 36 0 UabilitylBldrs Risk Component 35 152.766.93 % 2.00 3,05! 39 0 WrkCompiSSlUnmplymnt Component 21 5,499.26 % 25.00 1,37· 40 0 Overhead @ 2.5% Component 35 152,766.93 % 2.50 3,81' *1 0 JOB TOTAL 161,011 *2 0 #HAWff"N8~;~##Off"w"NN ;3 0 Profit @ 10% Component 41 161,016,25 u, r: 1000 113 H) t4 0 JOB TOTAL+ PROFIT Component 43 16,101.63 1.00 177,11 I!> 0 Perf Payment Bond Component 44 177,117 88 "~ *6 0 ADD BONO Component 45 0.00 1.00 177,11 H 0 "U'N#'#iJNN,aNU~l"N# t8 0 BID TOTAL 1n,11 CHANGE ORDER REQUEST NELTRONICS. LLC Change Order Request #: 003 (Rv3) 41SCTexasAvenue Date: 09/01/2011 Round Rock,Texas 78664 Project No.: 201~34 Project: Brushy Creek Regional Interim Floating Intake Facilities Change Proposal Request #9 (CPR#9) To: T. Morales Company ElectrIc &Controls, Ltd. From: Neltronics, LLC P.O.Box 859 415C Texas Avenue Florence, Texas 76527 Round Rock, Texas 78664 Attn: Farrell Prewitt Attn: John McClanahan Phone: 2S4-793~344 Phone: 512-844-0710 E-Mail: fprewitt@moralescompany.com E-Mail: ·ohmccOlneltronics.net We propose to provide the following equipment and services as per Change Proposal Request #9: Additional Equipment as RequiredPer Change ProposalRequest 119 (CPRII9} Lot Wireless Backhaul System at Trails End Rd. <->Cedar ParkWTP <-->Standpipe <--->Brushy Creek WTP as Provided and Installed By JTS, Inc. Lot Radwln Spare Parts Lot Trails End Road -15' antenna mast/hardware, stainless steel white polyester finish enclosure for PLC/radlo equipment, aluminum hood/shields & enclosure heater/thermostat Lot Elevated Tank -provide and install PLC (CompactLoglx 1769-L32E), 8 port ethernet switch &increase size of enclosure for additional equipment Lot Standpipe - stainless steel white polyester finish enclosure for radio's/ethernet switch, aluminum hood/ shields & Radwin inverter DCPOE's lea Solar Power Products 100 watt solar equipment to include (12) 135 watt solar panels in an array, (12) 265 amp/hour batteries, 60 amp solar controller and (2) quad enclosures Solar Power Products Model S5-G56D-12-162Q-24 lea 200' World Tower Company self supporting tower with climbing and coax ladders, safety climb cable (no harness), dish mounts for antenna's, E1 dual strobe tower light kit, assemble and erect tower Totol PrIce for Change ProposalRequest119 (CPRII9} $147,095.00 Note 1: Solar equlpmem will be sized to handle the present load of the radlo's and ethernet switch. A7S watt system will be provided; 30%extra capadty will not be provided. The radlo's and the ethemet switch wli be located within the solar enclosure; a separate enclosure to house this equipment will not be required. Note 2: All concrete work for tower structure and antenna mast by others (GC). Core drill samples by others. Not responsllbe for damage to parking lots, sidewalks, sprinkler systems, etc. This price is good for 30 days. If conditions change, this price Is void. We are requestinl a time extension of 20 weeks from notice to proceed with this change proposal request. The reduced time extension is contengent upon an approved as noted submittal process. John P. McClanahan 09/01/2011 Author Date The above prices and specifications of this Change Order request are satisfactory and are hereby acepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise specified. 