Loading...
BCRUA_R-15-04-15-6B �� BRUSHY CREEK REGIONALUTHORITY SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING, INC. ("Engineer") ADDRESS: 4401 West Gate Boulevard, Suite 400,Austin,TX 78745 PROJECT: Phase 2 Deep Water Intake Preliminary Design This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA"and HDR Engineering, Inc., hereinafter called the"Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', on the 19th day of November, 2014 for the Phase 2 Deep Water Intake Preliminary Design Project in the amount of$5,945,300.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $21,900.00 to a total of$5,967,200.00; and NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: 1. Article 2. Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $21,900.00 the lump sum amount payable under the Contract for a total of $5,967,200.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.03/2011 0140.4634-37;00332731 215829 gCoeGCA- J2 /5 D�/SSIP HDR ENGINEERING,INC. By: yh Date BRUSHY C �KUFLEGIONnL UTILITY AUTHORITY, INC. By: s Wh' iel ,President Date *. L eets, BCRUA Attorney 2 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The purpose of Supplemental Amendment No. 1 is to collect supplemental survey data at the intake site and along the transmission tunnel alignment. BASIC SCOPE OF SERVICES Task 11.0—Surveying and Mapping 11.4 Supplemental Design Survey. Utilize conventional survey methods to collect supplemental survey data at the intake site and along the transmission tunnel alignment as illustrated in the two attached figures. Produce one-foot internal contours and record visible improvements including driveways, pipes, drainage structures, pavement edge and crown,guardrails,fences, signs, and visible utilities. Establish two additional project control points (5/8" iron rods) and tie to the primary project control. Merge and append the supplemental design survey data with the existing combined survey data to create a seamless 3D drawing. Locating trees is outside the scope of services. Additional services will be required should the water surface level of Lake Travis rise and inundate portions of the supplemental survey area before the survey can be completed. Figure 1:Transmission Tunnel Supplemental Survey Area • a all < r ser 1� 3/24/2015 ER 7 . Jeck.�5k , } .s , ADDENDUM TO EXHIBIT C WORK SCHEDULE Basic Scope of Services Task 11.4 shall be completed within one month of Notice-to- Proceed. 3/24/2015 ��� ADDENDUM TO EXHIBIT D FEE SCHEDULE The total compensation for services under Supplemental Agreement No. 1 is estimated to be $21,900. OWNER shall pay ENGINEER for Basic Services Task 11.4 on the basis of Lump Sum as described in Paragraph D1.01 of Exhibit D of the Phase 2 Deep Water Intake Preliminary Design Contract. Total compensation for Task 11.0 — Surveying and Mapping shall be adjusted to be $120,300. Total compensation for the Phase 2 Deep Water Intake Preliminary Design shall be adjusted to be$5,967,200. 3/24/2015 FYZ