BCRUA_R-11-10-19-6FRESOLUTION NO. R-ll-IO-19-6F
WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has
previously entered into a contract ("Contract") with S.l Louis Construction of Texas, Ltd for the
BCRUA Raw Water Pipeline Phase One - Contract No.1 Project, and
WHEREAS, the BCRUA has determined that it is necessary to make
adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies
to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in
said Contract in accordance with the attached Quantity Adjustment//Change Order No.7, Now
Therefore
BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY
AUTHORITY,
That the Board President is hereby authorized and directed to execute on behalf of the
BCRUA, Quantity Adjustment/Change Order No. 7 to the Contract with S.l. Louis Construction
of Texas, Ltd for the Raw Water Pipeline Phase One - Contract No.1 Project, a copy of same
being attached hereto as Exhibit "A" and incorporated herein for all purposes.
The Board hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting
was open to the public as required by law at all times during which this Resolution and the
subject matter hereof were discussed, considered and formally acted upon, all as required by the
Open Meetings Act, Chapter 551, Texas Government Code, as amended.
Z:\BCRUA\BoardPackctsIPacketDocumenlll\\O\91\IR••. BCRUA ChUlg. Order # 7 w-S.J. Looi. - Raw WL Pipeline (OO235447).DOCIrmc
RESOLVED this 19th day of October, 2011.
_~~~ LJLv9.L
GEORGE WHItE, President
Brushy Creek Regional Utility Authority
ATTEST:
MIT H~Secretary~"'""'
2
9/14/2011
Page 1 of 1
Contract Quantity Adjustment/Change Order =":JI~~~J;~~
.t•••••.•••••fr; •••• "' ••• ~ .
...wu
BCRUA Raw Water Pipeline Phase One •
Project Name:,.;;CoI;.;;.;n.;,;;;tra..;;;,ct-..:,l _
Contractor: SJ. louis ConstructIon of Tecas, Ltd. Dale:
Olange
Order/Quantity
EngIneer: Jaoobs Engineering Group, Inc. AdjustmentNo.
SUMMARY Amount ~
OrtgInai CortnIct PrIce: $19,371,138.19_
PrevIous QuanIly Adjustmenl(s):
ThIs QuanIttY Adjustment:
Totli Quantly Adjustment(s):
Totli ContrICt Price with QuantllyAdjUstment(s):
~O1Inge Order(s):
ThIs O1Inge Order:
TOCII Olange ORIer(s) To Dale:
Ortglnlll 0JntnIc:t Prtoe Plus Q\ange Otdet(s) Plus
QulInlily Adjtatment(s):
0rfgInaI Contract Time: 730calendardays (Rnal)
ConlraCll1me Prtor to this Change Older: 734 calendardays (Final)
contract 11me with All Approved Change Orders: 794 calendar days (Rnal)
Glenn A.8I1dges, P.E., Project EngIneer
Jacobs EngIneering Group, Inc. 10-1-1\
Printed Name, TIle and CCllq)Iny
~"".Pf~ ~1&rNIWQ4""'"
~.1". 1.OlI.$ ~., 'IF~, IJR
Prtnted Name, TItle
~,
7
r •
CHANGE ORDERNo.7
EFFECTIVEDATE: _DATE OF ISSUANCE: 09-14-11
OWNER: BCRVA
CONTRACfOR: S..J. Louis Construdion of Texas, Ltd.
PROJECI': BCRVA Raw Water PJpeJine Phase One - Contract 1
ENGINBER: Jacobs Engineering Group,Inc.
The Contractor is hereby directed to make the following changes inthe Contract Documents:
ChanD PrQposal ReQuest m
I. Install drop inlets.24"diameter drainage culvertsand headwalls withenergy dissipalors at two
locations under Trails End Road.
