BCRUA_R-14-01-15-6A r�BRUSHY CREEK SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: CDM SMITH INC. ("Engineer") ADDRESS: Y2357-A Riata Trace Parlc�vay.Suite 210.Austin.TX 78727 PROJECT: BCRUA Water Ta-catanent Plant—Plaasc lA Proicct.Cmastruction Phasc En¢ineerin¢Services This Suppleanenlal Contract No. 2 to Contract for Engineering Seavices is made by and between Ula BRUSI-IY CREEK REGIONAL UTILITY AUTHORITY, INC_, hereinafter called "BCRUA"and CDM SMITId INC.,hereinafter called the"Engineer". WHEREAS, BCRUA and Eaaginecr executed a Contract for Enginccring Services, hereinafter called the "Contract", on the 18th day of November, 2009 For the BCRUA Water Treatment Plant — Phase lA Project, Conslraction Phase Engineering Service-s in the amount of $2,913,038.00;and WHEREAS,BCRUA and Engineer executed Supplemental Contract No. I on June 19, 2013 to amend the scope of services and to increase the compensation by $294,531.00 to a total of $3,207,SG9.00;and WHEREAS, it bas become necessary to amend the Contmct [o modify tlu: provisions for the scope of services and to incaease[he coprpensa[ion by$368,796.00 to a total of$3,576,365.00; NOW THEREFORE, premises considered, BCRUA and the Engiueer agree that said Contazact is amended as follows: I. Article 2. En¢ineerin¢ Services and Exhibit B. En¢ineerin¢ Services shall be amended as se[ forth in the attached Addeaadum To Hxhibit B. Exhibit C_ Work Schedule shall be amended as set foath in the attached Addendum To Exhibit C. II. Article 4_ Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $368,796.00 the lump sum amount payable under the Contract for a total of$3,576,365.00, as shown by the attached Addendum to Exhibit D_ SupplemenMl Contract Rev.032011 0140.4634-5;00258841 215829 .BC�G�fk- �-f�f-oi- fS-4 f� IN WITNESS WI-ICAL+OF, BCRUA and the Engincer have executed this Supplemrntal Conteact in duplicate. D CDM 5 T +INC%i� , / JC��/���� By: b /!/(///ll 2 � .�,/moo%oi4 Date BRUS7IY CREEK REGIONAL UTILITY AUTHORITY,INC. Byv Mitch ller Pr en �s-�� Date BAS PRO A ATO]�'OR : Stepha L_Sheet/t`s,BCRUA Attorney SupVlemanlul Contract ltcv.03/2011 0140.4634-5;00288841 215829 ADDENDUM TO E7CI�BIT'B SUPPLEMENTAL AMENDMENT No.2-SERVICES TO BE PERFORMED BY THE ENGINEER Brushy Creek Regional Utility Authority Brushy Cre¢k R¢gional Water Treatm¢nt Plant-Phase 1A Conatzvction Phase S¢rvic¢s Task 1e G¢n¢zal ConatrucHan Phase and Warranty Services 1. Services und¢r the G¢neral Construction Phase involve consulting with and advising the AUTHORIf'Y during coxistruction and are limited to those services assodated with performing as the AUTHORITY'S representative,including: a. Prepare monthly bill'�g rate time and materials invoice zeporffi including:expenditures to date,cost to-budget ixiformation,with direct cost backup information submitted for out-oF town aiffi visits only_ b. Prepare For and participate in a preconstruclion conference on b¢half of the AUTHORITY. c. Receive,review,and provide written comment on the ad¢quacy of the Contractor's Schedule of Values,Submittal Schedule and Construction Schedule. d. Rec¢iv¢,revi¢w,and provide written comment an Contractor-prepared submittals including shop drawings,samples and OBrM Manuals. For this effort'ENGINEER antidpates about 1600-1500 submittals however,ENGINEER has only budgeted 1,400 submittals due M budg¢tary constraints. ENGINEHR assumes that AUTHORI"l'Y will augment ENGIIVEER's budget from Contractor per Articl¢6.2.6 of Supplemental Gez+eral Conditions,Section OOSOD,for repetitive submittal reviews. e_ Review laboratory,shop,and mill best reports on materials and equipment £ Receive,review and provide written response to all Contractor-generated R¢qu¢ats for Ixtformation(RFI)and Requests for Deviation(RPD). For this effort,ENGINEER anticipates about 500 RFIa and RFDs will be submitt¢d by the Contractor. g. Visit the project sit¢as construction proceeds to observe and attend biwe¢kly construction progress me¢tings- h Provide construction service-related consultation as necessary to the AUTHORITY Project Team during the course of coxistruction. Such consultation may inclssd¢,but is not limited to,the following: 1) Issuing necessary interpretations and clarifications of the Contract Documents and h¢]ping to resolve interpretation disputes. 2) Assisting in the development of d¢fidency lists as requested by the AUTHORITY,and making recommendations as to the acceptability of the work. 3) Preparing sketches required to resolve problems due m actual Held conditions encountered. 4) Reviewing the reasonableness of Contractor-prepared Change Ord¢r Proposals. i. In conjvncHon with all of the above,prepare Change Order Proposal Requesffi for the AUTHORITY'S considemtion as necessary bo deliver th¢intent of the Contract Documenffi_ j. Determine amoun[s of progr¢ss paym¢nffi due to Contractor based on degree of completion of the work determined by AUTHORITY'S inspectors,and recommending issuance of such payments by the AUTHORI"f'Y_ ��1�t.