Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BCRUA_R-22-10-26-6C
RESOLUTION NO. R-22-10-26-6C WHEREAS, the Brushy Creek Regional Utility Authority, Inc. ("BCRUA") has previously entered into a contract ("Contract") with Thalle Construction Company for the Repair of the 36" Underwater Pipeline Project; and WHEREAS, the BCRUA has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided; and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY, That the Board President is hereby authorized and directed to execute on behalf of the BCRUA, Quantity Adjustment/Change Order No. 1 to the Contract with Thalle Construction Company for the Repair of the 36" Underwater Pipeline Project, a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The Board hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of October, 2022. ANNE DUFFY, Presi n Brushy Creek Regional lity Authority ATTEST; 4 AN� - . NA'COLE THOM ON, Secretary 03304634-A•4874.2517,63781rmc Change Order No. 01 Date of Issuance: 10/25/2022 Effective Date: Project:SCRUA 36-Inch Underwater Pipeline Repair o-ner SCRUAowner's Contract No.: Contract: ate of Contract: September 8,2022 Contractor Thane Construction Co., Inc. Engincces Project No.:3-00821. The Contract Documents are modified as follows upon execution of this Change Order. Description: Permanganate Feed System Improvement Attachments:(List documents supporting change): Permanganate Feat System Improvements CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: _ Original Contract Pricr. Original Contract Times: ❑ Working days x Calendar days Substantial completion(days or date):10/8/20 $1.601.668.35 Ready for final payment(days or date): 10/8/2022 [Increasel[Decreasel from previously approved Change Orders [Increase] [Decrease]from previously approved Change Orders No. to No.______. No. _ to No. Substantial completion(days):N,& Km Ready for final payment(days):N,& Contract Price prior to this Change Order. Contract Tunes prior to this Change Order. Substantial completion(days or date): 10/8/2022 $1691&68.35 Ready for final payment(days or date): 10/8/2022 [Increasel[Deeressel of this Change Order Increase of this Change Order 53 days Substantial completion(days or date): 11/.30/2022 $167,885.99 Ready for final payment(days or date):11/30/20 2 Contract Price incorporating this Change Order. Contract Times with all approved Change Orders: Substannal completion(days or date):111301202 St-769-554,34 Ready for final payment(days or date): 11/30/2022 RECOM.N11' 'DI{D: ACCEPTED: ACCEPTED: By: By: By: ].ngi ter(Authorized Signature) Owner(Authonzed Signature) Contractor tAuthonzed Signature; Date: Date: Date Approved by Funding Agency(if apphcable}. NA Date:N "A00 A I s I A I s + I r r I I I u w N s s S Ae►f 0•/7pKDliL warAxQ? 1lrelf m arlrrwawlc rp'/Kr11mY rvrrs r• M 00 Lf .,Ax7 er►rs WAGE W V r. new yr Aorla+w Loovc.co.TRACMaero r On aFncr,W.0m L nNVARV M7m a 1CnwrAL S e we0wr AerA rwmrr o al/a[vaenoKr•4komcme ar.POW ON rear oanwowr m ran rwv L04] m DOW lar[Inane eerrrr al/aG nlltr./was AAp/DWMt Arr/�AK eaVarrrwla{vawr m AprT) x•. wM Ara earl eatl fGrK i; 1 GENERAL NOTES IV MUM a ww WFW,4a rM . aear m 7omr rm Orl[i/U1eOwr AIrA treat m lKwrIDIC m sr. xl x oolm 10 enAll ALM caw mums wM awar m FXEA MGo=M eaters ARt" ran omaMf r AWA r area war/Dior eel er rasaem. WIN QaQ MMr aMR Y - '4 a w 841FAQ FM.pv Ar0/dr lf mwiq.r a ICAt LWfAMa �Ei'LAQIaiT 2M iWrArlm MM { r_ PM FAM".AS OUALM we Imo!"W aM ft"eG'p 9W2R ' _`�_-.- �=~'`W. SOfARM �NO At•ISrA11 J14'WC wG/at LKS CAN.91AIL t mov P/tM r10.f A aPf Poorerar balm ApwAe Arlo AeiprAllm, _ ; I AW MF . PAL ear Mr1nIrCrO i /tart FYI/[ ae w woa—.r►A AArlaaMr E SCROeK AT AelO At-=NLWw \ wYhtlt E/Ntl LDM D_M AMM �\ `\ lar. w/a•+ef /re p■ ' \ . i'� ©Walker Partners R % eng:neor/I surveyors \\ BRUSHY CREEK REGIONAL UTILITY AUTHORITY PERMANGANATE FEED _ �mKe� AAW.0 \ `.� SYSTEMIMPROVEMENTS \ OVERALL SITE PLM e — ales AW lMa ,a Al I OVERALL SITE PLAN waw as w. rC-1 I I >• I t I s I a 1 s 1 t f 1 * I u -- rws�ruEars -- n O�,MC _ uurEn l s t • �•�..� ,.�■� GENERAL NOTES 7•rr;�r: -� .woftc owi rrF+n+r No sswarrs KEY NOTES cmftuswE,n --� ■, 1 r AD41 LU s.V ee+c4aFaRl'm _ • AX Atl~ vrsrnvtr of usrrD r[Mvwcv n.vr fYt®r« - { WY IrOtR AflgYAl. a NLD/FOCSS 1\ VLS YI.C.-1 K 2...