ADD $l2Z,540.oo
Page I
•I
Project: BCRUA Raw Water Pipeline Phase One -ContnlCl I
Change Order No. 7
CHANGE IN CONTRACT PRICE:
Original Contract Price:
$ 19.371.131.1'
Net inc:rease from previous Change Orders
No. 1 through No.6:
SI45.515,H
Contract Pricepriorto this Change Order:
$ 1?S1§.653,85
Net increase from this Change Order:
$ 121,540.00
Contrae1 Pricewith all approved ChangeOrders:
$19,639,193.85
CHANGE INCONTRACfTIME:
Original Contract Times:
Substantial Completion (Day,): 630 eWer daD
Final Completion (Days): 730 gJspder diD
Substantial Completion (Dale): .Illy 10.2011
Final Completion (Date): Ostober 18. 2011
Netchange from preVious Change Orders:
Substantial Completion (Days): • calendar dlYs
FinalCompletion (Days): .lilA.
Substantial Completion (Date): Jyly 14.2011
Final Completion (Date): October 22. 2011
CODInlCI TImes prior 10 this Change Order:
Substantial Completion (Days): §31 ffltndl r elm
Final Completion (Days): 734glendlr r
Substantial Completion (Date): Jgly 14.2011
Final Completion (Date): OsIober P. 2011
Net inc:rease thisChanae Order: 60days
Substantial Completion (Days): July 14. 2011 (/I
FinalCompletion (Days): December 2 J. 20ll
Contract TImes withall approved Change Orders:
Substantial Completion (Days): 63f glmdar elm (I)
Final Completion (Days): '194 felspde••
Substantial Completion (Date): July 14,2ttl
FinalCompletion (Dale): DetsmMrD, ZOll
III Note:Certificate of Substantial Completion established July 8as dale of Substantial Completion.
Page2
2705Bee CINeRo.d. SuiIe 300
AuIIIn. Telles 78746 U.S.A.
t.St2.314.3100 FAll 1.5123143135
~ACOBS
September 13.201t
Miehlel P.'FhaII. N), )
Construction Manager
Brushy CreekReaionaJ Utility Authori
1906 HwlDduItriIJ Boulevard
Cedar Part. Texas78613
RECEIVED MFT
By ./chlle' F. ThUD, P.E. at 4:11 pm. Sep 13, 2011
'ty(BCRUA) APPROVED
By Mlcha.1 F. Thuss, P.E. at 9:48 am, Sep 14,2011
Re: BCIll1A Raw Water Plpellae, , .....One· Contnet 1 Mlchae' F.Thuss,
Cb....PropoaI Reqa.m A ~. P.E.A •
~.f~2011.09.14
Dear Mr. ThUll: 09:48:33-05'00'
Enclosecl i. the reaponae fiom SJ. Louis Construction ofTexu. Ud. (SJ. Louis). dated September 9,
2011, to aR tn.7. Jacobi EqineeriDa Group,lnc. baa reviewed the COlt information submitted by
SJ.LouiI. It is our opinion that the toCa1 COlt is fair IDd reuonable for the added KOpe ofwOlk. If
BCRUA accepts thiscost proposal,• total of $122,540.00 will be incorporated into the nextchlD&e
order.
One correction shou1cl be made to the nota &om S.J. Louis included in tile proposal. The 45 day
time a;tenlion should be chanaed to 60 clays, as requested in 1M breIkdown ofproposa1 eectioo.
Consequently, iftbia it tceepted 1Mfinal completion date for 111 CODInCt work wi]) be a;tended from
October 18,2011 to December 17,2011.
Ifyouhaveany questions or Deed additional information, pleasecall.
Sincerely,
JACOBS BNGJNEERJNO GROUP, INC.
Glenn A.Briclges, P
Senior Project EnBineer
XC: Jenn Higby, BCRUA
Grace Stillman, BCRUA
wi enclosures
K:'4)~_trIC( l'CPR'l'OR G7'tCPR tl27ltuer 091311 doe
Jacobs Engineering GroupInc.
PropOSlll
.,..
",...,I'W-'.-w_ PhMe One· Contrect 1 MlM110,..,...",
1taIMINfIIf ",
".,. Glenn 8ItcfgM, P.E S8InueIO.~
JabI!ngIneImg Group, Inc. Prqect Coordnib'......• Bee Cave Roed. SUite 300 ~,T_78748 saMWd. 1). MON:ol1A
11U propOllledm-1IddIlone1 COllI aaoc;iIIed with ~of 24-dlemeelr dralnlgt cu!Yertl. drop ......
end headwlllllII two locItIons lI\CIer TI"IIII End Roed ..requeIIed by JlcobI Engineering 8nd deecribeclln CPR
.27 (au.::hed).
