BCRUA_R-21-10-20-5A RESOLUTION NO. R-21-10-20-5A
WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously
entered into a Contract for Engineering Services ("Contract") with Walker Partners/Freese and Nichols
Joint Venture for the BCRUA Phase 2 Raw Water Delivery System Project, and
WHEREAS, Walker Partners/Freese and Nichols Joint Venture has submitted Supplemental
Contract No. I 1 to the Contract to modify the provisions for the scope of services and to increase the
compensation, and
WHEREAS, the BCRUA desires to enter into said Supplemental Contract No. 11, Now
Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY CREEK
REGIONAL U'T'ILITY AUTHORITY:
That, subject to the approval of the Participating Cities, the Board President is hereby
authorized and directed to execute on behalf of the BCRUA Supplemental Contract No. I1 with
Walker Partners,`Freese and Nichols Joint Venture, a copy of same being attached hereto as Exhibit
"A" and incorporated herein for all purposes.
The Board of Directors hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public a-, required by law at all times during which this Resolution and the subject matter
hereof were discussed, copsidered and formally acted upon, all as required by the Open Meetings Act.
Chapter 551, Texas Government.Code, as amended.
RESOLVED this 20th day of October, 2021.
VcservCF21WllUX1DATA'SCCIms.033054614-A%1UNICIPALkM93634 DOC
NACOLE THOMPSO , President
Brushy Creek Regional Utility Authority
AT7' ST:
RE. E FLORES, Secret
2
' Ob
w,NBRUSHYCREEK
REGIONAL UTILITY AUTHORITY
A P.r t n,r s h i p 90 Cad— P r r 4. L s r}d—r. r i d R,,r d h o r L
SUPPLEMENTAL CONTRACT NO. I1
TO CONTRACT FOR ENGINEERING SERVICES
FIRM:WALKER PARTNERS/FREESE AND NICHOLS JOINT VENTURE ("Enzineer")
ADDRESS: 804 Las Cimas Parkway, Suite 150,Austin, TX 78746
PROJECT: BCRUA Phase 2 Raw Water Delivery System
This Supplemental Contract No. 1 I to Contract for Engineering Services is made by and between
the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called
"BCRUA" and Walker Partners:`.`Freese and Nichols Joint Venture, hereinafter called the
"Engineer".
WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the 28th day of November, 2018 for the BCRUA Phase 2 Raw Water
Delivery System Project in the lump sum amount of $12,518,037.00 for Engineering Services
excluding Task 5.3.1 Geotechnical Investigation; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 1 on April 24, 2019 to
amend the scope of services, specifically, Task 6.0, and to increase the compensation by
$75,496.00 to a total lump sum amount of $12,593,533.00 for a total project amount of
$13,697,291.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 2 on August 7, 2019 to
amend the scope of services, specifically, Task 5.0 - Special Services, and to increase the
compensation by $42,348.00 to a total lump sum amount of$12,635,881.00 for a total project
amount of$13,739,639.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 3 on March 5, 2020 to
amend the scope of services, specifically, Task 6.0 - Agency and Stakeholder Coordination, and
to increase the compensation by $47,000.00 to a total lump sum amount of$12,682,881.00 for a
total project amount of$13,786,639.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 4 on March 20, 2020
to amend the scope of services, specifically, Task 6.0 Agency and Stakeholder Coordination,
and to increase the compensation by $18,155.00 to a total lump sum amount of$12,701,036.00
for a total project amount of$13,804,794.00; and
Supplemental Contract Rev.03:2011
0140.4634-47;00483708 215829
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 5 on May 28, 2020 to
amend the scope of services, specifically, Task 5.3.1 Geotechnical Investigation, by reducing
the compensation by $256,761.00 and adjusting the total Time and Materials amount to
$846,997.00; and to reallocate $256,761.00 to Task 5.0 Special Services and Task 6.0
Agency and Stakeholder Coordination, and to modify the provisions for the scope of services for
Task 5.0 by increasing the compensation by $24,212.00 to a total lump sum amount of
$12,982,009.00 for a total project amount of$13,829,006.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 6 on October 22, 2020
to amend the scope of services, specifically, Task 5.0 - Special Services, and to increase the
compensation by $27,985.00 to a total lump sum amount of$13,009,994.00 for a total project
amount of$13,856,991.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 7 on April 28, 2021 to
amend the scope of services, specifically, Task 5.0 Special Services, and to increase the
compensation by $137,201.00 to a total lump sum of$13,147,195.00 for a total project amount
of$13,994,192.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 8 on June 7, 2021 to
amend the scope of services, specifically, Task 5.0 - Special Services, and to increase the
compensation by $47,238.00 to a total lump sum of$13,194,433.00 for a total project amount of
$14,041,430.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 9 on August 17, 2021
to amend the scope of services, specifically, Task 5.0 -- Special Services, and to increase the
compensation by $25,000.00 to a total lump sum of$13,219,433.00 for a total project amount of
$14,066,430.000; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 10 on October 15,
2021 to amend the scope of services, specifically, Task 6.0 Agency and Stakeholder
Coordination, and to increase the compensation by $29,800.00 to a total lump sum of
$13,249,233.00 for a total project amount of$14,096,230.00; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for basic
engineering services and to increase the compensation by $745,999.00 to a total Time and
Materials amount of$1,592,996.00 for a total project amount of$14,842,229.00;
NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract
is amended as follows:
1.
Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set
forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as
set forth in the attached Addendum To Exhibit C.
2
II.
Article 4, Compensation (2) Not-to-Exceed Sum and Exhibit D, Fee Schedule shall be amended
by increasing by $745,999.00 the not-to-exceed sum amount payable under the Contract for
Engineering Services, to a total not-to-exceed amount of $1,592,996.00 for a total Project
amount of$14,842,229.00, as shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental
Contract in duplicate.
[signature pages follow]
3
WALKER PARTNERS
By:
Date
FREESE AND NICHOLS JOINT VENTURE
By:
Date
BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC.
By: - -
Nacole Thompson, President
Date
APPROVED AS TO FORM:
By: .
Stephan L. Sheets, BCRUA Attorney
4
ADDENDUM TO EXHIBIT B
ENGINEERING SERVICES
GENERAL
The purpose of Supplemental Amendment No. 11 is to provide bidding phase services for the Phase
2 Raw Water Delivery System Project. Proposals shall be received and evaluated, and subsequently
the Project shall be awarded as a single construction contract to the selected Contractor.
BASIC SCOPE OF SERVICES
Task 1.0-Project Management.
1.1 Progress Meetings. Attend monthly progress meetings with Owner for a total of seven
meetings.
1.2 Project Administration.
1.2.1 Manage and coordinate staff resources, subconsultants, and project planning.
Conduct weekly team coordination meetings in person or by teleconference.
1.2.2 Prepare and submit monthly invoices and project progress reports. As a minimum,
monthly progress reports shall include a summary description of tasks completed as of
the report date, description of activities planned for the next 60 days, financial status
of the project, status of schedule for project, and identification of technical,
commercial or other issues which may have an impact to the overall project budget
and/or schedule.
Task 2.0-Bidding Phase. Assist Owner in advertising, obtaining, and evaluating proposals for the
Work. Prequalifying prime contractors and subcontractors is not included in this effort. The
Bidding Phase will be considered complete upon issuance of Notice-to-Proceed to the selected
Contractor or upon cessation of negotiations with prospective contractors.
2.1 Assist Owner in advertising for and obtaining proposals for the Work and, where applicable,
maintain a record of prospective proposers to whom Bidding Documents have been issued,
conduct one pre-Proposal conference, attend one site visit, and attend two rock core
reviews. Owner shall pay for advertisement of the Work and make the Contract
Documents available on CIVCAST.
2.2 Respond to Proposer questions. Issue Addenda as appropriate to clarify, correct, or modify
the Bidding Documents.
2.3 Evaluate and determine the acceptability of"or equals" and substitution of materials and
equipment proposed by prospective proposers, provided that such proposals are allowed by
the bidding-related documents (or requests for proposals or other construction
procurement documents) prior to award of the Contract for the Work.
2.4 Attend the Proposal opening, prepare Bid tabulation sheets, and assist Owner in evaluating
Bids or proposals including Alternate Proposals. Review the information in the proposals
1
and advise Owner regarding the interpretation of the information provided as it relates to
the selection criteria. Provide reference checks on key personnel from the information
provided in the proposal and review the qualifications of key personnel offered. Report
findings of the review of proposals and investigations to the Owner's selection committee.
Facilitate scoring of proposals by the selection committee and assist in determining which
proposal appears to provide the best value to the Owner based on proposals received.