= xr� APIND * 1 CL�MAR ON owee rw mpowa i � � ruevD npNsva�paem i F,LGrrrCN MFIWC�i !w MN dRn rD,K lr11F[ � ,�i t 1� G ••�"Ct 4 4 1'1 •1 OMIBHOM mcm ``\ `•\ w r1104rM 4l Aow CWF ID x KWGIME - \ D \ \ 3 �VVaIker Partners ♦ry4�afpdf 1 OLrveyor$ \ \ BRUSHY CREEK REGIONAL \ UTILITY AUTHORITY \ PERMANGANATE FEED \ SYSTEMIMPROVEMENTS $ff 1.2 p— \ YARD PIPING PARTIAL PLAN e NLS �•\ r,ern Al DI YARD PIPING PARTIAL PLAN C-2 4 rt 1 ! 7 . S { i 1 1 10 11 0 11 N N SR*RDJW AF l ofCilfdl arts i1vl Ie110 ' IFKI A 177.0 GENERAL NOTES I. AS-S=A Oonarm AILS Y OOOW AM MMMAMI COMM KV=jt r K NSrAUM MWED AW ROM CAD"OW PACL�AM Wk� MIF b FAWTAI7 M7rA IM a DE tor[N•MUNT 91Q NMI W VISW f•/f•/f/•/�• //� _� �..�`` -•+1 QrAW&.Mr s'PIC MW AM/'•RM -ti •••f/f• MM111fAIr0T �NYOCiAR RD.•r6 pr N A/P•OO41F - f�f i 910 nK Ar H 7Onl n Ier.O 't • • / If 1: 11 Y• 1 i N. a 1• l 4/ 1 � F 1 rACWV E `y.\ `\ awxclOu roll �'\ ®V�alkerPartners `\ �{ anglnae rsl su rreyors \ I`( BRUSHY CREEK REGIONAL \ \, UTILITY AUTHORITY \ \ PERMANGANATE FEED \ SYSTEM IMPROVEMENTS \ EROSION d SEDIMENTATION OONTROLPLAN �r— Adl TFG A Al I PLAN >�•..,.. - IrNY SCO�A7 ri {A.1'r2F 1 cm-1 1 2 4 r 1 S 10 11 17 I] 7A , r I s I l I s I r s + KAfCwi./wc El Ion n.15.AaI.w .ea.w wnwoll• Y yrc qa.- a TFAMN CROS SECTION SILT FENCE AP9wL rmp itr/4RX lPW[D a6affw!10 M,.aO1ML Pwryti.!Ol'1111.R MIO O.lal IafJn1011S 0 OCIOIYM[0 N On v vOM rinll aO�+laN'SS YWl l,twC EIIT i/'aatD SM[IT fM W ql 17td w16R. 1 1RAA=9x M���t.oQ ww�a K w{rym o`a asn alai i wwr wp R PAW W a 1/rw v tt.m.fiw IR R/14.5 � R w.olm w wlw•./r"r a rew.o,.w4lel,xis wwl M ppialpS raOr v tl[,w41 w Mt s.OnOCOI.a N n[uw v MQIr wQ owl!PIR,woo r rNml�wan r/wOG.w wIM app Aw/4 W VwLL Rf tp IIWn.IAO W44 rpa[.+aClp p.plSiMYi R V,O CIGi.110 MOOYLDim�� � I Ill.OSS f9Y4i R wwanT IaYm w riw aap nwor roar v m a0np.w.wq.�w TPM M.LTSO R ni rlm IML IOw. a rriw Y wl�Na OOw uw wiww p afIV040n iNl K IW[.tlVll Y�10m. wlam.a n�rrt a mwamT arse le r im A iA4,pt Yom[POIM npi P PMYnOL/OWMM,m il,YWL w _ � ooip we n w:,oas a IVO.5•btl LI 'vYmn K'a'�vtl�wrt r0 r fIP.a wrnl ai m ww6,P i!1/1= H _ LI YS F011 PN,nw wraolnL a a e G 1 I SILT FENCE G4 NOT USED G8 I NOT USED Ws wn wn i -- — L M*51 I� r r� la RYfe"T 111f91 K CON Z nll YwwwY — .» -- ©'Malker Parmers eng neers I s4rvayars s ta.l r BRUSHY CREEK REGIONAL £ wN• . ... •�x UTILITY AUTHORITY } c rJA=R pwx= PERMANGANATE FEED SYSTEM IMPROVEMENTS 1.wYwt. .w+Ner nw.www.�wwwww w w w r I awl"°Oa'Nwp wYlww STANDARD CIVIL DETAILS ti� �wr "1011 was mwP r 11111 wwwM"wrwalwapwi p MAwl.wi wMww4l1 O�MN Mw h14 ♦MI's'YI nr fPwIIMI RwiPpl�wg�Ya1 A b41[IOww , �� � • wwwwa�awl aiP//lOYll YYii w.r �+ 4w•elti� I�w,r,siret K�w�/aeswre.wwa 1+M7 _ mww aMw w.w. —s1r OMVW CWnM LPGs M-40M K V WTi SIM"IM r{W[P.W K d I awl " Al NOT USED A5 NOT USED q8 EROSION CONTROL LOG q12 I NOT USED .4 wrs wrs CZ-1 3 i I I ► 1 ,6 „ ,7 '3 Y 1 S i ! q 11 17 13 % GENERAL NOTES r r ir�iin+tar rsr suu aE aaz+Mm near Msa7 w10 nu sat AW num.slat 10 nrerme ra<rsr�' r erc 1,c f7m tM[Awa 0MC9 war _ r,r s/.•aaresn�ars Iln�e eerrr+c on L Dean =AWA Rl W-ON MOM nwr rat ecrrrrra AM bA r cNram mmr MUD"EMIM MW� K n.elMe APOIC S W kVF=AM LW IW I W7W Aro SmrrCrm� rd b aff m YF arM a-- ri — rout ara+as owrsr l am mr or ow .r nx u .>»r ecru re.rnr �anM• sQ WYM tan.rraM.e nrwc arr�Ks n a r e®e tree wr nor x sm rdrr. r ttr Wlt e en uMrrru wa $ a ©V�alker Partners engineers i surveyors BRUSHY CREEK REGIONAL UTILITY AUTHORITY PERMANGANATE FEED SYSTEM IMPROVEMENTS SCHEMATIC PROFILE e 7A'R �r— JMa mp Al I SCHEMATIC PROFILE > aMMlnpp M-1 + 7 I 7 I 4 5 e I r e i w 11 13 13 u r P m m u n I M. „� GENERAL NOTES 10 NUMA70ft mo m w AW OX -was MVCM 3, w loom rwc m i Comm ra Art K KEY NOTES e. ,'_}a kc Cr.rsr�aM sC.n CM BMW a ®gymodea rrrr,*A**W s+"M to manor eswa m e roorvan TO O.5Ir6 CONED MM tura b4 3UPPOr= i soros wa Mm�Tm UM0M V.A ver m"MP9 T u {/Mnl nTrwa TO,Ma w NSf.Ylc IR P �" CKLICK ' u1�COMp11rIFln nP[MD� L M�mawu�ON FC r c rLitolo.POW MOUTIC.or u4 'W'Ttt % SVI/Q1On AT NO ADDFnc 1 COST ro C"KML ' - r•M1e n mownwr mOft rta lML Mar=1W6 wn+ "-a Moro uronm w snsaa+CM son- ro aiwma k eo,ruamM nus w s,MrgM rmwr i I sar,wC wct tCssKCr+oM Ta. w ' n[crroM rover .� ns II11[CIgM� nliC+W� I M�IrOyJ ~- w[C+wJ _ { I Ml SM-tt4Nr-wYF M•+I'+r& I ©VAlkeir Partners ■ng n•♦.i i surveyors r. BRUSHY R TIYRURYUILTATHOII J PERMANGANATEFEED SYSTEM IMPROVEMENTS BCRUA RAW WATER INTAKE BARGE EQUIPMENT LAYOUT PLAN e =em �A .w a r.o,w.w..• room=ot Al I PLAN s"* arw+r.a»o �M' „ MA-1 4 _ r r7 14 !9 T7 17 a w GENERAL NOTES $3.m r $m ODOM Koro KEY NOTES K f.