Loading...
BCRUA_R-18-10-24-7B RESOLUTION NO. R-18-10-24-713 WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") hereby determines that "Competitive Sealed Proposal" is the delivery method which provides the best value for the BCRUA Phase l C Water Treatment Plant Expansion Project, and WHEREAS, after advertising for and receiving proposals from offerors, the BCRUA determines that Excel Construction Services, LLC is the offeror which offers the best value for the BCRUA for the BCRUA Phase 1 C Water Treatment Plant Expansion Project, and WHEREAS, the BCRUA now wishes to enter into a "Standard Form of Agreement between Owner and Contractor" with Excel Construction Services, LLC, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY: That the BCRUA has determined that "Competitive Sealed Proposal" is the delivery method which provides the best value for the BCRUA for the BCRUA Phase 1 C Water Treatment Plant Expansion Project. BE IT FURTHER RESOLVED That, after advertising for and receiving proposals from offerors, the BCRUA hereby finds that Excel Construction Services, LLC is the offeror which offers the best value for the BCRUA. BE IT FURTHER RESOLVED That, subject to the approval of the Participating Cities, the Board President is hereby authorized and directed to execute on behalf of the BCRUA a "Standard Form of Agreement between Owner and Contractor" with Excel Construction Services, LLC for the BCRUA Phase 1C Water Treatment Plant Expansion Project. C'Uurianylvi.+rl Wnllaaal'JLniwiq'N'udmJ�la{ �Caw OL03...Lal1LC I TAYK` -BCRUA-Slm&l lt—HarAtImMIWiw EkLd Ctwwwxn Swxm LLC(IMM 1794v111XFA)Lkk The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of October, 2018. ANDREA NAVARItETTE, President Brushy Creek Regional Utility Authority ATTEST: RE E FLORES, 4caZiary (gi,F4�q surveyors 804 Los Cimas Pkwy.,Suite 150 Austin,Texas 78746 October 9, 2018 Karen Bondy, General Manager Brushy Creek Regional Utility Authority(BCRUA) 221 E. Main St. Round Rock, TX 78664 Re: BCRUA Phase 1C Water Treatment Plant(WTP) Expansion Project No.: 03-00619 Dear Ms. Bondy.- On ondy:On September 26,2018,Walker Partners assisted the BCRUA in opening competitive sealed proposals for the above referenced project. Four responsive, competitive sealed proposals were submitted by Archer Western Construction, LLC(Archer Western)of Irving,TX, CSA Construction, Inc. (CSA)of Houston,TX, Excel Construction Services, LLC (Excel) of Leander, TX and Kiewit Water Facilities South Co. (Kiewit) of Irving, TX. None of the proposals included any deviations from the contract documents. The proposals were evaluated and ranked based on the following selection criteria: 30%for Contractor Relevant Experience and References,60%for Cost Proposal and 10% for Proposed Schedule. Based on evaluation of the proposals, Excel is the highest ranked proposer offering the best value, as determined by the selection criteria and ranking assessment. Evaluation of Excel's proposal included a review of their technical qualifications and experience,including major subcontractors.A background check was performed via telephone poll of owners and engineering firms for similar projects Excel has completed over the past