BCRUA_R-18-10-24-7B RESOLUTION NO. R-18-10-24-713
WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") hereby
determines that "Competitive Sealed Proposal" is the delivery method which provides the best
value for the BCRUA Phase l C Water Treatment Plant Expansion Project, and
WHEREAS, after advertising for and receiving proposals from offerors, the BCRUA
determines that Excel Construction Services, LLC is the offeror which offers the best value for
the BCRUA for the BCRUA Phase 1 C Water Treatment Plant Expansion Project, and
WHEREAS, the BCRUA now wishes to enter into a "Standard Form of Agreement
between Owner and Contractor" with Excel Construction Services, LLC, Now Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY
CREEK REGIONAL UTILITY AUTHORITY:
That the BCRUA has determined that "Competitive Sealed Proposal" is the delivery
method which provides the best value for the BCRUA for the BCRUA Phase 1 C Water
Treatment Plant Expansion Project.
BE IT FURTHER RESOLVED
That, after advertising for and receiving proposals from offerors, the BCRUA hereby
finds that Excel Construction Services, LLC is the offeror which offers the best value for the
BCRUA.
BE IT FURTHER RESOLVED
That, subject to the approval of the Participating Cities, the Board President is hereby
authorized and directed to execute on behalf of the BCRUA a "Standard Form of Agreement
between Owner and Contractor" with Excel Construction Services, LLC for the BCRUA Phase
1C Water Treatment Plant Expansion Project.
C'Uurianylvi.+rl Wnllaaal'JLniwiq'N'udmJ�la{ �Caw OL03...Lal1LC I TAYK` -BCRUA-Slm&l lt—HarAtImMIWiw EkLd Ctwwwxn Swxm LLC(IMM 1794v111XFA)Lkk
The Board hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting
was open to the public as required by law at all times during which this Resolution and the
subject matter hereof were discussed, considered and formally acted upon, all as required by the
Open Meetings Act, Chapter 551, Texas Government Code, as amended.
RESOLVED this 24th day of October, 2018.
ANDREA NAVARItETTE, President
Brushy Creek Regional Utility Authority
ATTEST:
RE E FLORES, 4caZiary
(gi,F4�q
surveyors
804 Los Cimas Pkwy.,Suite 150
Austin,Texas 78746
October 9, 2018
Karen Bondy, General Manager
Brushy Creek Regional Utility Authority(BCRUA)
221 E. Main St.
Round Rock, TX 78664
Re: BCRUA Phase 1C Water Treatment Plant(WTP) Expansion
Project No.: 03-00619
Dear Ms. Bondy.-
On
ondy:On September 26,2018,Walker Partners assisted the BCRUA in opening competitive sealed proposals for the
above referenced project. Four responsive, competitive sealed proposals were submitted by Archer Western
Construction, LLC(Archer Western)of Irving,TX, CSA Construction, Inc. (CSA)of Houston,TX, Excel Construction
Services, LLC (Excel) of Leander, TX and Kiewit Water Facilities South Co. (Kiewit) of Irving, TX. None of the
proposals included any deviations from the contract documents. The proposals were evaluated and ranked based
on the following selection criteria: 30%for Contractor Relevant Experience and References,60%for Cost Proposal
and 10% for Proposed Schedule. Based on evaluation of the proposals, Excel is the highest ranked proposer
offering the best value, as determined by the selection criteria and ranking assessment.
Evaluation of Excel's proposal included a review of their technical qualifications and experience,including major
subcontractors.A background check was performed via telephone poll of owners and engineering firms for similar
projects Excel has completed over the past several years.The overall impression from this investigation and review
is that Excel provides quality work in a timely and professional manner.Also,our Walker Partners team has recently
completed successful projects with Excel, including at the City of Cedar Park Water Treatment Plant.
The WTP Expansion proposal includes eight Additive Alternates that are listed in the table below.Since the total
Base Proposal amount is favorable,the BCRUA elected to include Add Alternates 1A, 1 B.2,4 and 5 into the project.