\ Q !FFWC!Qf Y4�!EOR IQl IMI]. l)Y, Mort COMWOMM Un/BY[ V V MIO V MEL fVmM M X00[LIES mm tomos)us HM LIES Noah wimi l pom To a mpm3sm TEES w ftMO p PW TET;MO KTMEEM CMrsl®OM Im M rr rm.PW TOES Mq own cow xno N Try fflMr M �rover Ta Oawamrcv+rcnw xMrr n � (TrPI P F1 I SECTION F11MX1(SIM) F1O NOT USED E rIu ytEA,M•.rc-lM/t aff.rsmv ori ,. AM ruawls. rm o (OWN" M)Aft" 1%'PQKMAL�t QQ9 GQQrt I S`fVQyGfC r�'GK EYMKt .o..�• TO��'�,W ON� BRUSHY CREEK REGIONAL r (VW)pL TM1![!( I V b UTILITY AUTHORt Y I Sao¢aQr/cu r®&V.aE'uI[3.rsbe�t sarn.rdr Est M aCMM eARW aaroxO6716a +w'MMMMW lva.cw PM Mb SPM40 lMK ro K OMWO"ANO PERMANGANATE FEED 3 JA,Pa�nr abrx mW Aw s'uw La 9.aa K mmua As ac SYSTEM IMPROVEMENTS corEO JM"t ra[(Mo AMU Mau NAM WrKM aortal CWarM MW AW SCRUA RAW WATER INTAKE 6ARGE riOR4 a5/ALxp N W a vA=r4M Pawr Tai a/O a Amiew A m awm 5..w OltwM rrm 9w LCs waK MD$ A Paaa¢a J/!'M4WKM 80r +M AM MA4 r s K xirA AS arc casr/ra aaaw fwS am"rove a/sMKc LAQaI �, EQUIPMENT SECTION R DETAILS cwwAo=MW Lw lw sun"Me RAW KTMmr/K[T:rcM r Tram car Mowi-MV CAQrEIr APE A'GPM cAmw ME me GMmr/It Y FMMLONAMC AKIMl.1rRM a aorto.r®•aPAK 1Q0 111Ks+r MOSQ.Iu.AMWAII 9Aar aF C n..D r m"Alp N.¢GnKcr Poe nm OtPtAaE MME (ata Mar RSM!) mo Mor vaxm) — Mom wx wM arm POrA r MI raoraa P=M-M 1 rMnu� YAM W- J/0 PQ,rnMalt alF]rDt F>m NO 9rAK EAU Vl K M MVM AS W S aMSTIXa J/4'MW M W tQXW l cion AW~7 L M M/errowa A.n RYC6[4 axrMsars Icor LL(W w"Sm YNa)trim.m/TAO ftA ow R MO ftu Da+d AOA A IQ'GPpYD A/K-Pc,rIMlltMr aoMCM.PCW AAV MAW L0 VK K PSlA AS RI[L w mw c AWCMW J/.•VMWM at 04.r+a PCW ANO VW L"*W K PWAaW AS aE Na mm 1st aO PLEM CCeKmr m m PM Qat/r Two#ARM omwcxw Part TGC EmRxas rant lx"oar Ilan JrAMs)arrww crams pu ear R Ave smuo � Tr4 Nat a>rnsaaw x RAarrX r® KA; JYG Al 6•RUBBER HOSE SECTION Afi 4-CPVC SECTION IA10 I TYPICAL 4'CHEMICAL FEED LINE SECTIONw awKwaKo°0 " Kos >�ws OL&L Mm MA-2 r I r f s 1 I r 1 r I w I T= 13 t. r I y s y ! y Y y 1 12 1 u 1 w * GENERAL NOTES 1. cararAcmr 10 am lasr 9R 7 na 9PZr SPAM A MIINAWC �n AVWSINY XW 0/AK"Ar. a rue PAM(0 SIMM—1 f M-S N1 WK AFIAMM�MoIARM[nrR 9101 4 wl*a W FOr mom NIFAAF.0 M AMU EM M All IWFAum IY W CaMwcror K 1 Au 00-Cq savAOr A0.4 A AF MSTAUM WIVNI OOIKS o G FAIMWN' CLM � WWI; w n9n : (=Lot od Aor pgA>IO, KEY NOTES nesT L'Ji+•arf.cA[ rmnrc 20"4/4'In•(ao.c.e E ra0 lAF[. o qr OSAsie urs ro f AVIA®m DX 04MO L /! �} suuncw fomes$sm OVIO is Aw MIAA=S F ano.A S JR1MG!aMFY1_QCA rq4 M OfrOe + t mrw V.'IOrF 6iQFLM rf,Mps b A M+ I �. P/.•.W 04.C-1K AVIAKApr DOS AT oOA rm m AmSBn IIAP r over omw*TxM w wlt f f i s2•N+TO MMf sm i w•.Td � I.v omrler o ! ©Walker Partners eng-ears 1 surveyors BRUSHY CREEK REGIONAL UTILITY AUTHORITY 1 PERMANGANATE FEED i - SYSTEM IMPROVEMENTS CHEMICAL FEED m TAMIOrr ANA AAY C som Ar MECHANICAL PLAN y Arr wmw. I aoasmr n.A•ry M•fcFar.v1r1 >nr �/. wre.aln rlem } — 1101[1 ApF Si 1. " IiMnGO1ME" r 1rfWs At AIAWKK AROM" OOPSM1pMO�SrAl- A� [A M f1�C 071'TA/MPrT rA110.M'/IAMAO+r ArfTGJ PLAN �A SCALE Y7•s rd' r �v MC-1 17 1 13 u r x s . s i r I s I t0 I n I sr 17 I u VA L K IFMIEir eaeQ l•corr�wa+r rr[ oo Mor eanrur rtnw..,e.r wa r ewrr�er„r wr fee Nor eisnwsl saeu weer .'*QMIOXWTFM ON blralC- arts a". lM \—(�xrtss ye aes-M n)SPtWr.(1)!►weC m" FAWt (rrr a x) n Me><: L CWWAUaMv or Banat ame ftW,uo rrwrou MW 0WAROrnr Mt It e+raOMAM eanacmr XM M"w ert mw me aeagr 04bW Y.W9 JM L.a[.Qrr As#W*M t G1 I NOT USED rj5 NOT USED �g SECTION' av+r r rw smEt. rs• air. a O. 2 a r rlu e�•rra,nAls a�+vrn•a• O. . t f` RAL MM-WW-r•wss SM W"-r 3 g en essarmn ens $ o M eana,,,.'MW ©%Wer partners fr aoasmrrw aur engineers I surveyors Y BRUSHY CREEK REGIONAL UTILITY AUTHORITY PERMANGANATE FEED 10""wnuas SYSTEM IMPROVEMENTS CHEMM RED MECHANICAL$Ec nONS B ay 7 r R — AGA iiSS !M TFG Al ' A SECTION IIw �'.00N�0' VA.E Vr i,-V —M-C-2 1 2 1 3 I 4 1 5 I r 1 r 9 10 rr 12 u >. 1 1 I 1 I . S i I -] N .CNT AfmAIY .901mflf 1-o10eC+1 RL(C1er OIrAHr opLY0lpffi L ®OAu law sm r0 /'priRAiILM-dA/t plrMor mr CePC1rMl o[s01PIgM LLIO}MAMMALS PP SS 9PW111N FM NrR.IAL mmwmr1W K Y.Illr sEV ArOdARED ti IGR Pr•F lAROPr iPrAR.r• 4MAr NLLK + r1+[Are ssr Imr - ®NRLAAI lillrYfi LOAOrO ® rLr]m[r 1100E J/.-r3lr JL!lR11a0 SST �L OEOf�Rud Ap1r 1 � Y r 1/,•nlrr 510 ssT [YG rtr6 SaYd(�tlw] 0eKL1AY WWL —W■M SR SOreRf 7 rr01 OWr{OIOKR 1G4 e0.r �Scr AAO ARGLAMM OR fAIAL _ foRL1A[S-CPMOOrrS!1.OIC+eCALa'p� nllr IUIrx+L or sauna+Am a ooe3e Colsrsnrls ,r ALem f/.