NOTES;
•,.workIn'1IfIMII not tpeCIIIcIIv deecrlbed hIrIIn .... exdlldlcl.
•M WICMtt .......til plOpOllllncludlng MItaIalkIn wi be perfotmed bv Bryant & F.., ConllNdlon.lnc
·OIHlte ~.be prvvIcI.cI bf8Iyn & FNY CoMtIucIIon, Inc., Peregreement ..IM EngI"",, 8.J.
LouII ConItrucIan " notIWqURd 10prcMde. M tIIM ~for th1I watt.
• ThlI PftlPOI'IIIndudeI eddIIIon of..a cIayIlD ..... oompllClon d-. of project CommIncImIrt of IdclIIIonII dIyI
18 nat to.slit unlil. A1lly .-cuted chlnoe ord«• rwctMId by S..L LouIs ConItrudIon.
fill"""
... Dllcltpllon unit QIw. UnItS r.... COIIt
NIW INSTALLATION Of'DRAINAGI CULV&JtT8". DElCRlIID ..CPR.
%r La 1 '111,400.00 • 111.«10.00
8U8I'OTAL • 111,400.00
10'ltPROm • 11.140.00
NET CONTRACT CHANGE • 1Z2,....OO
REQUESTED ADDI110NAL CALeNDAR DAYS 10
LJ. &.0.-Couhdorl AcffDft
In
1M V. Whlnwl. S.J. LoullConltnJetion of T.... lid.
.
.
BRYANT 6: FREY COKI'IRUCftON CO., INC
-_......"CII""'I
204S WASHINGTON LANE
WAOO, TEXAS 78708
PH: 254-753-2702 FAX: 254-753-2724
PROPOSAL
DATE: __rt."1 Rev 918/201'
JOB NAME: BCRUA -Change OrdtrRlq....27
BRYANT. JlRDICOPI 01''-: .....CON1'RACtORICOPI OFWORK
A.FURNISH ALL LAlORAND EQWIMENT A.PERMfT8
NECUlAlWTOCCMlLEM 80AES 8. DEWATERItG PLAN
8. SET UP N«J AEMGYAL 01'I!QUIPMENT C. TRN'PIC 00N1R0L PLNI
INTO AND OUT OFlORE PIT(a) D. Nt(CLEARI'G OF R.O.W.
C.FURtIIH TRENCH IOXESADEQUATE POR BORE PITS
D.REMOVE ~PROM lORE PIT e. DEWATIR lOR!PIT
F. FUANlH ~PPEA8.ECIFII!D
ON THE! PLANS 0It1HCS
G.GROUI'INGOF AtlU.ARSPACE BeTWEEN ENCASEMENT
IHJ NATURAL GROUND If'REQUIRED
:ray D!8CRrP'nON PEltLJIT. MIOUNT
" TRMS END DRAINAGE ..EI CULVERT8
_ ATTAaIID POItDITAU
'111,400.00 $11 t.400.GO
SO.oo
so.oo
10.00
$0,00
ALL MAT!RW.818 TOBIAS -AND THEMOYEWORK TO IE
PERFORMED INACCORDNCEwnHne DRAWlNB AND IPICFICATION8 ~FOR
THE ABOVE WORK AND COIR.E'TED tI A SUBSTANTIAl.WORICMAN UI<E MANNER
FOR THE SUM OF:
APPROXIMATE DOlLARS: [: '111_10 j
WITH PAVMI!NT TOIE MADE M FOLLOWS: • DAft UPON COMPLITION
NI'( ALlERAnONl OR~TIONI FROM THE A80W SPECIFICATIONS INVOlVING EXTRA cosr WILle EXECUTED
ONLV UPON WRmEN ORDI!R8NmWIU IECOMEM ADDfTtOtW. CHARGE OYER AltO MOW 'M!ESTlMATe.
ALL AGREEMEN1I CONTWGENTIJPON aTRl<ES. ACCIDENTS, OR DELAYS BaOND OUR COH'TROL
RESPECTFULLV SUBMITTED: IItVANrI,...,CON8TItUCIION CO..IIC
PER: .9'9 .....