The total amount of the selected Add Alternates is $1,612,000.00.The BCRUA decided to exclude Add Alternates
1 C and 3 from the project.Add Alternate 6 is for Texas Water Development Board reporting purposes and is not a
requirement of this project.
Item No. Quantity Unit Item Description Unit Price Amount
Three 72-inch BFVs,two
AA-1A 1 LS 72-inch steel wye fittings $765,000.00 $765,000.00
and one 72-inch steel tee
AA-113 1 LS Two 72-inch BFVs $380,000.00 $380,000.00
AA--JG -1 I6& 49n -2L . 4 .I I...... S1']iia'ln
-+i , vvnnn rnvv
AA-2 1 L5 Six Vacuum Breaker/Air $355,000.00 $355,000.00
Release Valve vaults
AA ' Gi.,L.F 11 i.,rl. Cil*.,r T..
$12n nQno 5
199
4Al..n7
www.WalkerPartneFS.com
TSPE Registration No.8053 1 TBPLS Registration No. 10194317
Item No. Quantity Unit Item Description Unit Price Amount
EST interior coating rehab
AA-4 1 LS with 100%polyurethane $76,000.00 $76,000.00
(elastomeric) coating
Coating existing wall of
AA-5 4,000 SF Sedimentation Basin 3C $9.00 $36,000.00
Settled Water Channel
AA-6 -1 }3 �} �sA;999:48 $ 59;999:98
Based on the information presented and evaluation of the proposals, Walker Partners recommends that the
BCRUA award a contract to Excel in the amount of$9,100,270.00 for the Phase IC WTP Expansion,which includes
the total Base Proposal amount of$7,488,270.00 plus the selected Add Alternates total amount of$1,612,000.00.
We will prepare the Notice of Intent to Award Letter and other contract documents for transmittal to Excel, pending
final acceptance and direction from the BCRUA.
Sincerely,
YVL,
Jason Christensen, P.E.
Project Manager
Cc: Project t=ile
www.WalkerPodners.com
2
Brushy Creek Regional UpTity Audhodty
Phase IC Water Treatment Plant Exparalm
Compedthre Sealed Proposal-Proposal Opening
Proposals Opened September 26,2018 at 2;00 PM
Fhel Nego#a*d Proposal
Pt000sor Excel Construction Services LLC
Attachments:
Proposal Security ✓
Proposal Form(Section 00300) ✓
W-9(Section 00300) ✓
Conflict of Interest Questionnaire(Section 00300) ✓
Statement of Proposers Experience(Section 00400) ✓
TWDB-0459 ✓
BASE PROPOSAL ITEMS
Pr000sal Item Description Quantity Units Unit Price Total Price
1 Bonds,.Mobilization b Startup 1 _ LS S 360,000.00 s 360 000.00
2 Trench Safety 1,200 ._.LF $ 5.00 S 8,000.00
Construction of all Work as specified
and detailed,except for Work included
3 in other Proposal items 1 LS S 6,853,170,00 $ 8,853,170.00
_ 4. Allowance for SCADA Programming 1 LS $ 69,100.00 s 69,100.00
5 Owner's Contingency Allowance 1 LS S 200 000.00 $ 200 000.00
TOTAL BASE PROPOSAL PLUS ALLOWANCES S 7,488,270.00
ADD ALTERNATE PROPOSAL rTEMS
Proposal Item Description Quantity UnHs Unit Price jotal Price
Installation of three 72-inch Butterfly
Valves,two 724nch fabricated steel I,Jason J.Christensen,Texas P.E.
wye fittings and one 72-Inch fabricated #97527,so hereby certify that this
AA-1A steel We with appurtenances 1 LS S 765,000.00 3 765,000,00 proposal tab is accurate and true.
