Loading...
BCRUA_R-12-02-22-6E----- RESOLUTION NO. R-12-02-22-6E WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into a contract ("Contract") with Excel Construction Services, LLC for the BCRUA Interim Floating Intake Facilities Project; and WHEREAS, the BCRUA has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided; and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No.7, Now Therefore BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA, Quantity Adjustment/Change Order No. 7 to the Contract with Excel Construction Services, LLC for the BCRUA Interim Floating Intake Facilities Project, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of February, 2012. GEORGE ~I~L....!:-=t4{....q"..-----­ Brushy Creek Regional Utility Authority ATTEST: ~H F;:?secretary Z:IBCRUAIBoard Packet.IPacket Documents120 I210222 J2IRe. BCRUA QA-CON7 w-EKeel Construction (OO24l868).DOC/rrnc Page 1 of 1 Contract Quantity Adjusbnent/Change Order 11!V. 9(2011 Project Name: BCRUA Interim Aoatlng Intake Facilities Contractor: Engineer: Excel Construction services, UC Jacobs Engineering Group, Inc. Date: Change Order/Quantity Adjustment No. 2/2/2012 7 Justification I~ SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Quantity Acljustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: - Amount ~ $3,807,500.00_ $0.00 $0.00 $3,807,500.00 $530,290.82 13.93% $61,819.00 1.62% $592,109.82 Plus $4,399,609.82 365 calendar days 411 calendar days 462 calendar days Glenn A. Bridges, P.E., Project Engineer Signature Printed Name, Trtle and Company Date Jacobs Engineering Group, Inc. Contractor Approval: ~ , Signature Printed Name, Title and Company Date BCRUA Approval: ~;~~..c..g...L:.I'~~=M:!:II~E'iiUZ~.e:.4f':.......;7i-.=~.=...=~;...::.~---:1:......----=-P._~...::..~ .2_'~_.1....:..;;2:......-_ Signature Printed Name, Title Date BCRUA Approval: ~ ~:;"';"";''''';;;';'---S-ig-na-tu-re----------p-r-in-ted-N-ame-,-T~J\n ICI I H Date CHANGE ORDER No.7 DATE OF ISSUANCE: 02-02-12 EFFECTIVEDATE: _ OWNER: BCRUA CONTRACTOR: Excel Construction Services, LLC (Excel) PROJECT: BCRUA Interim Floating Intake Facilities ENGINEER: Jacobs Engineering Group, Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: Change Proposal Requests 1. Add conduit and conductor to connect electrical building smoke alarm signal to PLC, per CPR #16. ADD $1,724.00 2. Add 51 calendar days to the date of Substantial Completion, per CPR #18. ADD 51 calendar days ADD $18,000.00 3. Add installation and wiring of surge suppressors and analog input module, per CPR #19. ADD $3,380.00 4. Add fiber optic cabling between electrical building and radio tower in lieu of Ethernet cabling, per CPR #20. ADD $19,188.00 5. Modify solar panel mounting arrangement at Cedar Park Standpipe site, per CPR #9 Supplement 1. ADD $19,527.00 TOTAL ADD $61,819.00 Project: BCRUA Interim Floating Intake Facilities Change Order No.7 CHANGE IN CONTRACT PRICE: Original Contract Price: $ 3,807.500.00 Net increase from previous Change Orders $ 530.290.82 Contract Price prior to this Change Order: $ 4.337,790.82 Net increase from this Change Order: $ 61,819.00 Contract Price with all approved Change Orders: $ 4.399,609.82 CHANGE IN CONTRACf TIME: Original Contract Times: Substantial Completion (Days): 334 calendar days Final Completion (Days): 365 calendar days Substantial Completion (Date): November 5. 2011 Final Completion (Date): December 6, 2011 Net change from previous Change Orders: Substantial Completion (Days): 375 calendar days Final Completion (Days): 400 calendar days Substantial Completion (Date): December 16, 2011 Final Completion (Date): January 13,2011 Final Completion (Date): January 17.2012 (for SCADA work only) Contract Times prior to this Change Order: Substantial Completion (Days): 375 calendar days Final Completion (Days): 411 calendar days Substantial Completion (Date): January 21, 2012 Final Completion (Date): January 21.2012 Net increase this Change Order: 51 calendar days (See Notes 1 & 2 below) Substantial Completion (Date): January 21, 2012 Final Completion (Date): January 21. 2012 Contract Times with all approved Change Orders: Substantial Completion (Days): 462 calendar days Final Completion (Days): 462 calendar days Substantial Completion (Date): March 12, 2012 Final Completion (Date): March 12. 2012 Notes: 1. It is the desire of BCRUA that the project be complete up to pump testing (substantial completion) as soon as possible, but not later than March 12,2012. When Excel is ready to test the pumps for substantial completion prior to March 12th , Excel shall notify BCRUA. BCRUA and Excel will then coordinate the date for the start of pump testing. In no case shall the start of pump testing be scheduled later than March 12th without the permission of BCRUA. 