2.5 Assist the Owner in coordinating and conducting interviews with the top two or three
ranking proposers. Assist in developing pertinent interview questions. Facilitate the
interview process and work with the Owner's selection committee to determine what, if
any, adjustments should be made to the scoring based on information obtained in the
interviews.
2.6 Compare prices received to the cost estimate to determine that the prices proposed are
responsive to the Bidding/Proposal documents. Identify cost difference if estimates and
prices are not within allowable tolerances for cost estimates. Provide information or
assistance needed by Owner during negotiations allowed under Texas Government Code
2269.
2.7 Prepare conformed bidding documents. Incorporate addenda modifications into the
drawings and specifications. Assist Owner in assembling the final Contract for the Work for
execution by Owner and successful Proposer. Prepare stamped Engineer's
recommendation of award letter and bid tabulation analysis. Furnish up to ten printed
copies of the conformed bidding documents,four of which shall be provided to the
Contractor.
2.8 Attend Owner Board and individual City council meetings to present a recommendation
of award of the construction contract.
2.9 Submit advertisement, all addenda, bid tabulation, Engineer's recommendation of award
letter and associated proposal to Texas Water Development Board (TWDB)to allow for
contingent award of Contract.
2.10 Consult with Owner to review contractor's certificates of insurance and other required pre-
NTP submittals for conformance with the requirements of the contract documents. Submit
executed contract documents and contractor's certificates of insurance to TWDB to receive
authorization to issue Notice-to-Proceed to the successful Proposer.
2.11 Assist Owner in selection of an independent testing laboratory to perform required
construction materials testing services.
Task 3.0-Stakeholder Coordination.
3.1 Assist Owner in the renewal of permits required by the Travis County Fire Marshal's Office.
Task 4.0-Additional Services
The following Additional Services are not included in the Scope of Services and will not be
performed unless specifically authorized by the Owner:
4.1 Preparing additional Bidding Documents or Contract Documents for alternate bids or prices
requested by Owner for the Work or a portion thereof.
4.2 Assistance in connection with Bid protests, rebidding, or renegotiating contracts for
construction, materials, equipment, or services.
4.3 Assist Owner in coordination of permit requirements between the Bidders,Travis County
Transportation and Development, LCRA, PEC, and the USAGE.
4.4 Preparing additional drawings or revisions to existing drawings in response to Travis County
or other Stakeholder request, per the direction of the Owner.
3
ADDENDUM TO EXHIBIT C
WORK SCHEDULE
The Bid Phase will commence upon advertisement of the Project and will last for approximately
seven (7) months. Bid Phase terminate upon issuance of Notice-to-Proceed to the selected
Contractor or upon cessation of negotiations with prospective contractors.
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
ADDENDUM TO EXHIBIT D
COMPENSATION
Total compensation for services under Supplemental Amendment No. 11 is estimated to be$745,999
as shown in Attachment 1 to Exhibit D.
Owner shall pay Engineer for Basic Services set forth in Supplemental Amendment No. 11 on the
basis of Standard Hourly Rates as described in Paragraph 2.0 of Exhibit D.
Total compensation for Standard Hourly Rates tasks shall be adjusted from$846,997 to$1,592,996.
Total compensation for the Project shall be adjusted from$14,096,230 to$14,842,229.
5
L N. :g -m NO12
3W A
O
..
...........
NmNNmMmNMM M M
�I o HIP �
4
F
LL
W�
�W
m� 1 999 FUI R
W F wm .mwmw Nmmmmw .
ti
� ml
5
avv av g
w � F
tt Nm Siax$v-S$fill
:S ITITITI
111
I'l
g min N tl wl
a
g
ITI
F m �F i �F
m I a
•S R11 ONN-I I 1N-N-�1m
n ���N(VNNN NN NN NNN M
|
| q MPH
H 4 ,
. ,
— !
|
--
! �
| i' � [
�
|� i \
I, r1i I 111 ;
\ }
. _ .!
| • - 0 . c '
� 4 \9Vij.,\ �
\ � > .
| ; AF /!a=
M..:•...M.,.o..,.,.1..-....... lx Attachment 1 to Exhibit D
r..Y w� ,..Breaan.n f.ma.q. w... �..a wo`Y asw IV+NI MwIW+1'B.�nl..w Bona.BRw Ouy�w- ar.. ��
WI RI BIW pR>t1
Y
-
x -M-
21
M
u Ywnaw ,
yi
]
l+ Bata 1W f ea
]4 B•+ ��ti ]6 +
All21
_
mnaa.._�8.; w.ra.wwe..w Y
x,o e..R w�.n`irxlr-wre+ +
s
s
— s
,.r a s s ,
]MOBMVr�r]Rww�Mrrl�wlw_Nww�wK+IW�x M�h ��
.R+r�R.q. WaAft,4 ...