• Paga 1 of 12 wea.nmm w enam.w aa.n...ua tvaisr a> ADDENDUM TO EXFIIBIT B SUPPLEMENTAL AMENDMENT No,2-SERVICES TO BE PERFORMED BY THE ENGINEER k. When requested by the AUTHOAI"IY,partidpate in ixispections fox substantial and final completion including recommendations concerruxrg final payments to constructors and zel¢ase of retained percentages. Subsequent to all inspections,ENGINEER will prepare work d¢ficienry punch-lista for ttae Contractots address_ 7. Conduct witnessed factory ixlapectioxls with two AUTHORITY Project Team representatives including air travel,lodging,meals and miscellaneous related expenses of the Projects steel pipe supplicYs manufacturing and fabrication facilities, Prepare and submit to Yh¢AUTHORITY Project Team five copies of a brief memorandum highlighting the results of each inspection visit m. Continue coordination with regulatory agencies as requested by AUTHORITY. n. Monitor scheduling and control systems,process,tools,and resource planning For project controls. Monitor the flow of information to support project objectives, o, Review status updates for schedule and costs. Identify potential scheduling conflictr including utility"shutdown"requirements. p. Monitor document and records control Foz claims and proper storage at project completion,Review the contractor's bazeline schedule and cost loaded summary schedule and any revisions to those schedules, Provide time impact analysis for change orders and schedule claims analysis. q. Review contractoz monthly progress schedule updates and compares it to the approved schedule and makes monthly reports. Analyze and moxtitor coat and schedule trends and provide an independent assessment of progress and forecast at completion of schedule and cost. r_ Provide cost estimates supporting the review and assessment of change requests and value engineering proposals. Prepare and monitors the operating budget. s. Additional Onsite Controls(SA7) 1) Provide additional onsite controls as described in Task 1,Items n-r For extended construction period as requested by the AUTHORITY. 2) Original scope included a maximssm of 4,880 man-hours, A total of 5,867.5 man-hours have been provided through December 22,2012 totaling 1028.3 additional man-hours beyond original budget, 3) HNGINEER estimates an additional 320 man-hours will be required to finish the Project,which brings the total man-hours required to complete the oxlsite controls to 1,348.3 additional man-hours beyond the origizlally contracted amount. t. Filter Flume/Gullet Slabs Inspection(SAl) 1) As requested in AUTHORITY's letter dated Apri118,2012,ENGINEER provided ix�spection services zelated to filter gullet/flume slabs for Filters 1 1,while the Contractor ixvstall¢d a coating system_ 2) A Contrac[or dispute exists related bo the constnrction of the filter gullet/flume slabs for FIIters 1-8. Until that claim is settled,ENGINEER is ozaly requesting compensation for the AUTHORITY-directed inspection services provided by ENGINEER's subcoxlaultant. �m�lh Page 2 of 12 aaa•aaa••,•e^a�a••�s.mn•a��axwan a> ADDENDUM TO EXIiIBTT B SUPPLEMENTAL AMENDMENT No.2-SERVICES TO BE I'ERFOI2MED BY THH HNGINEER u. Sodium Permanganate Request for Deviation (SAl) 1) Provide additional engineering design services related to implementing AUTHORITY-requested design change from Potassium Permanganate to Sodium Permanganate chemical feed system. 2) Prepare change order documents(e.g.,drawing and spendficafion revisions)for the Contractor to prepare a proposal. 3) Review and comment on Contractor-prepared change order proposal. 4) Review submittals and shop drawings related to these changes. v. ' Redesign of Roadways(SAl) 1) Provide additional engineering design services related to redesigning the plan and profiles of th¢entire roadway systems at the request of the Contractor due to contractor install valve maxtholes at incorrect elevations. 2) Prepare Field Order documents containing revised roadway plan and profile drawings and grading drawings. w. Repetitive Submittal Reviews(SA7) 1) In accordance with Article 6.2.6 of Supplemental General Conditioais,Section 00800, and Section 01300,Paragraph 1.14,Contractor shall reimburse AUTHORITY for ENGIIVEER's costs related to repetitive submittal reviews. ENGINPER's cosh to date include$21,760. In accordance with the Contract Documents as noted above, ENGINEER recommends deducting this amount from the Contractor's payment application. x- AUTHOI2I'PY-R¢quested Design Changes(SAl) 1) Provide additional engineering design services related to implementing AUTHORITY-requested design changes in the form of preparing change order documents(e.g.,drawing and specification revisions)to the Contractor. This work includes preparation of the following change proposal request(CPRj documents: a) CPR#32-Additional Sample Pump,Pipeline and Chlorin¢Analyzer,and Turbidimeter and Free Chlorine Analyzer at Filter Control Box. b) CPR#33-Sodium Hypodiorite Diffuser Modifications c) CPR#37A-30"Manway on Raw Water Line(Materials onity) d) CPR#37B-Remove the 78"plug from the Raw Water Lin¢ e) CPR#37C-Install 30"Manway on th¢7S"Raw Water Line f) CPR#41-Installation of Fire Hydrant with Manhole g) CPR#42-Sludge Dewatering Facility Rolloff Container Area Modifications h) CPR#46-Water Meter