BCRUA_R-21-09-22-5C RESOLUTION NO. R-21-09-22-5C WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into a Contract for Engineering Services ("Contract") with Walker Partners for the BCRUA Phase IC Water Treatment Plant Expansion and Phase 2 Land Rights and Stakeholder Coordination Project, and WHEREAS, Walker Partners has submitted Supplemental Contract No. 16 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the BCRUA desires to enter into said Supplemental Contract No. 16, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY: That the Board President is hereby authorized and directed to execute on behalf of the BCRUA Supplemental Contract No. 16 with Walker Partners for the BCRUA Phase I C Water Treatment Plant Expansion and Phase 2 Land Rights and Stakeholder Coordination Project, a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of September, 2021. hnps-rowdrocklexas sharepoiat comisittVAdministrationMepenment PIIWBCRUA/B=d AacketstPacket bocumenls/2021/09222021 5C Res BCRUA SC 016 w•Walker Partners for the Phase 2 land Rights and Stakeholder Coordination Progecr,(00491620xAOSFE).doc NACOLE THO PSON, President Brushy Creek Regional Utility Authority ATTEST: REE FLORES, Se etary :e72 BRUSHY CREEK REGIONAL UTILITY AUTHORITY A fir..,r+h 1, •f 4:064r P,.F. L*41#I.. Fn# R,4 n 4 R,•4 SUPPLEMENTAL CONTRACT NO. 16 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WALKER PARTNERS ("Engineer") ADDRESS: 804 Las Cimas Parkway, Suite 150,Austin,TX 78746 PROJECT: Phase 1C Water Treatment Plant Expansion and Phase 2 Land Rights and Stakeholder Coordination This Supplemental Contract No. 16 to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA"and Walker Partners, hereinafter called the "Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 19th day of April, 2017 for the BCRUA Phase l C Water Treatment Plant Expansion in the lump sum amount of $1,763,900.00 and Phase 2 Land Rights and Stakeholder Coordination Project in the maximum amount of $2,012,600.00 for a total Project compensation of$3,776,500.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 1 on July 19, 2017 to amend the scope of services and to increase the compensation by $14,100.00 for Phase I C Water Treatment Plant Expansion to a lump sum amount total of$1,778,000.00 and by $212,000.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of $2,224,600.00 for a total Project compensation of$4,002,600.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 2 on November 20, 2017 to amend the scope of services and to increase the compensation by $19,600.00 for Phase I C Water Treatment Plant Expansion to a lump sum amount total of $1,797,600.00 for a total Project compensation of$4,022,200.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 3 on April 18, 2018 to amend the scope of services and to increase the compensation by $105,200.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$2,329,800.00 for a total Project compensation of$4,127,400.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 4 on October 24, 2018 to add the construction phase services for the Phase IC Construction Phase Services Project and to increase the compensation by $897,200.00 for a total Project compensation of$5,024,600.00; and I Supplemental Contract Rev.03.2011 0140.4634-40;00467114 215829 WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 5 on April 30, 2019 to modify the provisions for the scope of services and to increase the compensation by $40,300.00 for Phase 1 C Water Treatment Plant Expansion to a lump sum amount total of$2,735,100.00 for a total Project compensation of$5,064,900.00; and WHEREAS, BCRUA and Engineer executed amended Supplemental Contract No. 6 on September 25, 2019 to modify the provisions for the scope of services and to increase the compensation by $497,885.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of $2,827,685.00 for a total Project compensation of $5,562,785.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 7 on November 15, 2019 to modify the provisions for the scope of services and to increase the compensation by $49,400.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$2,877.085.00 for a total Project compensation of$5,612,185.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 8 on November 20, 2019 to modify the provisions for the scope of services and to increase the compensation by $447,880.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$3,324,965.00 for a total Project compensation of$6,060,065.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 9 on January 22, 2020 to modify the provisions for the scope of services and to increase the compensation by $498,590.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$3,823,555.00 for a total Project compensation of$6,558,655.