Attachment 1 to Exhibit D
T
+1
a y rr o�waw so rrn., sa R.,ra sawm.] wewna sn r.n.s '� *r+ww,
] f
22
2i Bwo i.,R.ww s f ,fM
s �e
f ,22,2
— is
]q f f
i.0 Bwo RIrrRWrMrr�� f f
�i1 Bw!' h,4rSaMrsf f LTi
f
f f
py Rewr/ i
Tm MYn f 1 f
,*i r'I/P,W�?R�wr orrF+���1'rYr,t`Aw M1r 9.riRr_A rM�
DATE: October 15, 2021
SUBJECT: BCRUA Board Meeting—October 20, 2021
ITEM: 5B. Consideration a resolution by the Board of Directions of the Brushy Creek
Regional Utility Authority,Inc.,authorizing the issuance of"Brushy Creek Regional
Utility Authority, Inc. City of Leander, Texas Contract Revenue Bonds, (Brushy
Creek Regional Water Treatment and Distribution Project), Series 2021";
establishing the procedures for selling and delivering the Bonds and resolving
other matters incident and relating to the issuance, payment, security, sale, and
delivery of such Bonds.
PRESENTER: Karen Bondy,General Manager
ORIGINAL EXECUTED DOCUMENT
TO FOLLOW...
DATE: October 15,2021
SUBJECT: BCRUA Board Meeting--October 20, 2021
ITEM: 5A. Consider a resolution authorizing the President to execute Supplemental
Agreement No. 11 for BCRUA Phase 2 Raw Water Delivery System, Bid Phase
Services with Walker Partners/Freese and Nichols Joint Venture.
PRESENTER: Karen Bondy,General Manager
BACKGROUND/JUSTIFICATION:
The initial contract for the design of the Phase 2 Raw Water Delivery System Project, in the amount of
$12,518,037,was awarded to Walker Partners/Freese and Nichols Joint Venture on November 28, 2018.
Since that time ten supplemental agreements have been awarded that increased the compensation to
$13,249,233.
Supplemental Agreement No. 11 includes engineering services for providing bidding phase services for
the Phase 2 Raw Water Delivery System Project. The Board voted to use the Competitive Sealed Proposal
(CSP) delivery method for this project. Under competitive sealed proposals, changes in the nature of a
proposal,and in prices,may be negotiated after proposals are opened.The project team will receive and
evaluate proposals and make a recommendation to the Board to award the project as a single
construction contract to the selected contractor.
FUNDING:
The total compensation for Supplemental Amendment No. 11 will not exceed $745,999 and will increase
the total compensation for Lump Sum tasks to $13,995,121. Funding for this Supplemental Agreement
for the City of Round Rock's portion will use Phase 1A project savings.The City of Leander's and the City
of Cedar Park's portions will use BCRUA's 2018 SWIFT Loan bond funds.This contract exceeds the Board
maximum limit of$500,000,and will therefore require separate consideration and approval by all three-
member city councils, before final authorization to proceed can be issued.
Staff and the Operations Committee(OC) have reviewed the attached amendment and exhibits,and
recommend approval.Staff and representatives of Walker Partners/Freese& Nichols Joint Venture will
be present at the Board meeting, and will be available to respond to any questions.
'WEBRUSHYCREEK
REGIONAL UTILITY AUTHORITY
A P.r[n.r.h Ip .1 Ced., Pa-h. leans+_ and A.—I k—,
SUPPLEMENTAL CONTRACT NO. 11
TO CONTRACT FOR ENGINEERING SERVICES
FIRM:WALKER PARTNERS/FREESE AND NICHOLS JOINT VENTURE ("Enzineer")
ADDRESS: 804 Las Cimas Parkway, Suite 150, Austin,TX 78746
PROJECT: BCRUA Phase 2 Raw Water Delivery System
This Supplemental Contract No. 11 to Contract for Engineering Services is made by and between
the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called
"BCRUA" and Walker Partners//Freese and Nichols Joint Venture, hereinafter called the
"Engineer".
WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the 28th day of November, 2018 for the BCRUA Phase 2 Raw Water
Delivery System Project in the lump sum amount of $12,518,037.00 for Engineering Services
excluding Task 5.3.1 Geotechnical Investigation; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 1 on April 24, 2019 to
amend the scope of services, specifically, Task 6.0, and to increase the compensation by
$75,496.00 to a total lump sum amount of $12,593,533.00 for a total project amount of
$13,697,291.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 2 on August 7, 2019 to
amend the scope of services, specifically, Task 5.0 Special Services, and to increase the
compensation by $42,348.00 to a total lump sum amount of $12,635,881.00 for a total project
amount of$13,739,639.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 3 on March 5, 2020 to
amend the scope of services, specifically, Task 6.0— Agency and Stakeholder Coordination, and
to increase the compensation by $47,000.00 to a total lump sum amount of$12,682,881.00 for a
total project amount of$13,786,639.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 4 on March 20, 2020
to amend the scope of services, specifically, Task 6.0 Agency and Stakeholder Coordination,
and to increase the compensation by $18,155.00 to a total lump sum amount of$12,701,036.00
for a total project amount of$13,804,794.00; and
. upp el menntaA2-ack17 434 Rev.03..'2011
0140.4634-47;00483708 215829
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 5 on May 28, 2020 to
amend the scope of services, specifically, Task 5.3.1 - Geotechnical Investigation, by reducing
the compensation by $256,761.00 and adjusting the total Time and Materials amount to
$846,997.00; and to reallocate $256,761.00 to Task 5.0 - Special Services and Task 6.0 -
Agency and Stakeholder Coordination, and to modify the provisions for the scope of services for
Task 5.0 by increasing the compensation by $24,212.00 to a total lump sum amount of
$12,982,009.00 for a total project amount of$13,829,006.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 6 on October 22, 2020
to amend the scope of services, specifically, Task 5.0 - Special Services, and to increase the
compensation by $27,985.00 to a total lump sum amount of$13,009,994.00 for a total project
amount of$13,856,991.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 7 on April 28, 2021 to
amend the scope of services, specifically, Task 5.0 - Special Services, and to increase the
compensation by $137,201.00 to a total lump sum of$13,147,195.00 for a total project amount
of$13,994,192.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 8 on June 7, 2021 to
amend the scope of services, specifically, Task 5.0 Special Services, and to increase the
compensation by $47,238.00 to a total lump sum of$13,194,433.00 for a total project amount of
$14,041,430.00; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 9 on August 17, 2021
to amend the scope of services, specifically, Task 5.0 Special Services, and to increase the
compensation by $25,000.00 to a total lump sum of$13,219,433.00 for a total project amount of
$14,066,430.000; and
WHEREAS, BCRUA and Engineer executed Supplemental Contract No. 10 on October 15,
2021 to amend the scope of services, specifically, Task 6.0 - Agency and Stakeholder
Coordination, and to increase the compensation by $29,800.00 to a total lump sum of
$13,249,233.00 for a total project amount of$14,096,230.00; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for basic
engineering services and to increase the compensation by $745,999.00 to a total Time and
Materials amount of$1,592,996.00 for a total project amount of$14,842,229.00;
NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract
is amended as follows:
1.
Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set
forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as
set forth in the attached Addendum To Exhibit C.
2
11.
Article 4, Compensation (2) Not-to-Exceed Sum and Exhibit D, Pee Schedule shall be amended
by increasing by $745,999.00 the not-to-exceed sum amount payable under the Contract for
Engineering Services, to a total not-to-exceed amount of $1,592,996.00 for a total Project
amount of$14,842,229.00, as shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental
Contract in duplicate.
(signature pages follow]
3
WALKER P RTN '
By:
Cli nt Manager
October 14, 2021
Date
FREESE AND NICHOLS JOINT VENTURE
By: - ---
Erin Flanagan - PrincipalNice President
October 14, 2021
Date
4
BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC.
By:
Nacole Thompson, Presi nt
C -..