•OR!lar sl)v r SAIL CW&Boor SPIarC sat sGrOuef Prost orL.cAe rEm urs Dow r mW Yr 1109[ - SIN SOc\AI11pWAA0ARAff+ar r J1e Sn ltDAar b #~ r � 15"m!YwCJ S m) SOLD Oar nAlCyy aprwrL Starts lm�L � m�Star rl�AOA►ltlr A KTA"SNTAAL IOR WN IrIC 1'R[DNIF!s0 P90 Qr!!SZ AAO!®Iw[i'A Ua / fslJaL� MOarC Iwr Raaf d Plplb[,A.rAA[Sc/►plr STSRrr A9 Pp 9[CaW b/!07.wAAYXlS!SIwPPRIe Pr71 PRaC(9S P/wrC mw,Wmam - Ssr sArra Burr I MR-p1.N, !• i• KPrA1Rr+LL SERI COr1•KS9P'1 irI11Ya r_! (fYR er!) s MMA110Y YNLw _ SMEAW. PRarla[I11Q8 A11e1tC]gl CayKCr�.•1A•t�.9dLiY0O 9 r naffs I AMR a'.Wf*4 IO 0 OL COUP—M MNIOIS MO SiCQALS r09 PRO=POW IM=hKr SADME ffimL VtprlCaaWS Ane ArpwlpLRr9 _ I COIIRKIPr�G LO+KCr�'rq[NM i%'+IOK GPeIl59Pr LARP4 tr FA01 T GWN I W"MV W KWL 90 rT rACLs ROW MMMk sQ 10AroP ALLVer M?4%9 P o POK WAu of CWWA*vS(110 Ara vM0 KALK)Kwrre R+i 60#9 a Q 1 I EXISTING CHEMICAL INJECTOR,RETRACTABLE,FLEXIBLE HOSE(FOR INFORMATIONAL PURPOSES) G 1 1 TYPICAL PULL BOX fns "5 O O �W:ARP ur M r'Cr FAW pr F . ' -. -W 11-u�ioc u1i t aar...ovr rr6 !r1Tr)f!ss r ("m EACH Cr O r• 1 O &.0 n1 3/1,I ' _o r.r LPrO wK . srO wsA1r�r ar mr a a s rf rs) (".0.) Tte O s E tar Fm.telP,1 nv.war E,Iona O O Ml ©Viker Partners rys 4n9.neers I surveyor $ hp,I BOOM PIYs BRUSHY CREEK REGIONAL UTILITY AUTHORITY C LW u Li LW PERMANGANATE FEED _ SYSTEMIMPROVEMENTS STANDARD MECKMICAL DETAILS I a �n +lolls r. w6rN1 srAA l SM Alco nMKr AT 010 P N=Vg R-ou 11x0 3/. L MTALL(t)J/.'OR9 IOP Llrs w t1U7W.'CWTAWNT WE OW 09 R Rsr SERV♦[!GW ZT Owwfrm rKrtS 111ACV4+erP1D ALArItQ w 11rnA.W rprALB CMPWX ro 1S A YAOL DSS CWTARAeRT ftV4 CW LxLrS)!BOOM AMPS AND MWwATS APAW. $R V (Ape SIa(a rratrs}meLCr ran[]rlerAs ro pALALf tmr0 COIer<S9iOY APA rtawa pcwR Ains E eosusAOruR A m r ro Smarr SIK Lr pr root IROLI IOOt07r WALK a.9CrIMQ ro A4olI NR COVLCIA]Y a<sOrN¢LW^�AY APO PLANX"TA AQrON1A!P"OW!r VAWW;slat or PIANX M adµ 1 wSTA A J/4-ftA a w W EApr 9F hXf LW PGR NAVAL LOrrr1C Or Alt ft"1i.MSfALL A W RAftX W 7PARC Lw I Wr?AOW OR .Lv��'(� SAOR==LPr rrOasS 00MRL'iIP1S 9M41 r FA RperwO - I11(SlaC a fs0 PS1C w E=WG COWRESSIOH FMM CM#C n°" 4"CPVC CONTAINMENT PIPING VENT AND DRAIN . A 1 (FOR NFOWAT001 P OWMS) A5 r�. rrN!Ra qWL r'.rP MZ-1 1 7 3 4 1 + r 1 11 f3 u t I 2 1 3 1 A I s 1 f I r 1 1 } ,6 I w v 1 13 w "f Me17 2 "A"i"""a GENERAL NOTES srf Aam 2 -ewa RAMn t r/r'x rn'srm I sFF ft[FT t¢-, �1 SFA YIA �A•MP'C W."amsm •SFCYA 1'LFY. — I M mdwt aro s00t FerY. rr LCAIS 9Vr RenTo /Y oft ••yIF FMq COOKM sA=2 rAF•a :F•R -rlr Me I 3111'OW ANCND*R MNS M r facer Na —,2" 2 t"r sovw r�(Tp) I • • mNrcm�aJ A� LY& s¢wit i qro mr FP � 'A9E N.3 rMW FW6- CLARITY /R • •—I I I I I n wrr so"co ccnw 3rwrN A1L s m Au txsPAc 3/i'Hors aowsr ---------- f "T rw aw+rr wrMer faes�n i'ss•ed Host ,..tar mwtorfm T1T[1 l :n Aswc taro.FVC r1AtV,•L9g1 AIM SWA 5 V E 31{LnsILSS rZR C'AMI om 3.M Msm TAM AOC F3TC.♦IOAM fir 9 ANW*FVC At 12 1/r t10rCS CAAI&MIM IOefC rn. I. ALL AC•ITs11CIRN AORDIS A FASMM6 A W QALWM=FW cuff¢ssrt I fluff 't ALL 1M CA= >_t m SCi.�nl Ai w M fm 9QIAI FV[SVnslll C01IPdI5 Gr fASr[IQ Afalgl YRr K 6 WAm or FW SAM[g1aiLJs M 2. -aw IAib st7+ M AM RAM¢ 3 PAL•PAF rl�AT IMAP W••Mt•INVAIL'Ir WLMeitm we Sw AM oa w me _ PLAN SEG770W J $ECTAW 2 G 1 I I ��� ,mss G4 EXISTING TYPICAL 6"RUBBER HOSE!BARGE CONNECTION FOR BCRUA AND CEDAR PARK BARGES(FOR INFORMATIONAL PURPOSES) G Will IirxetQ•.rd F A F FALL SM•AQW4-IULF SM•IW-1,4r MEv OBWrrYt an PI) 9 Q Walker Partners engineers i surveyors BRUSHY CREEK REGIONAL UTILITY AUTHORITY PERMANGANATE FEED — SYSTEMIMPROVEMENTS STANDARD MECHANICAL i DETAILS II – Fon —fT AM Will A Al NOT USEDA4 NOT USED Ag NOT USED j � DR„w,,,,,,,,3°"'-0' wrl MTS ITi MZ-2 I I 2 I 3 1 4 1 5 1 6 I � I f f m i tt u n w CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties CERTIFICATION OF FILING I Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2022-948191 THALLE CONSTRUCTION CO., INC ALVARADO, TX United States Date Filed: 2 Name of governmental entity or state agency that is a party tot the contract for which the form is 10/25/2022 being filed. BRUSHY CREEK REGIONAL UTILITY AUTHORITY Date Acknowledged: 10/2512022 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. EMERGENCY UNDERWATER REPAIR 36-INCH UNDERWATER PIPELINE REPAIR 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary 5 Check only if there is NO Interested Party. ❑ X 6 UNSWORN DECLARATION My name is and my date of birth is My address is (street) (city) (state) (zip