Installation of two 724nch Butterfly ON••E OF 7*,
AA-IB Valves with appurtenances 1 LS S 380,000.00 $ 380,000.00
Installation of six Vacuum Breaker/Air i
Release Valve vaults with *:• *��
AA-2 appurtenances 1 LS S 355,000.00 S 355,000.00 /
— r................................./
Rehabilltation of 2.0 MG EST Interior % AWN J.CNRISTENSEN i
r..:............
coating system with 100% 4: 97527......:...i
AA-4 lyurethane(elaatomeKg)coating 1 ___ LS 5 76,000.00 S 76,000,00 '9'. <4Qi
Coating concrete wall on existing ����F
pardon of Sedimentation Basin 3C
AA-0 Settled Water Channel 4,000 SF S goo S 36 000.00
TOTAL ADO ALTERNATE AMOUNT $ 1,612,000.00
TOTAL BASE PROPOSAL PLUS ADDITIVE ALTERNATE AMOUNT
$ 910D 270.00
Prapamd by., Walker Partners,LLC
TSPS Registration No.8053
804 Las Cimas Parkway,Suite 150
Austin,7X 78746
512-082-0021 Telephone
&—M Crank A09-01 Ut78y Aurionly
PNU 1C WstrrTmftY"d PWntEv m m
Camu t-Gnaw Rupetd-Peapasei Opwft
Pespe+ds OpenM aeptemWr 2s,2018 al=PM
Proposer Archerwastem conaw" LLC CSA Inc. Excel C2nal00on Sacyllcm LLC Klawlt
Attaelan.rhta:
Prvposd Security ✓ ✓ ✓ ✓
Proposal Form(Section 00300) ✓ ✓ ✓
W-0(Section 06300) ✓ ♦ ,� ✓
Cont a of Merest Ouestionnaire(Saxton 06300) ✓ ✓ ✓ ✓
Statement of Proposers ExpetWm(Section 00400) ✓ ✓ ✓ ✓
TWOB-0459 ✓ ✓ ✓ ✓
N&E PROPOSAL flFJll4
UnAll Unit Price Total Price UDft Pries Total Price Unit Price Total Pries Unit Price Total Price
1 Bonds,Mobi2ts8orh&stomp 1 LS 3 175,000.00 S 17S.0W.00 s 300,006.00 3 300,006.00 S 380,000.00 S 360,006.00 S 300,000.0 S 300,00000
2 Trench ssdsty 1200 LF 3 5.00 s 5,00000 S 5.00 s 6,000.00 S 5.00 s 6,000.0 3 1.00 s 1,200,00
ConsUtrtkn of all work as speefad
OW Marled,except far work ntlded
3 in other Proposed items 1 LS S 8,339,200.00 f 8,393,200.00 3 6,737,900.00 S 8,737,900.00 s 6,853,170.0 S 6,853,170.00 S 8,844,0011.00 3 8,644,000.011
4 Adowarteefor SCAOAProprammnp 1 LS s 69,100.00 3 69,100.00 .3_ 69,100.00 s 69,100.00 S 69,100.00 S 69110600 S 69,100.00 S 69,100.00
5 Owner's Calftermy AOawance 1 LS s 1011000.0 3 100000.00 S 100 000.00 S 100 00000 3 100 000.00 S 100 OOQOQ 3 100 0011.00 3 100,0=00
TOTAL BASE PROPOM PLUS ALLOWANCES f .DO 3,OWDO s 7 00 3 2,314,31WOO
ADO AL7FJtNATE AROPO.S.aL 1mms
Preeetal Mem Desert flon Quantity Unk Unft PHu Total Price Unk Prtea Total Pries
unitrice IagLP.tlsf 3!8lLPd5! TeWPries
Installation of three 724nCh BunerOy
Vehras,two 72-kch fabricated steel
wye fdiips mrd one 72-Inch febricBW
AA-1A steeihewith appurter icas 1 LS s 848,900.06 S 646,900.00 S 1.675,000.013 S 1.075,000.00 S 765,000.00 s 765.000.00 S 1,1100.000.00 3 1.100.000.00
nstetle8on of two 72-inch Bu6m0y
AA-1B VWeswith appuranances 1 LS S 335,300.06 S 335,306.06 3 400,060.06 S 400,000.00 s 386,666.00 3 360,000.00 S 806,006.06 3 606.000.00
hsb4dan of one 724%h ldxicdad
AAACsLdw0—+hihaQpurtananoes 1 LS S 187,606.00 S 1 00
67,6 .00 3 22600.