Nom81Frey
NOT!: 1lI8 PAOPOCW. MAV Be WIIMDRAWN IV US.NOT ~wmilN 10DAYI.
ACCEPTANCE OFPROP08AL. lHEAIOVE PRICES SPECIFICATIONS MD CONDmoNS ARE SATISFACTORV
AND YOU ME HEREBY AUTHORIZED TO DO THE WORK SPECIFED. PAYMENT WILLBe MADE AS0U1\INED ABOVE
IDATI!: SlGNATURE:I~=======~COMPANY:[ ____
YourBoring Fdends
8CRUA RlWWaIer PIpeIne• PMH One·ConIract 1
Che".. PrcIpoAI .......t.17
Unit E8L UnI
Men. Otx. PrIce
$15.000.00 $16,000.00LS ' _ $2.100.00
3 Trench s.ttty 1.....,lIlIon LS ss.ooo.oo $3.000.00
80
'--;,.,;,.--
_
• 2401ftch X.5OOWd....e......ent LF $1Z5.00 "0.000.00
LS t 17,500.00
4 -.,0,000.00EA
LF 80 $200.00_ "'.000.00
$10,100.00••••00
-'000.00
2--;".,;..--
1La
t TyITxDot. Drap........ W10tfJllM tnd Aprone EA 2
""'4)To ..8Ihd In ,.,.SO DaV-01Project
TOTAL LS 1 ••800.00 13e.ooo.oo
....1-7) To Be Billed,., LFT
TOTAL 80 $&37.50 M1.ooo.00LF
~N) To" a.d Wbeft CoMpte"
Total LS S22.,,00.00 122.400.00
TOTAL $111,400.00
FInn: Bryant & FNy Construction
By. $f'-r"I NonnaD Frey
nile: I pMdent
DATE: October 14, 2011
SUBJECT: BCRUA Board Meeting -October 19,2011
ITEM: 6F. Consider a resolution approving Change Order No.7 with SJ louis for Raw Water
Pipeline Phase One, Contract 1.
PRESENTER: Michael F.Thuss, P.E.
Program Manager
Justification:
This change order is to correct pre-existing drainage issues in two different locations on Trails End Road.
The drainage culverts will extend the reliability of the roadway. The change order will not change the
substantial completion date and adds sixty (60) calendar days to the final completion.
Funding:
Change Order #7 is for an additional $122,540.00 to the contract, revising the total contract amount to
$19,639,193.85. Funding for this change order is from the project's contingency.
EXECUTED
DOCUMENTS
FOLLOW
Page1 of 1
COntract Quantity Adjustment/Change Order
BCRUA Raw Water Pipeline Phase One
Project Name: ..,;.Con.......;..tra....;..;.ct....;1'--_
Contractor: S.J. Louis Construction of Texas, Ltd. Date: 9/14/2011
Change
Order/Quantity
Engineer: Jacobs Engineering Group,Inc. Adjustment No.
Justification
1
SUMMARY
Original Contract PrIce:
-
Amount ...::.=a:..
$19,371,138.19_
Previous Quantity Adjustment(s):
this Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
$0.00
$0.00
$19,371,138.19
Previous Change Order(s):
this Change Order:
Total Change Order(s) To Date:
OrIginal Contract PrIce Plus Olange Order(s)
Quantity Adjustment(s):
Plus
$145,515.66
$122,540.00
O.15oto
0.63010
OrIginal Contract Time:
Contract Time PrIor to this Change Order:
contract TIme with All Approved Q\ange Orders:
730 calendar days
734 calendar days
794 calendar days
(Anal)
(Rnal)
(Final)
268055.66
Signature=r w~A.vD/I#7,u---
Glenn A. Bridges, P.E., Project Engineer
Jacobs En neerln Grou, Inc.
PrintedName, Title and Company
~,o"". Pf~loi SO~ 1£oIAS' fItI.CA ~
..;.T. U>vl$ ~QlooJ Sf ~~ IJfZ
Signature Printed Name, TItleand Company Date
BCRUA
Approval:
PrInted Name, TItle
Cr-al-.(,,-F \.sl~~ ~"\.... ~eb ...n.