Date
APPROVED AS TO FORM:
By:
UA Attorney
ADDENDUM TO EXHIBIT B
ENGINEERING SERVICES
GENERAL
The purpose of Supplemental Amendment No. 11 is to provide bidding phase services for the Phase
2 Raw Water Delivery System Project. Proposals shall be received and evaluated, and subsequently
the Project shall be awarded as a single construction contract to the selected Contractor.
BASIC SCOPE OF SERVICES
Task 1.0-Project Management.
1.1 Progress Meetings. Attend monthly progress meetings with Owner for a total of seven
meetings.
1.2 Project Administration.
1.2.1 Manage and coordinate staff resources, subconsultants, and project planning.
Conduct weekly team coordination meetings in person or by teleconference.
1.2.2 Prepare and submit monthly invoices and project progress reports. As a minimum,
monthly progress reports shall include a summary description of tasks completed as of
the report date, description of activities planned for the next 60 days,financial status
of the project, status of schedule for project, and identification of technical,
commercial or other issues which may have an impact to the overall project budget
and/or schedule.
Task 2.0- Bidding Phase. Assist Owner in advertising, obtaining, and evaluating proposals for the
Work. Prequalifying prime contractors and subcontractors is not included in this effort. The
Bidding Phase will be considered complete upon issuance of Notice-to-Proceed to the selected
Contractor or upon cessation of negotiations with prospective contractors.
2.1 Assist Owner in advertising for and obtaining proposals for the Work and, where applicable,
maintain a record of prospective proposers to whom Bidding Documents have been issued,
conduct one pre-Proposal conference, attend one site visit, and attend two rock core
reviews. Owner shall pay for advertisement of the Work and make the Contract
Documents available on CIVCAST.
2.2 Respond to Proposer questions. Issue Addenda as appropriate to clarify, correct, or modify
the Bidding Documents.
2.3 Evaluate and determine the acceptability of"or equals" and substitution of materials and
equipment proposed by prospective proposers, provided that such proposals are allowed by
the bidding-related documents(or requests for proposals or other construction
procurement documents) prior to award of the Contract for the Work.
2.4 Attend the Proposal opening, prepare Bid tabulation sheets, and assist Owner in evaluating
Bids or proposals including Alternate Proposals. Review the information in the proposals
1
and advise Owner regarding the interpretation of the information provided as it relates to
the selection criteria. Provide reference checks on key personnel from the information
provided in the proposal and review the qualifications of key personnel offered. Report
findings of the review of proposals and investigations to the Owner's selection committee.
Facilitate scoring of proposals by the selection committee and assist in determining which
proposal appears to provide the best value to the Owner based on proposals received.
2.5 Assist the Owner in coordinating and conducting interviews with the top two or three
ranking proposers. Assist in developing pertinent interview questions. Facilitate the
interview process and work with the Owner's selection committee to determine what, if
any, adjustments should be made to the scoring based on information obtained in the
interviews.
2.6 Compare prices received to the cost estimate to determine that the prices proposed are
responsive to the Bidding/Proposal documents. Identify cost difference if estimates and
prices are not within allowable tolerances for cost estimates. Provide information or
assistance needed by Owner during negotiations allowed under Texas Government Code
2269.
2.7 Prepare conformed bidding documents. Incorporate addenda modifications into the
drawings and specifications. Assist Owner in assembling the final Contract for the Work for
execution by Owner and successful Proposer. Prepare stamped Engineer's
recommendation of award letter and bid tabulation analysis. Furnish up to ten printed
copies of the conformed bidding documents, four of which shall be provided to the
Contractor.
2.8 Attend Owner Board and individual City council meetings to present a recommendation
of award of the construction contract.
2.9 Submit advertisement, all addenda, bid tabulation, Engineer's recommendation of award
letter and associated proposal to Texas Water Development Board (TWDB) to allow for
contingent award of Contract.
2.10 Consult with Owner to review contractor's certificates of insurance and other required pre-
NTP submittals for conformance with the requirements of the contract documents. Submit
executed contract documents and contractor's certificates of insurance to TWDB to receive
authorization to issue Notice-to-Proceed to the successful Proposer.
2.11 Assist Owner in selection of an independent testing laboratory to perform required
construction materials testing services.
Task 3.0-Stakeholder Coordination.
3.1 Assist Owner in the renewal of permits required by the Travis County Fire Marshal's Office.
Task 4.0-Additional Services
The following Additional Services are not included in the Scope of Services and will not be
performed unless specifically authorized by the Owner:
4.1 Preparing additional Bidding Documents or Contract Documents for alternate bids or prices
requested by Owner for the Work or a portion thereof.