,000 S _ _220,000.00_.S 132,DMOO 3 132,000.0 00
.6 S 350,0 .06 S 350,000.00
hsteilsdon Of six Vacvun SmakerfAir
Release Valve vauhs with
AA-2 apprrtanances 1 LS 3 200,600.00 S 2DO.WG.D0 s 506,000.00 S__._.._800,000.06 3 365,0011.0 _S_ 355,000.00 s 860,666.66 3 800,000.00
Demofbon and replacement of egN 12
AA-3 inch FOW-ToANAslavalves 1 LS s 30,600.00 s 30.606.60 5116,000.00 S 1t8000.D0 S 120,00000 S_ 120,OOD.00 3 110000.00 S 116,000.00
Rahabirlaticrt of 2.O W EST auarior
mating system Wm 106%
AA-4 Poyhretharte(sladomade)cos" 1 LS S 129.000.00 3 129,06000 S 85,0013.00 3 65,000.00 s 76,00600 S
Coatiq ooricrw wallon ads6sg 7600066 S 80,000.00 S 80,000.00
portion al Sed'snerttation Baan 30
AAS SetWdVftWChannel 4,OD0 SF S 6.00 s 24,00000 s 35.00 S 140,00000 S 9.00 S 35,000.00 S 5.00 S 20,000.00
Cod to inclu ds US kcn and Steel
rtpWnmend fmM it Taw Water
A" Cods Section 17183 1 LS I S 360 000.00 S 360 006110 i s 845 660.00 S M000.00 S 250 00000 3 250 000.00 I S 5W.000.00 3 500 000.00
TOTAL ADD ALTERNATE AMOUNT 1S toKomm 13,01000.00 11 004011 5W 000.09
TOTAL BASE PROPOSAL PLUS ADDITIVE ALTERNATE AMOUNT S 10,779,WDM S 19 U 00
1.,lasun J.Chdsb nserr,Ti P.E.A 97527,ob hereby 5�••'' •• S'`, Prepared by: waAwPwomm.LLC
oatdythatthisproposal pitanue r �+ TBPER-Waw.,No.8053
10 .1• •+• ! 604 can Chws P
* :* 67 Side 150
AuzW.7X7
............................t... 512-M-W21 Telephone
JASON J CHRISTENSEN 40 WintMAKREMKIII.COM
!9=. dW
!k W,"CICENS9P:��,W-
DATE: October 19,2018
SUBJECT: BCRUA Board Meeting—October 24, 2018
ITEM: 7B. Consider a resolution authorizing the President to execute a Construction Contract
with Excel Construction Services, LLC for Phase 1C Water Treatment Plant
Expansion.
PRESENTER: Karen Bondy,General Manager
BACKGROUND/JUSTIFICATION:
Bids were opened for this project on September 26,2018. Responsive Competitive Sealed Proposals(bids)were
received from Archer Western, Excel Construction,CSA Construction and Kiewit(see attached).The rank order
of the base price proposal was as follows:
Excel Construction: $7,388,270.00
Archer Western $8,683,300.00
CSA Construction $9,213,000.00
Kiewit $9,314,300.00
Each proposal also includes eight alternate proposals. After considering the alternate proposals,Staff and the
OC recommend including Alternate Items 1A, 1B, 2,4 and S. Excel's proposal for these items is$1,612,000.After
considering these items, Excel Construction remained the lowest responsive bidder with a Final Negotiated
Proposal of$9,100,270.00. Based on the recommendation of our design engineer,Walker Partners,the lowest
responsive and highest ranked bid was from Excel Construction.
Staff and the OC held a conference call with Walker Partners on October 3, 2018 and agreed unanimously to
recommend award of this contract to Excel Construction Services, LLC in the amount of$9,100,270.00.
FUNDING:
Funding for this contract was approved at the April 17,2017 Board meeting,and by all three-member city
councils in subsequent meetings.
Since the contract award will exceed the BCRUXs authorized maximum of$500,000, per the Master Agreement,
Board approval of this contract will need to be contingent on approval by all three BCRUA member city councils.
Staff,OC representatives,and representatives of Walker Partners will be available to answer any Board
questions.