BCRUA_R-22-08-24-6C RESOLUTION NO. R-22-08-24-6C WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into a Contract for Engineering Services ("Contract") with Walker Partners for the BCRUA Underwater Pipeline Replacement Project, and WHEREAS, Walker Partners has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the BCRUA desires to enter into said Supplemental Contract No. 1, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY: That the Board President is hereby authorized and directed to execute on behalf of the BCRUA Supplemental Contract No. I with Walker Partners, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of August, 2022. ANNE DUFFY, Presiden Brushy Creek Regional Uti ty Authority ATTEST: � NA'CO)LE TI IOMPSON, Secretary 01304614-A,4979-8042-9101 e :e7Z BRUSHY CREEK RFGIONAL UTILITY AUTHORITY A • l Cadar P ii,na.- ♦.i■ I .,..-1 l., , SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WALKER PARTNERS (44Engineer") ADDRESS: 804 Las Cimas Parkway, Suite 150 Austin TX 78746 PROJECT: Underwater feline Replacement , This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA" and Walker Partners, hereinafter called the "Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the"Contract," on the 26th day of January, 2022 for the Underwater Pipeline Replacement Project("Project") in the amount of$277,645.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the Project compensation by $81,966.00, adjusting the lump sum amount from $214,855.00 to $279,593.00 and the maximum amount from $62,790.00 to $80,018.00 for a total Project compensation to $359,611.00; and NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: 1. Article 2 Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II_ Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing the lump sum amount payable under the Contract from $214,855.00 to a total of $279,593.00 and the maximum amount payable from $62,790.00 to a total of$80,018 for a total Project amount of $359,611.00,as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract E• WRITwRev.0312011 0140.4634-56;4889-8560-8749 215829 WALKER PARTNERS By: Date BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC. By: Na'Cole Thompson, BCRUA President Date APPROVED AS TO FORM: By: Stephan L. Sheets, BCRUA Attorney 1 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The Project consists of final design of a parallel pipeline from the Phase 1A underwater pipe manifold to approximately STA 14+63. Design initially assumed the use of HDPE pipe. Transient analysis conducted during design of this alternative predicts vapor pressure in the HDPE pipeline if power is lost to the floating pump station with six pumps operating. Accordingly, the use of ductile iron pipe (DIP)is required to maintain positive pressure in the underwater pipeline. Supplemental Amendment No. 1 is required to redesign the underwater pipeline using this new basis of design including the addition of a controlled venting vacuum relief valve on the Phase 1A raw water pipeline on Trails End Road at approximately STA 177+00. BASIC SCOPE OF SERVICES Task 1.0-60 Percent Design Submittal. Prepare drawings and specifications at a 60 percent level of completion showing the scope, extent, and character of the work to be performed by or furnished by the Contractor. 1.1 Prepare construction drawings to a 60 percent level of completion. This level of completion shall advance the drawings to include the following: cover sheet,sheet index, general notes, abbreviations and symbols, overall site piping plan, connection plans, and plan and profiles. 1.2 Prepare specifications to a 60 percent level of completion. This level of completion shall generally include the following:table of contents,select front end documents, and specifications for work related to major project elements. 1.3 Prepare a 60 percent design opinion of probable construction costs(OPCC). Contingency shall be set at approximately 20 percent for total project costs. The 20 percent contingency is within the recommended contingency range for a Class 2 estimate based on the guidelines set forth by the American Association of Cost Engineers for a design with 30 to 75 percent project definition level. 1.4 Submit 60 percent design documents to Owner for review. Incorporate Owner comments into subsequent submittals and provide written responses to review comments. Task 2.0-Special Services. Prepare deliverables for the following special services required to facilitate the design of the Project and development of bidding documents. 2.1 'transient Evaluation. Perform additional transient analysis for the following two strategies. No further transient analyses (beyond what has already been completed)will be performed for the originally proposed 36-inch diameter HDPE underwater pipeline (i.e., Strategies 1 and 2) between approximately STA 0+47.09 (i.e.,just downstream of the underwater hose manifold at the Floating Water Intake, existing pipe stationing) and STA 14+50 on the existing DIP underwater pipeline. Evaluation of the following two strategies will also consider the need for additional controlled vacuum relief valves on the Phase 1A pipeline. 