4.2 Assistance in connection with Bid protests, rebidding, or renegotiating contracts for
construction, materials, equipment, or services.
4.3 Assist Owner in coordination of permit requirements between the Bidders,Travis County
Transportation and Development, LCRA, PEC, and the USACE.
4.4 Preparing additional drawings or revisions to existing drawings in response to Travis County
or other Stakeholder request, per the direction of the Owner.
3
ADDENDUM TO EXHIBIT C
WORK SCHEDULE
The Bid Phase will commence upon advertisement of the Project and will last for approximately
seven {7} months. Bid Phase terminate upon issuance of Notice-to-Proceed to the selected
Contractor or upon cessation of negotiations with prospective contractors.
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
ADDENDUM TO EXHIBIT D
COMPENSATION
Total compensation for services under Supplemental Amendment No. 11 is estimated to be$745,999
as shown in Attachment 1 to Exhibit D.
Owner shall pay Engineer for Basic Services set forth in Supplemental Amendment No. 11 on the
basis of Standard Hourly Rates as described in Paragraph 2.0 of Exhibit D.
Total compensation for Standard Hourly Rates tasks shall be adjusted from$846,997 to$1,592,996.
Total compensation for the Project shall be adjusted from$14,096,230 to$14,842,229.
s
&f v 5: n
W
F
N M
a
n
ti
W
R
r
rvw �ieM3l2Rm
$$ =ggg�$�e�ygmmm d
~ »N »N N N N N N N N M M N
m�m i
»
S
S
F n Ns..
1''1 111 11 1 1 111 t I I I it I I
c
nerl
g
71
1�"rvSSN.gnrvry
a T T
pill
MON
-
Q ����NN rv,n ti.N f1NN�NN Mri �.���NIVNNNrvnnrvrvn�n G�»OnMnntNVIH nNNn'
n�m
M
a.NM..a1..�u.1q]r.1b ...
.eN.x.lrl.n..r o.1..,•1.1.1.•w..... �. , m.1e
� ..,b.. ! Attachment 4 to Exhibit D( NI tads)
e.r.•er.1 r.f••nn1 m na
T.r.
•..r« ..� �� ..... �....,..+ M..w. ..... .....�. ...n. �.� r.... � w�or• �..� mow. ......-.. a...... �...,. ww �� a.� TM.I1rw
r M.er rr o..vq.e .. .w w ...�..� .quo evc r� .�.a .r1n.. ..1w.. _—_ '^'►.-..'^F.- �m ..�.yi *..... r.ua err ono r.rrwr. �
s7m a+5] llao vea H.1 1rN STI �/laf � Sia] iV1 '/dee sun us] vel •IM /A. fIn/
e1y�.ey�q A } owl
� S] bee �ti— �I�10 M 10 16 } aTa
A 1111YrMd N 1n !
21 g� 1] 6 6 ` 11 1] 1222
m ! UIS7
N e. • r 1 x +f r ! rola/
]J eis rwwrnlp+�nr_ ]0 ]. t] ro r fe ! 11.11
—fra m
O�wn.�Oy Msd�"IR_�wnw!!►Cw + N 12 e iF Ii }
Zi rs •wwcawv` ,..a: T s
]w a.ie f.1m rew.' f
w.wr w.a f
s
!
IM •! 1. 1] y M M N i
Th/ / 1 1 111. / 110 / 1 f 1 •0 • nu1 } r i } f t 1 l IN
f 1NoeMp�]•wwr DlwYr•Ire1..._Wrlaew 1W�aw.]M.�w!e >Rar
.I-..R:.,r.r.D.lWWYSYU— -. w Attachment 1 to Exhibit D
T
iw.rr .r.u. rr o�ewn ,.mow ww wr. wr eaw l.,..0 aalr.ra e.vvlweN Bo<a•Bw.pp....lr., OxY w.n
Ib ni Bew l.p nl
e
u ss eeerre..r e
to e..e �w.wi.w,we�. w m e
"ie ere e
(rwrl�wew�\�r.rr Prb�.n 4 _ e
ie
--------------
,. ...w�ewws�rrr.r ,w,err
u e,wr,w.o..w,r e
e
,
v
a
L
x
W
0
c
v
E
533
s
s _I_
i
! It1 IIISI .I I h I Jill