BCRUA_R-21-03-24-6A RESOLUTION NO. R-21-03-24-6A WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into a contract ("Contract") with Excel Construction Services, LLC for the BCRUA Phase I C Water Treatment Plant Expansion Plant Project; and WHEREAS, the BCRUA has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 5, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA, Change Order No. 5 to the Contract with Excel Construction Services, LLC, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of March, 2021. REN FLORES, President Brushy Creek Regional Utility Authority ATTEST: ANNE bUFFY, Ser tary ht1psJkuunJnxArrayshanpnint.cnm/ailcalAJmmlx[ralinnllhparlmcnt FiIcJHCHUAIRtu J 11acket.JYaLkcl I1CRUA C0#5 w.Hed Cnnlruown 11$W h7 5 4 K x A 11K FK 1.Juc 1 Change Order No. 05 Date of Issuance: 113/17/2I t:ffectice Date Pr.,Fu:BCRUA Phase 1C%<TP Expansion etyl,tr.BCRU:1 t>u"�'"t11°CJSO�'" Coutnnc DRIV.4r ontno December G,2018 Cutitmon-Exce!Construction Services,LLC t.ngwf" 11..I qi�—.3-00619 The Contract Documents are modified as follows upon execution of this Change Order: Descripww This change order includes: • CMR-11117:Price of 5101,157.(X1 tr.repair freeze damage caused by the 21121 winter storm;30 days added to Final Completion. Attachments: (listdocumuntssuppt)riing(:hange): C\IR-1X17 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working day's X Calendar dal s Substantial completion e.da%..,r date;;tMili W 11011 _ $9,100,270.W Ready for final pa:mcnt(dare...dx*e; 08/0-1/1010 Increase from preciously approved Change Orders Increase from previously approved Change Ordcrs No_ 01 to No- IN No. 01 . to No. 04 Substantial completion(days):59 days 5398,080.(X1 Ready for final payment(days):2116 days _ Contract 1'rice prior to this Change Order: Contraet'I'.mts prior to this(:hangs Order Substantial completion tdars or due):08/03/21120 59.498-350.1X1 Read)'for final payment tdal:s or date):02/26/2021 Increase of this Change Order: Increase of this Change Order; Substantial completion(days or datt):II days 5101.187.00 Rcadv for final payment(lows t.r date): Contract Price incorporating this Change Order: Contract•I•imcs u-tth all approted Change Orders: Substantial completion(daysor date):08/03/20211 52,599,537.(X1 Read)'for final payment(days or date):113/28/3021 RECOi\IAIFNI)E±D: ACCFFI•ED: 1r,1 FP'I FU i3y: Eiy: Br: Engineer(Authorized Sipiaturc) Oa ner(Authonzed Signature) Contractor-'Authortzed Signature) Date: 03/1711011 Date. Date 3/18/21 Approved b+-Funding Agency(if applicable): Daty EXH 15"IT 'W' Payt 1 of I EXC � COTISTRUCTton SERVICES LLC A> March 17, 2021 Walker Partners 804 Las Cimas Parkway, Suite 150 Austin Texas 78746 Attn: Jason Christensen P.E. Re: BCRUA Phase 1 C Water Treatment Plant Expansion-PCM 015 Mr. Christensen P.E. Excel Construction is offering pricing of$101,187.00 to repair the work as outlined in your email dated March H, 2021. The attached proposal includes pricing for repairing the Phase IC water line, repairing insulation on the existing Phase 1A hydrant station, and repairing damaged concrete on the exterior of the Phase 1 A filter control box. Scope of Work per March 11,2021 email. Item #1 - Redo 6" scum -No price offered. Corrected by BCRUA. Item #2 - Replace all compromised flange gaskets on Phase I C 4" PTW piping basin (MA-3). Repairs are