813/2022 01 Fen Partners engineers * surveyors 2 2.1.1 Strategy 3—Install a new 36-inch diameter HDPE underwater pipeline between approximately STA 0+47.09 (i.e.,just downstream of the underwater hose manifold at the Floating Water Intake, existing pipe stationing) and the 36-inch DIP upstream of the meter vault (i.e., or if necessary, all the way to the 78-inch diameter Phase 1, Contract 1 Pipeline). The proposed pipeline would be parallel to the existing DIP pipeline. 2.1.2 Strategy 4—Install a new 36-inch diameter Ductile Iron Ball/Socket Joint underwater pipeline between approximately STA 0+47.09 (i.e.,just downstream of the underwater hose manifold at the Floating Water Intake, existing pipe stationing) and STA 14+50 on the existing DIP underwater pipeline. The proposed pipeline would be parallel to the existing DIP pipeline. Task 3.0-Land Acquisition. Acquisition of a temporary construction easement on Trails End Road for the addition of a controlled venting vacuum relief valve. 3.1 Survey. Perform surveying services to verify and recover existing project controls. Horizontal and vertical datums for project control will remain on NAD83/NAVD88 Texas State Plane, Central Zone. Perform boundary survey and prepare exhibits and field notes for the temporary construction easement. 3.2 Acquisition and Right of Way. 3.2.1 Research official public records to update ownership and provide vesting deeds to surveyor. 3.2.2 Submit request for authorization to make offers. 3.2.3 Prepare and send the letter transmitting the Landowner's Bill of Rights by Certified Mail-Return Receipt Requested (CMRRR). 3.2.4 Prepare documents required on forms approved by Owner (i.e., the initial offer letter, memorandum of agreement, instruments of conveyance). 3.2.5 Maintain follow-up contacts and secure the instruments necessary for the closing upon acceptance of the offer. 3.2.6 Respond to property owner inquiries verbally or in writing within two business days. 3.2.7 Cause the recordation of original instruments immediately after closing at the respective County Clerk's Office, except for donations, which must be forwarded to Owner for acceptance by the Owner Board prior to recording. 3.2.8 If negotiations are unsuccessful, obtain an appraisal report and send a final offer package to property owners by CMRRR. 3.2.9 Prepare and provide to Owner a memo requesting condemnation proceedings using information from the Title Commitment and other available sources to join interested parties. 3.2.10 Maintain parcel/easement documents and transfer permanent records to Owner. Maintain records of payments to property owners and copies of correspondence 8/3/2022 (6)Walker Partners 3 3.3 Appraisal Services. If negotiations are unsuccessful, prepare an appraisal report for each parcel/easement to be acquired. Reports will conform to the Uniform Standards of Professional Appraisal Practice as promulgated by the Appraisal Foundation. 8/3/2022 (6)WAer Partners PRrc i St cveyrjrS ADDENDUM TO EXHIBIT C WORK SCHEDULE The assumed overall project schedule is approximately 8 months from notice-to-proceed based on 60%, 90%, 100% design, and bid phase durations of 2 months, 2 months, 1 month, and 3 months, respectively, and subject to regulatory agency approvals. 8i3/2022 @)WAer Partners r ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page ADDENDUM TO EXHIBIT D COMPENSATION Total compensation for services under Supplemental Amendment No. Z is estimated to be $81,966. Total compensation for Lump Sum tasks shall be adjusted from $214,855 to$279,593. Total Compensation for Standard Hourly Rates (Task 7.0 - Land Acquisition) shall be adjusted from $62,790 to$80,018. Total compensation for the Project shall be adjusted from $277,645 to $359,611. 8/312022 @)WAer Partners engineers + sur:,eycrs »IN N N NM NIN Mlwl NM N N M N S F V 4 T1 Lu a Jim ' q x— I SI � V Fi E IF 11 g i ilia �JIIL.�t I a�}..' q o f ,oil+ rk# & !e■ � . \�\ ` |k !| ! | . .I - .. ..--� ---- -- -- -- -- ------- - a | - ! . | . . | ! e � ! (ƒ ! ` s - r � ■ ! . f I gg!! SAS Yq� 3� n N 1 p i tic�n m S M W 9 Y_ Y I N ORIGINAL EXECUTED DOCUMENT TO FOLLOW... 016 w,RBRUSHYCREEK REGIONAL UTILITY AUTHORITY r, ,rna•ah p of C-Oar Pa ry, 4a a.4 or. a+t M*. .• M446: SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WALKER PARTNERS ("Engineer") ADDRESS: 804 Las Cimas Parkway, Suite 150 Austin TX 78746 PROJECT: Underwater Pipeline Replacement This Supplemental Contract No. l to Contract for Engineering Services is made by and between the BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., hereinafter called "BCRUA" and Walker Partners, hereinafter called the "Engineer". WHEREAS, BCRUA and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract,"on the 26th day of January, 2022 for the Underwater Pipeline Replacement Project("Project") in the amount of$277,645.