several years.The overall impression from this investigation and review is that Excel provides quality work in a timely and professional manner.Also,our Walker Partners team has recently completed successful projects with Excel, including at the City of Cedar Park Water Treatment Plant. The WTP Expansion proposal includes eight Additive Alternates that are listed in the table below.Since the total Base Proposal amount is favorable,the BCRUA elected to include Add Alternates 1A, 1 B.2,4 and 5 into the project. The total amount of the selected Add Alternates is $1,612,000.00.The BCRUA decided to exclude Add Alternates 1 C and 3 from the project.Add Alternate 6 is for Texas Water Development Board reporting purposes and is not a requirement of this project. Item No. Quantity Unit Item Description Unit Price Amount Three 72-inch BFVs,two AA-1A 1 LS 72-inch steel wye fittings $765,000.00 $765,000.00 and one 72-inch steel tee AA-113 1 LS Two 72-inch BFVs $380,000.00 $380,000.00 AA--JG -1 I6& 49n -2L . 4 .I I...... S1']iia'ln -+i , vvnnn rnvv AA-2 1 L5 Six Vacuum Breaker/Air $355,000.00 $355,000.00 Release Valve vaults AA ' Gi.,L.F 11 i.,rl. Cil*.,r T.. $12n nQno 5 199 4Al..n7 www.WalkerPartneFS.com TSPE Registration No.8053 1 TBPLS Registration No. 10194317 Item No. Quantity Unit Item Description Unit Price Amount EST interior coating rehab AA-4 1 LS with 100%polyurethane $76,000.00 $76,000.00 (elastomeric) coating Coating existing wall of AA-5 4,000 SF Sedimentation Basin 3C $9.00 $36,000.00 Settled Water Channel AA-6 -1 }3 �} �sA;999:48 $ 59;999:98 Based on the information presented and evaluation of the proposals, Walker Partners recommends that the BCRUA award a contract to Excel in the amount of$9,100,270.00 for the Phase IC WTP Expansion,which includes the total Base Proposal amount of$7,488,270.00 plus the selected Add Alternates total amount of$1,612,000.00. We will prepare the Notice of Intent to Award Letter and other contract documents for transmittal to Excel, pending final acceptance and direction from the BCRUA. Sincerely, YVL, Jason Christensen, P.E. Project Manager Cc: Project t=ile www.WalkerPodners.com 2 Brushy Creek Regional UpTity Audhodty Phase IC Water Treatment Plant Exparalm Compedthre Sealed Proposal-Proposal Opening Proposals Opened September 26,2018 at 2;00 PM Fhel Nego#a*d Proposal Pt000sor Excel Construction Services LLC Attachments: Proposal Security ✓ Proposal Form(Section 00300) ✓ W-9(Section 00300) ✓ Conflict of Interest Questionnaire(Section 00300) ✓ Statement of Proposers Experience(Section 00400) ✓ TWDB-0459 ✓ BASE PROPOSAL ITEMS Pr000sal Item Description Quantity Units Unit Price Total Price 1 Bonds,.Mobilization b Startup 1 _ LS S 360,000.00 s 360 000.00 2 Trench Safety 1,200 ._.LF $ 5.00 S 8,000.00 Construction of all Work as specified and detailed,except for Work included 3 in other Proposal items 1 LS S 6,853,170,00 $ 8,853,170.00 _ 4. Allowance for SCADA Programming 1 LS $ 69,100.00 s 69,100.00 5 Owner's Contingency Allowance 1 LS S 200 000.00 $ 200 000.00 TOTAL BASE PROPOSAL PLUS ALLOWANCES S 7,488,270.00 ADD ALTERNATE PROPOSAL rTEMS Proposal Item Description Quantity UnHs Unit Price jotal Price Installation of three 72-inch