required from where the 4" PTW turns up in the Phase 1C settled water channel (MA-2) to the Phase I C 4" gate valve on the south end of the sedimentation basin (AIO/MA-13). Redo the 4" PTW wall penetration referenced on AIO/MA-13. Repair Phase I C hydrant stations and taps (MA-3). Prepare and repaint piping as necessary. Repair insulation as necessary. Pressure test Phase 1C 4" PTW after repairs are complete. Item #3 - Repair insulation on eight Phase I A filter hydrant stations as requested by BCRUA. Item #4 - Repair damaged concrete on the exterior of Phase I A filter control box per the procedure provided previously. Tnemec Enviro-Crete to match. Attached is Excel's pricing breakdown. The pricing is based on the basin being empty during the duration of the repair. Excel is not including the cost for any new or reworked pipe supports. Please review and let me know if you have any questions. Attached is the punch list from Excel Construction and Walker Partner. Sincerely, 00141 Chad Mitchell Project Manager. PO Box 2260, Leander, Texas 78646 1202 Leander Drive, Leander, Texas 78641 512.259.5005 512.259.5665 www.excelconstruction.com EXCEL CMR-007 (Not a Change Order) Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Project Owner: BCRUA Engineer: Walker Partners.LLC Initiated by: ® Engineer ❑ Contractor Contractor: Excel Construction Services,LLC Date:March16,2021 PO Box 2260 Leander,Texas 78646 Attention: The following change in the contract on this project is proposed Please provide your proposed price for the cost of this change. . A breakdown of cost SHALL be provided upon request by the Owner or Engineer. + Work shall not commence until authorized by the Owner Description of the Proposed Change: By Chad Mitchell _ All work shall be in accordance with the terms,stipulations,and En ' eer Recommendation: conditions of the original Contract Documents. If the work herein Recommend Acceptance provided for is Approved by Change Order,the time of completion (] Do Not end Acceptance will be: ® Increased ❑ Decreased ❑ Unchanged �-� 9 :Jason Christensen,P.E. By*calendar days. Date 3-17-21 This change will: ® Add ❑ Deduct ❑ No Change Owners Action $ 101,187.00 ❑ Accepted ❑ Not Accepted Chad Mitchell General Contractor By: Karen Bondy Date March 16,2021 Date Non-Taxed Labor Material Subcontract Equipment/faxed Material Item Unit Total Unit Total Unit Total Unit Total No Description Qty Unit Cost Cost Cost Cost Cast Cost Cost Cost 1 Rework Scum Line Work Performed by BCRUA 2 Plant Water Repair 4"gasket 6500 ea 17400 11,310.00 1859 1,208.35 0.00 0.00 100,00 6,500,00 Repair 4"Mega Flange 1400 ea 261 00 3,65400 152 11 2,129 54 0.00 000 0.00 000 Repair Water Tap 700 ea 26100 1,827 00 6878 481.46 0,00 0.00 0.00 0.00 Replace Pipe 0'to 5' 700 ea 17400 1,21800 21330 1,493 10 000 000 20000 1.40000 Replace Pipe 5 10 10' 300 ea 522.00 1,56600 429,75 1,289.?5 000 000 200.00 600.00 Replace Pipe 10 to 20' 200 ea 783.00 1,56600 681,75 1.363.50 000 0.00 200.00 400.00 Repair Insulation 100 LS 1,566,00 1.566.00 0.00 0.00 19,100.00 19.100.00 0.00 000 Repair Wall 100 LS 1,566.00 1.566.00 180.00 180.00 0.00 0.00 0,00 000 Coating 100 LS 000 0.00 0.00 0.00 2,500.00 2,500.00 2.00 0.00 Testing 300 days 783.00 2,349.00 0 00 0.00 0.00 0.00 85.00 255.00 3 Repair Phase I Insulation Install new Insulation 800 ea 0.00 