BCRUA_R-21-01-27-7B RESOLUTION NO. R-21-O1-27-7B WHEREAS, the Brushy Creek Regional Utility Authority, Inc. (`BCRUA") has previously entered into a contract ("Contract') with Excel Construction Services, LLC for the BCRUA Phase 1 C Water Treatment Plant Expansion Plant Project; and WHEREAS, the BCRUA has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 4, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA, Change Order No. 4 to the Contract with Excel Construction Services, LLC, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of January, 2021. RENE FLORES, Presi Brushy Creek Regional Utility Authority ATTEST: ANNE UFFY, 8e tary https: roundrocktcuas.sharepotni.com sites Administration Department Filer BCRUA Board Packcls Packet Docummta=1+01.720:1 Res.BCRUA Co"u•-Esccl Construction (06163964aA08F8).doc Change Order No. 04 Date of Issuance: 01/22/21 Effective Date: Project BCRUA Phase 1C WTP Expansion Owner BCRUA Owner's Contract%o-: Conteacr. Date ofcontmct. December 6,2018 contractor Excel Construction Services,LLC F.ngtneer's Project No 3-00619 The Contract Documents are modified as follows upon execution of this Change Order: Description: This change order includes: • Credit of$1,500 for EST disinfection(approved via PCM-002 and CO-001,but the amount was not deducted in CO-001),0 days. • PCM-008:Credit of$49,608 for deletion of unnecessary concrete coatings and Additive Alternate No.5;0 days. • CMR-002:Price of$6,039 for revisions to Sedimentation Basin baffle wall;9 days added to Substantial Completion. • CMR-003.1:Price of$5,488 for addition of heat trace to BPS pump control valves;30 days to added to Final Completion;to be billed to remaining Owner's Contingency. • CNIR-004:Price of$9,307 for replacement of failed 24-inch BFV;5 days added to Final Completion. • CMR-005.3:Price of$47,347 for addition of air valve taps at BPS per transient analysis;60 days added to Final Completion. • CMR-006:Price of 56,668 to repair wall leak in existing Phase 1A Rapid blix basin;2 days added to Final Completion. Attachments: (List documents supporting change): PCM-008,CMR-002,CMR-003.1,CbIR-004,CMR-005.3,CNIR-006 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days X Calendar days Substantial completion(days or date):06/05/2020 $9,100,270.00 Ready for final payment(days or date):08/04/2020 Increase from previously approved Change Orders Increase from previously approved Change Orders No. 01 to No. 03 No. 01 to No. 03 Substantial completion(days):50 days 5379-827.00 Ready for final payment(days):100 days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or date):07/25/2020 $9.480.097.00 Ready for final payment(days or date):11/12/2020 Increase of this Change Order: Increase of this Change Order: Substantial completion(days or date):9 days $18.253.00 Ready for final payment(days or date):106 days Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion(days or date):08/03/2020 $9.498.350.00 Ready for final payment(days or date):02/26/2021 &/fA� if—2 1,t I I ?-, — Page 1 of 2 RECO\�IENDE'l ACCEPT 71): ACCI'sP1'I;D- By: By: `� �3y; Engineer(Authorized Signature) .w12- X(Autho'zc �� rc) Contractor(Authorized Signature) Date: 01/22/2021 Date: -7 7 r nate: 1/26/2021 Approved by Funding Agency(f applicable): Date. Page 2 of 2 r�WHOLS Proposed Contract Modification PROJECT Phase 1 C Water Treatment Plant Expansion PROJECT NUMBER OWNER Brushy Creek Regional Utility Authority(BCRUA) BUILDER Excel Construction Services, LLC DESIGNER Walker Partners; Freese and Nichols, Inc. CM Jason Christensen PCM No. PCM-008 Builder Submittal No. Specification 09 96 00 Drawing/Detail Various NOTIFICATION TO BUILDER The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Documents.Authorization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Documents,prior to commencing the work involved. Submit a Price/Credit Proposal with detailed cost breakdown of labor,materials,equipment and all other costs related to this change. Impacts on Contract Time shall be shown in a revised schedule, included with the submitted proposal. Comments Please submit a credit proposal for the following changes to concrete coatings on the project. 1.After reviewing the blasted wall of the existing treatment structure,it was determined that the Additive Alternate No. 5 coating system is not required. In lieu of the coating system,use Tnemec Series 217 Mortarcrete or approved equal to repair/patch voids and"bug holes"equal to or greater than 1/2"inch diameter or depth along the existing wall. Mortarcrete does not require a top coat after installation. 2. Since the south, exterior wall of Sedimentation Basin 3C will become an interior basin wall in a future phase,it was determined that the specified exterior concrete coating (Tnemec Series 156 Enviro-Crete) is not required on the south wall. Coat the east,exterior wall of Sedimentation Basin 3C as specified to match the adjacent,existing wall. Attachment Submitted By Jason Christensen Date 05-07-2020 BUILDER'S RESPONSE We respond to your request as follows: We submit the attached Price/Credit Proposal with detailed cost breakdown and revised schedule for performing the described change. Cost Impact $-13,608.00 Time Impact 0 days Comments Attachments PCM-008-DeleteConcreteCoatings-Chad Mitchell-Pending.pdf CONSTRUCTION MANAGER'S RESPONSE Status Change Order will be Issued Action Final Distribution Comments A deductive change order will be issued. Deletion of Additive Alternate No. 5 for a credit of $36,000 will be included in the change order. Returned By Jason Christensen Date 09-24-2020 Page Left Intentionally Blank EXCEL_ �� COfL4TRUCTOn SERVICES LLC - Proposed Contract Modification No.008 (Not a Change Order) Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Project Owner: BCRUA Engineer: Walker Partners.LLC Initiated by: ❑ Engineer ® Contractor Contractor: Excel Construction Services,LLC Date:September 23,2020,2020 PO Box 2260 Leander,Texas 78646 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. . A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Please find attached a copy of PCM 008 for the deletion of Exterior coating. By Chad Mitchell All work shall be in accordance with the terms,stipulations,and En eer Recommendation: conditions of the original Contract Documents. If the work herein 79 Recommend Acceptance provided for is Approved by Change Order,the time of completion ❑ Do Not ommend Acceptance will be: ❑ Increased ❑ Decreased ® Unchanged _ y:Jason Christensen,P.E. by 0 calendar days. Date 11/2/20 This change will: Deduct ❑ No Change Owner's Action: $ 13,608.00 ® Accepted ❑I Not Accepted Chad MitchellQ^Q� General Contractor By: Karen Bondy Date September 23,2020 Date 11/2/2020 CHANGE PROPOSAL SUMMARY SHEET EXCEL_ CDIISTRUCT10n SERVICES LLC _ Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Change Description: Exterior Coating CPR No: 8 Date: September 22, 2020 MATERIALS/QUOTES: Amount Op Rate Extended Material $1.00 X 44 $44.00 Subtotal $44.00 Sales Tax $44.00 X 0.00% $0.00 MATERIAL/QUOTES SUBTOTAL $44.00 LABOR: Hours Op Rate Extended Straight Time Labor(3 Men @ 1 days): 8 X $27.00 $216.00 Overtime Labor: 0 X $37.50 $0.00 Subtotal Manhours: 0 Foreman Time : 1 X $35.00 $35.00 Assistant Superintendent: 0 X $0.00 $0.00 Superintendent Time (Brad Clark): 0 X $70.00 $0.00 Material Proc. & Hndlg. Labor(5% of Man Hours): 0 X $0.00 $0.00 Update