0 Accepted AUTHORIZED SIGNATURE COMPANY DATE 2705 Bee Cave Roali. SlIile 300 Austin, Texas 76746 US,AJACOBS 15123143100 Fax 1.512314.3135 June 24.2011 Matt CaI1D011 ExcelCoDStJ'UCtion Services,UC 1201 Leander Drive Leuder. TIC 78641 Re: Bruthy Creek Jle&IoaaI UtlUty Authority (BeRUA) Interim P1oatill& latab ,1dUtieI Ca.PnpoaI RecpIeIt '" DearMr. Cumon: Please provide a cost proposal for dac following proposed revisions to the IUbj~t project: Reference Sheet 7Y03 I. Delete six (6)Viii ......at Trails Em Road. Cedar PIIk WIP. Standpipe. and BCRUA Water Treatment Plaut Elevated StoIa.Tank and replace with aiDe (9) RadioWaveHPD2-4.7 ....... or approved equal. 2. Delete six (6)OR radios atTrails BDd Road,CedarParkW'IP.Standpipe, and BCR.UA Water Treatment PlantElevated Ston. Tillie and replace with nine(9) Radwin C·2000 Series ndios (Outdoorand IndoorUDits). or approved equal. 3. Addthe requiIed Cat6 EdIemet cables. coaxial cables IDd HubSite Synchronization (HSS)units, network switches.....anestorIlDCI pound kits. as shown OIl the enclosed revised Sheet7Y03. 4. Modify power. COIdIOIIIId telemetry wiring in the appropilte puels. S. Supply additional DaIaConceaIrator in the panelat the BCRUA EST. as shown on the enclosed revised Sheet 7Y03. RefemJCe Specific.tjon Sectjon 13400- Part6 6. Delete original towa' daIa sheet andreplace it with the eoclosed revised tower data sheet. If the costproposal is acc:eptIld, a et.ae order will be prepared for the work. If you have any questioDs. please do not hesitate to CODIICt me at 512-314-3182. Sincerely. JACOBS ENGINEBRING GROUP. INC. GleanA. Bridles. P.E. Senior Project BngiDeer XC: Mike Thuss. P A. BCIlUA leon Higby. BIT. BCRUA Grace StillmaD. BT. BCIlUA Dustin Riley. WaIeI'R.esourc:e Management J.R.Tolles.P.E. Wi enclosures K \WJXK0201ConlrlCt 3'tCIaIItIe PIaposaJ R.ecpsas'CPR I9'\CPR19 final.doc Jacobs Englneermg Group Inc 2705 Bee Cave Road, Suite 300 Austin, Texas 78146USAJACOBS 15123143100 Fax 1.5123143135 August 12.2011 Matt CaDDOl1 Excel Construction Services. u.c 1201 LeanderDrive Leander, TX 78641 Re: BnDy Creek .......UtlBty Autlaorlty (BCRUA) "tem JI..tIDa I.tab .... Chan. ' .....Req 119 8A (Revised 88-12-11) DearMr. Cannon: Based on the meetiD. held yesterday at BcaUA's om~ pleue incorponte the rollowiBg items in revised IeSpOnsel to the subjectC?Il's: 1. Revise CPR 119 mpoIIIC to include all credit amounts forinstallation labor,etc.for items from origin8l CODlnlctthat IDe beiDa deleted by CPR 119. 2. Revise tables showilla AdditioDal EquipmentI.... 1-9 and Deductions (Credit)Items1-3 to iDclude costs for each individual item. inadditionto Total(Additions)and TOIII (credit). 3. Revise Cbaoge OrderSummarySheet &om NELtronics.u.c 10 that markup amounts apply to tbe net amount added,after cndiIs "ve been cleductM. 4. Delete UPS It 8taDdpipe ad provide a solarpanel with backup to match the existin.installation at the S1Indpipe. The newequipment (which includes thendio panel and the 1011r pIIIlel and associaled batteries) should be separate &om the existina equipment at the Staodpipe S. Install IUD shield cover fbi' eaclosln.t Standpipe. 