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 10 on April 3, 2020 to modify the provisions for the scope of services and to increase the compensation by $38,608.00 for Phase I C Water Treatment Plant Expansion to a lump sum amount total of$2,773,708.00 for a total Project compensation of$6,597,263.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. I I on April 3, 2020 to modify the provisions for the scope of services and to increase the compensation by $40,815.00 for Phase I C Water Treatment Plant Expansion to a lump sum amount total of$2,814,523.00 for a total Project compensation of$6,638,078.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 12 on April 3, 2020 to modify the provisions for the scope of services and to increase the compensation by $26,400.00 for Phase 1C Water Treatment Plant Expansion to a lump sum amount total of$2,840,923.00 for a total Project compensation of$6,664,478.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 13 on November 4, 2020 to modify the provisions for the scope of services and to increase the compensation by $38,600.00 for Phase 1 C Water Treatment Plant Expansion to a lump sum amount total of $2,879,523.00 for a total Project compensation of$6,703,078.00; and 2 WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 14 on February 3, 2021 to modify the provisions for the scope of services and to increase the compensation by $49,700.00 for Phase IC Water Treatment Plant Expansion to a lump sum amount total of $2,929,223.00 for a total Project compensation of$6,752,778.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 15 on April 28, 2021, to modify the provisions for the scope of services and to increase the compensation by $254,311.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$4,077,866.00 for a total Project compensation of$7,007,089.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $69,598.00 for Phase I C Water Treatment Plant Expansion to a lump sum amount total of$2,998,821.00 for a total Project compensation of $7,076,687.00; NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $69,598.00 the lump sum amount payable under the Contract for Phase 1 C Water Treatment Plant Expansion Project to a total of $2,998,821.00 for a total Project compensation of $7,076,687.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follonr] I WALK RPA ERS By: Aaron Archer Client Manager 16 September 2021 Date 4 BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC. By: Nacole Thompson, President Date -- - - ------ ------- APPROVED AS TO FORM: By: Stephan L. Sheets, BCRUA Attorney ADDENDUM TO EXHIBIT B ENGINEERING SERVICES BASIC SCOPE OF SERVICES Insert Task 1.10 as follows: Task 1.10—36-inch Underwater Pipeline Post Construction Support Services 1.10.1 Coordinate with WJE to obtain fee proposal to evaluate the cause of the pipeline failure and validate the appropriateness of continued operation. Provide construction phase submittals, operational data, and reconnaissance and dive inspection reports to support the WJE evaluation. Review the WJE Initial Analysis Report and provide comments. 1.10.2 Coordinate with Chapman Marine, Excel Construction Services, and Owner for continued dive inspections of the pipeline repair. Review inspection reports as submitted. 1.10.3 Review and provide comments on the U.S. Underwater Pipeline Inspection Report. 1.10.4 Phase 1D Raw Water Delivery System Evaluation. 1.10.4.1 Develop conceptual engineering solutions to install a parallel pipeline adjacent to the existing 36-inch diameter underwater pipeline. Consider hydraulic and operational requirements, constructability, planning-level capital costs, impacts to operation of the existing raw water delivery system, and schedule. 1.10.4.2 Develop conceptual engineering design for improvements to support of the existing underwater pipeline. Prepare planning-level costs and a project schedule. 1.10.4.3 Evaluate permit and land right requirements for the conceptual design alternatives developed up Task 1.10.4.1 and 1.10.4.2. 1.10.4.4 Evaluate the capacity of the Phase 1C raw water intake barge (RWIB). Review raw water pump submittals and performance curves and perform hydraulic calculations to estimate available output from the RWIB under varying lake levels. Develop a field test plan to individually test raw water pumps. Conduct field testing plan with support of Owner to collect pump performance information. Summarize estimated firm RWIB capacity at lake levels ranging from elevation 623 ft-msl to 681 ft-msl. 1.10.4.5 Evaluate options to encase the existing MJ sleeve and megalugs to address the existing leak at the 1:00 position on the north megalug. 