CM-2024-161 - 6/7/2024STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: FREESE AND NICHOLS, INC. ("Engineer") ADDRESS: 10431 Morado Circle, Suite 300, Austin, TX 78759 PROJECT: Addition of a 211 Electric Utility Feed to the Reuse Facility This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Freese and Nichols, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 27th day of April, 2023 for the Addition of a 2"d Electric Utility Feed to the Reuse Facility Project in the amount of $307,001.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on March 29, 2024 to amend the scope of services and to increase the compensation by $23,662.00 to a total of $330,663.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $45,229.00 to a total of $375,892.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2, En in�g Services and Exhibit B, Engineering_Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $45,229.00 the maximum amount payable under the Contract for a total of $375,892.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rn.06-16 0199 202303..4853-6A21-dd65 W ,w FREESE AND NICHOLS, INC. By; — Anne Hoskins Principal 05/30/2024 Date Supplemental Contract Re%.06116 0199.202303,4853-6821-4465 84275 CITY OF ROUND ROCK By: La rie Hadley, City Mana r 9 Date Supplemental Comma 009 2023W- 4853.6821.4465 APPROVED AS TO FORM: Stephanie L. Sandre, City Attorney Rev.06116 8427,o 10431 Morado Circle, Suite 300 • Austin. Texas 78759 • 512-617-3100 • fax 512-617-3101 www.freese.com ADDENDUM TO EXHIBIT B Engineering Services Project Understanding The City of Round Rock (City) desires to incorporate plans and specifications for improvements from the 2 Million Gallon Reuse Ground Storage Tank project into the Reuse Pump Station 2"d Utility Feed and Pump Addition Project. Based on discussions with the City, this amendment will include the following major work elements: 1. Incorporation of plans and specifications for installation of a transfer pump, transfer pump variable frequency drive (VFD), rerouting of fiber optic lines, and related scope of work into the Project drawings and specifications. BGE will be retained as a subconsultant to FNI and shall be the Engineer of Record responsible for design and construction phase services for the following improvements associated with the major work elements: All improvements to the Transfer Pump Station Installation of the VFD within the Reuse Electrical Building associated with the new Transfer Pump Rerouting of Fiber Optic Lines ARTICLE I Basic Services: Project Management Services: 1. Periodic Internal Meetings 2. Monthly Status Reports (One Page Reports) 3. Maintain Scope, Budget, and Schedule 4. Periodic Communication with the City 5. Coordination with subconsultants Design Phase FNI shall provide professional services in this phase as follows: 100% Design 1. incorporate plans for the transfer pump, VFD, fiber reroute, and related components into the 100% drawings. Incorporated drawings will be on title block provided by subconsultant and subconsultant will retain the design for the plans. 2. Incorporate specifications for the transfer pump station into the 100% specifications. Reuse Pump Station Second Utility Feed and Pump Add t ° Amendment Number 2 May 20, 2024 Page 2of2 3. Incorporate the transfer pump, VFD, fiber reroute, and related components into the 100% OPCC. Construction Phase Provide the following construction phase services associated with the additional design scope noted above. 1. Review submittals and RFIs associated with the transfer pump and fiber reroute (3 submittals max — by Subconsultant). 