6. Install SlID shieldcover for eaclosure at Trails Eod Road. 7. ProtectCAT5 cablewiIbftexibleconduitwhere it is exposedon tops oftaDks. (Also applies to CPRII9A) 8. Revisematerial for IIdeDDa supports fiom galvanized steel to aluminum. (Also applies to CPIl #9A) Note:For Items 4, S and 6 above, pleasetefcr to the enclosed revised Sheet 7Y03, which shall replace the previoussheet. Ifyou have any questions or need additicmaJ iDfcmnation, please do not bai1atc to contactmeatS12-314­ 3182. S~crely, JACOBS ENGINEERING GIlOUP,INC. Glenn A. Bridges, P . Senior Projcct Engineer xc Mite Thuss, P.E.•BCRUA Jeon Higby. EIT.BCRUA Grace Stillman, EIT, BCIlUA Dustin Riley, Water Resource Management J.R.Tolles,P.E. Wi enclosures K:\WJXK0201\COIIll'lICl J\Chanae Proposal ReqBes&s'CPR t9'CPR tI9 aIId #9A revisll>ns.doc Jecobs Engineering Group Inc. -------------------------------------- ------- ._----_.---­ ~,'ll ., lieJi,---ii1 .~~ ill] UTITf --r=.~ E ~. . e flIIEM1\4(a.-)R.-EI! ...-.........(N*'*"l ~ .r si; ~iinlil ~T;;:=l f''1 i ~~~, ~ ?j I~'~~ 1 tTraIIaIndRolfl_.....--_._1'-•.._ I :I CfClItPaIIIWTPRllcIlo 1'_ e~-.• $" Pi'n~l Cnn~tfuc.Hot1Noles ~ CecIIr1'l1li 'ItT!' _ &leclrtc.lIllClOlll ux:"TION, POWI!'ANIl COIITINT8 Of' MIllO CCNTIIIOI. ""lEU-'-I............. It._............... -=..~...,.................,,... ..­..........001 ....... .....1 .... "....."-...., ............---.... 1.-............. __.n...,.,.............."'.................. ~_..IlCIUI.............-­_......IT._........ __flIC ...IDT.....,. -...............,. ........._"......L • ...,.....' ... ._­ ,_....c..-...." ... ... _­ .­ ,...,..........-.............. ................,......,IM__.......,........................ ........._ ............\lIIto"".......................... ,.......e-................, ~.................. ~.....-...~....-......­ ,..............~ .-...-. Chw~"""'''---•-....,,... ........­~JoCr:t:u_'I'J.J • C 11"(. t_·1.-00001 .~.............. • 'LC.G_._­ • ~\«-'..-.t1Ql..11._­· c...a~t_..-t' .~----...·_iowS)oncflrorc:__·,' • -.utOall........ o c.oc...c.li&......................_­. tur._,..,.,.._ ~W'liI .­..... • .....I.CQI ...1q .C'-.....~ ..------­._­ ••I.a .... ~~,­ -M' ...-...........-.... ri ff .. ~ 'f,.~CI'l:l" t~I·\~~l ...~t, ..__ .......~IJl~Ilt'..... _ ;o((;;~ __...........~-­::===-~......................-• II",......,..........-.......~~ ............... c.-.·.... ­..... cal).JMM.........._ ... ..---.......-....III ..............._.........., p~~ ~~~ D a r-~~HSS '~ WW~~ - -plpe"­ seePa... ConouU<llOn No.. P3lKll CGn~'''c:JCln N:;les Panel sh.~ tle • Ha/lma" <:ndOSu •• Par,l" inside .fl<I "",.....__"""".I eleClfOOl""C8lIy ~TOIC PO'_' ..._II<JIlIde'coaling P ...I'. t. onol.11cd ""tn. hood and """,lei ,h....... ll''''.d lie lOp. _ and _.<,flhcl pard Hood aIllI __be conatnlde<I(rem 10 GA __. T-._ •n'flbe lcttlK:tl ft[jma fYnilC ~cc~. be 1fKr\,,nlod'J.,reasz. r Il'c.rn ... PHliandbll~t6U.Un8lrutIor....... The toPlind ....Ih•• Il101» 01. JItlgIe...... ."d aM "P""" edge' ,n .. "" 9'0."" .,.,.OIII.nd butr II•• n..top end side....aII ... """'_II .....0" tomlhe pentt IE-E_'~~~?:"-~~":: .._,'0 ;~~; _._­ """-I -'I;i. ~~ E • t r ~E \E-'~,,_._,.__ --------,-···:::-=-E--e- - ­ a.