As Built Drawings: 0 X $0.00 $0.00 SUBTOTAL LABOR: $251.00 DIRECT JOB EXPENSES: Amount Op Rate Extended Project Manager(Chad Mitchell): 1 X $85.00 $85.00 Jobsite Trailer(Monthly) $0.00 X 1 $0.00 Port-o-can (Monthly) $0.00 X 1 $0.00 Water(for injection) $0.00 X 1 $0.00 Backhoe (weekly) $0.00 2 $0.00 SUBTOTAL DIRECT JOB EXPENSES: $85.00 EXCEL CONSTRUCTION MARKUPS: Amount Op Rate Extended Direct Costs: $380.00 X 1 $380.00 Work Comp/SS/ Unemployment: $336.00 X 35.00% $117.60 SUBTOTAL: $497.60 OH&P 15%: $497.60 X 15.00% $74.64 EXCEL CONSTRUCTION SUBTOTAL: $572.24 SUBCONTRACTS WITH MARKUPS: Amount Op Rate Extended 1.) Jean's Waterproofing -$14,180.00 X 1 -$14,180.00 2.) X 1 $0.00 3.) X 1 $0.00 4.) X 1 $0.00 5.) X 1 $0.00 6.) X 1 $0.00 SUBTOTAL: -$14,180.00 OH&P 10% $0.00 X 10.00% $0.00 SUBCONTRACTS SUBTOTAL: -$14,180.00 SUBTOTAL/SUMMARY: Amount Op Rate Extended Liability/Builders Risk(Cost of Work Only): $0.00 X 1.00% $0.00 SUBTOTAL (Excel Subtotal/Subcontracts/ Builders Risk): -$13,607.76 P&P Bond $0.00 X 2.00% $0.00 GRAND TOTAL THIS CHANGE: -$13,608 Chad Mitchell From: Tom De Pippo <tdepippo@jwtexas.com> Sent: Wednesday, September 23, 2020 8:17 AM To: Chad Mitchell Subject: Re: PCM 8 - Deleting the Exterior Concrete Coat $14180.00 Tom De Pippo Jeans Waterproofing of Texas (830) 557-4240 (830)832-0648 Cell 1 EXCEL : CMR-002 consrnucrcn swvice u_c r" --- contraet-me (Not a Change Order) Project Name- BCRUA Phase 1C Water Treatment Plant Expansion Project Owner: BCRUA Engineer: Walker Partners.LLC Initiated by: ❑ Engineer ® Contractor Contractor: Excel Construction Services,LLC Date:October 1,2020, PO Box 2260 Leander,Texas 78646 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Please find attached a copy pricing for coring the additional holes in Baffle Wall By Chad Mitchell All work shall be in accordance with the terms,stipulations,and Eneer Recommendation: conditions of the original Contract Documents. If the work herein 9 Recommend Acceptance provided for is Approved by Change Order,the time of completion ❑ Do No��end Acceptance will be: ® Increased ❑ Decreased ❑ Unchanged Zi22 y:Jason Christensen,P.E. by 9 calendar days. (r Date 11/2/20 This change will: ® Add ❑ Deduct ❑ No Change Owner's Action: $ 6,039.00 ® Accepted ❑ Not Accepted Chad Mitchell , �5p� General Contractor By: Karen Bondy Cz— Date October 1,2020 Date 11/2/2020 CHANGE PROPOSAL SUMMARY SHEET EXCE!_ CCII'ISTRUCT7on SERVICES LLC Project Name: BCRVA Phase 1C Water Treatment Plant Expansion Change Description: Additional Coring in Baffle Wall CPR No: 10 Date: September 22, 2020 MATERIALS/QUOTES: Amount Op Rate Extended Anchor Bolts $1.00 X 60 $60.00 SS Plate $750.00 X 1 $750.00 Subtotal $810.00 Sales Tax $810.00 X 0.00% $0.00 MATERIAL/QUOTES SUBTOTAL $810.00 LABOR: Hours Op Rate Extended Straight Time Labor(3 Men @ 1 days): 48 X $27.00 $1,296.00 Overtime Labor: 0 X $37.50 $0.00 Subtotal Manhours: 0 Foreman Time : 1 X $35.00 $35.00 Assistant Superintendent: 0 X $0.00 $0.00 Superintendent Time (Brad Clark): 1 X $70.00 $70.00 Material Proc. & Hndlg. Labor(5% of Man Hours): 0 X $0.00 $0.00 Update As Built Drawings: 0 X $0.00 $0.00 SUBTOTAL LABOR: $1,401.0011 DIRECT JOB EXPENSES: Amount Op Rate Extended Project Manager(Chad Mitchell): 1 X $85.00 $85.00 Jobsite Trailer(Monthly) $0.00 X 1 $0.00 Port-o-can (Monthly) $0.00 X 1 $0.00 Water(for injection) $0.00 X 1 $0.00 Backhoe(weekly) $0.00 2 $0.00 SUBTOTAL DIRECT JOB EXPENSES: $85.00 EXCEL CONSTRUCTION MARKUPS: Amount Op Rate Extended Direct Costs: $2,296.00 X 1 $2,296.00 Work Comp/SS/Unemployment: $1,486.00 X 35.00% $520.10 SUBTOTAL: $2,816.10 OH&P 15%: $2,816.10 X 15.00% $422.42 EXCEL CONSTRUCTION SUBTOTAL: $3,238.52 SUBCONTRACTS WITH MARKUPS: Amount Op Rate Extended 1.) Hunter $500.00 X 4 $2,000.00 2.) Jeans Waterproofing $800.00 X 1 $800.00 3•) X 1 $0.00 4.) X 1 $0.00 5.) X 1 $0.00 6.) X 1 $0.00 SUBTOTAL: $2,800.00 OH&P 10% $0.00 X 10.00% $0.00 SUBCONTRACTS SUBTOTAL: $2,800.0011 SUBTOTAL/SUMMARY: Amount Op Rate Extended Liability/Builders Risk (Cost of Work Only): $0.00 X 1.00% $0.00 SUBTOTAL (Excel Subtotal/Subcontracts/Builders Risk): $6,038.52 P&P Bond $0.00 X 2.00% $0.00 GRAND TOTAL THIS CHANGE: $6,03911 - Hunt Construction Services Invoice ' 708 Charyl Lynn Argyle,Texas 76226 Date invoice# 9/2/2020 19751 Bili To Excel Construction Services LLC Ship To 1202 Leander Drive 1906 Hur Industrial Blvd Leander,Tx.78641 Cedar Park,Tx.78613 P.O. Number Terms Rep Ship V1 F.O.B. Project 9/2/2020 Quantity Item Code Description Price Each Amount 4 Core Drilling 10"x15"Holes in Wall 500.00 2,000.00 Thank you for your business. Phone# E-mail a $2,000.00 972-256-6749 www,HuntGPRnet PROJECT Phase 1 C Water Treatment Plant Expansion PROJECT NUMBER OWNER Brushy Creek Regional Utility Authority(BCRUA) BUILDER Excel Construction Services, LLC DESIGNER Walker Partners; Freese and Nichols, Inc. CM Jason Christensen FO No. FO-002 FO Description Modifications to Sedimentation Basin inlet baffle wall Specification NA Drawing/Detail SA-5,Section Al Make the following modifications to the Contract Documents as set forth in this Field Order pursuant to the General Conditions of the Contract Documents. It is the Construction Manager's and Engineer's opinion that this Field Order does not alter the Contract Price or the Contract Time. Notify the Construction Manager prior to commencing the Work and submit a Change Proposal if the Builder does not agree with the Construction Manager's and Engineer's opinion. Detail Desc. During a site visit on 9/1/20,the Engineer noticed that the inlet baffle wall of the Sedimentation Basin 3C was drawn incorrectly.The baffle wall sections illustrated on Sheet SA-5,Section Al and Sheet MA-11,Section G1 should have been reversed.As a result,four 10"baffle holes need to be plugged on the south side of the wall and four 10" baffle holes need to be added on the north side of the wall as indicated in attached Sheet SA-5. Complete proposed modifications as follows: New baffle holes: Core four new 10" diameter holes in line with existing holes as indicated on attached drawing. If rebar is exposed in new holes,notify RPR and Engineer. Engineer will determine appropriate means of protecting exposed rebar,such as coating. Existing baffle holes: Plug four existing 10"diameter holes adjacent to slide gate TSC-SLG-SB301 as indicated on attached drawing. Install 10"Sch 80 PVC plugs on inlet side of baffle wall. Do not solvent cement plugs into baffle holes. Include threaded SS eye bolt into center of each plug end to assist removal by Owner. Attachments FO-002-SA-5-Jason Christensen-Pending.pdf Status Filed as Received Action Final Distribution Submitted By Jason Christensen Date 09-02-2020 1 1 2 1 3 1 4 1 5 1 6 1 7 1 e I a I 10 I TI I 12 I u I 14 L 262'-B" -6' 14'-6' 1'-- 14'-6" 1'- 4'-0"1'-' 4'-4" 1'-' 6'-B" 4'-3" 1' }t"EJ1'- EJ- MATCH EXIST LIM r' 'fo-C ELN TO/BL 1080'-0' O O NOTE 2 _T/GONG EL 4 1080'-0" L SCUM PORT #4 U-BAR NOTE I TYPE A TOPPING BEYOND(TYP) (RE:O1/SA-7) SLAB(G1/SZ-3) I SANG FILL #4 26's 14126" T/�-ECA9� S- J \ U-BARO 12"C/C SECOND I 1 TYPE A TOPPING `EXISTING STAGE GROUT 6•-0" SUB(RE:G1/SZ-3) REINF.VERT:NOTE 1 NOTE I 1066'-2" TOPPING ]'-0" 1- HORIZ:#5010"C/C.EF A6 I T/GONG 1"EJ FILLER T/GONG EL EJ RE:PUN EL VARIES 066'-2" (5)AOD'L#5 O MATERIAL BTWN 1065'-10" IM I I 1067'-7' EXIST k NEW O HI PTS IO6fi'-0' EF(SIM F1/SA-B) OPNG(COORD LLO,— A4 1066'-0" _ I SLOPE 1061'-9'• WE T LONG / W/MECH.ttP) O GRAINS L A 1 5 1062'-0" ITV\J�`�/fir// 1062'-O" T/CONC EL l ` SUPE I CONC E ,-I Ti 1062'-0 1 2.00 H U_a.MATCH TYP •• �T/CONC 5•-0"BAR SIZE k SPACING. O J-' NOTE 1 _ STRUCTURAL FILL STD LAP SPLICE ° i E%ISTUNDISTURBED NOTE 3 o STRUCTURAL FILL SANG SUBGRADE (NOTE 4) FILL ____- 2'M G �ECnON NOTF�, Z- 1REFER TO DI/SA-7 FOR REINFORCING. i REFER TO F10/SA-8 FOR BAFFLE WALL REINFORCING. 