2. Included in this change order is Excel's agreement to coordinate a potential "decommissioning" plan for the Barge in case lake levels force the Barge out of operations. Jacobs Engineering, BCRUA, Excel, HDR, and Chapman Marine may participate in developing the plan, with Jacobs Engineering in the lead. Excel agrees to participate in plan development, review, and cost estimating. EXECUTED DOCUMENTS FOLLOW Page 1 of 1 Contract Quantity Adjustment/Change Order rev. 9/2011 Project Name: BCRUA Interim Floating Intake Facilities Contractor: Excel Construction Services, LLC Engineer: Jacobs Engineering Group, Inc. Justification Date: Change Order/Quantity Adjustment No. 2/2/2012 7 1 _ SUMMARY Amount Original Contract Price: $3,807,500.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $3,807,500.00 Previous Change Order(s): $530,290.82 13.93% This Change Order: $61,819.00 1.62% Total Change Order(s) To Date: $592,109.82 15.55% Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): $4,399,609.82 Original Contract Time: 365 calendar days Contract Time Prior to this Change Order: 411 calendar days Contract Time with All Approved Change Orders: 462 calendar days Glenn A. Bridges, P.E., Project Engineer Jacobs Engineering Group, Inc. • 1-• fa- Printed Name, Title and Company Date Contractor ~-rl'I _A~pp_ro_va_I:__/_·_l,"fb\(_----Io__--==::.....------l!M"'--=-rlf C~.--i tP-\ ,"'.{ Signature Printed Name, Title and Company Date BCRUA Approval: ~«6.~'J Printed Name, Title Date BCRUA Approval: f!.-/2-02-2?:~f A Partnersl"aip of Ceda,. P~rk, le-ander. and R.ound Rock CHANGE ORDER No.7 DATE OF ISSUANCE: 02-02-12 EFFECTNEDATE: _ OWNER: BCRUA CONTRACTOR: Excel Construction Services, LLC (Excel) PROJECT: BCRUA Interim Floating Intake Facilities ENGINEER: Jacobs Engineering Group, Inc. The Contractor is hereby directed to make the following changes in the Contract Documents: Change Proposal Requests 1. Add conduit and conductor to connect electrical building smoke alarm signal to PLC, per CPR #16. ADD $1,724.00 2. Add 51 calendar days to the date of Substantial Completion, per CPR #18. ADD 51 calendar days ADD $18,000.00 3. Add installation and wiring of surge suppressors and analog input module, per CPR #19. ADD $3,380.00 4. Add fiber optic cabling between electrical building and radio tower in lieu of Ethernet cabling, per CPR #20. ADD $19,188.00 5. Modify solar panel mounting arrangement at Cedar Park Standpipe site, per CPR #9 Supplement 1. ADD $19,527.00 TOTAL ADD $61,819.00 Page 1 Project: BCRUA Interim Floating Intake Facilities Change Order No.7 CHANGE IN CONTRACT PRICE: Original Contract Price: $ 3,807,500.00 Net increase from previous Change Orders $ 530,290.82 Contract Price prior to this Change Order: $ 4,337,790.82 Net increase from this Change Order: $ 61,819.00 Contract Price with all approved Change Orders: $ 4,399,609.82 CHANGE IN CONTRACT TIME: Original Contract Times: Substantial Completion (Days): 334 calendar days Final Completion (Days): 365 calendar days Substantial Completion (Date): November 5, 2011 Final Completion (Date): December 6, 2011 Net change from previous Change Orders: Substantial Completion (Days): 375 calendar days Final Completion (Days): 400 calendar days Substantial Completion (Date): December 16, 2011 Final Completion (Date): January 13,2011 Final Completion (Date): .January 17, 2012 (for SCADA work only) Contract Times prior to this Change Order: Substantial Completion (Days): 375 calendar days Final Completion (Days): 411 calendar days Substantial Completion (Date): .January 21, 2012 Final Completion (Date): .January 21,2012 Net increase this Change Order: 51 calendar days (See Notes 1 & 2 below) Substantial Completion (Date): .January 21, 2012 Final Completion (Date): .January 21, 2012 Contract Times with all approved Change Orders: Substantial Completion (Days): 462 calendar days Final Completion (Days): 462 calendar days Substantial Completion (Date): March 12, 2012 Final Completion (Date): March 12, 2012 Notes: 1. It is the desire of BCRUA that the project be complete up to pump testing (substantial completion) as soon as possible, but not later than March 12,2012. When Excel is ready to test the pumps for substantial completion prior to March 12th , Excel shall notify BCRUA. BCRUA and Excel will then coordinate the date for the start of pump testing. In no case shall the start of pump testing be scheduled later than March 12th without the permission of BCRUA. 2. Included in this change order is Excel's agreement to coordinate a potential "decommissioning" plan for the Barge in case lake levels force the Barge out of operations. Jacobs Engineering, BCRUA, Excel, HDR, and Chapman Marine may participate in developing the plan, with Jacobs Engineering in the lead. Excel agrees to participate in plan development, review, and cost estimating. Page 2