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the Project compensation by $81,966.00, adjusting the lump sum amount from $214,855.00 to $279,593.00 and the maximum amount from $62,790.00 to $80,018.00 for a total Project compensation to $359,611.00; and NOW THEREFORE, premises considered, BCRUA and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing the lump sum amount payable under the Contract from $214,855.00 to a total of $279,593.00 and the maximum amount payable from $62,790.00 to a total of $80,018 for a total Project amount of $359,611.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, BCRUA and the Engineer have executed this Supplemental Contract in duplicate. �eJ44a—e 22,-OZ - Supplemental Contract Rev.032011 0140.4634-56;4889-8560-8749 215829 WALKER PARTNERS By: Aa on Archer- Vice President 8/5/2022 Date 2 BRUSH41,� 1 L UTILITY AUTHORITY, INC. By' "RU resident Dat APPROVE S TO FORM ByL di Stephan .. Sheets, BCRUA Attorney 3 1 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES GENERAL The Project consists of final design of a parallel pipeline from the Phase IA underwater pipe manifold to approximately STA 14+63. Design initially assumed the use of HDPE pipe. Transient analysis conducted during design of this alternative predicts vapor pressure in the HDPE pipeline if power is lost to the floating pump station with six pumps operating. Accordingly, the use of ductile iron pipe(DIP)is required to maintain positive pressure in the underwater pipeline. Supplemental Amendment No. 1 is required to redesign the underwater pipeline using this new basis of design including the addition of a controlled venting vacuum relief valve on the Phase IA raw water pipeline on Trails End Road at approximately STA 177+00. BASIC SCOPE OF SERVICES Task 1.0-60 Percent Design Submittal. Prepare drawings and specifications at a 60 percent level of completion showing the scope, extent, and character of the work to be performed by or furnished by the Contractor. 1.1 Prepare construction drawings to a 60 percent level of completion. This level of completion shall advance the drawings to include the following: cover sheet,sheet index,general notes, abbreviations and symbols, overall site piping plan, connection plans, and plan and profiles. 1.2 Prepare specifications to a 60 percent level of completion. This level of completion shall generally include the following:table of contents, select front end documents, and specifications for work related to major project elements. 1.3 Prepare a 60 percent design opinion of probable construction costs (OPCQ. Contingency shall be set at approximately 20 percent for total project costs. The 20 percent contingency is within the recommended contingency range for a Class 2 estimate based on the guidelines set forth by the American Association of Cost Engineers for a design with 30 to 75 percent project definition level. 1.4 Submit 60 percent design documents to Owner for review. Incorporate Owner comments into subsequent submittals and provide written responses to review comments. Task 2.0-Special Services. Prepare deliverables for the following special services required to facilitate the design of the Project and development of bidding documents. 2.1 Transient Evaluation. Perform additional transient analysis for the following two strategies. No further transient analyses(beyond what has already been completed) will be performed for the originally proposed 36-inch diameter HDPE underwater pipeline (i.e., Strategies 1 and 2) between approximately STA 0+47.09 (i.e.,just downstream of the underwater hose manifold at the Floating Water Intake, existing pipe stationing) and STA 14+50 on the existing DIP underwater pipeline. Evaluation of the following two strategies will also consider the need for additional controlled vacuum relief valves on the Phase 1A pipeline. 8/3/2022 Fenalker Partners gir}eers * surveyors 2 2.1.1 Strategy 3—Install a new 36-inch diameter HDPE underwater pipeline between approximately STA 0+47.09 (i.e.,just downstream of the underwater hose manifold at the Floating Water Intake, existing pipe stationing) and the 36-inch DIP upstream of the meter vault (i.e., or if necessary, all the way to the 78-inch diameter Phase 1, Contract 1 Pipeline). The proposed pipeline would be parallel to the existing DIP pipeline. 2.1.2 Strategy 4—Install a new 36-inch diameter Ductile Iron Ball/Socket Joint underwater pipeline between approximately STA 0+47.09 (i.e.,just downstream of the underwater hose manifold at the Floating Water Intake, existing pipe stationing) and STA 14+50 on the existing DIP underwater pipeline. The proposed pipeline would be parallel to the existing DIP pipeline. Task 3.0-Land Acquisition. Acquisition of a temporary construction easement on Trails End Road for the addition of a controlled venting vacuum relief valve. 3.1 Survey. Perform surveying services to verify and recover existing project controls. Horizontal and vertical datums for project control will remain on NAD83/NAVD88 Texas State Plane, Central Zone. Perform boundary survey and prepare exhibits and field notes for the temporary construction easement. 