3. REFER TO SHEET C-3 FOR DETAIL REGARDING BENCHING OF E%ISTING FILL AND EXCAVATION ADJACENT TO EXISTING STRUCTURE. 4. REFER TO SHEET 5-1,FOUNDATION NOTE 3•FOR REQUIREMENTS OF STRUCTURAL FILL GRADATION AND PLACEMENT. O F F1 SECTION EULL 6pE•316•I'-0-HALFSQE•30211'4i o° SCALE NO.2 1FULLS RE=1M'=1'-0'-HALF SIZE=1�1'd -9" 55'_5'* FREESE BAFFLE HOLE: WE 4'a Trp MICHOL E IO'0 SCH 80 PVC PIPE EXIST DING Core four 10'1 •, 4NICHOLS PVC PIPE(TM Plug four 10" (TMP 4) O FILTERS diameter holes diameter holes - I 0 c 0 2-s- -7 4'-2" 0 P O O O IIO BAFFLE _ sA'-")TMP —O1 0-66•--2" —O ( O I-1-6—I— —III — ' I EJ r WALL 2k'-E7J BEYOND ttTYP O HOLES(TYP tt0 0 E 51F gTRE'pA�uTM...EPrM. ra �P Rr m eneers+surveyors N O O O O O O 7'-4" r/wEs o O FILLET SCHTYP P 1066-0BAFFLE HOLE BRUSHY CREEK REGIONALO DRAIN BEYOND 80 PVC PIPE(10 WALL EDC aHIP ( P) P" 0 " 0 -2ttO O O UTILITY AUTHORITY G O O O O O 0 O O O 0 ————— — 079"07- 010'-6'0 07•-6'O O O 0 O O O PHASE ICRIPIP NOTE 3 TYP 4"a SCH so WATER TYP) DIWDER TYP TYP PVC PIPE EXPANSION FILLET 0 0 0 0 0 0 0 0 0 SLEEVE TREATMENT STRUCTUREttPp ) SECTIONS II B 1059'-6" ' .' •. '..:'.:.. �..AN1059'-0' .. DETAIL NODES: NODE 2 B/FEC BEYOND 8116111 EL I. MLAO SUB O SUBGRADE PREPARATION NOT SHOWN. 11 .iIM7iTiw 2. On NOT UNDERMINE THE EXISTING STRUCTURE. NOTE Z GRAVEL ORAIN T R PHA IC 1 REINFORCE SIMILAR TO AB/SZ-3.PROVIDE 24-UP SPLICE AT °F PHASE IC %1 T %I T PHA IC (RE AIO/54-8) P 1 F R yA ADA 1059'-11"O HORIZONTAL BARS AND ADHESIVE DOWEL INTO INTERSECTED UST DETAIL NOTES: y�t,,...,•,��L4.1 PAB DRAIN,TYP AND WEST CONCRETE FILLET, 12"EMBED INTO F1LLEr AT EACH SIDE. 1 MUD SUB AND SUBGRADE PREPARATION NOT SHOWN. G ' \✓°• Am 2 00 NOT UNDERMINE THE EXISTING STRUCTURE = AD •RRR♦IWAGa+ dwrt A Al SECTION A8 SECTION t DRAWNGND' 19 SCALE NO.1 SCALE No.I SA-5 1 1 2 1 3 1 4 1 5 6 1 7 1 a 9 1 10 1 11 1 12 1 13 1 14 EXCEL CMR-003.1 Nin 1311 cons�ucnon seAvcEs u.c A} (Not a Change Order) Project Name: BCRUA Phase 1 C Water Treatment Plant Expansion Project Owner: BCRUA Engineer: Walker Partners. LLC Initiated by: ® Engineer ❑ Contractor Contractor: Excel Construction Services,LLC Date:December 14, 2020, PO Box 2260 Leander,Texas 78646 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Please find attached a copy pricing for additional Heat Tracing at the booster pumps. By Chad Mitchell All work shall be in accordance with the terms,stipulations,and Enni..qeer Recommendation: conditions of the original Contract Documents. If the work herein Recommend Acceptance provided for is Approved by Change Order,the time of completion ❑ Do Not Rc mend Acceptance will be: ® Increased ❑ Decreased ❑ Unchanged Jason Christensen,P.E. By 30 calendar days. Date 12-15-2020 This change will: ® Add ❑ Deduct ❑ No Change Owner's Action: $ 5,488.00 ® Accepted ❑ Not Accepted Chad Mitchells a General Contractor By: Karen Bondy Date December 14,2020 Date 12/15/2020 CHANGE PROPOSAL SUMMARY SHEET EXCEL COfISTRLIC ion SERVICES LLC Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Change Description: Heat trace for Booster Pumps Control Valves CPR No: 11 Revised Date: December 15 2020 MATERIALS/QUOTES: Amount Op Rate Extended Anchor Bolts $0.00 X 60 $0.00 SS Plate $0.00 X 1 $0.00 Subtotal $0.00 Sales Tax $0.00 X 0.00% $0.00 MATERIAL/QUOTES SUBTOTAL $0.00 LABOR: Hours Op Rate Extended Straight Time Labor(3 Men @ 1 days): 0 X $27.00 $0.00 Overtime Labor: 0 X $37.50 $0.00 Subtotal Manhours: 0 Foreman Time : 0 X $35.00 $0.00 Assistant Superintendent: 0 X $0.00 $0.00 Superintendent Time (Brad Clark): 8 X $0.00 $0.00 Material Proc. & Hndlg. Labor(5% of Man Hours): 0 X $0.00 $0.00 Update As Built Drawings: 0 X $0.00 $0.00 SUBTOTAL LABOR: $0.00 DIRECT JOB EXPENSES: Amount Op Rate Extended Project Manager(Chad Mitchell): 1 X $0.00 $0.00 Jobsite Trailer(Monthly) $0.00 X 1 $0.00 Port-o-can (Monthly) $0.00 X 1 $0.00 Water(for injection) $0.00 X 1 $0.00 Backhoe (weekly) $0.00 2 $0.00 SUBTOTAL DIRECT JOB EXPENSES: $0.00 EXCEL CONSTRUCTION MARKUPS: Amount Op Rate Extended Direct Costs: $0.00 X 1 $0.00 Work Comp/SS/Unemployment: $0.00 X 35.00% $0.00 SUBTOTAL: $0.00 OH&P 15%: $0.00 X 15.00% $0.00 EXCEL CONSTRUCTION SUBTOTAL: $0.00 SUBCONTRACTS WITH MARKUPS: Amount Op Rate Extended 1.) T- Morales $5,227.00 X 1 $5,227.00 2.) $0.00 X 1 $0.00 3.) X 1 $0.00 4.) X 1 $0.00 5.) X 1 $0.00 6.) X 1 $0.00 SUBTOTAL: $5,227.00 OH&P 10% $5,227.00 X 5.00% $261.35 SUBCONTRACTS SUBTOTAL: $5,488.35 SUBTOTAL/SUMMARY: Amount Op Rate Extended Liability/Builders Risk(Cost of Work Only): $0.00 X 1.00% $0.00 SUBTOTAL (Excel Subtotal/Subcontracts/Builders Risk): $5,488.35 P&P Bond $0.00 X 2.00% $0.00 GRAND TOTAL THIS CHANGE: $5,48811 . Morales Company -. Project: Brushy Creek WTP TMC Change#: COR-03REV01 Owner: Brushy Creek Project Change#: Date: 12-10-2020 Change Order Request T. Morales Company is pleased to offer change pricing for consideration by the Owner to add Heat Trace at Booster Pump Solenoid piping. Included: • Run additional feeds from existing Low Voltage Panel in Elect Room to Booster pump pad in existing underground conduit • Install additional exposed conduit to tie into existing alum conduit • Install HT Controllers x 1 • Install Racking for controllers x 1 • Re-Label conduits • Install HT cable on piping @ 18' per valve. • Misc. Racking and Terminations Item Excluded • Valves • MCC Breaker • Existing J-Box • Anything not specifically mentioned above Total cost for the work associated with this change is $5,227.00. Extension in Time Request: Lead time for procurement: 2 weeks. Approx time for installation: 2 weeks. Change Initiated By: Chad Mitchell / Excel Const Change Prepared By: Zachary Eldridge/TMC Change Delivered To: Chad Mitchell / Excel Const Response Rqst'd By: ASAP Carbon Copy To: None PO Box 859 601 South Patterson Avenue Florence, Texas 76527 Florence, Texas 76527 Phone: 254-793-4344 Fax: 254-793-3044 EXCEL CMR-004 consraucrian soayses.Lc (Not a Change Order) Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Project Owner: BCRUA Engineer: Walker Partners.LLC Initiated by: ® Engineer ❑ Contractor Contractor: Excel Construction Services,LLC Date:January 13,2021, PO Box 2260 Leander,Texas 78646 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Please find attached a copy pricing for removal of existing 24"BFV at station 68+00 By Chad Mitchell All work shall be in accordance with the terms,stipulations,and En ' eer Recommendation: conditions of the original Contract Documents. If the work herein Recommend Acceptance provided for is Approved by Change Order,the time of completion ❑ Do Not R c mmend Acceptance will be: ® Increased ❑ Decreased ❑ Unchanged B 'Jason Christensen,P.E. By 5 calendar days. Date 1-14-21 This change will: ED Add ❑ Deduct ❑ No Change Owner's Action: $ 9,307.00 ® Accepted ❑I Not Accepted Chad Mitchell0 General Contractor By: Karen Bondy Date January Date 1/14/2021 CHANGE PROPOSAL SUMMARY SHEET EXCEL GdRSTRUC'i'Id 1 SERVICES LLC Project Name: BCRUA Phase 9C Water