000 0,00 0.00 150.00 1,200.00 0.40 0.00 4 Control Box Repair Chip out area 100 ea 391 50 391.50 0.00 0,00 0.00 0.00 000 000 RepairAera 100 ea 391.50 391,50 0.00 000 0.00 0.00 000 0.00 Coat 6.00 sf 0.00 0.00 0.00 4.04 0.00 0.00 150.00 900,00 Small Tools(Air Hammers) 1.00 ea 0.00 0.00 0.00 0.00 0.00 0.00 30.00 30.00 100 ea 0.00 0.00 0.00 0.00 0.00 0.00 30.00 30.00 Supervisor time 1 80.001 HRs 1 85.00 6,80000 WOO 0 00 0.00 000 0.00 000 C1 C2 Q3 C4 A Direct Cost Subtotal 34,205 00 8,14520 22,800.00 10,115.00 R Labor Burden 35% 11,971 75 n/a n/a nla C Tax @ 8.25% n/a nla nla 834.49 D Contractors Fee 115°/for labor,mai I,and equipment&100o for subs] 5,130 75 1,221 78 2,280.00 1,517 25 E Subtotal 2(A+B+C+D) 51,307 50 9,36698 25.080 00 12,466 74 F Liability&Insurance rr 1% 51308 916' 25080 12467 G Bonds a 2% 1.03641 18921 50662 251 83 H Subtotal(F+G+H) 52.856 99 9.64986 25,837 42 12,843 23 1 Total of all columns(CI+C2+C3+C4) IG1,187 50 Other ri a Current Total Cost $101,187 PO Box 203818 Job # Austin, Texas 78720 Date: 3-15-2021 Phone: 512-563-4806 Email: starinsulationaustin@gmail.com QUOTATION FOR WORK Company Excell Submitt to Chad Mitchell Name of Job: Brushy Creek Waste Water Location 1.Panrlt*r TY Bid: Repair Insulation From Freeze $ 19,100.00 Damage $ Total: $ 19 100.00 Items Not Included In Bid: 1 Sizing, Painting & Identification 2 Lined Ductwork 3 Sheet Metal Shields 4 Vitalic Couplings 5 Firestopping 6 Primer on Piping 7 Underground and Slab Piping 8 Premium Time Wages 9 Night or Shift Work 10 Sales Tax Respectfully Submitted Dan Fears Star Insulation Company, Dake: 3-15-2021 Accepted by: Chad Mitchell Date: 3-15-2021 Name and Company (Signature Authorizes Star Insulation Company, Inc. To Proceed With Work.) Start Date: Date Completed: EEizo-1 Bid Proposal for BCRUA -4" Repair Pipe EXCEL CONSTRUCTION SERVICES Core&Main Bid Date:03/04/2021 7620 Grissom Rd Core&Main 1709369 San Antonio,TX 78251 Phone: 210-684-1150 Fax: 210-684-5521 Seq# Qty Description Units Price Ext Price 10 4X1/8 FLG FF RR GASKET EA 3.80 20 4 316SS HEX BOLT&NUT KIT EA 14.79 30 4 MEGA-FLG 2104 W/SS 316 BOLTS EA 152.11 40 317-048008-000 4X11P SADDLE EPDXY W/304SS STRAPS 4.40 4.80 OD EA 68.78 CONFIRM OUTLET SIZE 60 4X05'00" FLXPE DI PCL EA 213.30 70 4X10'00" FXLPE DI PCL EA 429.75 80 4X18'00" FLXPE DI PCL EA 622.80 90 4X18'00" FLXFL DI PCL EA 681.75 Sub Total Tax Total Branch Terms: UNLESS OTHERWISE SPECIFIED HEREIN,PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY CUSTOMER FOR MANUFACTURE WITHIN THIRTY(30)CALENDAR DAYS FROM THE DATE OF THIS QUOTATION.CORE&MAIN LP RESERVES THE RIGHT TO INCREASE PRICES UPON THIRTY(30)CALENDAR DAYS' NOTICE TO ADDRESS FACTORS,INCLUDING BUT NOT LIMITED TO,GOVERNMENT REGULATIONS,TARIFFS,TRANSPORTATION,FUEL AND RAW MATERIAL COSTS.DELIVERY WILL COMMENCE BASED UPON MANUFACTURER LEAD TIMES.ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES.THIS BID PROPOSAL IS CONTINGENT UPON BUYER'S ACCEPTANCE OF SELLER'S TERMS AND CONDITIONS OF SALE,AS MODIFIED FROM TIME TO TIME,WHICH CAN BE FOUND AT:tgl2s.//coreandmain.com/TandC/ 03/04/2021 -10:36 AM Actual taxes may vary Page 2 of 2 1 I7 I ' TSCA–SLGool TSC–PV-002 _ SEM.ED _ ----------- -----------------------; . . :..,...........: ---------;._..........