code) (country) I declare unnpr penalty of perjury that the foregoing is true and correct. Executed in County. State of on the day of ,20 (month) (year) Signature of author-zed agent of contracting business entity {Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V3,5.1.d1b92728 DATE: October 21, 2022 SUBJECT: BCRUA Board Meeting—October 26, 2022 ITEM: 6C. Consider a resolution approving Change Order No. 1 with Thalle Construction Company for the repair of the 36" Underwater Pipeline. PRESENTER: Karen Bondy, General Manager BACKGROUND: A contract was executed in August 2022 with Thalle Construction Company to repair a leak in the 36- inch diameter ductile iron pipeline that connects an underwater pipeline manifold at the floating raw water intake barge to the 78-inch diameter raw water pipeline on Trails End Road. Additional construction services are required to replace a previously broken chemical feed line that provides treatment to the raw water pipeline for zebra mussels.This line extends from the raw water barge to the shoreline and will require underwater work with divers and marine support equipment. Walker Partners has developed drawings and specifications for the project and BCRUA has purchased the needed materials.The total cost of the change order is$167,885.99. Staff and the Operations Committee recommend the contract for approval, and will be available, along with representatives of Walker Partners to answer any questions during the meeting. FUNDING: Funding for this contract will be from unused TWDB loan funds or local funds. ORIGINAL EXECUTED DOCUMENT TO FOLLOW. .. Change Order No.01 Date of Issuance: 10/25/2022 Effective Date: P.otrcr BCRUA 36-Inch Underwater Pipeline Repair .BCRUA Owmes Corrina No. CO6uaeY Date of Coa..aet:September 8,2022 c.,...Thalle Construction Co.,Inc. Eve,P.otra Na:3-00821 The Contract Documents are modified as follows upon execution of this Change order: Dere Wo! Permanganate Feed System Improvement Attachments:(List documents supporting change): Permanganate Feed System Improvements CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Prir.e: Ongtnal Contract Times: ©Working days $Calendar days Substantial completion(days or date):10/8/2022 $1.601.668.35 Ready for final payment(days or date):10/8/2022 [Incrcasel[Decrease)from previously approved Change Orders [Increase][Decrease]from previously approved Change Orders No. to No. No. to No. Substantial completion(days):NA $4M Ready for final paymenrtdays):hjA Contract Price prior to this Change Order: Contract'l"naes prior to this Change Order: Substantial completion(days or&it):1018/2022 $1601.668.35 Ready for final payment{daps or date):10/8/2022 [Increase[FPcerease)of this Change Order. Increase of this Change Order.51 days Substantial completion(days or date):11/30/2022 $167,885.99 Ready for final payment{days or date):It/30/2022 Contract Price incorporating this Change Order. Contract Times with all approved Change Orders: Substantial completion[days or dare):I 11301 51.769.554.34 Ready for final payment(days or date):11/30/2022 Rscor<latr• Dr:D: ACC F iEU. ACCEPTED: By: Ry7 By: Engi ecr(.luthoriacd Signature) Own (Authorted S:gnatu ) Contractor(Authorized Signature) Date: Date. " Date: Approved by Funding Agency(if applicable): NA Date;NA I ' II � rAPM ro av1nuws xrxmr Prs k'` Nr-Fairs aAAae ys v IP{F :I P rEH114 Ka" /ppr gr jiKaK lSfarA ILS PRO+tl[0 MYO G'MfONCu f F IAWOFx ARi (SFT a BMCE POlFWS F AANw w' f oirA v�oP+off MN+.cyH+FAcrp.'m+KW wwl 1 NW[NARK H IC MOm ` ar?wzl wa MAC moos Aw Oid51[A f MAPS AfC CCY+NMII0115 paver'}PON fl FVr!MflO.9C.1YI ' GENERAL NOTES - l M1 Pf I,pvPrACfPr S+1AIl LOMp+AK MM ' T : � � AACAAPPA}I b uLMVIYYG i�O 91E.�� '{ : G'J'FPAirOA AINIµ!P(F(gpNArE OOFIFIF M @ CEMIYTA+i RSF aOA& 1 YCRYA MN ACFKCN rK1Y prr1CFw K NKA MCAS M1[IS MQIIf w AL IlIMd1LEO .TAPE OAFCC� _ .._ - .. P . I j pf olc' N+OFp 'L Mh.ttrvJ f n4.iu cAMVM pr' +x "D f5 urr� _ ��_� y.,.V. �; '�`�_ _ •"• - r°fwa.�irnr roaaro�c�.YaMOPcarsrAu _� �, 1 --�_:_ •�. - r .` � r�'. r _ _ ' +uirw r µiwera Hos �+o PArAnn +r�lr A4+wra.mmff Ave TORN A4LL lO!P r {OrEHnll LLSir44 ' + MAIK 11MOF ... �F�•BFri ilf C �J",Y . ._ ��MAt !UYDOAx NKA J � S'Y/rti IME A' /�FiAL 1lFIC ��-�D AIL � aui rri f ^�.