Treatment Plant Expansion Change Description: Remove the 24"BFV and Replace with 8"Gate Valve CPR No: 12 Date: January 12, 2021 MATERIALS/QUOTES: Amount Op Rate Extended Anchor Bolts $200.00 X 1 $200.00 Gate Valve $901.55 X 1 $901.55 Subtotal $1,101.55 Sales Tax $1,101.55 X 0.00% $0.00 MATERIAUQUOTES SUBTOTAL $1,101.55 LABOR: Hours Op Rate Extended Straight Time Labor(3 Men @ 1 days): 0 X $27.00 $0.00 Overtime Labor: 0 X $37.50 $0.00 Subtotal Manhours: 0 Foreman Time : 0 X $35.00 $0.00 Assistant Superintendent: 0 X $0.00 $0.00 Superintendent Time (Brad Clark): 0 X $70.00 $0.00 Material Proc. & Hndlg. Labor(5% of Man Hours): 0 X $0.00 $0.00 Update As Built Drawings: 0 X $0.00 $0.00 SUBTOTAL LABOR: $0.00 DIRECT JOB EXPENSES: Amount Op Rate Extended Project Manager(Chad Mitchell): 8 X $85.00 $680.00 Jobsite Trailer(Monthly) $0.00 X 1 $0.00 Port-o-can (Monthly) $0.00 X 1 $0.00 Water(for injection) $0.00 X 1 $0.00 Backhoe(weekly) $0.00 2 $0.00 SUBTOTAL DIRECT JOB EXPENSES: $680.00 EXCEL CONSTRUCTION MARKUPS: Amount Op Rate Extended Direct Costs: $1,781.55 X 1 $1,781.55 Work Comp/SS/Unemployment: $680.00 X 35.00% $238.00 SUBTOTAL: $2,019.55 OH&P 15%: $2,019.55 X 15.00% $302.93 EXCEL CONSTRUCTION SUBTOTAL: $2,322.48 SUBCONTRACTS WITH MARKUPS: Amount Op Rate Extended 1.) Austin Underground $6,023.00 X 1 $6,023.00 2.) X 1 $0.00 3.) X 1 $0.00 4.) X 1 $0.00 5.) X 1 $0.00 6.) X 1 $0.00 SUBTOTAL: $6,023.00 OH&P 10% $6,023.00 X 10.00% $602.30 SUBCONTRACTS SUBTOTAL: $6,625.3011 SUBTOTAL/SUMMARY: Amount Op Rate Extended Liability/Builders Risk(Cost of Work Only): $8,947.78 X 1.00% $89.48 SUBTOTAL (Excel Subtotal/Subcontracts/Builders Risk): $9,037.26 P&P Bond $9,037.26 X 2.00% $180.75 GRAND TOTAL THIS CHANGE: $9,307 Run Date: 1/07/21 Preshipment Notification Customer # 119162 Order # N573360 Date Ordered 01/07/21 Job # 18-031 m Job Name BCRUA PLANT 1C CORE • ' Purchase Order # 18-031 Method of Shipment OUR TRUCK Contract Order # K142448 Ordered By CHAD Ship Via CORE & MAIN LP Sold To: Ship To: Branch: EXCEL CONSTRUCTION SERVICES EXCEL CONSTRUCTION SERVICES SAN ANTONIO-E TX STOCK-ROUND ROCK BCRUA PHASE 1C WTP EXPANSION Branch - 011 PO BOX 2260 1906 HUR INDUSTRIAL BLVD 13790 Judson Rd LEANDER, TX 78646 2260 CONTACT: BRAD 512 415-1462 San Antonio, TX 78233 0000 CEDAR PARK, TX 78613 Phone: 210-657-1632 Bid Qty Qty Qty Seq# Product Code Description Ordered Shipped B/O Net Price UOM Ext Price 51082508F 8 AFC 2508FF FLG RW GV OL HW 1 1 901.55000 EA 901.55 Terms in accordance with shipping manifest. Special Instructions/Comments: WARNING-HEAVY ITEM-LIFT ASSISTANCE REQ'D BID # 4737297 C/O # K142448 Total Shipped: 901.55 Total Ordered: 901.55 1 FEATURES AND BENEFITS 0 FEATURES BENEFITS American Flow Control's Series 2500 Ductile Iron Resil- DUCTILE IRON CONSTRUCTION ient Wedge Gate Valves are suitable for use in drinking The ductile iron body and bonnet provide superior water, sewage and fire protection systems. These strength and allow a pressure rating of 250 p.s.i.g. valves have a rated working pressure of 250 p.s.i.g.The The strength of ductile iron is double that provided valve seals 100% leak tight. The waterway is clear, un- by gray iron. This added strength and higher pres- obstructed and free from pockets. sure rating is provided in a compact, lighter design. ADVANTAGES WHEN COMPARED TO BUTTERFLY FUSION BONDED EPDXY COATING VALVES The Series 2500 valve is epoxy coated both on the • No disc in waterway to restrict flow or to increase interior as well as the exterior of the valve. The fu- pumping costs. sion bonded coating is applied after the valve body is shot blasted clean.The coating is applied to all fer- • Allows passage of pigging devices. rous surfaces so that even the bolt holes and body- * Internal parts can be serviced without cutting valve to-bonnet flange surfaces are epoxy coated. out of pipeline. THRUST WASHERS • 250 p.s.i.g. rating allows working pressure to be in- Thrust washers are located above and below the creased above the 150 p.s.i.g. pressure rating found stem collar ensuring trouble-free operation of the on most butterfly valves. valve. ADVANTAGES WHEN COMPARED TO DOUBLE DISC DUCTILE IRON LIFTING LUGS GATE VALVES The stuffing box is constructed of high strength duc- tile iron with integral lifting lugs on most sizes, Lifting • 100% bottle tight seal. No more time consuming test- lugs allow the valve to be lifted safely,without risk of ing to determine allowable leakage rate. the valve falling or damaging the valve by lifting from • No pocket in bottom of valve to collect sediment or the operating nut. trap debris. TRIPLE O-RING STEM SEALS • Lower torque requirements to operate valve. This valve features triple O-ring stem seals.Two 0- rings are located above the thrust collar and one 0- 0 250 p.s.i.g. pressure rating compared to the 200 ring is located below the thrust collar.The 0-ring di- p.s.i.g. rating found on most double disc gate valves. rectly above and below the stem collar provide a • Fusion bonded epoxy coated inside and out. permanently sealed lubrication chamber. This fea- ture assures the ease of operation for long periods of time without the need for constant maintenance SERIES 2500 RESILIENT WEDGE GATE VALVE STAN- required for other designs.The upper O-ring acts as DARD FEATURES: a shield, sealing the stem from dirt and grit that might otherwise enter the stuffing box in buried and sew- * 250 p.s.i.g. rated working pressure. age service applications. • Ductile iron body, bonnet, wedge, operating nut and NO FLAT GASKETS stuffing box. The stuffing box gasket and bonnet gasket are pres- sure energized rubber O-rings. This assures bottle • Triple O-ring stem seals. tight seals without the need for excessive bolt load- * Thrust washers. ing as is required of flat gaskets. The 0-ring seals are reusable which eliminates the need for time con- * Fusion bonded epoxy coating. suming cleaning, scrapping and cutting of new gas- * 100% bottle tight closure. kets. • Rubber encapsulated wedge. UL-FM RATED VALVES ARE AVAILABLE The Series 2500 valve can be furnished in configu- • Flat features on valve body so valve stands upright rations that are listed by Underwriters Laboratories, for storage or during installation. Inc. and Approved by Factory Mutual Research. • Optional geared actuators. Configurations not available as UL/FM: • 4"thru 48"valves are certified to ANSI/NSF Standard • NRS with handwheel 61' Open right (NRS or OS &Y) • Fusion bonded epoxy coating material used on . NRS with gearing 2"thru 48"valves is certified to ANSI/NSF Stan- dard 61. 2" NRS AMERICAN FLOW CONTROL SERIES 2500 RESILIENT WEDGE VALVE SERIES 2500 - STANDARD NRS DIMENSIONS, 2"- 24" SIZES r l- I OPTION�I?