9/14/2021 O'Fenalker Partners gineers + surveyors 1.10.4.6 Prepare a technical memorandum (TM) documenting the results of the evaluation. Obtain and address Owner comments and prepare a final version of the TM. 9/14/2021 �ienlker Partners ineers * surveyors ADDENDUM TO EXHIBIT C WORK SCHEDULE A Draft TM will be submitted within eight weeks of execution of Supplemental Amendment No. 16. 9/14/2021 ers + surveyors 9)Walker Partners engine ADDENDUM TO EXHIBIT D COMPENSATION Total compensation for services under Supplemental Amendment No. 16 is estimated to be $69,598 as shown in Appendix 1.Total compensation for Task 1.0—Phase 1C WTP Expansion shall be adjusted from $2,929,223 to$2,998,821. Total compensation for the Project shall be adjusted from $7,007,089 to $7,076,687. 9114/2021ers f surveyors ,z Walker Partners engine Appendix 9 to Exhibit D Fee and Labor Summary Total Project Senior Hours Sub Fee I TASK DESCRIPTION Manager PE EIT CAD Expenses (FNQ 1.10.1 WJE support 8 4 12 $100 $2,940 1.10.2 Dive inspection support 2 2 4 $820 1.10.3 USU inspection support 4 2 6 $1,420 1.10.4 Parallel Pipeline Conceptual Design TM 14 116 112 64 306 $250 $4,548 $64,418 Totals 28 116 120 64 328 $350 $4,548 $69,598 9/14/2021 @)Waler Partners engineers + surveyors t DATE: September 17, 2021 SUBJECT: BCRUA Board Meeting—September 22, 2021 ITEM: SC. Consider a resolution approving Supplemental Contract No. 16 with Walker Partners for Phase IC Water Treatment Plant Expansion and Phase 2 Land Rights and Stakeholder Coordination Project. PRESENTER: Karen Bondy,General Manager BACKGROUND INFO: The original contract was approved on April 19, 2017 as follows: Phase 1C Water Treatment Plant Expansion Design (Lump Sum) $1,763,900 Phase 2 Land Rights&Stakeholder Coordination (Not To Exceed) $2,012,600 TOTAL $3,776,500 Fifteen Supplemental Contracts have since been approved. Approval of this $69,598 Supplemental Contract will result in the following new contract balances: Phase 1C Water Treatment Plant Expansion Design (Lump Sum) $2,998,821 Phase 2 Land Rights&Stakeholder Coordination (Not To Exceed) $4,077,866 NEW TOTAL $7,076,687 Supplemental Agreement No. 16 includes post construction support services and engineering evaluations for the 36-inch Underwater Pipeline.This Supplemental Agreement includes the following services: • Coordinate with WJE for evaluation of the cause of the pipeline failure and validate the appropriateness of continued operation. Provide construction phase submittals, operational data, and reconnaissance and dive inspection reports to support the WJE evaluation. Review the WJE Initial Analysis Report and provide comments. • Coordinate with Chapman Marine, Excel Construction Services,and Owner for continued dive inspections of the pipeline repair. Review inspection reports as submitted. • Review and provide comments on the U.S. Underwater Pipeline Inspection Report. • Develop conceptual engineering solutions to install a parallel pipeline adjacent to the existing 36-inch diameter underwater pipeline.Consider hydraulic and operational requirements,constructability, planning-level capital costs, impacts to operation of the existing raw water delivery system, and schedule. • Develop a conceptual engineering design for improvements to support of the existing underwater pipeline. Prepare planning-level costs and a project schedule. t • Evaluate permit and land right requirements for the conceptual design alternatives. • Evaluate the capacity of the Phase 1C raw water intake barge (RWIB). Review raw water pump submittals and performance curves and perform hydraulic calculations to estimate available output from the RWIB under varying lake levels. Develop a field test plan to individually test raw water pumps.Conduct a field-testing plan with support of Owner to collect pump performance information. Summarize estimated firm RWIB capacity at lake levels ranging from elevation 623 ft-msl to 681 ft-msl. • Evaluate options to encase the existing 36-inch underwater pipeline at the existing leak. The total compensation for these services is$69,598 and will be paid on a lump sum basis. BCRUA staff and the Operations Committee(O.C.) have reviewed the proposed Supplemental Agreement No. 16 with Walker Partners and recommend Board approval. Staff, the O.C., and the consultant will be available to answer any questions or concerns during the Board Meeting. FUNDING: Supplemental Agreement No. 16 will be funded by TWDB 2009 DFUNDs or 2017 SWIFT funds. THE FOLLOWING PAGES CONSIST OF THE FINAL ADOPTED DOCUMENT :e7a BRUSHY CREEK REGIONAL UTILITY AUTHORITY A P,rk.gr hLP RI Cqq,, P,,L. �i�n�1 r. 4n1 *iYaO A.,, SUPPLEMENTAL CONTRACT NO. 16 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WALKER PARTNERS ("Engineer") ADDRESS: 804 Las Cimas Parkway, Suite 150, Austin,TX 78746 PROJECT: Phase 1C Water Treatment Plant Expansion and Phase 2 Land Rights and Stakeholder Coordination This Supplemental Contract No. 16 to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA" and Walker Partners, hereinafter called the"Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 19th day of April, 2017 for the BCRUA Phase 1C Water Treatment Plant Expansion in the lump sum amount of $1,763,900.00 and Phase 2 Land Rights and Stakeholder Coordination Project in the maximum amount of $2,012,600.00 for a total Project compensation of$3,776,500.