Printed Name, TItle
Date
(D·t _
7
CHANGE ORDER No.7
DATEOF ISSUANCE: 09-14-11 EFFECTIVE DATE: _
OWNER: BCRUA
CONTRACTOR: SJ. Louis Construction of Texas, Ltd.
PROJECT: BCRUA Raw Water Pipeline Phase One -Contract 1
ENGINEER: Jacobs Engineering Group, Inc.
The Contractor isherebydirectedto make the following changesintheContract Documents:
Change Proposal Request #27
l. Install drop inlets. 24" diameter drainage culverts and headwalls with energy dissipaters at two
locations under Trails End Road.
ADD $122,540.00
Page I
Project:BCRUA RawWaterPipeline PhaseOne -Contract I
Change Order No. 7
CHANGE IN CONTRACT PRICE:
Original Contract Price:
$ 19,371.138.19
Net increase from previous Change Orders
No. I through No.6:
S 145,s15.66
Contract Price prior to this Change Order:
$ 19,516,653.85
Net increase from this Change Order:
$ 122,540.00
Contract Price with all approved Change Orders:
$19,639,193.85
CHANGE IN CONTRACf TIME:
Original Contract Times:
Substantial Completion (Days): 630 atlendar days
Final Completion (Days): 730 calendar days
Substantial Completion (Date): July 10, 2011
Final Completion (Date): October 18, 2011
Net change from previous Change Orders:
SubstantialCompletion(Days): 4 calendardays
Final Completion (Days): J:Y.A
Substantial Completion (Date): July 14,201 I
Final Completion (Date): October 22.2011
Contract Times prior to thisChangeOrder:
Substantial Completion (Days): 634 calendar days
Final Completion (Days): 734 calendar daxs
Substantial Completion (Date): July 14,2011 (Ij
Final Completion (Date): October 22, lOU
Net increase this Change Order: 60 days
Substantial Completion (Days): July 14,2011 (11
FinalCompletion (Days): December 21. 2011
Contract Times with all approved Change Orders:
Substantial Completion (Days): 634 calendar daYS 11)
Final Completion (Days): 794 calendar ~fr"s
Substantial Completion (Date): July 14, 2011
Final Completion (Date): December 21, 2011
(I) Note: Certificate of Substantial Completion established July 8 as date of Substantial Completion.
Page 2
2705Bee CaveRoad. Suite 300
Auslln.Texas78746 U,S.A,JACOBS
'512,314,3'00 Fall 1,5123'43135
Sepkmber13,2011
Miohael F. 'Fhuss. P.B. )
Construction Manager
Brushy Creek Regional Utility Authori
1906Hur Industrial Boulevard
Cedar Park,Texas 78613
RECEIVED MFT
By Michael F. Thuss, P.E. at 4:11 pm, Sep 13, 2011
'ty(BCRUA) APPROVED
By Michael F. Thuss, P.E. at 9:48 am, Ssp 14, 2011
Be: BCRUA Raw Water PlpeUDe, PUse ODe -CODtract 1 Michael F. Thuss,
Cbaage Proposal Reqaest #'1.7 A • ff ~P.E. ~.r~ 2011.09.14
Dear Mr.Thuss: 09:48:33 -05'00'
Enclosed is the response from S.I. Louis Construction of Texas, Ltd. (SJ. Louis). dated September 9.
2011,toCPR#27. Jacobs Engineering Group,Inc.has reviewed the cost information submitted by
S.J. Louis. It is our opinion that the total cost is fairand reasonable for the added scope of work. If
BCRUA accepts this cost proposal, a total ofS122,540.00 will be incorporated into the next change
order.
One correction should be made to the notesfrom SJ.Louis included in the proposal. The45 day
time extension should be changed to 60 days.as requested in the breakdown ofproposal section.
Consequently,ifthis isacceptedthe final completion date forall contract workwill be extended from
October 18,2011 to December 17.2011.
Ifyouhaveany questions or need additional information, pleasecall.
Sincerely,
JACOBS ENGINEERING GROUP, INC.
GlennA.Bridges. P •
SeniorProject Engineer
xc. Jenn Higby, BCRUA
Grace Stillman, BCRUA
wI enclosures
K:\OS0844'constrvclion'conll'Kt tICPR's'CPR 127'CPR 127 letlCT 091311 doc
Jacobs Engineering Group Inc.