-1$1G OPER ING NUT B y LAI LENGTH ` IL2522 O Valves to Open Left HIIMJ SHOWN WITH OPTIONAL HANDWHEEL Buried Valve to have Op Nut ENO TO ENO Above Ground to have HW SHOWN WITH 2'OPERATING NUT Valve Size Dimension Series 2500 Series 2500-1 Series 2500 2" 2-1/2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24„ A 9.25 11.03 11.84 13.91 17.12 20.47 24.06 27.59 33.25 36.75 39.62 43.25 51.25 B 10.22 12.00 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A End to End-MJ/MJ 8.25 N/A 8.62 10.00 10.50 11.50 12.50 13.50 20.25 20.62 22.75 23.25 25.25 Lay Length-MJ/MJ 3.25 N/A 3.62 5.00 5.50 7.50 8.50 13.25 13.62 15.75 16.25 18.25 End to End-FL/FL (Class 125) 7,00 7.50 8.00 9.00 10.50 11.50 3.00 14.00 15.00 16.00 17.00 18.00 20.00 End to End-FL/FL N/A N/A 11.12 12.00 15.88 16.50 18.00 19.75 22.50 24.00 26.00 28.00 31.00 (Class 250) End to End-TY/TY N/A N/A N/A 13.00 15.88 17.50 18.75 19.75 N/A N/A N/A N/A N/A End to End-PO/PO N/A N/A N/A N/A N/A N/A N/A N/A 22.12 24.62 N/A N/A N/A (Push-On) End to End-FUMJ N/A N/A N/A 9.50 10.50 12.38 13.62 14.38 17.62 18.31 19.88 20.62 22.62 (Class 125) End to End-FL/TY N/A N/A N/A 11.00 13.19 14.50 15.88 16.88 N/A N/A N/A N/A N/A (Class 125) End to End-PVC/ 10.75 11.12 11.38 13.00 15.88 17.50 N/A N/A N/A N/A N/A N/A N/A PVC End to End- Threaded 6.25 7.38 7.38 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Threaded End to End-FX/FX N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 34.50 (Flex-Ring) Lay Length N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 16.62 QFX (Flex-Ring) Handwheel Diameter 8.06 8.00 8.00 10.00 1 12.00 r17 M01 15.50 15.50 20.00 20.00 20.00 28.00 28.00 No.of Turns to Open 1 9 11 13 1 14 1 20 1 26 1 32 38 44 50 56 62 73 NOTES: 1. 3"thru 36"valves meet or exceed requirements of ANSI/AWWA C515. 2. 2-1/2"thru 16"valves may be ordered in configurations which are UL Listed and/or FM Approved. 3. 2"thru 48"valves have 250 p.s.i.g.AWWA rated working pressure. 4. 2-1/2"thru 12"valves have 250 p.s.i.g.UL and FM rated working pressure. 5. 14"and 16"valves have 200 p.s.i.g.UL and 250 p.s.i.g.FM rated working pressure. 6. Fusion bonded epoxy coating meets or exceeds requirements of ASME/AWWA C550. 7. Flanged ends are in accordance with ANSI/AWWA C110/A21.10(ASME 1316.1,Class 125). 8. Threaded ends are in accordance with ASME B16.4,Class 125. 9. Mechanical joint ends are in accordance with ANSI/AWWA C111/A21.11. 10. Tyton" ends and push-on ends are in accordance with ANSI/AWWA C111/A21.11 for use on cast iron(Cl)size ductile iron pipe. 11. PVC ends are suitable for use on steel(IPS)sizes of PVC or steel pipe. 12. 4"thru 48"valves are certified to ANSI/NSF Standard 61. 13. It is recommended that stems be vertical in raw sewage applications. SERIES 2500 RESILIENT WEDGE VALVE AMERICAN FLOW CONTROL Additional costs incurred due to the faulty butterfly valve on Trails End for Nov 24th, Nov 30th, Dec 3th, Jan 7th, and Jan 8th. PROJECT: BCRUA WTP ITEM NUMBER/DESC.:C0004-Troubleshooting Valve&Additional Mob/Demob Date Prepared: 1/12/2021 ITEM UNIT COSTS TOTAL COSTS Bid Unit DESCRIPTION QTY UNIT LABOR EQUIP MATERIAL OTHER O.T.Fador Price LABOR EQUIP MATERIALSUBC, OTHER Bid Pike LABOR Superintendent 5 HRS $ 38.00 $ 190.00 Foreman 20 HAS $ 25.00 5 500.0 Operator 20 HRS $ 21.00 $ 420.00 Common Labor 20 HRS $ Sfi.00 $ 320.00 Common Labor 20 HRS $ 16.00 $ 320.00 EQUIPMENT Cat 420 Bskhoe 20 HRS $ 6500 $ 1,300.00 Foreman Pkkup 2 DAYS $ 7500 $ 150,00 Small Tools 2 DAYS $ 50.00 $ 100,00 MATERIAL 24"Flange Bolt Nit(with longer bots) 1 EA $ 317.83 $ 317.83 oth.ruck for Equipment Mobilization/Demobilization 10 HR $ 9000 $ 900.0 TOTALS $ 1,75000 $ 1,55000 $317.83 $ 900.0 $ - Total Labor $ 1,750.00 Total Material $317.83 To.1 Other $ 900.00 Notes: Total Equipment $ 1,550.0 Removed vauB top,detemdned existing butterfly valve was taulty,and reinstalled vaufl top. SubTotal $ 4,517.83 Equipment demobilized,then remobibed when man line was depressurized. Labor Burden Longer flange bolt kit required to instal reducer directly to awsting manway as monway flange s titloker nan butterfly valve $ 1,750.00 L& 55.0% 5 962.50 Labor H&P $ 1,750.00 LB 15.0% $ 262.50 Material OH&P $ 317.83 15.0% 5 47.67 Equipment OH&P $ 1,550.00 LO 15.0% $ 232.50 SubTotal $ 6,023.00 Bond $ 6,023.00 00% $ TOTAL $ 6,023.00 Quantity Changes Unit Bid Items Total $ Nei lncrea TOTAL $ 6,023.00 EXCEL. CMR-005.3 (Not a Change Order) Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Project Owner: BCRUA Engineer: Walker Partners.LLC Initiated by: ® Engineer ❑ Contractor Contractor: Excel Construction Services,LLC Date:January 20,2021. PO Box 2260 Leander,Texas 78646 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Please find attached PCM 013-Additional ARV's for Booster Pumps Station. Below are the estimated delivery dates from approval for the additional materials. _ -"" Tapping Saddle-3-4 Weeks Gate Valves Stock-2 Weeks ARV-4-6 Weeks Weld Tap installation 6 working days Tap 6"1 working day Test Pipe 1 working day By Chad Mitchell All work shall be in accordance with the terms,stipulations,and En ' eer Recommendation: conditions of the original Contract Documents. If the work herein Recommend A pt ce provided for is Approved by Change Order,the time of completion will be: ❑ Po Not Reco n Aoceiance ® Increased ElDecreased ElUnchanged C/. .Jason Christensen,P.E. By 60 calendar days. Date 1-20-21 This change will: ® Add ❑ Deduct ❑ No Change Owner's Action: $ 47,347.00 Accepteo Not Accepted Chad Mitchell G��- General Contractor By: Karen Bondy Date January 20,2021 Date 1-20-21 CHANGE PROPOSAL SUMMARY SHEET EXC�� C0115TRUC 10n SERVICES LLC Project Name: BCRUA Phase IC Water Treatment Plant Expansion Change Description: Revised-Install 6"Taps on the Booster Pumps Piping CPR No: 13 Date: January 20, 2021 MATERIALS/QUOTES: Amount Op Rate Extended Piping Material $7,176.10 X 1 $7,176.10 ARV $1,995.30 X 3 $5,985.90 Misc Material for Testing $1,000.00 X 1 $1,000.00 Subtotal $14,162.00 Sales Tax $14,162.00 X 0.00% $0.00 MATERIAL/QUOTES SUBTOTAL $14,162.00 LABOR: Hours Op Rate Extended Labor-Assist Welder(2 Men @ 6 days): 108 X $27.00 $2,916.00 Labor-Assist AFT(2 Men @ 1 days): 18 X $27.00 $486.00 Labor-Install Gate Valve and Blind Flange(2 Men @1 days): 18 X $27.00 $486.00 Labor-Test Saddle (2 Men @1 days): 18 X $27.00 $486.00 Overtime Labor: 0 X $37.50 $0.00 Subtotal Manhours: 0 Foreman Time : 0 X $35.00 $0.00 Assistant Superintendent: 0 X $0.00 $0.00 Superintendent Time (Brad Clark): 0 X $70.00 $0.00 Material Proc. & Hndlg. Labor(5%of Man Hours): 0 X $0.00 $0.00 ,Update As Built Drawings: 0 X $0.00 $0.00 SUBTOTAL LABOR: $4,374.00 DIRECT JOB EXPENSES: Amount Op Rate Extended Project Manager(Chad Mitchell): (9 days) 72 X $85.00 $6,120.00 Jobsite Trailer(Monthly) $0.00 X 1 $0.00 Port-o-can (Monthly) $0.00 X 1 $0.00 Water(for injection) $0.00 X 1 $0.00 Backhoe(weekly) $0.00 2 $0.00 SUBTOTAL DIRECT JOB EXPENSES: $6,120.00 EXCEL CONSTRUCTION MARKUPS: Amount Op Rate Extended Direct Costs: $24,656.00 X 1 $24,656.00 Work Comp/SS/Unemployment: $10,494.00 X 35.00% $3,672.90 SUBTOTAL: $28,328.90 OH&P 15%: $28,328.90 X 15.00% $4,249.34 EXCEL CONSTRUCTION SUBTOTAL: $32,578.24 SUBCONTRACTS WITH MARKUPS: Amount Op Rate Extended 1.) Quality Welding (6 day) 48 hours 96 $4,608.00 2.)Jean Waterproofing (1 day) $4,230.00 X 1 $4,230.00 3.)ART-Tapping (1 day) $2,925.00 X 1 $2,925.00 4•) X 1 $0.00 5.) X 1 $0.00 6•) X 1 $0.00 SUBTOTAL: $11,763.00 OH&P 10% $11,763.00 X 10.00% $1,176.30 SUBCONTRACTS SUBTOTAL: $12,939.30 SUBTOTAL/SUMMARY: Amount Op Rate Extended Liability/Builders Risk(Cost of Work Only): $45,517.54 X 1.00% $455.18 SUBTOTAL(Excel Subtotal/Subcontracts/Builders Risk): $45,972.71 P&P Bond $45,972.71 X 2.00% $919.45 GRAND TOTAL THIS CHANGE: $47,347 CEizm- Bid Proposal for BCRUA - WTP 6" Tap C/O EXCEL CONSTRUCTION SERVICES Core&Main Bid Date:01/08/2021 7620 Grissom Rd Core&Main 1622303 San Antonio,TX 78251 Phone:210-684-1150 Fax:210-684-5521 Seq# Qty Description Units Price Ext Price —� 10 1 6 1 42X6 FTS445 WELD ON OUTLET SDL EA 445.14 2,670.84 —� 20 1 6 16 AFC 2506FF FLG RW GV OL HW AMERICAN FLOW CONTROL EA 595.19 3,571.14 30 3,d' 1 6 FLG AIR/VACUUM VALVE {� EA 1,995.30 1,995.30 PRATT WAVVB AIR VACUUM VALVE 00 h e+ —66-- 4—,-w(tlB6' I EA 177.16 5 ' i 80 -3' 6 BLIND FLG DI IMP EA 1 58.62 175.86 16 —, 100 21 6 3165S HEX BOLT&NUT KIT 12 ea EA 36.73 771.33 110 21 6X1/8 FLG FF RR GASKET 12 ea EA 4.87 102.27 Sub Total 10,684.95 Tax 0.00 Total — 19,684.M– Branch `���Branch Terms: $13,162.39 UNLESS OTHERWISE SPECIFIED HEREIN, PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY CUSTOMER FOR MANUFACTURE WITHIN THIRTY(30)CALENDAR DAYS FROM THE DATE OF THIS QUOTATION.CORE&MAIN LP RESERVES THE RIGHT TO INCREASE PRICES UPON THIRTY(30)CALENDAR DAYS'NOTICE TO ADDRESS FACTORS, INCLUDING BUT NOT LIMITED TO,GOVERNMENT REGULATIONS,TARIFFS,TRANSPORTATION,FUEL AND RAW MATERIAL COSTS.DELIVERY WILL COMMENCE BASED UPON MANUFACTURER LEAD TIMES.ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES.THIS BID PROPOSAL IS CONTINGENT UPON BUYER'S ACCEPTANCE OF SELLER'S TERMS AND CONDITIONS OF SALE,AS MODIFIED FROM TIME TO TIME,WHICH CAN BE FOUND AT:https://coreandmain.com�andc/ 01/07/2021-6:56 AM Actual taxes may vary Page 2 of 2 1 I I I a I I I I I I I I I I 14 AGENERAL NOTES *Nl ' 1EEA uwCKGROUNDATUS.. TPUCNRES/fFAF EXI CWIRACIpR TO 1TIEN5ELVE5 OF EXISTING I CON0Q CONSTpUCigN REWWENFN3 Of PROPoSEO WORK. 2- MDR TO CONSTRKMI.CONT TOR SNALL ETETD VERIFY IDCA—S...EN-NS Q ELEVAMNS OF ALL E—NG U na Q STRUCTURES TTMT PERTMN TO W0/OR AFFECT PROPOSED W- 3- CWT NEW AND LLOgi1E0 COMPoNENTS AND VALVES PER SECTON 09 96 W. KEY NOTES WELD NEW 42'A6'FABRCATED STEEL TAPPING SLEEVE DMO EASDNG 42'RNW. FIELD LOCATE TO AVOID EXMNC I' O1 TNREAOEO TM AND WELD SEWS.SEE DUAL GI/NE-4.REPAR EXISTING PIPE CWDNGS PER SECTION 09 96 DD WD LININGS PER AW WA STAIORROS SPECIFIED IN SECTXM 40 05 24 23. E WELD NEW 42'.6'FABRICATED STEEL TAPPMG SLEEVE OMD EXISTNG 42'FINW FIELD LOCATE M AYOq EXISTING CUNINNAMN AM VALVE ASSEMBLY AND O WELD SEWS SEE MAX.G7/DE-4. PEPAX EXLSnw PIPE COATNGS PER SECDO 09%00 WO LININGS PER AW WA STANDARD) SPEtlFIED IN SE.M. 40 05 24.23. H F 8 E FULSIZE•7B`+I'-0'•HA1F 512E•7It6'=1'-0' C CHR-005 I/2o/EI 22 i D OQ �O R�Ege�,�o�EsoV�rina�xyd�1�K���'S_ _ V anginearsrsu BRUSHY CREEK REGIONAL D UTILITY AUTHORITY PHASE IC WATER TREATMENT POINT — EXPANSION BOOSTER PUMP STATION PIPING PLAN AND SECTION 010121 C ' AOA r OFT JJC 8 TFG FEW PLAN Al i aT2 aaoM9 Ei i� oRAv-w+GNn SCALE 3B'-V& M E-3 I I 4 I I I I I I 11 I 12 I I KEY NOTES FT—C 6'VR%RV FM MATED STEEL B410-ON rAPRNG — .�ASSEA�LY O L FVNGE RO A FTSIS.M SC TN-S N MODEL 626,IVPE OR APPROVED E AS NUCN AS Pp55IB1E.W NOT INSTALLM1 SEAMING SLEEVE ON INC SLC WELD WNU INSTALL TAPING SLEEVE PER !hT II I MNUNO TH ER SLOE OC110NL.UMFR.UrWELD w MDUNO THE INSIDE OF THE SLEEVE NECK \ WNERE U CONTACTS ME EX1511NC PIPE O WELD NULL BEL;NO NININUTA MEN BUND MVGE FLEET WELD MWND ME BOD_Of ME FL NGE �, IT u LEEN.WELD THICKNESS BE SSMLIM_m W tE0 EFJ4GM ro NE MIAPPING SME MNOE EXISTING PWS OR EXIST SLEEVE BODY, ffi r �• WNICNEVIC IS EELS EXISTING RO PIPE G E O RL WALL THICKNESS IS i ♦ur S'FLu+cFo VALVE OPRESSURE /A'ACCORgNG ro Oo LET ECK / 1 FEANGED ELKµ 3O IIs WELU-UNAWµIN PRESUM 7 lOO TEST J PRIOR TO TAPPING MTONG 42'TNM. OGTE VALVE WIN NANOWWEEL PER SE 0 OS 61. DOY OOV PROMOE(BUT DO NOT INSTALL(6' VACUUM BRDKER VALVE MM AN ]/Ifi' ORRICE AIR REGSE VALVE PER SECTgN O 0 05 28 AND ASFCKURBS.VALVES 3 i MALL RE_SS I. D MK DL,C,TE RpN BODY,EPOu SEAT,3I6 STAINEES$ LTEEL FLGT,MIM AND NA�OWARE. PROVIDE ve/ARV ASSEMBLY TO OWNER FOR FUTURE INSTALUTKIN BY—ER- II G 1 6"WELD-ON OUTLET G7 6"WELD-ON OUTLET WITH FUTURE VB/ARV F E CYR-005 /io/2I F C C V OEURPBOx eXi4 'F 0 _ ©Walka m englrve G W BRUSHY CREEK REGIONAL L UTILITY AUTHORITY PHASE 1C s WATER TREATMENT POINT a n — EXPANSION BOOSTER PUMP STATION � B DETAILS olrzarzl ��' ADA h ]JL 8 TFG x1 p EDW 3 6]627 DRAWINCI NO. I. ME-4 1 I 14 B4228-A PART REVISIONS NO QTY NAME DESCRIPTION -- 1 1 ASSEMBLY WELD-ON TAPPING SLEEVE REV DESCRIPTION DATE APPROVED 1 BODY 5/16 THICK 1NECK 10-GAUGE THICK P= 4 11 FLANGE ASS D RING STYLE 1 P 3/4-NPT"3,000 LB 6 1 IPLUG 3/4" HEX HEAD 7.03 6.73 -� -6 4 5 3 5.18 r CUSTOM R TO OVIDE TEMPLATE 11.88 � 6.00 NOTE: - 12.00 A.ALL MATERIAL ASTM A36 OR EQUAL B. COATING PER CUSTOMER ORDER. C. 175 PSI MAXIMUM WORKING PRESSURE. D. DESIGNED FOR AWWA M11. E. REFERENCE THIS DRAWING FOR PRICING AND ORDERING. UNLESS OTHERWISE SPECIFIED SIGNATURES DIMENSIONS ARE IN INCHES °RWN ROMAC IND. INC. TOLERANCES ARE ON: 2 PL DECIMALS+/_ nn e THIS DRAWING CONTAINS CONFIDENTIAL 3 PL DECIMALS+/_ CHECKED FTS 4 4 5-4 8" N 0 M ~/\~ D F LG PROPRIETARY INFORMATION AND IS THE ANGLES+/- PROPERTY OF ROMAC IND INC.IT IS TO HE FRACTIONS USED ONLY FOR THE PURPOSE FOR WHICH IS SUBMITTED AND SHALL NOT HAVE ITS sA °""°"° B 4 2 2 8-A INFORMATION DISCLOSED OR REPRODUCED IN WHOLE OR IN PART FOR ANY PURPOSE WITHOUT PRIOR WRITTEN PERMISSION OF ROMAC IND INC. SCALE NTS -- 1 OF 1 Ann# RAIUS SAN Amos Fnr 1 aTiv 218-599-8831 " 972-7,28-8381 AQ`�NCFp fLOVf TELM�EW 00"06% AGREEMENT January 19, 2021 CUSTOMER NAME: Excel Construction ATTENTION: Chad Mitchell PHONE: 512-945-3287 EMAIL: chad@excelconstruction.com PROJECT LOCATION: Cedar Park WTP APPLICATION: Cut Only Hot Taps The cost for the work is as follows: Six (6) 6" Hot Taps (Cut Only) on 42" Sch. 40 C.S. Pipe 150# or less: 1. Mobilize to site. 2. Perform pressure test prior to hot tapping. 3. Perform six (6) 6" hot taps on your supplied and pre-installed materials (ANSI 150# Flange or IPS Connection, (5.25" cutter is typical). 4. Work to be performed during normal working hours. 5. ***60" Clearance is required for the Hot Tap Machine*** Total = $2,925.00 + applicable taxes ***STANDBY NOT CAUSED BYAFT, INCLUDING SAFETY MEETINGS, ACCESS TO WORK AREA, ORIENTATIONS, ETC. WILL BE BILLED AT$75/HR PER TECHNICIAN FOR STRAIGHT TIME & $95/HR PER TECHNICIAN FOR PREMIUM TIME*** Note: Do Not weld inside of connection fitting and keep connection as short as possible. Customer to Provide: 1. Confirmation of pipe O.D., temperature & pressure prior to ordering. 2. Provide max I.D. of tapping valve. 3. Provide the type of valve being used to tap through. (Ball or Gate) 4. Provide length from face of pipe to face of valve. 5. All rigging and lifting of tapping equipment, if necessary. 6. Access to pipe prior to our arrival. PIPEFREEZING • HOT TAPPING • LINE STOPPING • LIVE VALVE INSERTION 9 ON-LINE LEAK SEALING • BACKFLOW 7. Floor/wall /equipment protection shall be provided by the customer. 8. All ladders/scaffolds/ lifts/lighting to access the work area. 9. Support laborer to assist our technician at all times. 10. All welding of fittings with installation of valves. 11. Pressure test all welds prior to AFT arriving on site. 12. Round-ported flanged valves ANSI 150# or IPS to allow passage of a cutter. 13. When tapping below 3:00 and 9:00 on a horizontal pipe, shavings can create leakage through the valve. Make arrangements to remove tapping equipment with product passing through the gate valve. 14. Confined Space—Contractor to supply all safety equipment and additional personnel needed the entire duration of job. TERMS: 1. Net thirty (30) days. (*Only if credit has been established with AFT, otherwise the quoted amount will be due upon completion of work) 2. 0% retainage. 3. 