Butterfly Valves,two 724nch fabricated steel I,Jason J.Christensen,Texas P.E. wye fittings and one 72-Inch fabricated #97527,so hereby certify that this AA-1A steel We with appurtenances 1 LS S 765,000.00 3 765,000,00 proposal tab is accurate and true. Installation of two 724nch Butterfly ON••E OF 7*, AA-IB Valves with appurtenances 1 LS S 380,000.00 $ 380,000.00 Installation of six Vacuum Breaker/Air i Release Valve vaults with *:• *�� AA-2 appurtenances 1 LS S 355,000.00 S 355,000.00 / — r................................./ Rehabilltation of 2.0 MG EST Interior % AWN J.CNRISTENSEN i r..:............ coating system with 100% 4: 97527......:...i AA-4 lyurethane(elaatomeKg)coating 1 ___ LS 5 76,000.00 S 76,000,00 '9'. <4Qi Coating concrete wall on existing ����F pardon of Sedimentation Basin 3C AA-0 Settled Water Channel 4,000 SF S goo S 36 000.00 TOTAL ADO ALTERNATE AMOUNT $ 1,612,000.00 TOTAL BASE PROPOSAL PLUS ADDITIVE ALTERNATE AMOUNT $ 910D 270.00 Prapamd by., Walker Partners,LLC TSPS Registration No.8053 804 Las Cimas Parkway,Suite 150 Austin,7X 78746 512-082-0021 Telephone &—M Crank A09-01 Ut78y Aurionly PNU 1C WstrrTmftY"d PWntEv m m Camu t-Gnaw Rupetd-Peapasei Opwft Pespe+ds OpenM aeptemWr 2s,2018 al=PM Proposer Archerwastem conaw" LLC CSA Inc. Excel C2nal00on Sacyllcm LLC Klawlt Attaelan.rhta: Prvposd Security ✓ ✓ ✓ ✓ Proposal Form(Section 00300) ✓ ✓ ✓ W-0(Section 06300) ✓ ♦ ,� ✓ Cont a of Merest Ouestionnaire(Saxton 06300) ✓ ✓ ✓ ✓ Statement of Proposers ExpetWm(Section 00400) ✓ ✓ ✓ ✓ TWOB-0459 ✓ ✓ ✓ ✓ N&E PROPOSAL flFJll4 UnAll Unit Price Total Price UDft Pries Total Price Unit Price Total Pries Unit Price Total Price 1 Bonds,Mobi2ts8orh&stomp 1 LS 3 175,000.00 S 17S.0W.00 s 300,006.00 3 300,006.00 S 380,000.00 S 360,006.00 S 300,000.0 S 300,00000 2 Trench ssdsty 1200 LF 3 5.00 s 5,00000 S 5.00 s 6,000.00 S 5.00 s 6,000.0 3 1.00 s 1,200,00 ConsUtrtkn of all work as speefad OW Marled,except far work ntlded 3 in other Proposed items 1 LS S 8,339,200.00 f 8,393,200.00 3 6,737,900.00 S 8,737,900.00 s 6,853,170.0 S 6,853,170.00 S 8,844,0011.00 3 8,644,000.011 4 Adowarteefor SCAOAProprammnp 1 LS s 69,100.00 3 69,100.00 .3_ 69,100.00 s 69,100.00 S 69,100.00 S 69110600 S 69,100.00 S 69,100.00 5 Owner's Calftermy AOawance 1 LS s 1011000.0 3 100000.00 S 100 000.00 S 100 00000 3 100 000.00 S 100 OOQOQ 3 100 0011.00 3 100,0=00 TOTAL BASE PROPOM PLUS ALLOWANCES f .DO 3,OWDO s 7 00 3 2,314,31WOO ADO AL7FJtNATE AROPO.S.aL 1mms Preeetal Mem Desert flon Quantity Unk Unft PHu Total Price Unk Prtea Total Pries unitrice IagLP.tlsf 3!8lLPd5! TeWPries Installation of three 724nCh BunerOy Vehras,two 72-kch fabricated steel wye fdiips mrd one 72-Inch febricBW AA-1A steeihewith appurter icas 1 LS s 848,900.06 S 646,900.00 S 1.675,000.013 S 1.075,000.00 S 765,000.00 s 765.000.00 S 1,1100.000.00 3 1.100.000.00 nstetle8on of two 72-inch Bu6m0y AA-1B VWeswith appuranances 1 LS S 335,300.06 S 335,306.06 3 400,060.06 S 400,000.00 s 386,666.00 3 360,000.00 S 806,006.06 3 606.000.00 hsb4dan of one 724%h ldxicdad AAACsLdw0—+hihaQpurtananoes 1 LS S 187,606.00 S 1 00 67,6 .00 3 22600. ,000 S _ _220,000.00_.S 132,DMOO 3 132,000.0 00 .6 S 350,0 .06 S 350,000.00 hsteilsdon Of six