Loading...
BCRUA_R-16-02-17-6B RESOLUTION NO. R-16-02-17-6B WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into a Contract for Engineering Services ("Contract") with HDR Engineering, Inc. for the Phase 2 Deep Water Intake Preliminary Design Project, and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Contract No. 4 to the Contract to modify the provisions for the scope of services, and WHEREAS, the BCRUA desires to enter into said Supplemental Contract No. 4, Now Therefore BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA Supplemental Contract No. 4 with HDR Engineering, Inc., a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 17th day of February, 2016. RO ABRUZZES , P ent Brushy Creek Regio tility Authority ATTEST: KRI WHIP FIELD, Secretary Z:\BCRUA\Board Packets\Packet Documents\2016\021716\Res.BCRUA-SC 94 w-HDR Engineering,Inc.-Phase 2 Deep Water Intake(00351846xA08F8).doc CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-13456 HDR Engineering, Inc. Austin,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 02/15/2016 being filed. Brushy Creek Regional Utility Authority Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the goods or services to be provided under the contract. BCRUA R-14-11-19-7A F Supplemental Contract No.4-Physical Model Testing and Environmental Evaluations ' 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary HDR, Inc. Omaha,NE United States X i Little,George A. Omaha, NE United States X Keen, Eric L. Omaha, NE United States X I Felker,Brent R. Davis, CA United States X i i 1 O'Reilly, Charles L. Boston,MA United States X i i 'I 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. MICHELLE M BRITTON Z; y. NOTARY PUBLIC State of Texas ti•4 a� Comm.�•06-27 2017 / Sig ` of autho i ed a ent o tr itg business entity 111 AFFIX NOTARY STAMP/SEAL ABOVE Svd to and subscribed before me,by the said - this the day of —_� 20. to certify which,witness my hand and seal of offi e. 111 rel 1 /) AL1.17-101 Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.34944 CERTIFICATE OF INTERESTED PARTIES FORM .1295 101`1 7-7 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-13456 HDR Engineering, Inc. Austin,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 02/15/2016 being filed. Brushy Creek Regional Utility Authority Date Acknowledged: 02/16/2016 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the goods or services to be provided under the contract. BCRUA R-14-11-19-7A Supplemental Contract No.4-Physical Model Testing and Environmental Evaluations 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary HDR, Inc. Omaha, NE United States X Little, George A. Omaha, NE United States X Keen, Eric L. Omaha, NE United States X Felker, Brent R. Davis, CA United States X O'Reilly, Charles L. Boston, MA United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said this the day of 20 ,to certify which,witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.34944 L71qBRUSHY CREEK REGIONAL UTILITY AUTHORITY A Partnc rs h ip of Ccdar Park. Lc a n do r, and Round Rock SUPPLEMENTAL CONTRACT NO. 4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING, INC. ("Engineer") ADDRESS: 4401 West Gate Boulevard, Suite 400,Austin,TX 78745 PROJECT: Phase 2 Deep Water Intake Preliminary Design This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA" and HDR Engineering, Inc., hereinafter called the"Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 19th day of November, 2014 for the Phase 2 Deep Water Intake Preliminary Design Project in the amount of$5,945,300.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 1 on April 15, 2015 to modify the provisions for the scope of services and to increase the compensation by $21,900.00 to a total of$5,967,200.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 2 on July 15, 2015 to modify the provisions for the scope of services and to increase the compensation by$399,400.00 to a total of$6,366,600.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 3 on November 9, 2015 to modify the provisions for the scope of services and to increase the compensation by $27,000.00 to a total of$6,393,600.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $29,700.00 to a total of$6,423,300.00; and NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev.03/2011 - 0140.4634-37;0033178 215829 /r�c&oq g-16, �� �� 13 II. Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $29,700.00 the lump sum amount payable under the Contract for a total of $6,423,300.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. HDR ENGIN ERING,INC. By. P///"711j Date BRUSHY CREEK REGION L U ILITY AUTHORITY,INC. By: Ron Abruzzese,P esident 211-7 Date APPROVED A T RM: By: St mQet .,BCRUA Attorney 2 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The purposes of Supplemental Amendment No. 4 are to perform additional physical modeling testing and perform an environmental review of the proposed Nameless substation expansion plan. BASIC SCOPE OF SERVICES Task 2.0—Jurisdictional and Environmental Permitting Agency Coordination Insert Task 2.9 as follows: 2.9 Nameless Substation and Distribution Route Environmental Assessment. Perform the following evaluations in the area of the proposed expansion of the PEC Nameless Substation and document the results. 2.9.1 Waters of the U.S. Determination. Identify location and extent of potential waters of the U.S. in accordance with Section 404 of the Clean Water Act. Desktop and field investigations will be completed. 2.9.2 Cultural Resources Survey. Conduct a cultural resources survey including preparation of a Texas Historical Commission Antiquities Code permit application. The survey shall include shovel testing, pedestrian survey, site photography, recording and delineation of any newly discovered archeological resources, assessments of site eligibility for including on the Nation Register of Historical Places or for listing as State Antiquities Landmarks, data analysis, and report preparation. No artifacts will be collected as part of the survey effort. This task does not include Phase II NRHP archeological testing or the recovery of human burials. 2.9.3 Phase I Environmental Site Assessment (ESA). Conduct field work and prepare a Phase 1 ESA report in accordance with ASTM Standards 1527- 13 and All Appropriate Inquiry (AAI). The report will identify the potential presence and negative impacts of hazardous materials at the site. SBA certification is not included. 2.9.4 Endangered Species Evaluation. Perform a desktop evaluation for federally listed species know to occur in Travis County,Texas. Utilize available habitat modeling, documented observations of endangered species, mapped vegetation types on-site, current and historical aerial photography and topography. 2.9.5 Distribution Route Environmental Constraints Review. Review known archeological and cultural resources, EPA hazardous materials sites 1/27/2016 �N databases, and potential waters of the U.S. for the approximately eight- mile electrical distribution route from Nameless Substation to the BCRUA Phase 2 pump station site. Summarize environmental constraints within the subject area and identify any additional investigations recommended for the proposed project. Task 7.0—Pump Station Modify Task 7.3.5.1 as follows. 7.3.5.1 Complete a physical model study of the selected pump station design by a specialty lab to evaluate if flow approaching the pumps meets Hydraulic Institute Intake Design Standards. The study involves building and operating a scale model of the pump station to evaluate the hydraulic characteristics of design recommendations. Incorporate additional testing of the smaller, initial (approximately 15 MGD) pumps in the individual well shafts to the suction forebay to evaluate the hydraulic characteristics of the smaller diameter pump and shroud in the larger diameter pump well. 1/27/2016 FN ADDENDUM TO EXHIBIT C WORK SCHEDULE No changes to the overall Work Schedule are required. 1/27/2016 ADDENDUM TO EXHIBIT D FEE SCHEDULE The total compensation for services under Supplemental Agreement No. 4 is estimated to be $29,700. Total compensation for the Phase 2 Deep Water Intake Preliminary Design shall be adjusted to be $6,423,300. Total compensation for Task 2.0 — Jurisdictional and Environmental Permitting Agency Coordination shall be increased by an amount of$19,100. Total compensation for Task 2.0 — Jurisdictional and Environmental Permitting Agency Coordination (Paragraph D1.01.A.2) shall be adjusted to be $318,500. Total compensation for Task 7.0 — Pump Station shall be increased by an amount of $10,600. Total compensation for Task 7.0—Pump Station (Paragraph D1.01.A.6) shall be adjusted to be $1,497,700. 1/27/2016 FN