Loading...
BCRUA_R-14-07-16-6C RESOLUTION NO. R-14-07-16-6C WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has duly sought proposals for the design of the Phase 2 Deep Water Intake Project; and WHEREAS, HDR Engineering, Inc. ("HDR") has submitted the proposal determined to be the most advantageous to the BCRUA considering its qualifications and other evaluation factors included in the request for proposals; and WHEREAS, the BCRUA desires to enter into a contract with HDR,Now Therefore BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the General Manager is hereby authorized and directed to initiate contract negotiations with HDR Engineering, Inc. on behalf of the BCRUA. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 16th day of July, 2014. KRIS HIT LD, President Brushy Creek Regional Utility Authority ATTEST: John ux, ecretary Z:\BCRUA\Board PacketsTacket Documents\2014\2014-07-16-6C Res.BCRUA-Initiate Contract Negotiations w-HDR for design of Phase 2 Deep Water Intake(00306958xA08F8).doc