------ ,m. su W l, TSC–a'-58301 � f-' I•• Ir.a I i I IS'L:W v4H KEY NOTES Talc—sic—swot I I TSC–SC-003 SEOIMENTATON UASIN Na 3C +c MAE z-••_ oaxc MIaLL rRY{I$u4L c. Ewlo } x•:tr w- I r / I , : i�`J RIE wO+lL Cly 4urE I I z _ �* 1 — – — — — — – I I • � GENERAL NOTES I � � xz ; v raantt uw�xw nc.rrto wsuwna+rr I 1 I + I rLrrMr < O JS[M9.vcE wrtx 5L'trl9x w.l m rEa au 0 I I L TSC–SLO–S8301 a „� aaesEa aLauC:91.,crca:suJALca I I t SLIIOM'OOt G i -- I Nvr "FI Y26 I r.+ Gr S SES wrt I Ox sxcn W I ADDITIVE ALTERNATE 1 TSC–NL'-58302 Imp. � 1 �. �.Eonrrt.Lrtaxart xa sca.r c•rtarw ', :•w�vuvE r, V alsmc SErILm..ca:xJ.waL..0 �.•..•.:ru,m. urtw JItirt h.Jel T'."SL-p NIo I £U r+9 rAxC We+4 E '+-I r• aC0"nw.nox 1^p,,Jre TSC=SLO 303 ErL -LFFO M+l Y,2:kw.. 4F � sEE,oro aa'xL 8'i+)[S.S .Oa Cq+lixwlux R engineers+surveyors !BRUSHY CREEK REGIONAL s � UTILITY AUTHORITY ra`sEic WATER TREATMENT PLANT EXPANSION a uE vPxE SEDIMENTATION PLAN (ELEVATION 1082) fJ f! `X[!DA CenMWfgx TSC–PV–SLV201 env,l O ALM ",--aLuc v+LH r r — JJc SLUDGE VAULT • Ni; 2C Eorr +� A Al PLAN w.L. PJr MA-3 1 3 1 5 6 1 B 9 1 +0 0, KEYT � B KEY NOTES FOR CONTINUATION SEE MA-4 0 r"noo D Gwoi eENTO c.nnxc " xr•ary I I rd D a1E M •4L nrE 5.4L FlLTFR No 6C `.rGQ FIL7ER No SC {sry or z1Ii1' � I I q rr--,!3.'Lnc_±L I r[.w,2e+or rExw_alm.•rta },.- J `�-------- n 13•. C„.er uD BE rWPLa r7 sM w w/s -�f i J i r1_rr._Evis i . r' ears _____ _ _ __ T_T -"� __.7________1___ __________._ 1 [CK E.KTu,G suD ft-GE s 1 rr�..,�,----_--____J: -. _________ ______t_ O CO.eEC[e•M-G/1 i0 E.15M1 ME _Ja C M r ■ M i E�l�,T_________- { 1I -jT4:: _ Tx, SLG-003— I ]e',+YV.-_-___ JJffrr V____________yr -� - �-_ :. •itx w+E - ,yr;7 k TSC-SLC-FL502 ifi• Ili I Ill rsc TZc-nao: r ra.o-•s6+n ED - Mix �,._ „ lr'P1 Ii I I``I II n'CnEu: No 2C 4 r TSC-FL-05A TSC-FL-058 TSC-FL-OSC fl Vaor 5EE �'� I 5[C1Mlx5 EOP ' I TSC-SG-FL501 oE+ris.rml I'� a NI. .wl varr w.[ MV rt .Irt Y]. a4S Ciller V I - ; V I TSC-SC-FL6017 47PI I IIF I rt. @ II I LI � {f TSC-FF L-06A 75C-FL_06g TSC-FL-OK ` ruEsr&•+K•ry Icor s¢E•u•rtr sof w.rowEo M.,e,c enxn 15C�PSrrKs RM2 3 as]Gm - r>_a. n s;•.., n TSC-SLG-FL602 WaUcffPkrul.1J . �� w�s angrnaers�surveyo a s � tirE 1 BRUSHY REGIONAL OFCULATE0 WATER-CHANNEL = 0 ITR AUTO S3 . PHASE$C I' c e WATER TREATMENT PLANT EXPANSION +� .. BASIN No x J'•. I RAPID MIX 8 FLOCCULATION PLAN 11i 1�F INIFT 1:XANNFI rti..J (ELEVATION 1082) FOR CONTINUATION SEE MA-3 j& AlA l I PLAN p .M MA-2 1 r I x 1 a 1 E I B I r I 6 1 v I 10 1 11 I u I n I E z, WE n e0 PK r�Iryp] mDPwR 51�IgV ^ 5[lC�CDrnwEP (Tm1 NIJ 11PI (TP) (SEE NOT[xl TSC-SLC-SEL302 OIa1DOR.1L CETT ED WATER (Trs) _ .i.,,14MtNFL.' EL,Oe00 ---- G[m MENTATION BASIN ---- - •/"� 0.IaeD.a EL 10770 SU rgrE I ITrF�I'{ SEDIMENTATION OUTLET f 0 0 fl BASIN No 3C _ CHANNEL . 0 O O O 0 0 .a O 0 0 0 O O xR .ur R D + 51 x-Q O 0 0 0 WATEslPh CCa'wICR KR U R fE'a"0 RECONNEI.Wr CHANN 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 (D 0 0 0 0 -0 O 0 tm S Isa xRuc-CO El Ia6+] ^-,Ict sDR REr[R[xcE) 106)5 Rur 10660 ux C SCORE.� 'eI S,DP[ - (L,Oe25 )'•9� 'a-e• ^ n e0 VrC 4' DRary TIR KWE Ts M w: NOTE I PRp1«aLWnMN NC.ERD 1v41AF,lOM IN aCC CE 5C^SLD-4BJOC a TSc—AO—SBIO] SCCron•0 11 —A1 2 ROSE Rack x01 Sx W AWS SE•TIOM rp[WIT Q1 I SECTION G1/MA-3 G 10 SECTION G10/MA-3 •+a•L IR}' SGLE rq I kx«ka E L ' OFLL1SQEa SK•I'L'INLF SIZE•tA+l'ir - S*Rlrtiuru fdfrai � O ioE TOW IDeD e:IOT9Il 4 r IO.V,.