-_geT_P_ eLL OF .....TIIRIAUI p "'*'-'" _ e-ioI c.-to OOU ----XIDI'Ic.... ~ :tc,..... 1..~1 ._.......r_w M_':c.~ ....._­--, - __ .~=-.1.10_...10_ ::==..~~._­.....-­---­--­......RSIOOaI ... _t'PCI ._-­......­,­-_. '''ZZlI~ Q R.<l1o1~l.Mil-OOU) ~ ~1_Unl-1OUl ~ Hub SIIe SyncIltonir&1io1l UIIil l1'tS8) ~ ~P-""lll'S) "'"'i'~ Imili~,--. ,-­ ~Logic:e-r(PLC)-"""'m":flt d .. __"It. ! '11• ~ -..8IIItIGI~ CIiNlIO'Y 0 e-e­.--£--la..-R-.Ij t"t~~1'---LilJJJll!J1illJ ~ EJdIllng..-,1n EST-PI.C.OC ,~UPS'~ ~._~_! . ~. I ------·-E ., J CHANGE ORDER #4 ITEM 2 270c, Bee Cave Roao SUlle 3UO Austin, Texas 78746 U S f,JACOBS 1.5123143100 Fax 1512.314 313S APPROVED By Michael F. Thuss, P.E. at 3:13 pm, Sep 09,2011 September 8, 2011 o ,( ~ Michael F. Thuss, P.E • ./h~~2011.09.0915:14:57Michael F. Thuss, P.E. //Z 'tJ' -05'00'Construction Manager Brushy Creek Regional Utility Authority (BCRUA) 1906 Hur Industrial Boulevard Cedar Park, Texas 78613 Re: BCRUA Interim Floating Intake FacUities- RW-C3 Cbange Proposal Request #12 Dear Mr. Thuss: Enclosed is the response from Excel Construction Services. LLC (Excel), dated September 2, 20 11, to MIT CPR #1~. Jacobs Engineering Group, Inc. has reviewed the cost information submitted by Excel. It is our opinion that the total cost for the proposed material change is fair and reasonable and we hereby recommend acceptance of CPR #12. If BCRUA accepts this cost proposal, a total of $1,665.00 will be incorporated into the next change order. If you have any questions or need additional information, please call. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. Bridges, .E. Senior Project Engineer XC: Jenn Higby, BCRUA Grace Stillman, BCRUA Dustin Riley, WRM Jim Tolles, JR Tolles Associates wI enclosures K:\050844\construClion\comraCI 3\cPR's\cPR #3'.CPR /I12 leuer 090811 .doc ·' ." ...~....exc:eC:, ~~UJ:; Change Proposal BCRUA Floating Intake Request No. 12 JACOBS Project Name: InterimFloatlna IntakeFacilities Contractor: ExcelConstruction Services. LlC ProtectOwner: BCRUA Address: PO Box 2260 Leander. Texas 78646 Address: 221 E. Main Street Round Rock. TX 78664 Initiated by: X Engineer o ConlJ'aetor Attention: The following change in the contracton this project Is proposed. • Work shallnot commence until authorized by the Owner. Description of the Proposed Change: Excel Is pleased to offer the following changft for the owners consideration b~ the changes proposed by the enolneer In CPR#12. This DfOoosalls for upgradlna the band/na materia' from treBted lumber to a composite manufactured bv Bear Board. By I Malthew Cannon-Excel Construction Services. LLC All WOI'k shallbe in accordance with the terms, Jacobs Recommendation: stipulations. and conditions of the original Contract o Recommend Acceptance Documents. If the work herein provided for is Approved by o Do Not Recommend Acceptance Change Order. the time of completionwill be: Increased o Deaeased X Unchanged By: Jacobs By 0 calendar days. Date TI1ischange will: X Add Deduct 0 No Change Owner's Action: o Accepted 0 Not Accepted S 1,665.00 I~ ­ Excel Construction Services. LlC By: BCRUA I Date September 2.2011 I Date WORK PROPOSALCOSTITEMIZATION: CPRNo.12 BCRUA Interim Floating Intake Use Composite wood In lieu of treated lumber to band barge August 30. 