18% per annum interest will be assessed on invoices not paid within thirty (30) days. 4. The above prices are based upon acceptance within thirty (30) days. 5. Customer executes this Agreement without reliance upon any warranties, promises, guarantees, statements or representations by AFT or its agents, but is expressly relying on Customer's own judgment. This Agreement contains the entire agreement between the parties and supersedes any and all prior agreements, arrangements or understandings between Customer and AFT. No oral understandings, statements, promises or inducements contrary to the terms of this Agreement exist. The terms of this Agreement cannot be modified or altered orally. In the event of breach of this Agreement by Customer, AFT shall be entitled to recover its reasonable attorneys' fees and expenses incurred in enforcing the Agreement. 6. AFT MAKES NO WARRANTIES, EITHER EXPRESSED OR IMPLIED, WHETHER OF MERCHANTABILITY OR OF FITNESS FOR A PARTICULAR PURPOSE. IN THE EVENT OF BREACH OF CONTRACT, TORT, OR BREACH OF CONTRACT BY AFT, RETURN OF THE AMOUNTS PAID UNDER THIS AGREEMENT SHALL BE THE CUSTOMER'S SOLE REMEDY. IN NO EVENT AND UNDER NO CIRCUMSTANCES SHALL AFT BE LIABLE FOR INCIDENTAL, INDIRECT, SPECIAL, CONTINGENT OR CONSEQUENTIAL DAMAGES, WHETHER THE THEORY BE BREACH OF THIS OR OTHER WARRANTY, NEGLIGENCE OR STRICT LIABILITY IN TORT. AFT is non-signatory to union trades. Please make arrangements with unions to allow our work to be performed if necessary. AFT does not include bonds in its bid. AFT does not sign contracts after work is complete. AFT does not accept retention withholding. Prices are based on AFT standard insurance - any additional or modified insurance needs. OCIP requirements. 30 day notification of cancellation are priced per request. **Price based on simple form contracts -Additional Admin Fees will apply for additional paperwork processing. Duration & Delivery: Please allow approximately 3-5 days notice for delivery from acceptance of this proposal, and receipt of mutually acceptable purchase order and/or contract, along with pipe (OD) confirmation; subject to prior commitments. PIPEFREEZING • HOT TAPPING • LINE STOPPING • LIVE VALVE INSERTION • ON-LINE LEAK SEALING • BACKFLOW ***WITHOUT CUSTOMER PROVIDING SIGNATURE BELOW CONFIRMING THE ACCEPTANCE OF OUR TERMS, AFT CANNOT PREPARE OR MOBILIZE TO THE SITE*** Authorized AFT Representative: Signature: 9" (,Vu6m Date: January 19, 2021 Authorized Customer Representative: Agreed to and Accepted by: Date: PO#: (*Net 30 Days & 0% Retainage) A Service Fee of 3.5% will be added to all Credit Card Charges. PIPEFREEZING • HOT TAPPING • LINE STOPPING • LIVE VALVE INSERTION • ON-LINE LEAK SEALING 9 BACKFLOW '` Jeans Waterproofing of Texas 301 Main Plaza,#400 New Braunfels, TX 78130 (830)557-4240 (830)557-4249(FAX) SCTRCA Cert.#214119052 Texas HUB VID#1204721086400 Project: Contact: Chad Mitchell Job Location: Booster Pump ARV Date: 1/20/21 Scope of Work: Provide labor and material to coat new ARV. The price is base on one 8 hour day. If addition time and material is needed, the price will be adjusted per the attached unit price sheet. Proposal TOTAL:$4,230.00 (no taxes included) Terms Net 30 It is understood that the building and all surfaces on or against, which our material is to be installed will be in the proper condition for us to proceed and complete our work without delay. All orders are accepted and contracts closed, subject to delays from causes beyond our control. If any changes are made to said scope of work then any and all costs of said changes shall be paid in addition to the total amount of proposal named herein. This proposal is subject to cancellation thirty(30)days after date of proposal, unless extended in writing by our office. Acceptance of Proposal T.P. De Pippo Jeans Waterproofing of Texas, L.P. Date ounlity Welding $r '.'Abrication A Division of B.C.A.D. Zion Corporation 9425 Schoenthal Road INVOICE# New Braunfels, TX 78132 210-657-9090 Service@Qwftexas.com DATE BILL TO EXCEL CONSTRUCTION SERVICES PO Box 2260 Leander,Texas 78646 P.O. NO. TERMS Due on receipt ITEM QUANTITY DESCRIPTION RATE AMOUNT BRUSHY CREEK CONTRACT CONTRACT WELDER AND RIG-RATE PER HOUR. 96.00 Thank you for your business. Tota EXCEL CMR-006 cons =on se vses u.c: Proposed Con traGtAAadfficatioLn--NoXU (Not a Change Order) Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Project Owner: BCRUA Engineer: Walker Partners.LLC Initiated by: ® Engineer ❑ Contractor Contractor: Excel Construction Services, LLC Date:January 21,2021, PO Box 2260 Leander,Texas 78646 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Please find attached PCM 014-Injecting Rapid Mix Joint. Note:The rapid will needs to be filled with water. By Chad Mitchell All work shall be in accordance with the terms,stipulations,and Enoigeer Recommendation: conditions of the original Contract Documents. If the work herein { Recommend Acceptance provided for is Approved by Change Order,the time of completion ❑ Do NotR c mmend Acceptance will be: ® Increased ElDecreased ElUnchanged ,� Jason Christensen,P.E. By 2 calendar days. . Date 1-22-21 This change will: ® Add ❑ Deduct ❑ No Change Owner's Action: $ 6,668.00 ® Accepted ❑`` Not Accepted Chad MitchellrLd ' General Contractor By: Karen Bondy Date January 21,2021 Date 1/22/2021 CHANGE PROPOSAL SUMMARY SHEET r=XC CCIfISTRUCTIOn SERVICES LLC Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Change Description: Install 6" Taps on the Booster Pumps Piping CPR No: 13 Date: January 12, 2021 MATERIALS/QUOTES: Amount Op Rate Extended Piping Material $0.00 X 1 $0.00 ARV $0.00 X 3 $0.00 Subtotal $0.00 Sales Tax $0.00 X 0.00% $0.00 MATERIAL/QUOTES SUBTOTAL $0.00 LABOR: Hours Op Rate Extended Straight Time Labor(3 Men @4 days): 0 X $27.00 $0.00 Overtime Labor: 0 X $37.50 $0.00 Subtotal Manhours: 0 Foreman Time : 0 X $35.00 $0.00 Assistant Superintendent: 0 X $0.00 $0.00 Superintendent Time (Brad Clark): 0 X $70.00 $0.00 Material Proc. & Hndlg. Labor(5% of Man Hours): 0 X $0.00 $0.00 Update As Built Drawings: 0 X $0.00 $0.00 SUBTOTAL LABOR: $0.0011 DIRECT JOB EXPENSES: Amount Op Rate Extended Project Manager(Chad Mitchell): 8 X $85.00 $680.00 Jobsite Trailer(Monthly) $0.00 X 1 $0.00 Port-o-can (Monthly) $0.00 X 1 $0.00 Water(for injection) $0.00 X 1 $0.00 Backhoe(weekly) $0.00 2 $0.00 SUBTOTAL DIRECT JOB EXPENSES: $680.00 EXCEL CONSTRUCTION MARKUPS: Amount Op Rate Extended Direct Costs: $680.00 X 1 $680.00 Work Comp/SS/Unemployment: $680.00 X 35.00% $238.00 SUBTOTAL: $918.00 OH&P 15%: $918.00 X 15.00% $137.70 EXCEL CONSTRUCTION SUBTOTAL: $1,055.70 SUBCONTRACTS WITH MARKUPS: Amount Op Rate Extended 1.)Jean Waterproofing 4868 hours 1 $4,868.00 2.) $0.00 X 1 $0.00 3•) X 1 $0.00 4•) X 1 $0.00 5•) X 1 $0.00 6•) X 1 $0.00 SUBTOTAL: $4,868.00 OH&P P, 10% $4,868.00 X 10.00% $486.80 SUBCONTRACTS SUBTOTAL: $5,354.80 SUBTOTAL/SUMMARY: Amount Op Rate Extended Liability/ Builders Risk(Cost of Work Only): $6,410.50 X 1.00% $64.11 SUBTOTAL (Excel Subtotal/Subcontracts/Builders Risk): $6,474.61 P&P Bond $6,474.61 X 2.00% $129.49 GRAND TOTAL THIS CHANGE: $6,66811 Jeans Waterproofing of Texas, L.P. 301 Main Plaza, #400 New Braunfels, TX 78130 (830)557-4240 Project: Chemical Grout Injection-Brushy Creek Contact: Chad Mitchell, Excel Job Location: Cedar Park, TX Date: 01/21/2021 Scone of Work 1. Prepare joint to receive injection. Joint is approximately 25 f33t. 2. Place mechanical packers, at required intervals, to inject leaking joint. 