• r FM,E SIff.32'.1'11 NNF$1ZE.YAV.I'A' suK sp (Ts) I srlc:w.oEraes Y-t' on 51. + E Sn[n4x4ip aF["DR - k I s FUI$UE•1'•1'Jf NLLi Lh•,?.)/' ;FE 416 1n-r w4, w.w,..In�Eou.E _ T5C SLG-SB30 •iW�" {ho,I,/ _O! r___, a'DWD RC r a" xv'.aw a'rc.n I I SEDIMENTATION SEE Ron x13 y F.t 'ra I I E rA,m BaIN No 3[ roc 516 yn .l L___J [L 106942 JaWaNer �a'c. •^9�^Dors+avrreyars $I _e•^•I-u I-D' �_ ------J------- I BRUSHY CREEK REGIONAL } c UTILITY AUTHORITY PHASE 10 r-- WATER TREATMENT PLANT EXPANSION t!? SEDIMENTATION BASIN Price excludes work to supports SECTIONS e I FR�.,pE Rcunxw.uce[IED wsu�rok /— 3 -oRW+�GE wlh,SCEttOrl 40 42 9a W w EXP D 61I Y,e �i _ i A BLWO 11µ0E.C.,FIm PRowsm sant +� RN a ueONa RearDE - 1x0619 A 1 PLANT WATER PIPE SUPPORT I A5 SECTION ASrMA 3 I A 1 O ISECTION A101MA-3 ,..'r., iGeaE k0• SCALE NO 1 MA-13 'r J��GCL-G � C� d �l(bl�S' Change Order No. 05 I)atc of 15su.IncL 113,'17{2i ];ffrYn4'l Date I'n grrt.BCRUA Phase IC V IT)Expansion tort r:BCRU.-1 *`"''r'`''„"'�e0 Conrnct: Date.46.1 rare Deeembcr G,2018 t:mnncmr Excel Construction Services,LLC Lug"Ieeis 11n,pY1 3-006[9 The Contract Documents are modified as follows upon execution of this Change Order. This change order mcludes: • (:AIR-0117:Price of SIIII,1870)to repair freiic damay,-caused br the 31121 winter corm;311 dans added to Final Completion. Atraehments. ;lastdoeument.,suppurtingchingc;' CAIR-(W CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Onj&al Contract Pree: Orii6nal Contract Times: ❑ Worl ing day 5 X Calcndar day s ,Substantial completion(days or date}'11(1105/1010 _ S9-IM-17immi Reads for final payment(daysor data):08/04/21120__ Incrcast,•from previously approved Change Orders Increase from previously approved Change Orden to No. 04 No t" 11 _ to No. 04 Substantial comptction(days):59 S r 8 0 1(k) Ready for final payment(days):206 days Contract Price prior to this(.range Order: Contract Times prior to this Changs Order: ,Substantial completion(day.or dare).08103/1100 S9 498,3500 Ready for final payment(days nr dale):02/16/1011 I ncreau of thts Change Order: Increase of this Change()rder: Substantial completion(days or dale):1)dip's „.-- SIO 1.1870 Ready for final payment(days or date):311 days Contract Price incorporating this Change()rder: Contract Time.,with all approved Change()rders: Substantial completion(Ja).or dale)08/03/2020 . S9-599.537.1N1 Ready for final payment(day+nr dale):113/2X/20? RSCOA MIMED: A(:[;111'l'EiE): 1(7(a 'I"lilk kiy: tic; L '�-'• kS�. tingmcer(Authorized;ignmurv) (N-ner(.luthnnzcd Sign.tture) (inttractnr(luthorvcd Stpntature' Darer 413/17/24131 Date:�2-q, 0 Date 3118/21 ,3pprnycd by funding Agency(if applicable): PaFµ 1,.f I EXCE9-S LLC LLC > March 17, 2021 Walker Partners 804 Las Cimas Parkway, Suite 150 Austin Texas 78746 Attn: Jason Christensen P.E. Re: BCRUA Phase I C Water Treatment Plant Expansion-PCM 015 Mr. Christensen P.E. Excel Construction is offering pricing of$101,187.00 to repair the work as outlined in your email dated March 11, 2021. The attached proposal includes pricing for repairing the Phase I C water line, repairing insulation on the existing Phase 1 A hydrant station, and repairing damaged concrete on the exterior of the Phase l A filter control box. Scope of Work per March 11, 2021 email. Item #1 - Redo 6" scum -No price offered. Corrected by BCRUA. Item #2 - Replace all compromised flange