Proposal
If'roJecIIUme PropoaINo. 01.
Raw Water PIpeUne Phese One • Contract 1 10 919111
RequIred By n."."",.,By
Mr,Glenn Bridges. P.E Samuel D. Montoya
Jacobe Engineering Group, Inc. Project Coordinat<lr
2705 Bee C8\18 Road, Suite300 SlgnlICIn
Austin, Texu 78746 SA~..w. D. MO~~A
01CIt.".
This proposal addresses addltlonal costs associ8l8d with installation of 241\" diameter drainage culverts. dropInlels.
and headwalls at two locations underTrailsEnd Road as requested by Jacobs Engineering and described In CPR
#27 (attached),
NOTES:
• AI workImaterteIa not specifically described herein are excluded.
-AI WCIfk auoclatectwMh thispropOl8l including restoration witl be perfonned by Bryant & Frey Construction. Inc
• On-site supervision will be provided by Bryent &Frey ConsbUClion, Inc.• Per agreement with the Engineer, S.J.
louis Conatrudlon Ie not required to provide a fuI tine 8Upenntendent for this woJ1(.
-Thia propoaaIlnctudeleddltion of 45 days to final complltlon dateof prcject. Commencement of additional days
II not to startuntil• fully executed change order • reoelved by S.J. Louis Cons1ructlon.
afPrapoul
111m DescrIption Unit Qty. UnItS Total Colt
NEW INSTALLAnoN OF DRAINAGE CUlVERTS M DESCRIBED IN CPR' LS 1 S 111.400.00 S 111.<400.0027
SU8TOTAt. S 111,400.00
10% PROFIT I 11,140.00
NET CONTRACT CHANGe $ 1%2,140.00
REQUESTED ADDITIONAL CALENDAR DAYS 10
SJ. "",en. eo.trucfIof) Acffon
xc
I.ea V. Whitman. S.J.Louis Construction of Texas. Ltd.
"
BRYANT a: FREY CONS-rRUCTION CO., INC
ROAD BORIIIO IPI:CU',gY
204S WASHINGTON LANE
WACO, TEXAS 76708
PH:254-753-2702 FAX: 254-753-2724
PROPOSAL
DATE: Aug .... 27.2111 Rev 9181'201 ,
JOB NAME: BCRUA • CM", Order Request 27
BRYANT a FREY SCOPE OFWORK: PRIIIIE CONTRACTOR SCOPE OFWORK
A. FURNISH ALL LABOR AND ~ A. PERMITS
NECESSARY TOCOI.FlETE BORES B.DEWATERING PlAN
B.SETUP AND REMOVAL OF EQUIPMENT C.TRAFFIC CONTROL PLAN
INTO ANDOUTOF BORE PfT(1) D.Nff Cl.EARJNG OF R.O.W.
C. FURNISH TRENCH BO)CE8 ADEQUATE FOR BORE PITS
D. REMOVE SPOILS FROM BORE PIT
E. DEWA1'I!R BORE PIT
F.FURNISH ENCASEMENT PPEAS SPECIFIED
ONTHE PLANS ORSPECS
G.GROUTING OFANNUlAR SPACE BeTWEEN ENCASEMENT
AND NATURAL GROUND IF REQUIRED
APPROXIMATELY DESCRtP'nON PERLFT. AMOUNT
l' TRAI.S END DRAINAGE PIPE & CULVERTS $111,400.00 $111.400.00
$0.00
SU ATTACHID FOR DeTAILS $0.00
$0.00
SO.OO
ALLMATERIALS ISGUARANTEED TOBEAS SPEClFED AND THEASOVE WORK TOBE
PERFORMED IN ACCORDANCE WITH THE DRAWlNG AND SPECIFICATIONS SUBfMTTED FOR
THEABOVE WORK AND COMPlETED IN ,.,SUBSTANTIAL WORKMAN UKE ~NER
FOR THE SUN OF:
APPROXIMATE DOLLARS: []111,400.00
WITH PAYMENT TOBE MADE M FOLLOWS: 30 DAYS UPON COMPLETION
Nf'( ALTERATIONS OR~nONS FROM THE MOVE SPECIFICATIONS INVOlVING EXTRA COST WILL BE EXECUTED
ONLY UPONWRmEN ORDERSAM} Will BECOME AN ADOtTIONAL CHARGE OVER AND ABOVE nE ESTIMAlE.