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. I on July 19, 2017 to amend the scope of services and to increase the compensation by $14,100.00 for Phase 1 C Water Treatment Plant Expansion to a lump sum amount total of$1,778,000.00 and by $212,000.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of $2,224,600.00 for a total Project compensation of$4,002,600.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 2 on November 20, 2017 to amend the scope of services and to increase the compensation by $19,600.00 for Phase 1C Water Treatment Plant Expansion to a lump sum amount total of $1,797,600.00 for a total Project compensation of$4,022,200.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 3 on April 18, 2018 to amend the scope of services and to increase the compensation by $105,200.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$2,329,800.00 for a total Project compensation of$4,127,400.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 4 on October 24, 2018 to add the construction phase services for the Phase I C Construction Phase Services Project and to increase the compensation by $897,200.00 for a total Project compensation of$5,024,600.00; and i Supplemental Contract Rev.012011 0140.4634-40;00467114 215829 �Cre, - 0e-2 r-c 6- ?Z-5G WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 5 on April 30, 2019 to modify the provisions for the scope of services and to increase the compensation by $40,300.00 for Phase l C Water Treatment Plant Expansion to a lump sum amount total of$2,735,100.00 for a total Project compensation of$5,064,900.00; and WHEREAS, BCRUA and Engineer executed amended Supplemental Contract No. 6 on September 25, 2019 to modify the provisions for the scope of services and to increase the compensation by $497,885.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of $2,827,685.00 for a total Project compensation of $5,562,785.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 7 on November 15, 2019 to modify the provisions for the scope of services and to increase the compensation by $49,400.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$2,877.085.00 for a total Project compensation of$5,612,185.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 8 on November 20, 2019 to modify the provisions for the scope of services and to increase the compensation by $447,880.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$3,324,965.00 for a total Project compensation of$6,060,065.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 9 on January 22, 2020 to modify the provisions for the scope of services and to increase the compensation by $498,590.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$3,823,555.00 for a total Project compensation of$6,558,655.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 10 on April 3, 2020 to modify the provisions for the scope of services and to increase the compensation by $38,608.00 for Phase IC Water Treatment Plant Expansion to a lump sum amount total of$2,773,708.00 for a total Project compensation of$6,597,263.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 11 on April 3, 2020 to modify the provisions for the scope of services and to increase the compensation by $40,815.00 for Phase I C Water Treatment Plant Expansion to a lump sum amount total of$2,814,523.00 for a total Project compensation of$6,638,078.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 12 on April 3, 2020 to modify the provisions for the scope of services and to increase the compensation by $26,400.00 for Phase 1C Water Treatment Plant Expansion to a lump sum amount total of$2,840,923.00 for a total Project compensation of$6,664,478.