}. WIMUM AW" IN / " fi VPA4F 4Y ®Vi�alker Nrrners �'' iF9�a1FEfF1 FY fYE Y9fF - wATAW BRUSHY CREEK REGIONAL 4 ":E:rE' Ir MTY AUTHORITY PERMANGANATE FEED AM=ANN YSTEM IMPROVEMENTS OVERALL SITE PLAN �$t ` OVERALL SITE PLAN �+ .1 S aG;E r-p A C-1 u 1 E°6rwC ' eaSeYErrr y ' •�• �""•• GENERAL NOTES r �••+Y�'i•r••:•" � r '�T• + r. xo srwr.ar rsLxow'c a rmrec.nvr www•'� � ° µRWArm r.enrc.r.ro sirrarn KEY NOTES rwsEY[es RMSMWe vvYr.r.rsreamEr ra MwsrKws wa/ai aruaws sae raw ffouwe M(M.ovµr emu arrfl r..4w.irr aur M_ i FLECr.KK 61rE6Y1G' - id1 BCAIA Mw ufER Mrr�6MCE- . f M A E r6Y191p.FR"W. wart wrwE ro '.• •..,•'•• N� x ecEa. ®Walker Partners � � - eng�nears i surveyors r BRUSHY CREEK REGIONAL _ UTILITY AUTHORITY PERMANGANATEFEED _ SYSTEMIMPROVEMENTS sees me }`>, YARD PIPING PARTIAL PLAN ww M&rrv.w 3 p[rgLs �mr IM - JCYB iFG A r,soYwe.eEs �. SitlB670r Al YARD PIPING PARTIAL PLAN °"' pewrq q rucrarcu arcs S'Dt ft c,r rrrn a mo GENERAL NOTES -- i ra-srm.0 oanwero.veus ro srsrcwr�ccrw ro nu rrrr w�ecau. _ cwrr ro r,uxrurt.AWY nw a err +,w"'• ... '`�`�� j �•]� 7 - IV(*MA rnrt."rs.��c�,wow f0 II r^�] •• rte" ""-. -_ ``�_ µ w r 9�-ff •rtrMar�c ar L unr,rsir J'•Rr••r , Pppr PDX EV nov H E4//rp i - i • u4� 6 N A i ►— rn* rl, f � r�u pttr FACUH A O r V�alker Partners ® — an g-neere i surveyors a. '\ BRUSHY CREEK REGIONAL UTILITY AUTHORITY " PERMANGANATE FEED r SYSTEMIMPROVEMENTS EROSION&SEDIMENTATION CONTROL PLAN a roof — w+ Al 34MM PLAN �, o..�rA •' CM-1 r 1 7 1 1 1 . I ; I I a I y 1 IF 1 i. 1 rp 1 V I r iim maimrt.... 01, L .qKa rtac TiMwr _ Ybra trwra IUOnwrSoa ryl;rAxr K TRENCH CROW SECTION SILT fFIICE aawww�a[s ustr rorca Lourso wrtcwr w vuweouos.rwrs.saxw.s wrP rns am.ruws a arFrwtio ar clrr a clow.ww awl[s[wurrrts — sww wrs sm w.aio s.rm crus ax.0 srta roars. mai ra..n.i..wo.:rrn.r:crr`iw.�cc s...K.m.u.P M.aon I w wo a° arc roar.�w°a rrc su mac Paaaors Tru or�*nom a rur.w rvcwcw.+o rfOrt ui or wwn"°'u.a a wuroiwwxr�umanr�n:i.us — aw wo s wn.4I A x[rK.Cn wq R.r.ruw.r a wW.ra lr[ swr rowc rwae w r ws w rt.l G.gwO.w aa6.rm.rt.eew.nle xno.r :art:.ac wrr r as:nw�.nnla�m ro ni srm MM rwr rml P.n w.tlpCrOr Swan a[WOa.bur p.ner rl�M/I.a MN wC.P.w M 4ryw{.prt rwry F aro[warelrr u rxrPtP. rYir ft- al...wm..or a�m e aa0a[tCar uwrPla W b W AOC.R wSK S1W rIW er a.rFwl..tlVwMlm Al Lra a! CITY OF UZOAK RW°P rp rt wGG[S.AYM d\aWi Lr w war oYrtNN[i6.aM9wa rwumw.m.ro w Tor.ray.a a H � PAstir F[x°Y o.asr.. .oan u.ra. -, G 1 I SILT FENCE G4 NOT USED G8 NOT USED *S _ ewnwrrr f%sa118 erre rams� —'r aac assn u err er ew av w } . r 4 .. P,,i)V g i ncer Partners on giera i surveyors BRUSHY CREEK REGIONAL UT-LITY AUTHORITY PERMANGANATEFEED SYSTEMIMPROVEMENTS 1i r• STANDARD CML DETAILS .1M PC [faPAM M Mft OGS•[els F.$w S1Gax Irp awrF Sr+wu �y.11 --_ JPB f"M.(Wf prFACY WSPA &Wf xaf eogL(p j ^� IFG .asor+wmen ♦sa w Al I NOT USED A5 I NOT USED A$ I EROSION CONTROL LOG Al2 I NOT USED '"" wuw>cwamar x Y F CZ-1 GENERALNOTES 1 A'WMA NOSY LONE SNML AY Wcowrm nmu fimm ren rui Aw 0, AND PM c Agorae r0 AWVr EMSrMC N Clfarr4 R -E rb PC www Me•S/.•cwrmio s nSMr"Wu —El T COviN sm SM4a AMinMAr b nmom rux to%VS "40 U-0. YAIIIMW INACM Mranlwc YASixC AtlSr rw POL1xA A9ip1Y N de MOI p3 AiA 1111SixG u1AI11L3 S AMO AVCfSMYS wff! ti))gee stt orrAa a raa x¢Ax4 'r'1'cr� +r r r...c orris YovrAeercMr T eor w a ea. OW m "cl-- ub ieN 0-bftA Ll SEE pelAl e fdP xQAM4 Pert orrms e'rsaerM Mosr vAr Mor ME 5.x , ME brr r PSI SUE-LT-1'V WNF SO-IM•1'T ex rid/'G. prF x o ®Walker Partners eng naerslsu ry a yo r BRUSHYUTILITY AUTHORITY UNAL - PERMANGANATEFEED SYSTEMIMPROVEMENTS SCHEMATIC PROFILE e .a A Al SCHEMATIC PROFILE ° ' pMANYYp Np h 4 M-1 a 1 I I EE R C o« GENERAL NOTES z W"TALS C SDC K,KIx Yl OKS.,.R 1� ucrras PC sr[crKwnO s W] I-pouD p 7--*Kg 4 0—mA A,ry S4Yl[R S—A KAAIry R,MAICD 30 KR TK 9K -rRVGfO OwcOm N4. ^ I SKFEF1GrUxSPR f0 H ObIrEO KR,K - --- , I Al-`I st' f�.I,I 6. -i r I � I KEY NOTES e.RCE On,xmlax Ra4r,./ � I II I i� I � I I III y:' OW mCDDGc q SAM 6�iwDIDRM TTo O,�wFEL ODxryr,[x,.wry AAD AFRD,rr . _• _ _ t Sv'SI[43,IPE.01 A4rKJRMEo GOxMocroe Y ,EWORMLY • 4 I I , vxm pua/efum F"l m'4. ,x w—w RERLM .xDK OK- - LK%oox,—C W NK"SLdRORr BETTwk SVSR4 S-BE RESTORED-D E.brv,G v4(C,IDx PPxr \ I I Omp4PLL1gxG0' ro UK 1"v4"TEE I R EKNI AT W ARomD,v4 EDEA'0 UVUzc i O xOWRKSsgx TICS t-IM RADE 1 ••' '' '+I' I I - D" 1''TffS KRVLf ES 1W LMS I I -' } � rx ODxIlRIgR 10 C LKS rRDY I4Rn,d,vonTs r0 GDLFRFSLDr,rEFS T tt RPOCK RORn RES 4n eEO covRRnsnx n R,,R.IE R*r x F RES MiD B4KR CONCCIIM Ff ttF RoRn 1 .. ROM ExRGHr P• Ruxr F. I �V�alker Partners i S4 ,•I-I- � ang�neers