Modifications i) CPR#47A-Aluminum Ssslfate,Fluosilidc Add,Liquid Ammonium Sulfate Metering Pump Modifications j) CPR#47B-Alumiztum Sulfate,Fluoailidc Acid,i.fgvid Ammonium Sulfate Metering Pump Electrical Modifications lc) CPR#47C-Aluminum Sulfate,Fluosilidc Acid,Liquid Ammonium Sulfate Metering Pump Modifications(Miscellaneous Spate Paris and Provisions) cp 1) CPR#53-Liquid Ammonium Sulfate Motive Water Modifications Sm,th Pege 3 of 12 ,weww..m e.E..am..r s..am.w tras�dr at ADDENDUM TO EXHIBIT'B SUPPLEMENTAL AMfiNDMENT No.2-SERVICES TO BE PERFORMED BY THE fiNGINfifiR a) CPR#54-Replacement of SCADA System HMI Server Computers b) CPR#55-Disinfection Basin Dlffuaer Modifications c) CPR#58-Fire Alarm System Modifications d) CPR#59-Coxtfiguring Redundant Win911 on Server Computers e) CPA#60-Liquid Ammonium Sulfate Diffuser Modifications f) CPR#61-S¢dim¢ntation Basin Sludge Removal g) CPR#62-SCADA Report Modifications h) CPR#63-Sludge Pump Station Level Indicating Transmitter Modifications i) CPR#64-Booster Pump Alarm Modifications j) CPR#69-Treatm¢nt Structure Polymer Feed System Modifications 2) Review and comment on Contracror-prepared change order proposals. 3) Review additional submittals and shop drawings related ro these chang¢s as required. 4) R¢lated ro the above-referenced CPR#32,AUTHORITY ducted ENGINEER to purchase materials related ro providing free chlorine monitoring system and turbidity monitor system and miscellan¢ous appurt¢nancea as manufactured by Advanced Process. AUTHORITY installed this equipm¢nt at the Filter Control Box. Advanced Process submitted an invoice for this work totaling$5,494 that was paid by ENGINEER. y. Additior�al Onsite Controls(SA2) 1) Provide additional onsite controls as described 3n Task 1,Items n-r for extended 11.6 month construction period as requested by th¢AUTHORITY. 2) Original scope included a maximum of 4,880 man-hours. Supplemental Amendment No.1 (SAl)includ¢d an additional 1,348.3 man-hours. A total of 7,190 man-hours have been provided through Ocrober 19,2013 rotating 962 additional man-hours beyond SAl. 3) ENGINEER estimates an additional 144 man-hours will be required ro finish the Project which brings the royal man-hours required ro complete the onsite controls to 1,106 additional man-hours beyond the original and SA7 contracted amount z. Rep¢titive Submittal Reviews(SA2) 1) In accordance with Article 6.2.6 of Supplemental General Conditions,Section 00800, and Section 01300,Paragraph 1.14,Contractor shall reimburse AUTHORITY For ENGINEER'S costs related to repetitive submittal reviews. ENGINEER's costs ro date beyond SA7 include$6,499. Tn accordance with the Contract Docum¢nts as robed above,ENGINEER recommends deducting this amount from the Contractor's payment application_ aa. Legal Assistance(SA2) '1) Provide legal assistance ro AUTHORITY and AUTHORITY'S attorney,which includes:documenting defective work ro Contractor,reviewing and providing professional engineering opinion ro Contracror's work,reviewing the CantractoYs expert reports,reviewing and providing professional engineering opinion ro Contracror's claims,participating in legal coordination meetings,and providing op general assistance ro AUTHORITY as required. Sm�lh Page4of I2 aaa...aa..me..am..a.me.aaaiezx�a�ra� ADDENDUM TO EXHIBIT B SUPPLEMENTAL AMENDMENT No.2-SERVICES TO BE PERFORMED BY THH ENGINEER bb. Additional Inspection(SA2) 1) In accordant¢with Article 147.3 of the Supplemental General Conditions,Section OOSOO,Contractor shall r¢imbssrse AUTHORITY for repetitive Substantial Completion inspections perforated b.Y the ENGINEER. ENGINHER's costs related to repetitive Substantial Completion inspections include$59,273. In accordance with the Contract Documents as noted above,ENGINEER recommends deducting this amourrt from the Contracbods payment application_ cc Dezurik Valve Investigation(SA2) 1) Pazticlpate in meetings with AUTHOI21"I'Y,Contractor and valve manufacturer to discuss vale¢deHcienci¢s- 2) Prepare memorandum reviewing available data and correspondence and suggest a program that wEl determine the cause of the DeZURZK vale¢probl¢nts. 3) Mobilize besting laboratory to perform on-site analysis of the disc edges for the butterfly valves located in both the fit»shed water and raw water sections of pipe. Testing includes conducting positive material identification(PML)on the disc edges for up to flue butterfly valves.Collect sample deposits on valves For lab analysis.A portion of the deposit will be analyzed in a scanriirtg electron microscope(SEM)using ¢rtergy dispersive X-ray spectroscopy(EDS)to identify the elements present.A portion of the deposit will be analyzed using powder X-ray diffraction(XRD) teclvtiquea m identify the compounds present if ample sample is available. 