3. Inject joint with de Neef Pure Flex LV. 4. Remove and Replace joint sealant in joint. Proposal: $4868.00 (NO TAX INCLUDED) 1. It is understood that the building and all surfaces on or against, which our material is to be installed will be in the proper condition for us to proceed with and complete our work without delay. 2. All orders are accepted and contracts closed, subject to delays from causes beyond our control. 3. If any changes are made to said scope of work, then any and all costs of said changes shall be paid in addition to the total amount of proposal named herein. 4. This proposal is subject to cancellation thirty(30)days after date of proposal, unless extended in writing by our office. Tom De Pippo Jeans Waterproofing of Texas, L.P 01/21/2021 Product Data Sheets 1j, p 9cp applied technologies DE NEEF ® Flex LV PURe Product Description DE NEEF®Flex LV PURe is a hydrophobic polyurethane designed to form a flexible gasket when injected into cracks and joints in concrete structures. DE NEEF®Flex LV PURe grout expands on contact with water and quickly cures to a tough,flexible foam that is resistant to most organic solvents, mild acids,alkali, petroleum and micro-organisms. Product Advantages • Free Foam Expansion up to 18 times • Contains no volatile solvents • Single Component • Controlled reaction time • Improved low temperature performance • Flex Cat PURe liquid to-40'F Product Applications • Sealing leaking cracks in concrete 0.02"and wider • Sealing moving and non-moving joints in concrete Installation Guidelines Warning:DE NEEF®Flex LV PURe must be used with DE NEEF®Flex Cat PURe. Consult the Technical Data Sheets and SDS before using. Installation Instructions: For detailed installation instructions refer to the DeNeef technical bulletin for your applicatio Catalyst: Shake catalyst can 2-3 minutes. Pour the desired amount of Flex LV PURe into a clean dry pail. Measure the appropriate amount of Flex Cat PURe(refer to the Reaction Times section of this data sheet for the desired set time) and pour it into the pail.Stir until adequately mixed. Exceeding the recommended amount of catalyst may adversely affect the reaction and quality of the cured foam. Injection: During injection the grout will follow the path of least resistance.When the material has stopped penetrating it will continue to expand against the limits of the confined space and compress within itself,forming a dense,closed cell foam. Extreme conditions: For application procedures in extreme temperatures and specific environments or equipment recommendations call the DE NEEF®Technical Service Department. Page 1 of 4 Product Data Sheets j,,,,qW gcp applied technologies Cleaning:Clean all tools and equipment which have been in contact with the resin with DE NEEF®Washing Agent before resin has cured. Products should be disposed of according to local,state, and federal laws. Reaction Times T %CAT END REACTION FOAM FACTOR 40'F 1 17'00" 12V 2 8'30" 14V 5 4'00" 16V 60'F 1 10'50' 14V 2 7'00" 16V 5 3'05' 16V 77'F 1 9100" 14V 2 5'35" 16V 5 2'10" 17V 86'F 1 7'30" 14V 2 4'40" 16V 5 1'45" 17V 95°F 1 6'45" 15V 2 4'00" 17V 5 1'35' 18V Packaging & Handling DE NEEF® Flex LV PURe: 5 gallon metal pail 50 gallon metal drum DE NEEF® Flex Cat PURe: 25 fl.oz. in 1 qt.metal cans DE NEEF8 Flex LV PURe is sealed under dry nitrogen because it is sensitive to moisture,and should be stored in original containers in a dry area. Storage temperature must be between 40°F and 90°F.Once the packaging has been opened,the useful life of the material is greatly reduced and should be used as soon as possible. Shelf life: 2 years. Page 2 of 4 Product Data Sheets jj, p 9cp applied technologies 01111, Limitations DE NEEF®Flex LV PURe must be used with DE NEEF®Flex Cat PURe. Low temperatures will significantly affect viscosity. Flex LV PURe is not designed for void filling and must be used in compression. If site temperatures are extremely low, heat bands or heated water baths may be used on the pails before and during installation to maintain the product's temperature.Avoid splashing water into open containers,as the material is water activated.Avoid exceeding 90°F when warming. CAUTION:pH NOTICE. Water used to activate PURe Grouts must be in the pH range of 3-10 for optimum foam quality. Health and Safety Always use protective clothing,gloves and goggles consistent with OSHA regulations.Avoid eye and skin contact. Do not ingest. Refer to SDS.For emergencies,call CHEMTREC 1-800-424-9300. Properties DE NEEF®FLEX LV PURE RESIN Solids 100% ASTM D2369 Viscosity 550 cps at 77°F ASTM D2196 Color Pale yellow Density 1.02 g/cm3 ASTM D4659 Flashpoint >270°F ASTM 093 Corrosiveness Non-corrosive DE NEEF®FLEX CAT PURE Viscosity 15 cps at 77°F ASTM D2196 Color Clear to pale grey Flashpoint 221'F ASTM D93 DE NEEF®FLEX LV PURE CURED Density confined 1.00 g/cm3 ASTM D3574 Density free about 3 PCF ASTM D3574 Tensile strength >174 psi ASTM D3574 Elongation% 100 ASTM D3574 Page 3 of 4 Product .a • Sheetsapplied technologies Phthalate free- no phthalate-based plasticizers Unregulated for transport- no hazmat shipping Reformulated TDI free-all MDI based technology. environmentally friendly-NSF/ANSI 61 approved. r c us Flex LV PURe when combined with Flex CAT PURe is certified by WQA to NSF/ANSI 61 for materials safety only, as verified and substantiated by test data. Please refer to WQA website(www.wga.org) for use ratios and Imitations. gcpat.com • • i AD877-423-6491) We hope the information here will be helpful.It is based on data and knowledge considered to be true and accurate,and is offered for consideration,investigation and verification by the user,but we do not warrant the results to be obtained.Please read all statements,recommendations,and suggestions in conjunction with our conditions of sale,which apply to all goods supplied by us. No statement,recommendation,or suggestion is intended for any use that would infringe any patent,copyright,or other third party right. DE NEEF is a trademark,which may be registered in the United States and/or other countries,of GCP Applied Technologies Inc. This trademark list has been compiled using available published information as of the publication date and may not accurately reflect current trademark ownership or status. ©Copyright 2018 GCP Applied Technologies Inc.All rights reserved. GCP Applied Technologies Inc.,62 Whittemore Avenue,Cambridge,MA 02140 USA. In Canada,GCP Canada,Inc.,294 Clements Road,West,Ajax,Ontario,Canada L1 S 3C6. This document is only current as of the last updated date stated below and is valid only for use in the United States.It is important that you always refer to the currently available information at the URL below to provide the most current product information at the time of use.Additional literature such as Contractor Manuals,Technical Bulletins,Detail Drawings and detailing recommendations and other relevant documents are also available on www.gcpat.com.Information found on other websites must not be relied upon,as they may not be up-to-date or applicable to the conditions in your location and we do not accept any responsibility for their content.If there are any conflicts or if you need more information,please contact GCP Customer Service. Last Updated: 2019-11-22 gcpat.com/solutions/products/de-neef-waterproofing-injection solutions/de-neef-flex-I v-pure Page 4 of 4