3.2 Acquisition and !tight of Way. 3.2.1 Research official public records to update ownership and provide vesting deeds to surveyor. 3.2.2 Submit request for authorization to make offers. 3.2.3 Prepare and send the letter transmitting the Landowner's Bill of Rights by Certified Mail-Return Receipt Requested (CMRRR). 3.2.4 Prepare documents required on forms approved by Owner(i.e.,the initial offer letter, memorandum of agreement, instruments of conveyance). 3.2.5 Maintain follow-up contacts and secure the instruments necessary for the closing upon acceptance of the offer. 3.2.6 Respond to property owner inquiries verbally or in writing within two business days. 3.2.7 Cause the recordation of original instruments immediately after closing at the respective County Clerk's Office, except for donations, which must be forwarded to Owner for acceptance by the Owner Board prior to recording. 3.2.8 If negotiations are unsuccessful, obtain an appraisal report and send a final offer package to property owners by CMRRR. 3.2.9 Prepare and provide to Owner a memo requesting condemnation proceedings using information from the Title Commitment and other available sources to join interested parties. 3.2.10 Maintain parcel/easement documents and transfer permanent records to Owner. Maintain records of payments to property owners and copies of correspondence $,3,2022 QWalker Partners engineers * surveyors 3 3.3 Appraisal Services. If negotiations are unsuccessful, prepare an appraisal report for each parcel/easement to be acquired. Reports will conform to the Uniform Standards of Professional Appraisal Practice as promulgated by the Appraisal f=oundation. 8,3,2022 O'Fen alker Partners gineers + surveyors ADDENDUM TO EXHIBIT C WORK SCHEDULE The assumed overall project schedule is approximately 8 months from notice-to-proceed based on 60%, 90%, 100%design, and bid phase durations of 2 months, 2 months, 1 month, and 3 months, respectively, and subject to regulatory agency approvals. 81312022 @)WAer Partners engineers t surveyors ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page ADDENDUM TO EXHIBIT D COMPENSATION Total compensation for services under Supplemental Amendment No. 1 is estimated to be$81,966. Total compensation for Lump Sum tasks shall be adjusted from$214,855 to$279,593. Total Compensation for Standard Hourly Rates (Task 7.0 — Land Acquisition) shall be adjusted from $62,790 to$80,018. Total compensation for the Project shall be adjusted from $277,645 to $359,611. $,3,2022 Walker Partners v engineers * surveyors ### . 2 !e■ | 2 W ! # o � `. ||| . t . . A |� | � #■§§ � . � , ...m . _. 4 <cL �| |.| ... ..;.. .... _� .. .... ....... . � § | ■■;; n .2§ | � & - � , -■ | I � � - -- - -- ,� | ■ | � ! r ■I | ! ■■ ■ § | � § � � &|ik|9 | || � � _:::�==2;�--2 �®| �„■ ;:;2 ■ ;=:=: _• a LL O b 4 4++ a n W g "l 8 "4 » N M O M g 4 K a S ��a F n N F ' N 9 x zs 3 lit sit a G_ Q_ r3..N g NNNn N N m Q N W O^ N qR^N R^ N n R Q o N n N O w ee�� �/+Nnn O� � Nh�p�p m c I� mm O m90 ### $ IS■ !;q |� |.! � g! f■ , Ei§ �| � — - -- -- \ § _ � | | ■ � I � ■ ! �| k | ■ 2 ! © ! � !� I,f �f!!{�7l� � It T ! -,_.��� .��.- ;;:2==|;,=:a ■;;:=___ DATE: August 19, 2022 SUBJECT: BCRUA Board Meeting—August 24, 2022 ITEM: 6C. Consider a resolution authorizing the President to execute a Supplemental Contract No. 1 for Engineering Services with Walker Partner for the 36" Underwater Replacement Pipeline. PRESENTER: Karen Bondy, General Manager BACKGROUND: In January 2022,the Board approved an engineering services agreement with Walker Partners to design a replacement pipeline for about 1,500 feet of the 36-inch diameter underwater pipeline that failed in December 2020.This pipeline delivers water from the floating intake barge on Lake Travis to the water treatment plant. Design initially included the use of a polyethylene pipe material for the replacement pipeline. However, pressure studies conducted during design of this alternative determined that this pipeline material would not withstand the pressure surges if power were lost to the floating pump station. The use of the higher strength ductile iron pipe is required to prevent damage to the underwater pipeline.Supplemental Contract No. 1 is required to redesign the underwater pipeline using this new basis of design, including the addition of an air venting valve on the raw water pipeline on Trails End Road. Services include additional design, land acquisition, and transient pressure studies. This Supplemental Contract increases the Project compensation by$81,966, from $277,645. It adjusts the lump sum amount from$214,855 to $279,593 and the time and materials amount from $62,790 to$80,018,for a total Project compensation of$359,611. FUNDING: Funding for this contract will be from the unused TWDB loan funds or local funds. Staff and the Operations Committee recommend the contract for approval, and will be available, along with representatives of Walker Partners to answer any questions during the meeting.