4) Collect valve elastomer seat sample and perform laboratory analysis to verify that materials of construction. S) Prepare memorandum summarizing valve investigatioxts and testing resulffi. dd. Additional Coordination 1) Provide additional coordination necessary as described in Task 1,Items t-j for 11.6 month extended construction period as requested by the AUTHORITY. _ 2. Providing Warranty Services as follows: a. Receive,review and provide written response to Contractor-generated and submitted 08rM Data,Startup,Testing,and Warranty Matrices submittals(hereinafter referred bo as the Wasanty Matrices)to verify compliance with the Contract Documents. Upon receipt of the submittal,maintain the warranty tracked Matrices document and provide quazterly updates to the AUTHORITY on the status of each service. Define a beneficial use date(or wazranty start date)For all equipment and materials. b. Receive AUTHORITY input on equipment and material malfunctiot�a or deficiencies,and notify the Contractor of all deficienefes or failures and request timely corrective actions. c Assist the AUTHORITY in preparing correspondence to the Contractor to document clarify and resolve discrepancies. d. Assist the AUTHORITY in plaxudng,scheduling,facilitating and documenting meetings with the Contractor to discuss warranty related issues as requested by the AUTHORITY Project Team_ ENGINEER assumes a maximum of S meetings will be necessary. Sm�lh Pe9e 5 of 12 waa�naum to aa�n...e.mu�sws tcx,sa�rst ADDENDUM TO EXHIBIT B SUPPLEMENTAL AMENDMENT No.2-SERVICES TO BE PERFORMED BY THE ENGINEER e. Moxtitor Contractor's correction of all deflr3andes and prepare and update a Warranty Service Order Log on a monthly basis and track warranty service order requ¢ats and corrective action response time. E Conduct a r¢view of the Warranty Service Order Log prior to the one-yeaz anniv¢rsary of the daM of Substantial Completion and subatit the updated Log to the AUTHORITY and Contractor for£final resolution. g. Assist the AUTHORITY Project Team and Contractor to resolve warranty service ord¢r discrepancies. Task 2: Engin¢ering Techxrical Consultation and Coordination 1. Provide consultation to the AUTHORITY as to the techr»cal d¢tails of ENGINEER'S desigzy and pazticipate in various technical meetings and provide technical input as requested by the AUTHORITY. Task 3: Operation and Maintenance(OBcM)�Startup and Accord Drawfng S¢rvices 1. 08rM Manual a. ENGINEER will prepare a plant specific OSrM Manual for the BCWTP that will meet the requirements of th¢Texas Commission on Environmental Quality(TCEQ).The manual will serve as a reference for operations and maintenance personnel seeking engineering d¢sign ixtformation as well as operations and maintenance requirements and guidance. Th¢manual will include sections for each process facility including: 1) Raw waffir conveyance 2) Treatment structure including rapid-mix,flocculation,and sedimentation facilities 3) Filtered water conveyance 4) Chemical storage and Feed faciliti¢s 5) Disinfection facilities(i.e.,pre-and post disixtfection systems) 6) High-rate gravity filtration and backwashing syst¢ma � Filter control box S) Fixushed water conveyance 9) Finished water distribution pumping and metering,and 10) Finished water ground and elevated storage. 11) Washwater settling and decant basin systems 12) Solids handing facilities including sludge pumping,sludge thickener,and dewatering facilities 13) Wastewater lift station 14) Electrical 15) Safety,security and access control systems 16) Include engineering design revisions based an Requ¢sts for Deviation from the AUTHORTl'Y_ This Chang¢includ¢d incorporating AUTHORITY-r¢queated design change from Potassium Permanganate to Sodissm Permangar�ate chemical feed system cp -SA7. Sm�ilh Pe9e 6 of 12 a,a.�,�m,e E�s,...,s.r�...=A,«���,r et ADDENDUM TO EXIIIBIT B SUPPLEMENTAL AMENDMENT No.2-SERVICES TO BE PERFORMED BY THE FIVGINHER b. The manual will include functional overviews,process diagrams,process descriptions, digital images of installed equipment,design aiberia,instrumentation and control and operations mode descriptions,record drawings,equipment irtforatation tables,safety practices -^^hiding material safety data sheets,and equipment specific operation and maintenance information as provided by the general construction contractor.Equipment descriptions will include an explanation of how individual pieces of provided equipment serve the systems and processes they are a part of and how the systems and proresses should be operated ro achieve the engineered intent. c. The manual will also provide guidance to operations personnel on plant systema including: 1) Disir.fectian C"I"calculation and compliance 2) Selection of chlorin¢application points for CI'compliance and disinfection by-product mitigation 3) Chemical flow pacing and assigr.nient of metering devices ro application points using the plant control system 4) Chemical feed dosage calculations and settings, 5) Gravity filter ripexuxtg turbidity spike m%+�tmt�ation,and 6) Regulatory compliance and laboratory ffisting requirements d. The manual will be delivered in a hard copy version that wffi be prepared in a format that Follows the guidelines and meets the requirements of the TCEQ.TCEQ requires the Following information be included in the manual: 1) Operations irtfonnation for operator review and reference 2) Routine maintenance and repair procedures 3) Protocols to be utilized in the event of a natural or man-made caffistrophe and telephone numbers of weber system persoxmel,system officieLa and local/sffite/federal agencies ro be contacted in the event of an emergency. 