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 13 on November 4, 2020 to modify the provisions for the scope of services and to increase the compensation by $38,600.00 for Phase I C Water Treatment Plant Expansion to a lump sum amount total of $2,879,523.00 for a total Project compensation of$6,703,078.00; and 2 WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 14 on February 3, 2021 to modify the provisions for the scope of services and to increase the compensation by $49,700.00 for Phase IC Water Treatment Plant Expansion to a lump sum amount total of $2,929,223.00 for a total Project compensation of$6,752,778.00; and WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 15 on April 28, 2021, to modify the provisions for the scope of services and to increase the compensation by $254,311.00 for Phase 2 Land Rights and Stakeholder Coordination Project to a maximum amount total of$4,077,866.00 for a total Project compensation of$7,007,089.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $69,598.00 for Phase I C Water Treatment Plant Expansion to a lump sum amount total of$2,998,821.00 for a total Project compensation of $7,076,687.00; NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. 11. Article 4, Compensation and Exhibit D—FeeSchedule shall be amended by increasing by $69,598.00 the lump sum amount payable under the Contract for Phase IC Water Treatment Plant Expansion Project to a total of $2,998,821.00 for a total Project compensation of $7,076,687.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] 3 WALK R PA ERS By: Aaron Archer Client Manager _ 16 September 2021 Date BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC. By: .- Nacole Thompson, Pres ent ---.. __q Date APPROVED AS TO FORM: By: ITO St an L. Sheets, BCRUA Attorn y 4 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES BASIC SCOPE OF SERVICES Insert Task 1.10 as follows: Task 1.10—36-inch Underwater Pipeline Post Construction Support Services 1.10.1 Coordinate with WJE to obtain fee proposal to evaluate the cause of the pipeline failure and validate the appropriateness of continued operation. Provide construction phase submittals, operational data, and reconnaissance and dive inspection reports to support the WJE evaluation. Review the WJE Initial Analysis Report and provide comments. 1.10.2 Coordinate with Chapman Marine, Excel Construction Services, and Owner for continued dive inspections of the pipeline repair. Review inspection reports as submitted. 1.10.3 Review and provide comments on the U.S. Underwater Pipeline Inspection Report. 1.10.4 Phase 1D Raw Water Delivery System Evaluation. 1.10.4.1 Develop conceptual engineering solutions to install a parallel pipeline adjacent to the existing 36-inch diameter underwater pipeline. Consider hydraulic and operational requirements, constructability, planning-level capital costs, impacts to operation of the existing raw water delivery system, and schedule. 1.10.4.2 Develop conceptual engineering design for improvements to support of the existing underwater pipeline. Prepare planning-level costs and a project schedule. 1.10.4.3 Evaluate permit and land right requirements for the conceptual design alternatives developed up Task 1.10.4.1 and 1.10.4.2. 1.10.4.4 Evaluate the capacity of the Phase 1C raw water intake barge (RWIB). Review raw water pump submittals and performance curves and perform hydraulic calculations to estimate available output from the RWIB under varying lake levels. Develop afield test plan to individually test raw water pumps. Conduct field testing plan with support of Owner to collect pump performance information. Summarize estimated firm RWIB capacity at lake levels ranging from elevation 623 ft-msl to 681 ft-msl. 1.10.4.5 Evaluate options to encase the existing MJ sleeve and megalugs to address the existing leak at the 1:00 position on the north megalug. 9/14/2021 01ealker Partners ngineers + surveyors 1.10.4.6 Prepare a technical memorandum (TM) documenting the results of the evaluation. Obtain and address Owner comments and prepare a final version of the TM. 9/14/2021ers * surveyors y-�,i Walker Partners engine ADDENDUM TO EXHIBIT C WORK SCHEDULE A Draft TM will be submitted within eight weeks of execution of Supplemental Amendment No. 16. 911412021 Walker Partners engineers + surveyors ADDENDUM TO EXHIBIT D COMPENSATION Total compensation for services under Supplemental Amendment No. 16 is estimated to be $69,598 as shown in Appendix 1.Total compensation for Task 1.0—Phase 1C WTP Expansion shall be adjusted from $2,929,223 to$2,998,821. Total compensation for the Project shall be adjusted from $7,007,089 to$7,076,687. 9/14/2021 OFen4�ginee(s er Partners } surveyors Appendix 1 to Exhibit D Fee and Labor Summary Total Project Senior Hours Sub Fee I TASK DESCRIPTION Mana er PE EIT CAD Expenses FNI 1.10.1 WJE support a 4 12 $100 $2,940 1.10.2 Dive inspection support 2 2 4 $820 1.10.3 USU inspection support 4 2 6 $1,420 1.10.4 Parallel Pipeline Conceptual Design TM 14 116 112 64 306 $250 $4,548 $64,418 Totals 28 116 1 120 1 64 328 $350 $4,548 $69,5510 9/14/2021 01�ker Partners neers * surveyors