All AOREEMENTS CONTINGENT UPON STRIKES, ACCIDENTS. OR DELAYS BEYOND OUR CONTROl.
RESPECTFULLY SUBMITTED: BRYANT & PRQ CONSTRUCTION CO..INC
PER: 9fQ,..sp
Norman Frey
NOTE: THIS PROPOSAl. MAY BEWI1'HDRAWN BY us IF NOT ACCEPTED WlT1iIN 30 DAYS.
ACCEPTANCE OF PROPOSAL. THEASOVE PRICES SPeCIFICATIONS AND CONDmONS ARE SATISFACTORY
AND YOU ARE HEREBY AUTHORIZED TODOTHE WORK SPECIFIED. PAYMENT WILLBE MADE AS 0IJn1NED ABOVE
IDATE: SIGNATURE:!=============
COMPANY:1 _
Your Boring FrIends
BCRUA Raw Water Pipeine •Phase One• Contract1
Chlnge ~81 Request. 17
Item Unit EsL Unit Item
No. OescrIpIIon MeIS. Qty. PrIce AmOUf1:;;.;..t__
MobllzaUon For Protect Incidentals LS $15.000.00 $15,000.00
2 Trench Safety Plan EA 1 $2.500.00_ $2.500.00
3 Trench Safety ImpJementaUon LS $3,000.00 $3,000.00
.. 24-lnch X .500Wei Steel Encasem.nt LF
80 $125.00_ $10,000.00
S TrafIIc Control Plan ImplemlnfBllon LS 1 $7,500.00 $7.500.00
5 Excavate Bore Pits EA 4 $2.500.00_ $10,000.00
6 24-lnch Bores LF 80 $200.00_ $16.000.00
7 Haul orr Excav8ted Matertal From PIts & BONa LS 1 $25.000.00 $25.000.00
EA 2 $5,400.00 $10.800.00
9 Ty I TxDol Drop InletsWlGratMJ and Aprons EA 2 $6.800.00 $11,600.00
(lterna 1-4) To Be Billed In FlNt 30 Days of Project
TOTAL LS 1 $25.600.00 $38,000.00
(IteIM 5-7) To Be SWed Per L.FT
TOTAL
(!tema 808)To Be Blled When Com".
Total
LF
lS
80
1
$637.50
$22,400.00
$51.000.00
$22.400.00
TOTAL $111_400.00
Firm: Bryant & Frey Construction
By: ~.....tm h!V I Norman Frey
nUt: I President
2705 Bee Cave Road. Svile 300
Austin. Texas 78746 U S.A ..JACOBS'
1.512.3143100 Fa. 1512 3143135
August4, 2011
Samuel D.Montoya
S.J. Louis Construction ofTexas Ltd.
9862 Lorene St.,Suite200
San Antonio, Texas78216
Re: Brushy Creek Realoaal Utility Aotlaority (BCRUA)
Raw Water PlpeliDe, Phase ODe -CODtnet 1
ClaaDge Proposal Request #27
Dear Mr. Montoya:
Please provide acostproposalforthe following additional scope of work:
1. Install dropinlets,24"diameter drainage culvertsand headwalls with energy
dissipators attwolocationsunder Trails EndRoad,as shownonthe enclosed
drawings. Plan &profileviewsare shown onnewSheetC-43,drop inletisshownon
newSheet e-44 (TxDOT Standard OI-TYl-(4) and headwall with energy dissipators
is shown onCityof Austin Standard Detail S08S-13.
If the proposal is accepted,achangeorder will be preparedforthe work. Ifyouhaveany
questions, please do not hesitate to contact me at S12-314-3182.
Sincerely,
JACOBS ENGINEERING GROUP, INC.
Glenn A. Bridges,
Senior Project En
w/encJosures
XC: Mike Thuss, P.E.,BCRUA
Jennifer Higby, BCRUA
Grace Stillman, BCRUA
David Dial, David Dial & Associates
K:'D50844\eonstruCtion\cootncl I'changeproposal requeslS\cPR 1127.doc
Jacobs Engmeermg Group Inc.