4) Procedures that operations personnel will use ro verify that leaks have not developed in the common wall between the settled water flume and filtered water gullet in each ffiter. Procedure must also describe record keeping procedures of all inspections conducted for the first 3 years of operation. e. The manual will be slructared ro have the following features: 1) Operations and maintenance text will be displayed in an easy ro read Format.The user will be able ro use the documents Table of Contents ro locate specific information. 2) ENGINEER will gather information necessary for preparing the 06tH Manual and developing the format of the manual.ENGINEER will prepare the draft manual ro incorporate the major aectior.s of the plant Two(2)draft copies of the 08tH manual will be delivered ro the plant staff for review and comment. 3) ENGINEER will incorporate BCRWTP staff comments and deliver two(2)hard copies of the final OSTM Manual ro plant staff. 2. Startup Services a. Assist the General Construction Contractor with the startup and commissioning of new Plant equipment systems and processes. Assistance will include review and comment on �.:ief. Pala�at,z ,�a_,�m��.o,....,..,��.,,�,aaa�ra> ADDHNDLTM TO EXIiIBIT'B SUPPLEMENTAL AMENDMENT No.2-SERVICES TO BE PERFORMED BY THH ENGINHER Contractor-prepared startup plan for the new BCRWTP;review of egssipment startup prerequisites and startup readiness with the Contractor;determination of whether plarmed startup activiti¢s properly demonstrate equipment system and/or process performance and functionality;malix+g recommendations for ixutial process equipment set points; making recommendations for performa+..w and/or funetiox<ality ffiating to augment that being proposed by the General Construction Contractor;and documenting the resells of all startup and commiasioxdng activities in the form of a startup and commissioning log. ENGINEER will provide startup and commissioning services on the Following equipment. 1) Vertical Shift Flocculators 2) Chain and Flight Sludge Collection Equipment 3) Gravity filter and backwash systema including backwash pumps and air scour blowers 4) Wastewater Settling and Decant Basin Clarification Equipment 5) Submersible Wastewater Recycle Pssmps 6) Chemical Metering Pumps and Appurtenances 7) Polymer Feed ITnite S) Hose Pumps and Appur ..mea 9) Potassium Permanganate Feed System 10) Submersible Sludge Pumps 11) Sludge Thickener Equipment 12) Progressive Cavity Pumps and Appurtenances 13) Sludge Polymer Feed System 14) Belt Filter Press 15) Vertical Turbine Can Pumper-Booster Pumps and Pump Control Valves 16) Submersible Wastewater Lift Station Pumps b. Prepare and submit a revised CT Study For the proposed BCRWTP when consti�uction is approxin<ately 90% complete with as-built dimensions. ENGEVEHR will submit plan for TCEQ review and approval. c. Prepare and aubxnit a Raw Water Monitoring Plan for TCHQ review and approval thaS meets the requirements of 30 TAC 290.111(b). Plan will be submitted prior to commencement of operations. d. Provide additional startup services related to assisting the contractor troubleshoot newly ix<stalled equipment or additional startup services related to Requests for Deviation from the AUTHORITY-SAl. e. Mobilize Wonderware software vendor to troubleshoot Contractor-provided software. The Wonderware Trip Report revealed that the issues with the software were contractor related issues. Wonderware submitted an invoice for this work totaling$5797 that was paid by ENGINEER. by accordax<ce with Section 13302,Paragraph 3.01A-"it is the responsibility of the Process Control System Supplier(PGSS)to provide a compleffi operational control system" and all costs Far shall be borne by the Contractor. HNGINEER recommends deducting$5797 fmm the Contractor's payment application to cover �p ENGINHER's coats-SAl. Sf*1M�f1 Page B of 12 nae.�a�...<o epee....s..a...anz�rrwaix a< ADDBNDUM TO EXHIBIT B SUPPLEMENTAL AMENDMENT No.2-SFiRVICES TO BE PERFORMED BY THE ENGINEER £ Provide additional startup services related to assisting the contractor troubleshoot newly installed equipment or additional startup services related to Acquests for Deviation from the AU'1"EIORTI'Y-SA2. 3. Record Drawing Services a. Integrate the general contractor s compiled red-line markings into the electronically produced conformed drawing docum¢nffi using Autodesk AutoCAD. Annotate the updated AutoCAD documenffi eleciroxtica3ly to indicate the source of the update(i.e.RFI No.,Change Ord¢r No-,Contractor's records,Engineer's records,etre_)and highlight the update using anagreed-to highlight method. Maintain the working electronic record drawing documenffi and upload such files to an offsite back-up drive on two-week intervals. b. Upon receiving and reviewing the general construction contractor's last installment of as- built construction information and incrorporafing such i..Formafion,along witty other FIVGINEFiR provided conatruciion record information,inM the elech�oxtic Record Documents;submit completed Project Record Documents to th¢AUTHORITY Project Team as Follows: 1) One eledrortic read/write copy of all Project Record Drawing Documents in Autodesk,AutoCAD format 2) One set of Mylar filar prinffid Project Record Drawing Documents in 22"x 34",double- mat,3.5 to 4.0 mil,format. 