Contract - Austin Engineering Company, Inc. - 5/9/2024 Page I of 3 Contract Quantity Adjustment/Change Order �IIOCI{11[A, rev,OU16 Department: Transportation Dept Project Name: McNeil Road Extension Railroad Culverts Date: 4/19/24 City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor Austin Engineering Company, Inc. P.O.Box 342349,Austin,Texas 78734 Company Name Address Phone No. Justification See attached documentation provided by Austin Engineering Co.,Inc. SUMMARY Amount %Change Original Contract Price: $869,428.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: -$574,347.10 Total Quantity Adjustment(s): -$574,347.10 Total Contract Price with Quantity Adjustment(s): $295,080.90 Previous Change Order(s): $113,231.56 This Change Order: $431,687.54 Total Change Order(s)To Date: $544,919.10 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustments)Plus Change Order(s)]: $840,000.00 Difference between Original and Adjusted Contract Prices: -$29,428.00 Original Contract Time: Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: 0 Prepared By: Signature Printed Name,Title,Company Date Contractor: Austin Keller Vice President,Austin Engineering Co.,Inc. 4/19/24 Signature Printed Name,Title,Company Date City Project �� 1I Manager: (N P -23 21 Sig ture Printed Name,Title Date Mayor/City Manager Si nature Printed Name,Title D to y- lib Page 2 of 3 _ Contract Quantity Adjustment/Change Order NOCK i rev,01/16 Project Name: McNeil Road Extension Railroad Culverts Quan.Adj./Change Order No.: 2 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) $0.00 1 EXCAVATE CULVERT 1 BORE PIT LS 1 $7,493.75 $7,493.75 2 REMOVE&REPLACE TRENCH BOXES LS 1 $19,403.15 $19,403.15 BACKFILL&COMPACT CULVERT 1 BORE 3 PIT LS 1 $20,045.90 $20,045.90 GRADE TO DRAIN EXCAV/EMBANK WORK 4 PAST CULVERT 2 HEADWALL LS 1 $7,865.15 $7,865.15 RELOCATE RCP,STEEL CASING& JUNCTION BOXES TO LONG-TERM 5 STORAGE AREA LS 1 $7,580.59 $7,580.59 MODIFICATIONS TO CULVERT 2 6 HEADWALL LS 1 $24,000.00 $24,000.00 CUT&RESTORE PAVING-REVISED 7 UNIT PRICE LS 83.6 $400.00 $33,440.00 8 RIP RAP STONE-REVISED UNIT PRICE SF 2916 $19.00 $55,404.00 9 RIP RAP CONC-REVISED UNIT PRICE SF 602 $139.50 $83,979.00 33 RAIL PROS COST PASS-THROUGH LS 1 $162,500.50 $162,500.50 RAIL MONITOR SURVEYORS(INLAND 34 GEODETICS) LS 1 $9,972.50 $9,972.50 $0.00 $0.00 $0.00 $0.00 TOTALS:1 $431,684.54 0 Page 3 of 3 Contract Quantity Adjustment/Change Order ROIINO ROCK II A•. rev,01/16 Project Name: McNeil Road Extension Railroad Culverts Quan.Adj./Change Order No.: 2 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount 2 162 6002 BLOCK SODDING SY -2129 $12.00 -$25,548.00 164 6039 DRILL SEEDING(PERM) 3 (URBAN)(CLAY) SY 1 -2129 $1.00 -$2,129.00 164 6041 DRILL SEEDING(TEMP) 4 (WARM) SY -2129 $2.00 -$4,258.00 5 164 6043 DRILL SEEDING(TEMP)(COOL) SY -2129 $1.00 -$2,129.00 6 168 6001 VEGETATIVE WATERING MG -64 $150.00 -$9,600.00 7 400 6006 CUT&RESTORING PAV SY -40 $600.00 -$24,000.00 402 6001 TRENCH EXCAVATION 8 PROTECTION LF -69 $50.00 -$3,450.00 432 6031 RIPRAP(STONE 9 PROTECTION)(12IN) SF -294 $70.00 -$20,580.00 10 432 6001 RIPRAP(CONC)(4 IN) SF -66 $195.00 -$12,870.00 11 450 6048 RAIL(HANDRAIL)(TY B) LF -84 $175.00 -$14,700.00 12 464 6009 RC PIPE(CL III)(42 IN) LF -12.866 $600.00 -$7,719.60 13 464 6010 RC PIPE(CL III)(48 IN) LF -86.08 $500.00 -$43,040.00 465 6009 JCTBOX(COMPL)(PJB) 14 (5FTX5FT) EA -3.498 $8,500.00 -$29,733.00 476 XXXX JACK BOR OR TUN PIPE(42 17 IN)(STL CASING LF -83.6 $1,500.00 -$125,400.00 476 6038 JACK BOR OR TUN PIPE(48 18 IN)(STL CASING LF -148.3 $1,625.00 -$240,987.50 506 6002 ROCK FILTER DAMS(INSTALL) 19 (TY 2) LF -60 $30.00 -$1,800.00 20 506 6011 ROCK FILTER DAMS LF -120 $5.00 -$600.00 506 6020 CONSTRUCTION EXITS 21 (INSTALL)(TY 1) SY -444 $14.00 -$6,216.00 506 6024 CONSTRUCTION EXITS 22 (REMOVE) SY -444 $5.00 -$2,220.00 506 6039 TEMP SEDMT CONT FENCE 24 (REMOVE) LF -713 $1.00 -$713.00 506 6043 BIODEG EROSN CONT LOGS 26 (REMOVE) LF -713 $1.00 -$713.00 27 529 6008 CONC CURB&GUTTER(TY II) LF -18 $60.00 -$1,080.00 28 529 XXXX RIBBON CURB LF -18 $57.00 -$1,026.00 666 6207 REFL PAV MRK TY II(Y)4" 29 (SLD) LF -36 $50.00 -$1,800.00 7012 6001 CURB INLET SEDIMENT 30 PROTECTION LF -45 $23.00 -$1,035.00 502 6001 BARRICADES,SIGNS AND 31 TRAFFIC HANDLING MO 3 $3,000.00 $9,000.00 TOTALS: -$574,347.101 0