2. Perform up to three (3) site observations limited to spot checking, selective measurement, and similar methods of general observation for Consultant to evaluate whether Contractor's work to install the transfer pump, transfer pump VFD, and fiber reroute is generally proceeding in accordance with the Contract Documents (by Subconsultant). ARTICLE II Revisions to Additional Services: Any services performed by FNI that are not included in the Basic Services described above are Additional Services. Additional Services to be performed by FNI associated with this PSSA, if authorized by City, are described as follows: 1. Revision of drawings to the same formatting and title block used by FNI will be an additional service. 2. Incorporation of the transfer pump site plan into the high service pump site plan will be an additional service. 3. Consolidation of civil and mechanical specifications for the transfer pump station with the civil and mechanical specifications for the high service pump station will be an additional service. 4. Revisions to the fiber line route are an additional service. ARTICLE III TIME OF COMPLETION: FNI is authorized to commence work on the Project upon execution of this Agreement and agrees to complete the services in accordance with the following extension of the project schedule and Exhibit C. a Design Phase Services Additional two (2) weeks from the notice to proceed. If FNI's services are delayed through no fault of FNI, FNI shall be entitled to adjust contract schedule consistent with the number of days of delay. These delays may include but are not limited to delays in Client or regulatory reviews, delays on the flow of information to be provided to FNI, governmental approvals, etc. These delays may result in an adjustment to compensation as outlined on the face of this Agreement and in Attachment CO. ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page O i ti w �Fo Frr��t c►' F h J, pO .Mn M yy pyp pp M n m M m M ry � n M .1-� N m m+ n`1 m m N d n 1� M .QV Q 1 0 ♦ O� N Q n �� E a S a a aLL LL LL LL LL LL 3 a ILL 12 IE �w �ny ryMM M n n a i m r � `o 0 o r � a a � c' °' `o o !� r r $ aa a` a a` o o co 0 o co oc o co E+ 4 4 T}} T n T A w }}} T V w w } T V }} } t n E � u u 4 • M Y C C - E � p Ic E c°x6C Fr E F yaga� ap� E= r �yFJ' n •^ a T � H a ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page 3z e' N �W i ~ N N N M N M N N C _ � � 7 � � 5 s � �� � � N N N v r rc N N P � � - � N b N r 4 ' � �" � � +N �n � � N � � .;� � �g � N ,yi 11l pp � L ♦ � �r N (3 N Q g ~ ■J' a n YI N M N � �N N ♦N IIILLL � $ � r s � � » �y rz � '� pp S g � a N V N N N N N '� ��� � N �� t W �� � � � � � ��� � � �. x ��" � � � R' q g� �~� ���-�� ' Pro Foo-IM-agY K 9enkes 45.229 caul Praj wt 45.229 Task Description Tech Charge Miles I Meets Hotei Total Expense EMon I f Maknain antl morwor scope r schedule r budget , $ news mann a wbmnsultant ffVrM One Pape Reportsl Perlotlic c9em oommuekWons 2 f t nr mann PM Seita AWisar � f te9% n f DeslpnTeam Ca�kitlMotion Meetlnps e f 00 min,bkvee Pricarporale pL and s by 49 I f . V .arw nbor route by sutr w"Um u 1 s amtrucom anm to marts)I s Total Noun r Q"fttdyl et Tow Effort $ s f s s 2�n L 7C1entOLCRVMow o Rack Cay oARau*Puny Stsbon Sawd UW y FaaNPW 2aArrrrmneMa Iw RarwmCORR 2nd Uuhy Feed PSSA 2 F«SPreaaneM_20244&3D Woo f.74702a Prolwct Fee Summ Brow lalProject 45229 Supoonsullants Total Task Description 9GE Total Sub Total Mort Effort tTIctrl 6.665 $ 7 354 $ 7.354 MaYrWn arr0 n10ni[Of scope t 3che0ule.f budget i f 666 moors mann A submrwdiara ml One Page Reports I Periodic cNM oommunkatIOM 3 f 434 1 M math PM Serge Adyis«MaMiNs S 3 942 166%pea $ f Desgn Team Coebin tkM Meefts f 3 1,468 6 min.bAr Inwrp"e plans and speciBra9ans by 14 860 i 16 346 3 25.456 subtOnsuham OG and Aber rase by supoauullarn S f 3.574 pr4dnwflon Phase(Illmonthal 4.649 $ 5,114 f 5114 Teta)Moura.Quantity f 26,194f 3 f Total Effort i 28.6113 f i f i 38,613 t 16,229 30f 3 L:1CYa %OLCR`R%Ra"Rock Coy*WR PMP mato Ucbre Vrah FaeOP53A M---nor a for ReyiamCORR 2nd VWy Fe.a Ps8A2 Fee 6p6aasnaat_202404-30.tivn f?5t1R2a CS % 4A % mot -qll 'IMMIN&L I p i P %pp RL