3) Two seffi of one-half size paper printed Project Record Drawing Documents in 20- pound,bound,format. 4) All hard copy versions of submitted Project R¢cord Documents will include afFix¢d professional Hngineer or Architect of Record seals(as appropriate)with signatures and dates. c. Prepare and submit to the AUTHORITY Project Team a Microsoft Excel-based template for use in id¢ntifying fixed assets resulting from the work in AUTHORITY'S future asset management system. Modify template based on receiv¢d comments and populate to reflect the fixed asseffi r¢sulfing from the work. Submit fiv¢copies of the completed fixed asset spreadaheeffi to th¢AUTHORITY Project T¢am for record purposes. Task 4:Applicat3on Engin¢¢ring S¢rvic¢a 1. Coordination and Quality Control a. Maintain overall quality assurance/ quality control(QA/QC)throughout the duration of the project. b. Submit monody progress reports d¢saibing status,work completed sine¢the last report anfir3pated work to be completed during the next reporting period,updated AES progress schedule,list of outstanding issues that require resolution by others. c. Perform and attend up to five one-day coordination meetings as directed by the AUTHORITY staff. ���.• Page 9 of t 2 waa=.e.,..m Eeme==�s=m.=.saz iExwian ao ADDHl�TDUM TO F.ICFIIBIT'B SUPPLHMHNTAL AMENDMENT No.2-SERVICES TO BH PHRFORMHD BY THS ENGINHER d. ENGINEER anticipalEs attending up to eight construction progress meetings with AUTHORI"IY peraonn¢1 and the contractors throughout the startup phase of construction to aide in commissiortir.g th¢system. 2. Submittals a. Project Plan Submittal 1) Prepar¢project plan to detail the work approach,work schedule indicating milestones and potential meetings,project orgaxdzation,overview of system programming, details of factory besting and field testing,d¢tails of traixung programa,and deliverables. b. Control Loop Narratives Submittal i) Provide d¢tafls required from a progra... tag perspective such as software pazmissives,failure scenarios,etc.Upon rec¢ipt of submiftal approval,ENGINEER will use th¢se documents,along with the programming standazds previously developed as the basis foz PLC programming and HMI graphic display development. 2) Process Graphic Displays and I/O Submittal 3) Develop process graphic displays and trends in accordance with the approved HMI system standards and conventions. 4) Conduct Process Graphic Display oxtc-day workshop with AUTHORITY personnel to aide in obtaixdxtg detail¢d comments regarding the graphics that have been implement¢d_ c. Testing Plan Submittal 1) Detail approach for testing of the vazious compon¢nts of the system to ensure the HMI/PLC programming accurately depicts the requirements set forth within the design documents. 2) D¢fine the overall beats anticipated for the various construction projects,sample test forms and procedures,and best approval and punch Eat procedures. d. Traixdxtg Plan Subadttal 1) Describe courses for operations,maintenance,and management staff.Coordinate traixting with the AUTHOL2I'i"Y staff ao that the schedule and contenf meets their n¢eds. e. Reports Subatittal 1) Conduct a one day Reports Workshop with the AUTHORITY staff to discuss requirements and determine all report defixutioxta and formats. 3. Programming,Configuration and Startup Services a. HMI Daffibase and Coxtfiguration 1) D¢velop the HMI database and th¢coxtfigvration of the Operator Workstations (OWS).The HMI database defin¢s all I/O interface points between the PLC and HMI nodes. 2) Develop up to 60 displays,including process and associated pop-ups,to reflect the equipment and I/O provided under the Phase 1A construction project. 3) Develop a trending scheme that allows the users to coxtfigvre and save user-defined �pM trends. Stnilh Pave�o m�a .ae..,a.._.o E.,a,.,..,s...�...e„:t�aa�r at ADDENDUM TO EXHIBIT B SUPPLEMENTAL AMENDMENT No.2-SERVICES TO BE PERFORMED BY THE ENGINEER b. Control Logic Programming 1) Develop a field I/O list and PLC database list for coordination with other Contractors. The Fi¢Id I/O list will include tag name,d¢scriptiory racly slot,and point for each PLC.'The PLC database Eat will include tag name,d¢scription,point type(AI,DI,etc.), data type(Real,Integer,Boolean,etc J,and the register address to be used for data transfer by other systems. 2) ENGTNEHR will use the PLC programnti:tg standards and conventions as the basis for logic developm¢nt and organization on tht project.Hardware and software will be provided in ENGINEER for it use in development,testing and commtsioxting of the PLC logic. 3) During coxtatruction,an Early Development System(EDS),as defined in the contract docum¢nffi,will be shipped to ENGINEER's office by the Process Control System Supplier(PGSS)For use by ENGINEER throughout the progra+....