Vacvun SmakerfAir Release Valve vauhs with AA-2 apprrtanances 1 LS 3 200,600.00 S 2DO.WG.D0 s 506,000.00 S__._.._800,000.06 3 365,0011.0 _S_ 355,000.00 s 860,666.66 3 800,000.00 Demofbon and replacement of egN 12 AA-3 inch FOW-ToANAslavalves 1 LS s 30,600.00 s 30.606.60 5116,000.00 S 1t8000.D0 S 120,00000 S_ 120,OOD.00 3 110000.00 S 116,000.00 Rahabirlaticrt of 2.O W EST auarior mating system Wm 106% AA-4 Poyhretharte(sladomade)cos" 1 LS S 129.000.00 3 129,06000 S 85,0013.00 3 65,000.00 s 76,00600 S Coatiq ooricrw wallon ads6sg 7600066 S 80,000.00 S 80,000.00 portion al Sed'snerttation Baan 30 AAS SetWdVftWChannel 4,OD0 SF S 6.00 s 24,00000 s 35.00 S 140,00000 S 9.00 S 35,000.00 S 5.00 S 20,000.00 Cod to inclu ds US kcn and Steel rtpWnmend fmM it Taw Water A" Cods Section 17183 1 LS I S 360 000.00 S 360 006110 i s 845 660.00 S M000.00 S 250 00000 3 250 000.00 I S 5W.000.00 3 500 000.00 TOTAL ADD ALTERNATE AMOUNT 1S toKomm 13,01000.00 11 004011 5W 000.09 TOTAL BASE PROPOSAL PLUS ADDITIVE ALTERNATE AMOUNT S 10,779,WDM S 19 U 00 1.,lasun J.Chdsb nserr,Ti P.E.A 97527,ob hereby 5�••'' •• S'`, Prepared by: waAwPwomm.LLC oatdythatthisproposal pitanue r �+ TBPER-Waw.,No.8053 10 .1• •+• ! 604 can Chws P * :* 67 Side 150 AuzW.7X7 ............................t... 512-M-W21 Telephone JASON J CHRISTENSEN 40 WintMAKREMKIII.COM !9=. dW !k W,"CICENS9P:��,W- DATE: October 19,2018 SUBJECT: BCRUA Board Meeting—October 24, 2018 ITEM: 7B. Consider a resolution authorizing the President to execute a Construction Contract with Excel Construction Services, LLC for Phase 1C Water Treatment Plant Expansion. PRESENTER: Karen Bondy,General Manager BACKGROUND/JUSTIFICATION: Bids were opened for this project on September 26,2018. Responsive Competitive Sealed Proposals(bids)were received from Archer Western, Excel Construction,CSA Construction and Kiewit(see attached).The rank order of the base price proposal was as follows: Excel Construction: $7,388,270.00 Archer Western $8,683,300.00 CSA Construction $9,213,000.00 Kiewit $9,314,300.00 Each proposal also includes eight alternate proposals. After considering the alternate proposals,Staff and the OC recommend including Alternate Items 1A, 1B, 2,4 and S. Excel's proposal for these items is$1,612,000.After considering these items, Excel Construction remained the lowest responsive bidder with a Final Negotiated Proposal of$9,100,270.00. Based on the recommendation of our design engineer,Walker Partners,the lowest responsive and highest ranked bid was from Excel Construction. Staff and the OC held a conference call with Walker Partners on October 3, 2018 and agreed unanimously to recommend award of this contract to Excel Construction Services, LLC in the amount of$9,100,270.00. FUNDING: Funding for this contract was approved at the April 17,2017 Board meeting,and by all three-member city councils in subsequent meetings. Since the contract award will exceed the BCRUXs authorized maximum of$500,000, per the Master Agreement, Board approval of this contract will need to be contingent on approval by all three BCRUA member city councils. Staff,OC representatives,and representatives of Walker Partners will be available to answer any Board questions.