I surveyors i I �; , I ;; I' BRUSHY CREEK REGIONAL E I _ I` UTILITY AUTHORITY � I I PERMANGANATE FEED SYSTEM IMPROVEMENTS BCRUA RAW WATER INTAKE BARGE EQUIPMENT LAYOUT PLAN 6 e�gR Tern k� bt W \ - C NO IF naa.ws,FFL –� r'� A Al=LAN SDI sG E w re. MA-1 i I A i 1 a I 5 I E 1 r I I I i GENERAL NOTES 5�y T —fiE�O({tvu.0 xul iT KEY NOTES PYrTW4 1.1w4 T. L OSE[9MI!W-i rOl!,>Cr NOBS. O~E N CWxrES no x90[ �I IMTw CO.f"HDPE S FR MU N c,"POVn9 To NxP11CSSON 1EE9 x w,AM.Po.n no wo K7w(. CDWRCSON RFs x'"CIM POwr RES Pw awwE c crL TEE I Ni,Nt! �po-TA Ppxr ru 3 ' (Dam"cawrcrMw PExr t 4"6 Rr n r'r� F•, F F 1 SECTION F1MA-1(SIM) F10 I NOT USED S 4t iv•i. BE TIT: E FULL SIZE•IN'•1'-0'E14F 51ff•1e+rfi AENW MMIi Enw by c7K r ]..-.eErclN„� ,. >• Y ,• alkerPartners g 6•BxeFrw Nose ( t"c'u rLi°'' engineers,surveyors 2 .r/.-raarNrw� y.•rarce,NENr f9•.Nq � fcw" mv) rxaw crFDacu ram aunoswc BRUSHY CREEK REGIONAL ]/•'P°rc""f M0fm 1D MAL sox g"Arra aH BARGE (VM j UTILITY AUTHORITY f ,- 91.NF 04rC.!PIED R 3P.Nt[PKS xfiM�K GTN1.w[xr Pel- — . y ro a=A BARGE z .,n•MrrFHT .F'(OLNN.4 rrm.ro».f)Ewts 10 of Moan.w ' f ;{ PERMANGANATE FEED •� 1 ~=&j14 PM rM fW"WG FEm AW SPNBE LWS 9Wt1 aE wVN.UD AS OW � � I SYSTEM IMPROVEMENTS canxuous nan EMC.No sun w sfmsl efTdm CMWr.t wlcroe mm Nw x. ' BCRUA RAW WATER INTAKE BARGE „oma ce.erass9n RLs x xxcnw PoNr RFs w o*wA coy.-"r Pero av a.Nor •.'-" EQUIPMENT SECTION 8 DETAILS N , SN.aYC CNLIYC4 FEW w 7.RC LMS wStY N09r . PAO.(IYO J/.•MrfntnE CN(WC.[Rm.w PAW EPOS 91.t1 aE WS?x m AS rwE r�lrlC B[�1. foftxc"Ao P. fP ?"a w* CCNlEYTIplS nelE lwl.w WR MEED w-si eneenl w Errm f.,IfEs Ox CrVAC.E I•cp'�c~Pe[ .'MK c.M�flr P" i(PSC cAw#PWC — 1 reCEO�.0 xSr4urA9Y er c Wc.E rEm N SP.Pr—Es.N Ot IIOSr£al N!/nlwR SP. a O➢N I.M(NT RPMI[.w eu,Et EVwTrnOAI PWr M. (PEPIAFE.OPE feo NO!OlSTExrI fOO Ne!85Me1J — N Jf N —"Of FOUPL.f w W* [NLNK'4 fEED Iw[S) �� ��� 1 PRe^rY'1/4•P po""r dk'W[.e rrm.wc Sm LWES SM` K wsl., AS C0 S EaSSiwp]/1'POE NTNKINf(CN[WCiI[!RD MD YMEJ LYIFS IO if AEMc1FO MO OISFGYe CLNIwNIpIS 1E7YF tPEr(w!!IA MEED YANSJ KTIKEN fpSOw 0.!1 BOi'/�MO xAl!c1'/] I�LR FeOPOYD]/.•PCE rcn.11fK CXEIKY REO VO SPNPr LWr9 91.tL Y NSl4t1D 45 dMF cONlP..OIIS a xro•oxo]/.•rarcrNn [NrYC.t AW N,O WMR-o 9141w Panum 4f are JWB MOPf LM(x)VEXES)Kr N EMnW 0. x1./1..v s.Na RwdCnON'Pcxr RE Co.ft"w Nw Lw(w WTI w o sf.NS)Srft"N fnMc Pyµor!1 w obm7fP A� rFC PtMW rOp(cew w dfW[.l nEE11 r.aurr. �wx+�wa.sE• R A 1 8M RUBBER HOSE SECTION Afi 4'CPVC SECTION A 10 TYPICAL 4'CHEMICAL FEED LINE SECTION �•x•oB W .F�•r fia,Fns 9CNE NT9 MA-2 ,B I u i7 I u i I r I r I r i i t i ■ f M -0 1 .I I It * y GENERAL NOTES r AC Cp14rpr re nrlD mw gmNde My Pe.'dr!e COQ low,eed P r a.5 WE'sroes A S An $ ArA[9rNrA il(AV a rllr acY rm Haut sEe sErrs.-i e..r ra. erferl4 pPrve+r*LWW.M aua Aa RAM77 ARS wprArpei Em b or wSrM rl)sr aC CGSMMW.. J A CWW^ -IIGW ITNG re S .514tlD■rwr COFNLs a PV.�rAMrrNr tree rnmw OW DO Wr�prs�Me i rle rw J/4-cWW" KEY NOTES rAKrwc,i.-o L i rcra uvr_ao mocrr w asrt+ra r aesmc eau.J/�'�.aerrx r Q Muaw e"oosXN nro w w orrc. - roft wr-c$ 1--[ MMorsc+ Rnrn cawewc wa 1 w awJirre/A�e m^ip°Eiuno d W&FM yr, eyes ro rr—w ar.a ♦ .... , ties Ar a Cc ro eaerra ft+ 1 r Warr ec++rtnw view J 4 ~ \ M v r .a ra•r*KGF uwra r 0 ®Walker neera Partners eng. aury ey0 ri 6 ' BRUSHY CREEK REGIONAL a UTILITY AUTHORITY a PERMANGANATEFEED SYSTEM IMPROVEMENTS w w CHEMICAL FEED tX r v xr AGFA r.va aw[oar MECHANICAL PLAN eaasrm av T w�ECaP.�r� qu J/a rtlK.Ads 7lerd ��"` �r— eer[s riu, 1. n,errc w+ew At St C S.x ar.fts r v v K rarAwD w DK MIIAvpA[Hr rinC cCWr.vrrtNr 'rg`'l.�-, JA6 SPK rraV+A r[a Af pASr P°SMrfx Pyre OAp�afµ, AlI PLAN "'"E mw.vo worcxo WAE Vt-TO 3 8 r ' LPSIAG ICAAIXR 6APGf C(N lAw[xr w•.[ rm xor arrlagel LJOSt i GO-P e.RG( G'rnJalwnfwr arc + mo NOT Lr'SAMB) 1-Lm(2)lf me I Jot- (Sl CASA J/.'mw I arL.c.G c.[s+rfsL.a wn. I \f+1 s[.xfss.1/�•aws xolY rr)em .«J s...,Q ro ew NlwRts I (Ilw a JJ x I r GLr/IGN•A IrOw P 00!(e4 RYAw♦AIIw.n0 L[.. NwLF Gp.rWI.M 4&A.D AN CTAM1wAC10R SN.G4 rfMY N!xC IDC AM ADLS!QeML1L IK.K3ACi•KM!AS IKgM[D G 1 I NOT USED G5 NOT USED Gg I SECTION I r e r lD NAM•r.rv,w4f M•14ry F 2 lrA 6a.1r(.To wosl -w-ro RwIV On4/tP O.R p YJ'I rm ,,,. �,� �V�alket Pa�runers Ar e�uosmr ww wrL�r!� engineers I surrayors �C BRUSHY CREEK REGIONAL UTILITY AUTHORITY PERMANGANATE FEED ro ww Nwns SYSTEM IMPROVEMENTS s CHEMICAL FEED MECHANICAL SECTIONS JJ47! Aj arB � e lMJ � Al ..