+ $phaze. c. Historical Daffibase/Reports 1) Provid¢the progra... :..g and configuration of the historical data management system.Historical data will be available for trending and report generation ENGIIVEER has budgeted to provide vp to 10 aingl¢page operational reports For this construction project.An operational report 3s defined as a single 8'/z X 11 inch page. The reports development will commence bazed on the approved final reports submittal. d. Coordination/Review Meetings 1) ENGINEER will attend up to three one-day coordination meetings with the PCSS.The primary purpose of these meetings is to allow ENGINFER's programmers the opportvrdty to coordinate issues with the PCSS throughout their construction effort. e. Testing and Startup System Support 1) HNGINEER will conduct an un-witnessed Pre-Factory Coxifiguration Development and Test at HNGIIVEER's stging facility.By utilizing the Early Development System (EDS)provided by the PCSS,ENGINEER will perform equipment configuration, develop,install and teat the HMI and PLC application software programs required for the control system.This test will verify the functionality,performance,and stability of the HMI and PLC programming software. 2) ENGINHER will conduct an un-witnessed Syat¢m Integration Test at the PCSS' staging facility.ENGINEER will install the application software onto the control system.Th¢purpose of tht test will be to verify the functionality,performance,and stability of the control syst¢m hardware and software as a complete integrated system. The objective of this teat is to confirm the control system is ready For demonstration to the AUTHORITY.This teat will include a complete point-by-point test ENGINEER's scope assumes that the PCSS will assist in the teat and will correct any deficiettciea with the equipment and control pan¢la th a lim¢ly manner. 3) ENGINEER will conduct a Witnessed Factory Test at the PCSS system staging facility. HNGINEFtz will demonstrate to the AUTHORITY representative that the control system operates as designed.The teat will demortatrat¢the system I/O functionality, ������ Paga 11 of 12 wm...w.mw Enp�nw9wlwsaTY tcaniartq ADDENDUM TO EXHIBTI'B SUPPLEMENTAL AMENDMENT No.2-SHRVICES TO BH PHRFORMED BY THH ENGINEER process graphic displays,PLC control logic,historical data collection,storage, retrieval,and reports.ENGINEER'S scope assumes that the PCSS will assist in the test and will correct any defidencies with the equipment and control panels in a timely n�axiner. 4) ENGINEER will provide fi¢ld startup services,including confirmation of Held I/O, graphics,trends,alarms,reports,and process control strategy startup_ENGINEER'S scope assumes that the PCSS will asaisi in the Held testing and startup and will corr¢et any deficiencies in the installation and equipment operation in a timely-^��++�r.Once a Facility is started up and is operating,ENGINEER w$d¢monatrate to th¢ AUTHORITY representative that the control system application software performs as d¢aigned.The system application engineering services shall be considered substantially complete for this construction project when the system has met the design intent and any ntir�or problems or issues have been noted on the project punch list 4. Training a. Operatioxia Traixuxig 1) ENGINEER will provid¢training bo operations staff as it relates to morutoring and controlling process operation For this project.ENGINEER will provide two identical sessions(3 days each session)for up to 1D students dssrirtg¢ach session ENGINEER will coordinate scheduling to meet the needs of the AUTHORITY operations peraormel. b. Managem¢nt Trairtirtg 1) ENGINEER will provide training m management staff.Manag¢m¢nt will be given an overview of the control system coxifiguration and operation.HNGINHER will provide one session lasting 2 hours.ENGINEER will coordinate scheduling to meet the needs of the AUTHORITY Management staff. c System Administrator Training 1) ENGINEER will provide training m System Administrator staff as it relates to mortitoring and controlling process operation for this project.ENGINEER will provide one,Hve-day session For up to 5 students.The primary purpose of this traixdxtg will be to review the specific programming dev¢loped by ENGINEER.ENGINEER will coordinate scheduling to meet the needs of the AUTHORITY persormel. 5. Documentation a. System Documentation 1) ENGINHHR will assemble final documentation generated from the previously defined activities for this project The final documentation will consist of the Heal control loop narratives(Hard and soft copy),the final Proc¢ss Graphic Displays(Hard and soH copy),the PLC control logic programs(Soft copy oxily),and the HMI programming applicatior�s(Soft copy only).The soft copies of the documents generated will be provided in the Adobe PDF format and in the native programming language,where appropriate. ��1�t.