gaskets on Phase I C 4" PTW piping basin (MA-3). Repairs are required from where the 4" PTW turns up in the Phase 1C settled water channel (MA-2) to the Phase 1 C 4"gate valve on the south end of the sedimentation basin (Al 0/MA-13). Redo the 4" PTW wall penetration referenced on AI OIMA-l3. Repair Phase I hydrant stations and taps (MA-3). Prepare and repaint piping as necessary. Repair insulation as necessary. Pressure test Phase l C 4" PTW after repairs are complete. Item #3 - Repair insulation on eight Phase 1A filter hydrant stations as requested by BCRUA. Item #4 - Repair damaged concrete on the exterior of Phase I A filter control box per the procedure provided previously. Tnemec Enviro-Crete to match. Attached is Excel's pricing breakdown. The pricing is based on the basin being empty during the duration of the repair. Excel is not including the cost for any new or reworked pipe supports. Please review and let me know if you have any questions. Attached is the punch list from Excel Construction and Walker Partner. Sincerely, 0 Chad Mitchell Project Manager. PO Box 2260, Leander, Texas 78646 1202 Leander Drive, Leander,Texas 78641 512.259.5005 512.259.5665 www.excelconstruction.com EXCEL CMR-007 � Prop1 contras (Not a Change Order) Project Name: BCRUA Phase 1C Water Treatment Plant Expansion Project Owner: BCRUA Engineer: Walker Partners.LLC Initiated by ® Engineer ❑ Contractor Contractor: Excel Construction Services,LLC Date:March16,2021, PO Box 2260 Leander,Texas 78646 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: By Chad Mitchell All work shall be in accordance with the terms,stipulations,and En ' eer Recommendation conditions of the original Contract Documents. If the work herein Recommend Acceptance provided for is Approved by Change Order,the time of completion ❑ Do Nota end Acceptance will be- f ® Increased ❑ Decreased ❑ Unchanged ytsyl [ - 30 Jason Christensen P.E By*calendar days. Date 3-17-21 _ This change will: ® Add ❑ Deduct ElNo Change Owners Action. $ 101,187.00 ❑ Accepted ❑ Not Accepted Chad Mitchell General Contractor By: Karen Bondy Date March 16,2021 Date Non-Tarred Labor Material Subcontract Equipment/Taxed Material Item Unit Total Unit Total Unit Total Unit Total No. Description Qty Unit Cost Cost Cost Cost Cost Cost Cost Cost 1 Rework Scum Line Work Performed by SCRUA 2 Plant Water Repair 4"gasket 6500 ea 17400 11.31000 1859 1,208.35 0,00 D.00 100,00 6,50000 Repair 4"Mega Flange 14.00 ea 261 00 3,65400 152 11 2,129 54 0,00 D.00 000 000 Repair Water Tap 700 ea 261 00 1,82700 6879 481 46 0.00 0.00 0.00 040 Replace Pipe 0'to 5' 700 ea 17400 1,21800 213 30 1,493 10 0.00 D 00 20000 1.40000 Replace Pipe 5 to 10' 3.00 ea 52200 1.56600 42975 1,28925 0.00 000 200.00 600 00 Replace Pipe 10 io 20' 2.00 ea 78100 1.566 00 681 75 1,36350 0.00 000 200,00 40000 Repair Insulation 1.00 LS 1,566.00 1.56600 0.00 000 19,100 00 19,100.00 000 000 Repair Wall IDO LS 1,566.00 1,566,00 18000 180.00 000 000 0.00 000 Coating 1.00 LS ON 000 0.00 000 2,500.00 2.500.00 0.D0 000 Testing '1.00 days 78300 2.34900 000 000 000 000 8500 25500 3 Repair Phase IA Insulation Install new Insulation 8.00 ea 0.00 000 0.00 000 15000 1,200.00 0 00 000 4 Control Box Repair Chip out area 1.00 ea 391 50 391 50 0.00 000 0.00 000 0.00 000 Repair Aera 1.00 ea 391 50 391 50 0.00 000 0.00 000 0.00 000 Coat 