�.' :.. SECTION II ria .� 30v�76i smi vl•ro MC-2 I I r n I 2 I J I L I s I f M i+ I n I n 1 u v irpa ASSr>ar SOaLLON[1 CiC1YG!LVLCfOrf WALIT COLMCYEN�J L 1rCWrRA OON-AA/P L'(Ydr(Nr $QUrLDM ILfr VN. MCMAO Or CaMPMI(NI afSY1lI]OX NPQI/au?645 S(Lr 4SrPAv(O 2I'"W PW LANCEP NAN W 15(aAPpl M.LK J/:PLP(J1c SST 00v ®AvrrmAL sPrrwc L ® n(Aarr Nas( !/:r1x!1a eNJoro m BALL "&A►r BR(r AI t' AN- v.MK J 1/1'rrPf!r6 SSr [NS A1C!'�P.P A.M•N} CW(CBW I ® 1.M 5YY SP[ONE] M'AAP BOrr CO'IOT(IF PLu BOY K •.5'B(KL ® PI.(W ASSLNBIT AJLT C 0 - -r S((Nor( A4O AMLAlAAgS Cf(OVµ - _ (A151i1a Sekfoa(2-COAOVWNrs or CWu" :CPK HON ayap „ —M-4 Or S"W?W :rloT iorairvlrs aP e'RLiB(R 21!/'CfB NPP( SAKAM OCIX@Xr 5(C SO[A.L r . JrBX �fro LA(S cm1'CPK ./r MOST SPM fOpW P(PYANWNAA.aB IIPC J1c SST OfrAlJtr (SCPMQ f YArAI CCN GAVKNr fA1V(M PJPNc J C<MOQ) mvU R a QAFPµNOBS r SQUJNJN MW AWIM A WTA(SWTA rM MArr LN(WS-WW 250 PSC aM Lf r ANO nm LW(J'OR llX - `� n(1081E® PAPWC NUl — NpY a PApMp(PITANt AOPOLT f TSr[r AS P(N S(CBP+b @ P2.NAMYRS I SrrPLMrS A(f rlepQsS PB1NO ssr sr(n ar.r1 ` (LBrr CNAA+1 I (sSA+c MOaA r' s• wrw.rAcµx.L nrAJi !._e. (rw or el I (M1 1.-0. �r9O11rgN vµK� S SA(rAOO. \ Pf0'AM[FA[I2C PPO ACPW M snranc NPAs r. AOr(P ro sftA IB 0S 04 CBANAM:A ADAPI(PS..o SPCOAts ra PPaQss Piwxa ra SCPMCC sAca( Nov. SP(Cr1S'AMINS AAO IHg1r4KN1S _ r ipv ilrAilOS r0 OWLCr J/1'wOP(V p!/:NOP(COYPRlSLW C10fA1'1C N(AOk P p Nr WXC2CS PP KM SO it rAQS nOw OMQOON.Sr(WNDOP PCC*hWWA OYNS PIAL Bpx.rp•C 41A(1 K CONJMVOVS(NO Wff N(LD SrANS)OrrMUN KU mMS Q 1EXISTING CHEMICAL INJECTOR.RETRACTABLE.FLEXIBLE HOSE(FOR INFORMATIONAL PURPOSES) G 11 I TYPICAL PULL BOX M' D:" o oN Y.a LAK 2A•BµL v w .M rM uw Pr 0 o !.B ssr [T.P Im(A� nA's J/'-WAv.Jc (NrY0 rKNr IK ,� rry au..Nn urt ! ,� MW ®V�lalker Partners nr engines rs I SMrveyArS SR NOA 1 fAOP BOOSRA gAMT BRUSHY CREEK REGIONAL t UTILITY AUTHORITY LW PERMANGANATE FEED SYSTEM IMPROVEMENTS STANDARD MECHANICAL DETAILS I Nora P14T SrAPaCSS S1F(1 BLM nANQ AI[rn o<A(PLYYR.BPA.PLAN J/1 r NSrAu(21 J/i"V"NBP(L"S W(JOS 1"co"? ML(NT"r ow(LAK K rCN S(Roff f aw ?AM — PArAr[rr Nw(s narPVwr B(vo nANQ:M(LB nwrAy(p r(Nµ(COLR+JO ro rt.SPARC r.$MO carA—tW P+.w KNrNr1rt'S ro OM?P PLANS"r(1NN1' M AP O—AMR CACN Su[Or NOL(:r, CONN(Cr NLMC ALNIC ro nANQ UaW eoWVf S" Apt nnNCS CN[MCAL N&CM N05C/SO1f w C cr ro"�,M Or LK rppr rwLv ep0lr(N PLPs pSpAnQ rOµLOr rar O�wrynBw a SRMQ LK ra Rv A eLBe HANG(NSf A'riOVAdl PLUG ar]MC OArlNirr SOC ar rLA ro SEA N51A A 3/.-Bµ1 vµK ft G W S(PNQ uK ra N.uV.4 KNrNG o AM e1MD W N 1T • XB Lsr SPAq PBAQSS lPL4 PMOCCU COWCNONS$.A K W(B FO.A Aae.Pre ft i MS Wu rARSSU4 Lr P30 PpC •� • �"' JWJ OWING COMPRESSM FITTING CONNECTION 4" PVC CONTAINMENT PIPING VENT AND DRAIN ""�' ofANALc�lme�2u1 Al (FOR INFORAIATOOMPURPOSES) A5 Mz-, W. 9CJGt '+I? 12 I 13 I 11 I a I ] 1 a I s 1 s 1 r 1 a 1 s 1 It I n I tz 1 I] sr wos a `'aurin nMrcr GENERAL NOTES L .Yr WE 2-' /-s•aaM FLAK I SCE sKrI Y7 1 I/T a�e'sat Pw wr Oxv I fie-SPOOL aECi M'aa raeaNt,Nrx WS r i +tav t C01iiK'o sm f-Love r •]anoe nor. r no-ro Ia.Lane COaMCCFCrM aAff15 4 A'M .••tr ere[SIr( ' � I /- ra'rrr K ]/a•ON.r„CW f/a wlaS Mr, fpWar aeras.FNAs,vvr j �(rmcu Fm.0 r7 rI",6"[ r" �5[r wA5„Eas[ l • •. LuvCcrgvS) m"Our„pr SIM aLn2: r•a dw Iu x0ll AW re.a nA III I I fa Wm cowcne,r • ] ep.w srm P rdw!rf l I ••� SanFRrry r4wetlr5 aAa ••� I - I NOt 9Y0Xr!FW QMrfY ]/e'rua fralrtMnl npK0r5 rnr s,oNa rar aMerr n01S2 I.NrICN[ -VA 511BN[NGCD as IOF,SG raw[ rF[oi. l.Nxyp � fie•ayeta rrosr MIO SwtLO LOLL K rvNt SIa srr.rns S,LCL. IS,/a' .arcs :.N.or moa Nau are avt,vNa,Oc m slNrm raourl0 Nit L, SIMIv artx taxa[m, r- ALL are r t Sm LrtuBFaf r r rratas 1`0 err cxLwNZta fa LMiR09W aa0r[CPW Mt,rra,rOto colsn„errn of err F.sa+ra.ssLleL Iarsr x c.LVAlrro a+a.c s.•r raaatss N ].NCILN TO YCI,OM W W Or FOR$IfC11L PYf SYPr'Olfl atolNaacrlrs, a. rruirr Ll010 SLuSoa ro WM nAfE S MaL!W Rr Al LO W Starr♦"Sl I 1/a'dy VWM W rr,•NIM 8M MW PLN SECTI0M11 SECTADlM2 EYJSTING PIPE CLAMP FOR INDIVIDLIAL PIPES EXISTING TYPICAL 6"RUBBER HOSE I BARGE CONNECTION FOR BCRUA AND CEDAR PARK BARGES(FOR INFORMATIONAL PURPOSESI G 1 JF0R INF0RMATI0NAL RWOSES) G M5 SCAE Irr•1'C I Fytallf•1!r•1'Jr 1NIF SIII:•1!r'•1'-0• rf M. fiY— tZ ®Valker Partners eng.neerslsurve yers BRUSHY CREEK REGIONAL UTILITY AUTHORITY PERMANGANATE FEED SYSTEMIMPROVEMENTS STAADARO WCHANICAL DETAILS 11 a �U rarer run ,N0.• -'— ]n] " AlNOT USED A4 I NOT USED A9 I NOT USED "'" aaesael ki 13