2011 I units I guantity I unit cost 0 total IA) Materials 1. Composite Wood (2X4) LF 104 $ $ $ $ 2.76 3.65 (0.44\ (0.53 $ $ $ $ $ $ $ $ $ $ 267.04 1,058.50 (45.24) (152.83) ~ -. . - - 2 Composite Wood (2X6) LF 290 3 Credit for using treated lumber (2X4) LF 104 4 Credit for using treated lumber (2X6) LF 290 5 6 7 8 9 10 IB) Labor/Equipment 1. $ $ $ $ $ - -. -- 2 3 4 5 Ie) Subcontractsi3r--------------------+----~~-=i--- Ie} Administration 1. M.Cannon HR 4 s 75.00 $ $ s $ 300.00 - - - 2. 3. 4. Sub-Total $ 1.447.47 15% OHP $ 217.12 TOTAL I $ 1,665 ~ 2705 Bee Cave Road. Suite 300 Austin. Texas 78746 U.S.A. .JACOBS 1.512.3143100 Fax 1.512314.3135 September 1, 2011 Matt Cannon Excel ConstructionServices,LLC 1201 Leander Drive Leander,TX 78641 Re: Brushy Creek Re&ional Utility Authority (BCRUA) Interim FloatiaclDtake Facilities - Change Proposal Request #12 Dear Mr. Cannon: Pleaseprovideacost proposalforthe following revision to the scope ofwork: 1. Upgrade treated lumberbandingatthenewbargetocompositewood banding. Quantities required: 104LF of2"x4" boardsand260 LF of2"x 6" boards. If the cost proposal is accepted, a change order will be prepared for the work. Ifyou have anyquestions,pleasedo not hesitateto contactmeat 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. Bridges, P.E. SeniorProject Engineer XC: Mike Thuss, P.E., BCRUA Grace Stillman,BCRUA Dustin Riley, Water Resource Management Jim Tolles, JR Tolles Associates wI enclosures K:\WJXK0201 \conlrllCt 3'chan1Dt propoal requests\chlnae proposal request ill2.doc Jacobs Engineering Group Inc. CHANGE ORDER #4 ITEM 3 2705 Bee Cave Road, Suite 300 Austin, Texas 78746 U.S.A..JACOBS' 1.512.3143100 Fax 1.512.3143135 September 1,2011 Matt Cannon Excel Construction Services, LLC 1201 LeanderDrive Leander, TX 78641 Re: Bruslly Creek Regiona' Utility Authority (BCRUA) IDterim FIoatiDg Iatake Facilities -Change Proposal Request #13 Dear Mr. Cannon: Please provide a costproposalforthe following addition tothe scope of work: 1. Remove and dispose of approximately 200LFofexisting16"ductileironpipe, whichextendsaboveground from theoldTwinCreeks barge. Pipeshall be removed at the sleeve where it transitions from above ground installation to buried installation. Note: Abandonment in place of buried portion is included in original scope of work (seenoteon Sheet1C02). Ifthecost proposal is accepted,achangeorderwillbepreparedforthe work. If youhave any questions, please do not hesitate to contactme at 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP, INC. GlennA. Bridges, SeniorProjectEngineer XC: MikeThuss,P.E.,BCRDA Grace Stillman, BCRDA Dustin Riley, WaterResource Management Jim Tolles,JR Tolles Associates wI enclosures K:\WJXK0201\conuxc 3'd18n1eproposal requc5lS'change proposal request'13.doc Jacobs Engineering Group Inc. 2705 BEe Cave R08(L Suue roo Austin. T",:as .,8746 U Sf>.JACOBS 15123143100 ra, 1 512 3i4 3135 APPROVED By Michael F. Thuss, P.E. at 3:10 pm, Sep 09,2011 September 8, 2011 Michael F. Thuss, P.E. Michael F. Thuss, P.E. . ~2011.09.09 15:11 :50Construction Manager ~ -05'00'Brushy Creek Regional Utility