• Page t 2 of 12 wme�e�m m e�sm.e.s=..m=.sa¢tExeie�T ao ADDENDUM TO EXHIBIT C SUPPLEMENTAL AMENDMENT No.2-WORK SCHHDULH Brushy Creek Regional Utility Assthority Brushy Creek Regional Water Treatment Plant-Plias¢1A Construction Plias¢Services The Worlc Schedule for this project will be completed as follows= Task No. Tesk Description Task Timeline 1.0 GENERAL CONSTRUCTION PHASE AND WARRANTY SERVICES 1.1 GENERAL CONSTRUCTION PHASE SERVICES 1-31 months 1.1.1 ADDITIONAL ONSITE CONTROLS(6A3) 32-39 months 1.1.2 NOT USED N/A 1.1.3 SODIUM PERMANGANATE DEVIATION (SAl) Complete 1.1.4 REDESIGN ROADWAYS(SAl) Complete 1.1.5 REPETITIVE SUBMITTAL REVIEW(SA3) Complete 1.1.6 AUTHORITY-REQUESTED DESIGN CHANGES(SAl) Complete l.l_7 ADDITIONAL ONSITE CONTROLS(SA2] 39-62 months 1.1.8 REPETITIVE SUBMITTAL REVIEW(SA2) Complete 1.1.9 NOT USED N/A 1.1.10 LEGAL ASSISTANCE(SA2) 39-62 months 1.1.11 ADDITIONAL INSPECTION (SA2) Complete 1.1.12 DEZU RIK VALVE INVESTIGATON (SA2) Complete 1.1.13 ADDITIONAL COORDINATION (SA2) Complete 1.2 WARRANTY SERVICES 28-43 months 2.0 ENGINEERING TECHNICAL CONSULTATION AND COORDINATION 1-2 months 3.0 OSaM MANUAL,STARTUP,ffi RECORD DRAWING SERVICES 3.1 06M MANUAL 10-30 months 3.1.1 ADDITIONAL 08aM MANUAL SERVICES(SA3) Complete 3.2 STARTUP SERVICES 27-31 months 3.2.1 ADDITIONAL STARTUP TROUBLESHOOTING(SAl) 32-39 months 3.2.2 ADDITIONAL STARTUP TROUBLESHOOTING(SA2] Complete 3.3 RECORD DRAWING SERVICES 31-35 months 4.0 APPLICATION ENGINEERING SERVICES 6-31 months /+gam "aW�orlc will be completed witliir months listed l�¢reixv �a•�t.■ Page � oft naeo..a..m�o wo.x s�n.e.m snz lexxianq ADDENDUM TO h?CHIBTT D SLTPPLEMHN'I'AL AMENDMHNT No.2-FEE SCHEDU[.E Brushy Cr¢ek Regional Utility Authority Brushy Creek Regional Water Treatrnexat Plant-Phase SA Cortstruction Phase Services The Fee Schedule For this project will/>e amended as follows= Other Task direct outside No. Task Descri tion Costs Professionals TOTAL 1.0 GENERAL CONSTRUCTION PHASE AND WARRANTY SERVICES 1.1 GENERAL CONSTRUCTION PHASE SERVICES $1,700,801 1.1.1 ADDITIONAL ONSITE CONTROLS(SAS) $O $O $114,904 1.1.2 NOT USED N/A N/A N/A 1.1.3 SODIUM PERMANGANATE DEVIATION (SA3) $O $5,092 $20,612 1.1.4 REDESIGN ROADWAYS(SAI) $O $11,476 $16,276 1.1.5 REPETITIVE SUBMITTAL REVIEW(SA3j $O $O $21,760 1.1.6 AUTHORITY-REQUESTED DESIGN CHANGES(SA3) $6,528 $8,751 $68,513 1.1.7 ADDITIONAL ONSITE CONTROLS(SA2) $667 $O $109,783 1.1.5 REPETITIVE SUBMITTAL REVIEW(SA2) $270 $O $6,499 1.1.9 NOT USED N/A N/A N/A 1.1.10 LEGAL ASSISTANCE(SA2) $780 $4,300 $79,151 1.1.11 ADDITIONAL INSPECTION (SA2) $999 $1,078 $59,223 1.1.12 DEZURIK VALVE INVESTIGATION (SA2) $219 $11,020 $18,539 1.1.13 ADDITONAL COORDINATON (SA2) $712 $13,85] $64,420 1.2 WARRANTY SERVICES $43,800 2.0 ENGINEERING TECHNICAL CONSULTATION AND COORDINATION $20,490 3.0 OffiM MANUAL,STARTUP,8<RECORD DRAWING SERVICES 3.1 OSaM MANUAL $316,310 3.1.1 ADDITIONAL OS,M MANUAL SERVICES(SAl) $O $5,200 $7,306 3.2 STARTUP SERVICES $98,450 3.2.1 ADDITIONAL STARTUP TROUBLESHOOTING(SAl) $560 $5,797 $45,163 3.2.2 ADDITIONAL STARTUP TROUBLESHOOTING(SA2j $2,013 $847 $31,180 3.3 RECORD DRAWING SERVICES $126,752 4.0 APPLICATION ENGINEERING SERVICES $606,435 PRIME AGREEMENT TOTAL $2,913,038 SUPPLEMENTAL AMENDMENT No. 1 (SAI)TOTAL $J,OSS $36,316 $294,531 SUPPLEMENTAL AMENDMENT No.2 (SA2)TOTAL $5,660 $31,102 $365,796 0milh Page 1 oft .aa�..a..�..o roe s�nee.ae s.ar�aia�r of (0IIOIHnlevsIPMOSea 0wnPUDRPV Z10ZAd q1W o smoq"I 9ullem'slaam leuopippe Zi JC)MN3 uepIan A wg ZI paismwo;leuoi0ppe uesawnsse 011.1 Hsel IZ smoq Edi aullelol'slaam leuoglppe 2I io;9tl9N3 ue3ogamlad D4 ZT palsmiolleuoplppe ue sawnsse I'I'I Hsel II MON T9EZ E'T91 SITS ZI E SZ'LL SZ'B6Z SIM S 1VIOAVSIZ'ON 1N3WONUMVIN3W31Mn5 But Z SIMI OZE 5'062 Z6 6411T RITE S'9 1tl1011TNS) YoN1N3WOUNVIV1N300S 061 Sul 0 BIZ "I'S Z6S'Z 6ZEb BET'S 86 W1011N3W33H9tl3WI8d E6Cf SSZ 0 0 0 S99 99th BSE'T 66 MIMS9NIH33NIMNOUVOIlddtl 0'6 066 LZ 0 96 ZE 801 96 SL £ MIMS9NIMtl8008033H E'E 66T 0 0 0 E 0 0'6 STET 0 (ZtlS(9NIl00HS31Sn081dn1Htl1SlYN0111aaV Z'Z'E SIZ 0 0 0 S'SE 0 S'6E SZ'O6T 0 (m)oNIl00HS31BnOH1dn18tl1SMOU100V 17E Us Z6 0 Z 0 0 M 9BE 0 SDAUSVISVIS Z'E 6T Z 0 0 0 6 9 Z 0 (IVS)S301AU35IVPMVN W201VNOWlaatl T'iE 9911 bb 0 0 0 ZL 096 06I'T 0 1tlnNtlW VRO VE S3)IAH3S9NIMnaG0 03389'dn18tl1s'1tlnNYNNio 0'E 001 6Z 0 0 0 ZZ OT 8Z 91 NOIIVN10S00)aNVNDlltlllnSNO)lVnINH)319NI833NI9N3 07 9ZE 95 0 0 0 Z6 9TZ ZI 0 S33IA83SA1NtlHHtlM ZI ZSE 9'6ST 0 0 0 SIT S'6 FELT 0 (ZtlSINOUNI0H000mowOav mm LE a 0 0 0 0 0 SIE 0 VVSI NODDI53AN13A1VA ABDO ZT'T'T SOE s'4 0 0 0 E'LZ SU S'60Z 0 (ZVS)N01103dSNI IVNONIaaV IT'T'I HE Z 0 0 0 LZ 0 i1S'S6E S (ZVSIDWSISSUV931 OT'T'T 0 0 0 0 0 0 0 0 0 035n10N 6417 SE VT 0 0 0 s'6 B'0 SU 0 IZtlSIMAR IVAWSOS3A IMS 8'll 90YT 0 SITS ZL a 0 1aS'91Z 0 0 (ZNS)51OVINODUSNOWNOW0OV Ell HE 0 0 0 691 TZ Z'T9 86 S'9 (IVS)S39NVH)N91S3a a31S3n03S-Alwan 9n'I S61 0 0 0 LZ SS L'S9 0 0 (m)wo ivavgSn53AUMS S'I'T 62 0 0 0 0 0 0 6Z 0 (Ivs)SAVMOVONN91S3a3S 6'1'I 68 0 0 0 61 ZI 5 Ls 0 (TVS) N011VIA3031VWWWOUNAI00S ETT 0 0 0 0 0 0 0 0 0 on1ON Z'T'T S6E'T 0 E'BZOT OU 0 0 0 0 0 (TVS)S10S1N0)311SNOIVNOW0atl T'I'T ZEO'ZT 1901 0 OZI ZTT'S E89'T 6E6,1 980'Z OE SDAH353StlHdNOO)n815NO3IMN39 T'T S3)IA83SAiNW8tlMONV3StlHdN01lln81SNOOW83N39 01 EL 08 201 911 BEI 991 OR OZZ 31W9 11119 smoH ulwpy SPIN) goal Z•T 6i 9'S S-L dmN10 umWpdsaaSsel iogel PSu0 solua5 H9N3 89% H9N3 89N3 'ON lelol Ssel 31MIDSSSS•Z'ON MfiGNMIv1. MIMaS a11sum01wacmaav No Text