6.00 sf 000 000 0.00 000 000 000 150.00 90000 Small Tools(Air Hammers) 1.00 ea 0.00 000 0.00 000 0.00 000 3000 3000 1.00 ea 0.00 000 0.00 000 0.00 000 3000 3000 Supervisor time 80.00 HRs 85.00 6,800.00 000 000 0.00 000 1 0.00 000 Q Q Q4 A Direct Cost Subtotal 34,205.00 8 145.20 22,800.00 10,115.00 H Labor Burden a 35% 11,971 75 nla 1113 Na C Tax Q 8.25% n/a ula o/a 834.49 D Contractors Fee[15%for labor,mat'I,and equipment&10°/for subs[ 5,13075 1,221.78 2180.00 1,517.25 F Subtotal 2(A+B+C+D) 51,307.50 936698 25,080.00 12,466.74 F Liability&Insurance a 1% 513,08 93.67 250.80 124.67 G Bonds rt 2% 1,036.4] 18921 506.62 251 83 H Subtotal(F+G+H) 52,856.99 9,64986 25,837 42 12.843.23 1 Total of all columns(Cl+C2+C3+C4 p 101.187 50 cher nla Current Total Cost $101,187 , + 1 PO Box 203818 Job # Austin, Texas 78720 Date: 3-15-2021 Phone: 512-563-4806 Email: starinsulationaustin@gmail.com QUOTATION FOR WORK Company Excell Submitt to Chad Mitchell Name of Job: Brushy Creek Waste Water Location 1.Pandpr TY Bid: Repair Insulation From Freeze $ 19,100.00 _ Damage $ Total: $ 19 100.00 Items Not Included In Bid: 1 Sizing, Painting & Identification 2 Lined Ductwork 3 Sheet Metal Shields 4 Vitalic Couplings 5 Firestopping 6 Primer on Piping 7 Underground and Slab Piping 8 Premium Time Wages 9 Night or Shift Work 10 Sales Tax Respectfully Submitted Dan Fears Star Insulation Company, Date: 3-15.2021 Accepted by: Chad Mitchell Date: 3-15-2021 Name and Company (Signature Authorizes Star Insulation Company, Inc. To Proceed With Work.) Start Date: Date Completed: EEizm Bid Proposal for BCRUA - 4" Repair Pipe EXCEL CONSTRUCTION SERVICES Core&Main Bid Date:03/04/2021 7620 Grissom Rd Core&Main 1709369 San Antonio,TX 78251 Phone: 210-684-1150 Fax: 210-684-5521 Seq# Qty Description Units Price Ext Price 10 4X1/8 FLG FF RR GASKET EA 3.80 20 4 316SS HEX BOLT&NUT KIT EA 14.79 30 4 MEGA-FLG 2104 W/SS 316 BOLTS EA 152.11 40 317-048008-000 4X11P SADDLE EPDXY W/304SS STRAPS 4.40-4.80 OD EA 68.78 CONFIRM OUTLET SIZE 60 4X05'00" FLXPE DI PCL EA 213.30 70 4X10'00" FXLPE DI PCL EA 429.75 80 4X18'00" FLXPE DI PCL EA 622.80 90 4X18'00"FLXFL DI PCL EA 681.75 Sub Total Tax Total Branch Terms: UNLESS OTHERWISE SPECIFIED HEREIN,PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY CUSTOMER FOR MANUFACTURE WITHIN THIRTY(30)CALENDAR DAYS FROM THE DATE OF THIS QUOTATION.CORE&MAIN LP RESERVES THE RIGHT TO INCREASE PRICES UPON THIRTY(30)CALENDAR DAYS'NOTICE TO ADDRESS FACTORS,INCLUDING BUT NOT LIMITED TO,GOVERNMENT REGULATIONS,TARIFFS,TRANSPORTATION,FUEL AND RAW MATERIAL COSTS.DELIVERY WILL COMMENCE BASED UPON MANUFACTURER LEAD TIMES.ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES.THIS BID PROPOSAL IS CONTINGENT UPON BUYER'S ACCEPTANCE OF SELLER'S TERMS AND CONDITIONS OF SALE,AS MODIFIED FROM TIME TO TIME,WHICH CAN BE FOUND AT: 03/04/2021.-10:36 AM Actual taxes may vary Page 2 of 2 1 I L + e 1 l0 1 u u u I u ------------ _ I I f w.•,sww lnn I 1 �— Jexac'ul°i TSC-PV-002- iIrm—m _. ... ._......------------ -----.........-----------------------.............---------------- Y ._._------7— - KEY — — — k I - L. NOTES Q- Zc-SIUIq I\ .r..r I, }TSC-SC-003 ate[ SEOIMENTA710N BASIN No 3C I °xa Iot+ PPoPpe[p sE4E urE Arte ' I lI/ /I x C9uicl,+ - • Z`/ OCm,I-»QIXES [V w Pin�oi( i el I` I - I i I I GENERAL NOTES i z ; .vv»o[uwww wnco wsuE.o».. I I i� I '• �� c .ccwa»c[.r»ulaw.o.:a ra u � rErwn nP. ;I � ,�, E•losco w..c.