Authority (BCRUA) 1906 Hur Industrial Boulevard Cedar Park, Texas 78613 Re: BCRUA Interim Floating Intake Facilities - RW-C3 Cbange Proposal Request #13 Dear Mr. Thuss: Enclosed is the response from Excel Construction Services, LLC (Excel), dated September 2,2011, to CPR #13. Jacobs Engineering Group, Inc. has reviewed the cost information submitted by Excel. It is our opinion that the total cost for the added scope of work is fair and reasonable. IfBCRUA accepts this cost proposal, a total of $3,113.00 will be incorporated into the next change order. Excel also states that 2 calendar days will be required for the added scope of work. However, the additional days will not be included in the change order, and the substantial completion date for the overall project will not change. If you have any questions or need additional information, please call. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. Bridges, .E. Senior Project Engineer XC: Jenn Higby, BCRUA Grace Stillman, BCRUA Dustin Riley, WRM Jim Tolles, JR Tolles Associates wI enclosures K:\oS0844IcooSlJUction'contract )\cPR's\CPR 113\C'PR 1t131c:ttc:r 090811.d()c ·..• , •..-.. "".'....,""2'~. ~~ Change Proposal BCRUA Floating Intake Request No. 13 JACOBS Pro/eel Name: Interim Floating Intake Facilities Contractor: Excel ConslnJClion Services. LLC Project Owner: BCRUA Address: PO Box2260 Leander, Texas78646 Address: 221 E. Main Street Round Rock TX 78664 Initiated by: X Enaineer o Conlraclor Attention: The following change in the contract on this project Is proposed. • Work shall not commenceuntil authorized by the OWner. Description of the Proposed Change: Excel Is pl..sed to offer ,INt followlno change for the owners consideration by the changes proposed by the ena/ne.,. In CPRtl13. The work will consist of removlmJ and dlsDOslng ofalJP1Oxlmat.iy 200' of 18" DIP discharge line th.,runs UD the hili towards ,he CP WTP. The Dloe will be removed UP to the nrst joint underground. By I Mallhew Cannon-Excel Construction Services. LLC All wor!< shallbe in accordance with !he tenns, Jacobs Recommendation: slipulatlons, and conditions of the original Contract o Recommend Acceptance Documents. If the work herein pnwided for Is Approved by o Do Nol Recommend Acceptance Change Order, the time of completion wiI be: X Increased o Decreased Unchanged By: Jacobs By 2 calendar days. Date This changewiN: X Add Deduct 0 No Change Owner's Action: o Accepted 0 Not Accepted$ 3,113.00 I~~__- Excel Construction Services. LlC By: BCRUA I Dale September 2, 2011 WORK PROPOSAL COST rrEMlZATION: CPR No. 13 BCRUA Interim Floating Intake Remove approx 200' of 16" DIP from hill (old TC discharge pipe) September 2,2011 I units I quantity I unit cost 0 total IA) Materials 1. $ $ $ $ $ $ $ $ $ $ - -- - · · - - · - 2 3 4 5 6 7 8 9 10 18) LaborlEqulpment 1. Remove acorox. 200' of restrained 16-DIP HR 48 $ $ 26.00 55.00 $ $ $ $ 1,248.00 880.00 - - 2 Excavator HR 16 3 4 5 $ - Ie) Subcontracts ~31:.~~------------r----__.......I rq$ ttj---r---_:_11 Ie) Administration 1. M.Cannon HR 2 $ $ 75.00 75.00 $ $ $ $ 150.00 300.00 . - 2. D. Henderson HR 4 3. 4. Sub-Total $ 2,578.00 5% Small Tools $ 128.90 15%OHP $ 406.04 TOTAL 1_) 3,113 1_