R-2024-140 - 6/13/2024 RESOLUTION NO. R-2024-140 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with DigDug Construction, LLC for the Kenney Fort, Joe DiMaggio and Brushy Creek Landscape Enhancements Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with DigDug Construction, LLC for the Kenney Fort, Joe DiMaggio and Brushy Creek Landscape Enhancements Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of June, 2024. /,, CR RG Mayor City o Round Plk,Texas ATTEST: MEAGAN SPKS, C' Clerk 0112.20242;4869-2916-42 Page I of 3 Contract Quantity Adjustment/Change Order EXHIBIT ROO[I f XAS reg,01/15 Department: „ Project Kenney Fort,Joe Dimaggio and Brushy Creek Landscape Enhancements Round Name: Rock,Texas Date: 4/25/24 City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor Dig Dug Construction LLC P.0 Box 92583 Austin,TX 78709 512-382-0008 Company Name Address Phone No. Justification SUMMARY Amount %Change Original Contract Price: $1,094,355.50 Previous Quantity Adjustment(s): This Quantity Adjustment: $33,625.00 Total Quantity Adjustment(s): $33,625.00 Total Contract Price with Quantity Adjustment(s): $1,127,980.50 Previous Change Order(s): $5,636.00 0% This Change Order: $20,593.00 2% Total Change Order(s)To Date: $26,229.00 2% Adjusted Contract Price [Original Contract Price Plus �� Quantity Adjustment(s)Plus Change Order(s)]: $1,154,209.50 Difference between Original and Adjusted Contract Prices: $59,854.00 Original Contract Time: 90 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 20 New Contract Time: 110 Prepared By: Scott By: Scott mcKhi��t Scott McKnight Dig Dug Construction LLC 4/25/24Scott McKnight Dig Dug Construction LLC 4/25/24 Signature Printed Name,Title,Company Date Contractor: Scott Scott mcyoi�ht Scott McKnight Dig Dug Construction LLC 4/25/24Scott McKnight Dig Dug Construction LLC 4/25/24 Signature Printed Name,Title,Company Date City Project �"� d� Manager: Greg Ciaccio Er..�,�� Greg Ciaccio, CORR Project Manager 4/29/24 Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order IIOUNO ROIX 1 f.%AS rev,01/16 Kenney Fort,Joe Dimaggio and Brushy Creek Landscape Enhancements Round Rock, Project Name: Texas Quan.Adj./Change Order No.: 2 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Davs) Remove already installed smooth dowel rods from existing curb to new sidewalk concrete. Asphalt expansion joint to CO2-1 remain as installed LS 1 $2,250.00 $2,250.00 Add #4 smooth owe rod @48 O.0 to asphalt expansion joint located at the CO2-2 sidewalk centerline LS 1 $2,868.00 $2,868.00 CO2-3 Repair sunken concrete LS 1 $2,725.00 $2,725.00 Remove existing forms and expansion CO2-4 joint to trench electrical 1 1 $2,000.00 $2,000.00 7 CO2-5 Dig new trench along curb for electrical 1 3 $2,000.00 $6,000.00 Reset forms, radius,and expansion joint CO2-6 along curb 1 2 $2,000.00 $4,000.00 6 CO2-7 New expansion joint material 1 1 $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order ROUND RUCK rev,0 1/16 Kenney Fort,Joe Dimaggio and Brushy Creek Landscape Enhancements Round Rock, Project Name: Texas Quan. Adj./Change Order No.: 2 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount 1.09 Additional type 2 hardscape SF 6500 $3.25 $21,125.00 7 1.24 Traffic Control Measures MO 1 $12,500.00 $12,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL $33,625.00, 7 a r«'� d T Y 1460 �� v m H a, F <_ _ Q O\d Sett\ecs B"6 Z ri �^�►, i 9 E palm V . . 1 � Round Rock U , r / G .7 B fi Kenney Fort, Joe Dimaggio and Brushy N RoORo�K Creek Landscape Enhancements n j `°""'°°°'"uN"`" Round Rock Transportation Department k