-owE.El[P a 5w.u[w I I I/ rSC-YO-SB301 5°i�Pie I I SEE vort a Srt[r w- ��• SIDP[ ��'[nPl • nFl �I i° I E ADDITIVE ALTERNATE TSC-MV-58502 •� mvr I t� x; FF Euprrv[v.l[PrMI[Mo !car E.ICMDP ll E.K1rW tET1ELD P.ICP_rvw[E • • 1 I r __ - _ __ __ .__ ...........} II . - ----------------� -- ...-----.----------------- ».._ ......-.. ._. - 1 r `��RNn.E . m.Dl/r rttP4 LL+iO ryPlCt Ml»� IaP[ia',n Mt.0 TSC-SLG-SO303' Futslg —114' -tix-•'a• rDP i grrtMV IPrP DI ■ I< aE. sc.Prn. ®Walker Parmm }!' engineers P surveyors BRUSHY CREEK REGIONAL UTILITY AUTHORITY PHASE 1, WATERED NS NTPLANT SEDIMENTATION PLAN oa iw r w . (ELEVATION 1082) x-d envie 4 /,TSC-PV-SLV201 _ --- rtivE .[r IM , SLUDGE VAULT No 2c (OPMA -3 EAB la[619 E Al PLAN I _may , 1 e I r I ■ I II I '1-- 1 - a d' KEY NOTES FOR CONInNux71ON SEE MA-4 TM,Y� �•�•,,I.0 I �locosm wol ur[aro s.rsrwc NSE Sr!41 . ,..Y - IY wR Yle 8[• i�'F + I'■RR Iw iC .r,r or. —25c-D .,.r.., .+r.••..Y '.- I Q�n�xrkw wo K 14. ae 5vp P r t �Yc,1 4 v4M[4l�a1lw11 JL- {1r�1 IY ...-.r ' _--------'---'- I -�. p IN r'44-Fl N —TK TOM Ld +R ar.x'anw rwr - �7C-fC f}544 cl law del 1 �' IIF 4r J.`iSS 51tkYr I ] + E • 1 19C=1L=Oi.� TSC-r`-GIA -4/t -" '� I ni •',r.rr wU is[E•■■-•r# Fr. was * �Y*1'r' ri � I�,rreex•,e• n TSC�1C-RMN �-=" ' tI? aii a.. 1 ' r' rl 1 ''. - ' •. Ian+ .711 _ '�' }'_��. Via- r . _ �•• =I• --�-- ., ''� aWalkei 4 irl�rl.fJrfT�*/TlY6rf € - 4e4 4 -- IF�`' C-A., BRUSHY CREEK REGIONAL rlJ�h1W M47Ert'Gi+16iEL ---- ---- # {# '.°~ 1 �iTY fk�` as TSt-YC-P1 r*rsrta Cr' If-9Y3 ��' + °�' -'- AAT15R .�7ME11TPLAMf -- — . .— CCC w4+s• .t �., fELL*++�TKM'r 1UE2) ■ AOR CGkI FN JA Ii Or4 SEE AIA-3 # y� + V1411 iAf� Y I PLAN -- MA-2 kti w, I I i 1 6 1 r0 I I 1 r 5 1 ' I I I I 5 I I I E I I l I I I l b i.-p/r Lr,rl 10o0'U. vSS NW1 vI ro00rF1 ilOrgx Sn, oAx1u1EG- 1. Lnrr ISLE rq,L=� TO urx TSC-SLG-SBJ02' &\ 1<HA SFTCWATER I.V �L T ow v -- -- SFOrMENTATION BASIN ---- — T ad6A Sx[M1L 1 Nn F 1 O O O V IV O O O O O BASIN F110 XOUTLET ::CHANNEL SEAQ VAt WATER O V O O O O tJ O O O O O O ya Lvxw rrn LL,m10 ' CHMNFl O O O O O O O O O .Iasax.[mMsrortayvO O O O O O O LL lncr.rL./rt- L.L lobi•..01 10!60.r. SLOPE. stWE Ll a J LL IWI C IEt rAl- ''P- rrtirwc c�,iFw rgrL :e11ii 1 s4[oo.Ew riox rw r abV+1M 41r+L.t'r1.ur RLO r.aAAAIq,.a.[Y0PEu1.LI. ,50-xG-S!)0:•+ac UH --. xc,ro..a.:m rrr 4L L.vUSID row:o-.r.rrLx.�srr4LL1r •ax.K,.or s.�.P.,rbs scc,a>.«.HP cwm G1 I SECTION G11MA-3 G10 I SECTION G101MA-3 Ywl Ir_ rJ4E r4 w.ro.a nF 1 axpL.w+..LJ I O FLLL 512E.14'•T4'•M SA•4B•I'4 vFv SpyO+LE'4 I --� s O srrtiLlLwL p+aa 7+Or IosO. [ 10,01,1 FLLL SItE•Jr.1'P.MLF 51k.Y16-.1'C' NChru L[l•AS 1-0- lglf I 7 :•nrx Jra 1 6 HAL 521E•I'•1'd.MJF 512E•v(.1'0' F S51[•rJNLOr.ati[,.Oo �I � N Ma K i -SM 1 — nw plr b !10.11.;"i�l r---1 I s ikYq clG ..✓ � i G_uC�Mc�YufNuT,CTSEf]•Ndaurx- { F bF IJ••a' k L_-_J K 10,100 HGVILLt1a 3C EL'IM 5- I �J , &Wal Y.lp�Pa -------- BRUSHY CREEK REGIONAL _ k UTILITY AUTHORITY PRASE Ic — �- WATER TREATMENT PLANT EXPANSION + SEDIMENTATION BASIN Price excludes work to supports sEcnoN/s�(� f � 1 vv(vnp[4Lwxurr Y.1.CR4 rrrM1Ae+ort ---^Nx g _ �+1aK b xw rwwE•.o E•,rw woaoxo.w1.c � F yr 9 �nuT -•- 381519 Al PLANT WATER PIPE SUPPORT A5 SECTION AWMA-3 A10 SECTION A10/MA-3 �,•+� �•MA 13 rJsx.�.J 544E IAi I �hk ro i